CN101859154A - 一种采用浮球的变电站积水处理系统及其方法 - Google Patents

一种采用浮球的变电站积水处理系统及其方法 Download PDF

Info

Publication number
CN101859154A
CN101859154A CN201010137974A CN201010137974A CN101859154A CN 101859154 A CN101859154 A CN 101859154A CN 201010137974 A CN201010137974 A CN 201010137974A CN 201010137974 A CN201010137974 A CN 201010137974A CN 101859154 A CN101859154 A CN 101859154A
Authority
CN
China
Prior art keywords
processing unit
central processing
ball float
transformer substation
accumulated water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201010137974A
Other languages
English (en)
Inventor
鲍长庚
周永宝
王大成
沈晓峰
朱伟
胡龙生
严福民
蒋小弟
徐锋
汪军
鲁志豪
周华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Original Assignee
Shanghai Bofan Enterprise Development Co ltd
Shanghai Municipal Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Bofan Enterprise Development Co ltd, Shanghai Municipal Electric Power Co filed Critical Shanghai Bofan Enterprise Development Co ltd
Priority to CN201010137974A priority Critical patent/CN101859154A/zh
Publication of CN101859154A publication Critical patent/CN101859154A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Level Indicators Using A Float (AREA)

Abstract

本发明公开了一种采用浮球的变电站积水处理系统及其方法,包括一中央处理器以及与该中央处理器相连的电源电路、浮球液位控制器以及手机,其中:电源电路给所述的中央处理器供电;浮球液位控制器与中央处理器相连,该浮球液位控制器置于变电站的低地势处,检测积水的水位;中央处理器对浮球液位控制器输出的信号进行转换、采集以及判断后输出短信信号给手机;方法包括检测步骤、信号转换步骤S2、采集步骤S3、判断步骤S4、输出步骤S5。本发明能够及时进行预警,使得工作人员能够提早做好准备,防止地下配电站被水淹没,避免了站内积水事故,提高了供电的稳定性,并且电源电路直接与中央处理器相连,使得中央处理器的运行更安全。

Description

一种采用浮球的变电站积水处理系统及其方法
技术领域
本发明涉及变配电站领域,尤其涉及一种采用浮球的变电站积水处理系统及其方法。
背景技术
近几年来,随着经济的持续高速发展,有部分配电站建设为地下配电站,配电站“入地”具有美观、减少噪音的优点,同时也节约了土地资源,另一方面,由于经济的发展,道路建设加快,一些道路重建后地势比变电站高出很多。而目前变电站和配电站一般无人值守,平时只有专人定期进行巡检时才进入站内。变电站为一个月巡视一次,配电站为三个月巡视一词,检修时间可能会更长,如果在两次巡检之间发生变配电站积水事故,而运行人员又无法得到消息,不能及时进行处理,则存在相当大的运行安全隐患,将可能直接危及地下设备的安全运行,有时甚至会导致人身事故。遇到大雨天气,若不迅速实施排水,则雨水很快将涌入开关室,影响设备的安全运行。积水造成了变电站和配电站设备的全面损失,导致大面积的供电系统瘫痪,影响了市民的生活起居,并且,事故一旦造成,抢修至少15天的时间。
造成变电站或配电站积水事故的根本原因是雨量很大,地势较低,从而形成倒灌,如果重新选择变电站或配电站地址,从而改变其地势低和偏僻的现状,虽然可以解决问题,但资金投入巨大,影响正常供电。因此,如何避免变电站和配电站因巡视人员未及时处理而导致的站内积水事故是本发明的发明人亟待解决的问题。
发明内容
本发明的目的在于克服现有技术的缺陷而提供一种采用浮球的变电站积水处理系统及其方法,它能够及时进行预警,使得工作人员能够提早做好准备,防止地下配电站被水淹没,避免了站内积水事故,提高了供电的稳定性,并且电源电路直接与中央处理器相连,使得中央处理器的运行更安全。
实现上述目的的技术方案是:
本发明之一的一种采用浮球的变电站积水处理系统,其中,包括一中央处理器以及与该中央处理器相连的电源电路、浮球液位控制器以及手机,其中:
所述的电源电路给所述的中央处理器供电;
所述的浮球液位控制器通过导线与所述的中央处理器相连,该浮球液位控制器置于变电站的低地势处,检测积水的水位,水位至设定的上限时则输出信号给所述的中央处理器;
所述的中央处理器对所述的浮球液位控制器输出的信号进行转换、采集以及判断后输出短信信号给所述的手机。
上述的采用浮球的变电站积水处理系统,其中,所述的中央处理器内嵌有短信集成模块以输出短信信号给所述的手机。
上述的采用浮球的变电站积水处理系统,其中,所述的中央处理器包括依次相连的模/数转换模块、采集模块以及判断模块,其中:
所述的模/数转换模块将浮球液位控制器的模拟量信号转换成数字量信号;
所述的采集模块采集所述的数字量信号;
所述的判断模块对采集到的数字量进行判断,判断积水是否达到上限需要报警。
本发明之二的一种采用浮球的变电站积水处理方法,其中,包括以下步骤:
检测步骤S1,检测变电站中的积水的水位;
信号转换步骤S2,将检测步骤S1中检测到的水位进行数/模转换,即将模拟量信号转换成数字量信号;
采集步骤S3,采集经过信号转换步骤S2的数字量信号;
判断步骤S4,根据采集到的数字量信号进行判断,判断是否积水到达上限,对于到达上限的则进入输出步骤S5;
输出步骤S5,输出短信信号给外围的手机以进行报警。
本发明的有益效果是:本发明通过浮球液位控制器来检测水位,当变电站内的积水到达上限时则输出电信号,通过中央处理器来实现报警,电源电路直接与中央处理器相连,则可避免中央处理器因为积水而无法运作,使得该检测结构的运行更稳定。
附图说明
图1是本发明之一的采用浮球的变电站积水处理系统的结构示意图;
图2是本发明之二的采用浮球的变电站积水处理方法的流程图。
具体实施方式
下面将结合附图对本发明作进一步说明。
请参阅图1,图中示出了本发明之一的采用浮球的变电站积水处理系统,包括一中央处理器1以及与该中央处理器1相连的电源电路2、浮球液位控制器3以及手机4,其中:
电源电路2给中央处理器1供电;
浮球液位控制器3通过导线与中央处理器1相连,该浮球液位控制器3置于变电站的低地势处,检测积水的水位,水位至设定的上限时则输出信号给中央处理器1;
中央处理器1对浮球液位控制器3输出的信号进行转换、采集以及判断后输出短信信号给手机4,该中央处理器内嵌有短信集成模块(图中未示出)以输出短信信号给手机4,中央处理器1包括依次相连的模/数转换模块11、采集模块12以及判断模块13,其中:
模/数转换模块11将浮球液位控制器3的模拟量信号转换成数字量信号;
采集模块12采集数字量信号;
判断模块13对采集到的数字量进行判断,判断积水是否达到上限需要报警。
本实施例中,短信集成模块采用JB35G短信模块,其内核采用法国WAVECOM公司生产的工业级短信芯片,模块体积超小型设计,内嵌实时时钟电路,待机功耗仅23Ma,工作电压范围5-40V。
浮球液位控制器3采用DFYK型浮球液位控制器,它适用于各种水池、水塔的液位控制,且特别适用于含有半固体漂浮物的液体及带粘性的污水水位自动控制与报警。
请参阅图2,图中示出了本发明之二的一种采用浮球的变电站积水处理方法,包括以下步骤:
检测步骤S1,检测变电站中的积水的水位;
信号转换步骤S2,将检测步骤S1中检测到的水位进行数/模转换,即将模拟量信号转换成数字量信号;
采集步骤S3,采集经过信号转换步骤S2的数字量信号;
判断步骤S4,根据采集到的数字量信号进行判断,判断是否积水到达上限,对于到达上限的则进入输出步骤S5;
输出步骤S5,输出短信信号给外围的手机以进行报警。
以上实施例仅供说明本发明之用,而非对本发明的限制,有关技术领域的技术人员,在不脱离本发明的精神和范围的情况下,还可以作出各种变换或变型,因此所有等同的技术方案也应该属于本发明的范畴,应由各权利要求所限定。

Claims (4)

1.一种采用浮球的变电站积水处理系统,其特征在于,包括一中央处理器以及与该中央处理器相连的电源电路、浮球液位控制器以及手机,其中:
所述的电源电路给所述的中央处理器供电;
所述的浮球液位控制器通过导线与所述的中央处理器相连,该浮球液位控制器置于变电站的低地势处,检测积水的水位,水位至设定的上限时则输出信号给所述的中央处理器;
所述的中央处理器对所述的浮球液位控制器输出的信号进行转换、采集以及判断后输出短信信号给所述的手机。
2.根据权利要求1所述的采用浮球的变电站积水处理系统,其特征在于,所述的中央处理器内嵌有短信集成模块以输出短信信号给所述的手机。
3.根据权利要求1所述的采用浮球的变电站积水处理系统,其特征在于,所述的中央处理器包括依次相连的模/数转换模块、采集模块以及判断模块,其中:
所述的模/数转换模块将浮球液位控制器的模拟量信号转换成数字量信号;
所述的采集模块采集所述的数字量信号;
所述的判断模块对采集到的数字量进行判断,判断积水是否达到上限需要报警。
4.一种采用浮球的变电站积水处理方法,其特征在于,包括以下步骤:
检测步骤S1,检测变电站中的积水的水位;
信号转换步骤S2,将检测步骤S1中检测到的水位进行数/模转换,即将模拟量信号转换成数字量信号;
采集步骤S3,采集经过信号转换步骤S2的数字量信号;
判断步骤S4,根据采集到的数字量信号进行判断,判断是否积水到达上限,对于到达上限的则进入输出步骤S5;
输出步骤S5,输出短信信号给外围的手机以进行报警。
CN201010137974A 2010-04-02 2010-04-02 一种采用浮球的变电站积水处理系统及其方法 Pending CN101859154A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010137974A CN101859154A (zh) 2010-04-02 2010-04-02 一种采用浮球的变电站积水处理系统及其方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010137974A CN101859154A (zh) 2010-04-02 2010-04-02 一种采用浮球的变电站积水处理系统及其方法

Publications (1)

Publication Number Publication Date
CN101859154A true CN101859154A (zh) 2010-10-13

Family

ID=42945111

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010137974A Pending CN101859154A (zh) 2010-04-02 2010-04-02 一种采用浮球的变电站积水处理系统及其方法

Country Status (1)

Country Link
CN (1) CN101859154A (zh)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2783448Y (zh) * 2005-04-07 2006-05-24 陈兴文 无线低功耗远程监测系统
CN2879574Y (zh) * 2005-09-30 2007-03-14 海盐天鸿科技有限公司 无线通信链接处理器
CN201293659Y (zh) * 2008-11-27 2009-08-19 山东康威通信技术有限公司 电力电缆多状态监控系统
WO2009111996A1 (en) * 2008-03-14 2009-09-17 Barco, S.R.O. Wireless security system with control panel as a web application
CN201381878Y (zh) * 2009-03-31 2010-01-13 河南省电力公司洛阳供电公司 电缆隧道远程监控排水装置
CN201681311U (zh) * 2010-04-02 2010-12-22 上海博繁企业发展有限公司 一种用于变电站积水处理的浮球检测结构

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2783448Y (zh) * 2005-04-07 2006-05-24 陈兴文 无线低功耗远程监测系统
CN2879574Y (zh) * 2005-09-30 2007-03-14 海盐天鸿科技有限公司 无线通信链接处理器
WO2009111996A1 (en) * 2008-03-14 2009-09-17 Barco, S.R.O. Wireless security system with control panel as a web application
CN201293659Y (zh) * 2008-11-27 2009-08-19 山东康威通信技术有限公司 电力电缆多状态监控系统
CN201381878Y (zh) * 2009-03-31 2010-01-13 河南省电力公司洛阳供电公司 电缆隧道远程监控排水装置
CN201681311U (zh) * 2010-04-02 2010-12-22 上海博繁企业发展有限公司 一种用于变电站积水处理的浮球检测结构

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李朝青: "《无线发送/接收IC芯片及其数据通信技术选编(2)》", 29 February 2004, 北京航空航天大学出版社 *

Similar Documents

Publication Publication Date Title
CN102928037B (zh) 基于物联网技术的道路积水监测与发布方法
CN202492923U (zh) 立交桥涵道路积水自动化排水系统
CN111649727A (zh) 一种水雨情监测方法和系统
CN201237502Y (zh) 尾矿库干滩自动化监测系统
CN204791440U (zh) 一种城市内涝预警系统
CN205091884U (zh) 一种基于暴雨预测模型的智能城市防汛系统
CN109255928A (zh) 一种城市暴雨和积涝分级预警装置及其预警方法
CN201173976Y (zh) Gprs实时雨量遥测预警装置
CN206847729U (zh) 一种水位的远程监测系统
CN201681311U (zh) 一种用于变电站积水处理的浮球检测结构
CN102364302B (zh) 雨量水位监测设备
CN212274923U (zh) 一种水雨情监测系统
CN203310475U (zh) 消防水池或水箱水位异常告警系统
CN202710762U (zh) 一种用于水产养殖的雷雨预报服务系统
CN102538910A (zh) 一种变配电站积水预警系统及其预警方法
CN201680877U (zh) 一种变配电站积水预警系统
CN201391337Y (zh) 电缆隧道自动排水系统
CN203721006U (zh) 基于多传感器的水情监测预警设备、控制中心及其系统
CN101859154A (zh) 一种采用浮球的变电站积水处理系统及其方法
CN106225883A (zh) 洪水信标
CN204926420U (zh) 杆塔山体滑坡自动化监测装置
CN107085928A (zh) 一种城市积涝报警装置及其报警方法
CN106886062A (zh) 降雨量远程报警装置
CN203313408U (zh) 遥测式水位检测终端
CN111830511A (zh) 一种基于多数据源的城市积水监测系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: SHANGHAI MUNICIPAL ELECTRIC POWER COMPANY

Free format text: FORMER OWNER: SHANGHAI BOFAN ENTERPRISE DEVELOPMENT CO., LTD.

Effective date: 20120523

Free format text: FORMER OWNER: SHANGHAI MUNICIPAL ELECTRIC POWER COMPANY

Effective date: 20120523

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 201700 QINGPU, SHANGHAI TO: 200002 HUANGPU, SHANGHAI

TA01 Transfer of patent application right

Effective date of registration: 20120523

Address after: 200002 Nanjing East Road, Shanghai, No. 181, No.

Applicant after: Shanghai Electric Power Corporation

Address before: 201700 Shanghai city Qingpu District Liantang Zheng Xia 89 Lane Road, room 55 No. A-1

Applicant before: Shanghai Bofan Enterprise Development Co.,Ltd.

Co-applicant before: Shanghai Electric Power Corporation

ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20121024

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121024

Address after: 200002 Nanjing East Road, Shanghai, No. 181, No.

Applicant after: Shanghai Electric Power Corporation

Applicant after: State Grid Corporation of China

Address before: 200002 Nanjing East Road, Shanghai, No. 181, No.

Applicant before: Shanghai Electric Power Corporation

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20101013