CN101858227B - Device for intensively and fast draining water in downward drainage drill hole - Google Patents
Device for intensively and fast draining water in downward drainage drill hole Download PDFInfo
- Publication number
- CN101858227B CN101858227B CN2010101836474A CN201010183647A CN101858227B CN 101858227 B CN101858227 B CN 101858227B CN 2010101836474 A CN2010101836474 A CN 2010101836474A CN 201010183647 A CN201010183647 A CN 201010183647A CN 101858227 B CN101858227 B CN 101858227B
- Authority
- CN
- China
- Prior art keywords
- pipe
- draining
- extraction
- hole
- drainage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Pipeline Systems (AREA)
Abstract
The invention discloses a device for intensively and fast draining water in a downward drainage drill hole. The device is characterized in that a three-way hole-sealing sleeve pipe composed of an inner pipe and an outer sleeve pipe is arranged in a drainage drill hole; an annular chamber used as an airflow channel is arranged between the side wall of the inner pipe and the side wall of the outer sleeve pipe, and an external air delivery pipe is communicated with the annular chamber; the inner pipe is used as a draining pipe, a nozzle at the bottom of the draining pipe is connected with a draining hose used for being inserted in the bottom of the drainage hole; the nozzle at the top of the draining pipe is provided with a water draining valve; and one path of the external air delivery pipe is connected with a high-pressure air pipe by an air inlet valve, and the other path is connected with a drainage pipeline by an air discharge valve. The device can effectively drain the accumulated water in the downward drainage hole, and ensure gas drainage effect.
Description
Technical field
The present invention relates to a kind of following in the coal mining of being applied in to extraction boring dewatering installation.
Background technology
Because ponding can't be along with extraction automatic discharge in hole in boring under the gas drainage under suction, therefore also can't utilize the pipeline tailrace to discharge water, accumulate a large amount of water in causing holing, and along with the prolongation of extraction time, the water that accumulates in the hole is also just more and more, has a strong impact on the gas drainage under suction effect.
Summary of the invention
The present invention is for avoiding above-mentioned existing in prior technology weak point, provide a kind of and concentrate quick dewatering installation to extraction boring down, so that can effectively discharge down the ponding in extraction boring, guaranteeing the gas drainage under suction effect.
Technical solution problem of the present invention adopts following technical scheme:
Concentrating the design feature of quick dewatering installation to extraction boring under the present invention is in extraction boring the threeway sealing of hole sleeve pipe that is made of interior pipe and outer tube to be set, have the annular chamber as gas channel in described between the sidewall of pipe and outer tube, external appendix is communicated with described annular chamber; With pipe in described is gutter, connects the scupper hose that is used to be inserted in the extraction foot of hole on the mouth of pipe of the bottom of described gutter; On the mouth of pipe of the top of described gutter, draining valve is set; Described external appendix is leaded up to admission valve and is connected with high-pressure air hose, and another road is connected with extraction pipeline by outlet valve.
Compared with the prior art, beneficial effect of the present invention is embodied in:
1, the present invention utilizes high-pressure blast to realize automatic draining, to the ponding problem of boring, improves the extraction effect under solving effectively.
2, the present invention can divide into groups to implement, and once can get rid of the ponding in a plurality of borings, thereby realizes efficiently draining fast.
Description of drawings
Fig. 1 is a structural representation of the present invention.
Number in the figure: 1 extraction boring, 2 appendixs, 3 gutters, 4 draining valves, 5 admission valves, 6 high-pressure air hoses, 7 outlet valves, 8 extraction pipelines.
The specific embodiment
Referring to Fig. 1, present embodiment is in extraction boring 1 the threeway sealing of hole sleeve pipe that is made of interior pipe and outer tube to be set, and has the annular chamber as gas channel between the sidewall of interior pipe and outer tube, and external appendix 2 is communicated with annular chamber; With interior pipe is gutter 3, connects the scupper hose that is used to be inserted in the extraction foot of hole on the mouth of pipe of the bottom of gutter 3; On the mouth of pipe of the top of gutter 3, draining valve 4 is set; External appendix 2 is leaded up to admission valve 5 and is connected with high-pressure air hose 6, and another road is connected with extraction pipeline 8 by outlet valve 7.
Shown in Figure 1, during normal extraction, outlet valve 7 is in opening, and draining valve 4 and admission valve 5 all are in closed condition.Wherein, closing of admission valve 5 is for avoiding high-pressure blast to enter extraction pipeline; It is for preventing that outside air from entering extraction boring 1 by gutter 3 and influencing extraction that draining valve 4 is in closed condition.
During central drainage, outlet valve 7 is in closed condition, suspend the extraction of gas, at this moment, admission valve 5 and draining valve 4 all are in opening, and the unlatching of admission valve 5 makes high-pressure blast be introduced appendix 2, and introduce in the extraction boring 1 by appendix 2, because the pressure of high-pressure blast, the ponding in the extraction boring 1 is by draining valve 4 emptying swimmingly.
Claims (1)
1. concentrate quick dewatering installation to extraction boring under one kind, it is characterized in that in extraction boring (1), being provided with the threeway sealing of hole sleeve pipe that constitutes by interior pipe and outer tube, have the annular chamber as gas channel in described between the sidewall of pipe and outer tube, external appendix (2) is communicated with described annular chamber; With pipe in described is gutter (3), connects the scupper hose that is used to be inserted in the extraction foot of hole on the bottom mouth of pipe of described gutter (3); Draining valve (4) is set on the top mouth of pipe of described gutter (3); Described external appendix (2) is leaded up to admission valve (5) and is connected with high-pressure air hose (6), and another road is connected with extraction pipeline (8) by outlet valve (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101836474A CN101858227B (en) | 2010-05-24 | 2010-05-24 | Device for intensively and fast draining water in downward drainage drill hole |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101836474A CN101858227B (en) | 2010-05-24 | 2010-05-24 | Device for intensively and fast draining water in downward drainage drill hole |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101858227A CN101858227A (en) | 2010-10-13 |
CN101858227B true CN101858227B (en) | 2011-12-28 |
Family
ID=42944360
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010101836474A Expired - Fee Related CN101858227B (en) | 2010-05-24 | 2010-05-24 | Device for intensively and fast draining water in downward drainage drill hole |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101858227B (en) |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102606208A (en) * | 2011-01-20 | 2012-07-25 | 淮南矿业(集团)有限责任公司 | Automatic drainage process of downward through beds hole |
CN102889098B (en) * | 2012-10-22 | 2014-11-19 | 淮南矿业(集团)有限责任公司 | Water discharging device of gas extraction pipeline |
CN102928571A (en) * | 2012-11-01 | 2013-02-13 | 中国矿业大学 | Method for measuring coal seam gas content directly through downward borehole of pressure ventilation pipe |
CN103867230B (en) * | 2014-03-25 | 2016-01-20 | 北京中矿大地地球探测工程技术有限公司 | A kind of deslagging water device for gas drainage pipeline under mine and utilize the method for its deslagging water |
CN104533509A (en) * | 2014-11-17 | 2015-04-22 | 大同煤矿集团有限责任公司 | Gas drainage protection device |
CN105697053A (en) * | 2016-02-26 | 2016-06-22 | 安徽理工大学 | Pumping and pressing hybrid gas extraction downward drilling and water draining device |
CN105889752B (en) * | 2016-06-12 | 2017-12-29 | 河南理工大学 | A kind of adjustable accurate pressure releasing method of threshold value and device |
CN107882585A (en) * | 2017-11-06 | 2018-04-06 | 贵州五轮山煤业有限公司 | To drilling integrate draining gas pumping integrated apparatus under one kind |
CN113027389B (en) * | 2021-04-01 | 2023-03-24 | 中勘资源勘探科技股份有限公司 | Double-ring air-pressure boosting type water lifting pipeline connecting structure and water lifting method thereof |
CN118548099A (en) * | 2024-06-11 | 2024-08-27 | 中国矿业大学 | Hydraulic cave making system and method for coal breaking and lifting collaborative operation of downward drilling |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101012755A (en) * | 2007-02-11 | 2007-08-08 | 杜志刚 | Equipment for increasing gas exhaustion of coal mine bed by hole drilling |
CN101029574B (en) * | 2007-04-02 | 2010-12-22 | 淮北矿业集团煤业有限责任公司祁南煤矿 | Long standpipe gas extraction in worked-out section |
CN101050696B (en) * | 2007-05-10 | 2010-05-19 | 河南理工大学 | Bag type paste injection hole sealing device and its hole sealing method |
CN100557194C (en) * | 2007-08-24 | 2009-11-04 | 阳泉煤业(集团)有限责任公司 | The high suction tunnel lower-returning drilling primary mining gas drainage method of fully mechanized coal face |
CN100485163C (en) * | 2007-09-07 | 2009-05-06 | 重庆大学 | Coal bed gas drainage method and device |
CN201687519U (en) * | 2010-05-24 | 2010-12-29 | 安徽省皖北煤电集团孟庄煤矿 | Centralized rapid drainage device for downward drainage drilled holes |
-
2010
- 2010-05-24 CN CN2010101836474A patent/CN101858227B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN101858227A (en) | 2010-10-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101858227B (en) | Device for intensively and fast draining water in downward drainage drill hole | |
CN208792969U (en) | Coal mine hydraulic slag discharging drilling orifice blowout prevention buffered device | |
CN105298510B (en) | Pipe replacing and slurry discharging device for slurry shield and slurry discharging mode | |
CN102337921A (en) | Gas-water separation, water discharging and slag discharge integrated device for drill hole in gas extraction crossheading drill site | |
CN107882585A (en) | To drilling integrate draining gas pumping integrated apparatus under one kind | |
CN102865104A (en) | Downward extraction drilling drainage device | |
CN200964580Y (en) | Plugging-proof checking type water drainer | |
CN202250165U (en) | Integration device for separating gas and water and discharging water and slag for drill hole in gas extraction crossheading drill site | |
CN201424956Y (en) | Drainage device of gas drainage pipeline | |
CN201687519U (en) | Centralized rapid drainage device for downward drainage drilled holes | |
CN117646649A (en) | Positive and negative pressure combined drainage device and method for double-layer casing pipe of gas extraction drilling hole | |
CN206304385U (en) | A kind of condensation vapor well construction for landfill gas collection system | |
CN203347833U (en) | Gas drainage pipe negative pressure automatic slag-discharge water-drainage device | |
CN103573288A (en) | Pneumatic negative pressure drainage device | |
CN205297635U (en) | Drainage device drills down | |
CN103527245B (en) | Drainage device used for gas pumping and releasing pipeline | |
CN201351811Y (en) | Gas-leakage preventive device for gas conduit drainer | |
CN201610761U (en) | General-purpose pneumatic automatic water drainage device | |
CN102061939B (en) | Automatic drainer | |
CN205557802U (en) | Take sewage lifting mechanism of self -cleaning function | |
CN205419813U (en) | Hydrocone type pulse water distributor | |
CN204817371U (en) | Pipeline geomantic omen linkage washing unit flows automatically | |
CN203603971U (en) | Drainage device used for gas drainage pipelines | |
CN202745934U (en) | Downward extraction borehole drainage device | |
CN207813649U (en) | One kind being used for gas pumping automatic water drainage device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111228 Termination date: 20120524 |