CN101858209B - 底板岩层裂隙分布同步探测方法 - Google Patents
底板岩层裂隙分布同步探测方法 Download PDFInfo
- Publication number
- CN101858209B CN101858209B CN2010101360542A CN201010136054A CN101858209B CN 101858209 B CN101858209 B CN 101858209B CN 2010101360542 A CN2010101360542 A CN 2010101360542A CN 201010136054 A CN201010136054 A CN 201010136054A CN 101858209 B CN101858209 B CN 101858209B
- Authority
- CN
- China
- Prior art keywords
- water
- drilling
- boring
- terrane
- detection method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000001514 detection method Methods 0.000 title claims abstract description 8
- 230000001360 synchronised effect Effects 0.000 title claims abstract description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 50
- 238000000034 method Methods 0.000 claims abstract description 26
- 238000005553 drilling Methods 0.000 claims abstract description 25
- 238000011161 development Methods 0.000 claims abstract description 8
- 239000011435 rock Substances 0.000 claims description 16
- 230000015556 catabolic process Effects 0.000 claims description 6
- 238000002347 injection Methods 0.000 claims description 5
- 239000007924 injection Substances 0.000 claims description 5
- 238000009835 boiling Methods 0.000 claims description 3
- 238000010586 diagram Methods 0.000 abstract description 4
- 238000012360 testing method Methods 0.000 abstract description 2
- 239000003245 coal Substances 0.000 description 6
- 230000018109 developmental process Effects 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 5
- 230000007812 deficiency Effects 0.000 description 4
- 238000005065 mining Methods 0.000 description 3
- 101100194817 Caenorhabditis elegans rig-6 gene Proteins 0.000 description 2
- 238000011160 research Methods 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 239000000523 sample Substances 0.000 description 1
- 230000011218 segmentation Effects 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
- 238000007569 slipcasting Methods 0.000 description 1
Images
Abstract
本发明公开了一种底板岩层裂隙分布同步探测方法,它主要是在钻孔的过程中边钻孔边注水,然后根据沿不同钻孔深度和对应的水流失量大小,绘制钻孔内不同位置水流漏失速度图,由此最终确定出不同深度岩层破裂或裂隙发育程度。本发明实现了打钻孔与注水测漏同步进行,保证了钻测的及时性,测量时间短,适合任何岩层地质情况。
Description
技术领域
本发明步及岩体工程测试技术方法,尤其涉及探测矿山底板岩层破裂程度及位置的技术方法。
背景技术
目前,用于岩体裂隙发育状况或围岩破坏的技术方法中,有钻孔电视探测法和钻孔测漏方法,前者是通过钻孔周边破裂摄像采集分析为主要手段;后者是通过钻孔内液体漏失情况来判定孔内岩体的裂隙发育。与本发明有关的技术是钻孔测漏方法。
钻孔测漏方法包括多孔封闭压水观测法和钻孔分段注水充气测漏技术。其中:多孔封闭压水观测法的不足是:工程消耗量大、且测得是所有深度上连续观测资料,限制了其推广应用。钻孔分段注水充气测漏技术是采用水气两用钻孔双端封堵测漏装置,配合其它仪表,对任何仰、俯钻孔进行分段封堵注水或充气测漏取得观测资料,根据钻孔不同深度和对应的水流失量大小,绘制钻孔内不同位置水流漏失速度图,由此最终确定出不同深度岩层破裂或裂隙发育程度;其不足是:在打钻成孔后,然后将测漏装置推入孔中进行测量;这样带来两个显著不足:一是钻孔与注水测漏分步进行,需要时间长,无法处理应急情况;二是要求钻孔成形后变形小和不允许出现塌孔,不适应一些特殊的地质条件的岩层。
为此,发明人承担了国家973项目“煤炭深部开采中的动力灾害机理与防治基础研究”(编号:2010CB226805),本发明是该项目研究内容中的一部分成果。
发明内容
本发明的目的是克服现有上述注水测漏方法的不足,发明一种注水测漏与打钻孔同步进行的对底板岩层裂隙分布情况进行探测的方法。
本发明的技术方法是:
①在地下巷道内设置水箱,水箱的出水软管上串接一水流量表和水流量控制开关;在巷道内布置坑道钻机和泥浆泵。
②用坑道钻机沿着垂直于岩层层面方向进行钻孔,在钻孔的过程中打开水流量控制开关,让水通过出水软管自动流入正在打钻的钻孔中,并边钻孔边注水,控制注水量,使钻孔注水平面与钻孔口持平。
③在边打钻孔边注水过程中,时刻记录钻头所在位置和该位置对应的水流量。
④当发现钻孔中的注水量突发性增大时,记录好增大后的水流量值和钻头所在位置,取出钻心,并关掉水流量开关,停止钻进,然后开动泥浆泵封堵漏水裂隙。
⑤封堵完后,重新继续向下打钻,重复②、③和④过程,直至钻探到设计深度为止。
⑥根据钻孔不同深度和对应的水流失量大小,绘制钻孔内不同位置水流漏失速度图,由此最终确定出不同深度岩层破裂或裂隙发育程度。
本发明的优点为:①本方法实现了打钻孔与注水测漏同步进行,保证了钻测的及时性,测量时间短,适合任何地质情况。②与目前常用的地面钻孔冲洗液消耗量观测法相比,本方法可以省去由地面钻深孔工程量;与多孔封闭压水观测法和钻孔分段注水充气测漏技术相比,可以省去压水泵等设备。③可以获取钻孔不同深度处水漏失速度的分布,通过定量建立水漏失速度与裂隙发育或岩层破裂程度之间关系,可以定量评价不同深度底板岩层内裂隙发育或岩层破裂程度。④应 用范围广,不但在井下采矿领域可以应用,而且在地面各类岩体工程中也可以应用。
附图说明
图1是本发明实施例钻探施工示意图;
图2是本发明注浆封堵裂隙施工示意图;
图3是沿着深度方向不同位置水漏失速度示意图;
图4是钻孔深度方向不同位置水漏失速度实施例实测图。
图例说明:1-矿车;2-水箱;3-水流量控制开关;4-出水软管;5-水流量计;6-钻机;7-钻孔;8-临时水池;9-岩层;10-泥浆泵;11-黄泥灌;12-输泥管。
具体实施方式
①在地下巷道内设置钻测设备(见图1),包括坑道钻机6、放置在矿车1上的水箱2和临时水池8,水箱2的出水软管4上串接一水流量计5和水流量控制开关3;在地下巷道内另布置注浆设备(见图2),包括泥浆泵10、黄泥灌11和输泥管12。
②开动坑道钻机6,沿着垂直于岩层9层面方向打钻孔7,在打钻孔7的过程中打开水流量控制开关3,让水通过出水软管4自动流入正在打钻的钻孔7中,并边钻孔边注水,控制水量保持流水平面与孔口持平。
③在边打钻孔边注水过程中,时刻记录钻头所在位置和该位置对应的水流量。
④当发现钻孔7中的注水量突发性增大时,记录好增大后的水流失量值和钻头所在位置,取出钻心,并关掉水流量控制开关3,停钻,然后开动泥浆泵10、黄泥灌11和输泥管12封堵漏水裂隙(如图2所示)。
⑤封堵完后,重新继续向下打钻,重复②、③和④过程,直至钻探到所需要的深度为止。
⑥然后根据沿不同钻孔深度和对应的水流失量大小,绘制钻孔内不同位置水流漏失速度图(见图3),由此最终确定出不同深度岩层破裂或裂隙发育程度
应用举例:某煤矿预开采六石门三槽底部的二槽煤,二槽煤倾角8-20度,了2-6m。二、三槽煤的层间距最大为37.5m,最小为30.3m,平均33.5m。由于两层煤层间距小,担心三槽煤开采时底板下陷,造成工作面塌垮事故。为此,确立探测该处的底板岩层情况。采用钻测同步技术,本发明方法进行底板裂隙分布情况。步骤如技术方案所述内容。采用钻测同步技术,钻测结果如图4所示,发现三槽煤底板自上至下依次为中等破裂区、轻微破裂区或严重破裂区,并且存在三个离层区。其中,轻微破裂区是承载关键层,对保障三槽开采时底板不塌陷起到了至关重要的作用,已被实践所证实。
Claims (1)
1.一种底板岩层裂隙分布同步探测方法,其特征在于,步骤如下:
第一步:在地下巷道内设置水箱,水箱的出水软管上串接一水流量表和水流量控制开关;在巷道内布置坑道钻机和泥浆泵;
第二步:用坑道钻机沿着垂直于岩层层面方向进行钻孔,在钻孔的过程中打开水流量控制开关,让水通过出水软管自动流入正在打钻的钻孔中,并边钻孔边注水,控制注水量,使钻孔注水平面与钻孔口持平;
第三步:在边打钻孔边注水过程中,时刻记录钻头所在位置和该位置对应的水流量;
第四步:当发现钻孔中的注水量突发性增大时,记录好增大后的水流量值和钻头所在位置,取出钻心,并关掉水流量控制开关,停止钻进,然后开动泥浆泵封堵漏水裂隙;
第五步:封堵完后,重新继续向下打钻,重复步骤二、三和四过程,直至钻探到设计深度为止;
第六步:根据钻孔不同深度和对应的水流失量大小,绘制钻孔内不同位置水流漏失速度图,由此最终确定出不同深度岩层破裂或裂隙发育程度。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101360542A CN101858209B (zh) | 2010-03-26 | 2010-03-26 | 底板岩层裂隙分布同步探测方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101360542A CN101858209B (zh) | 2010-03-26 | 2010-03-26 | 底板岩层裂隙分布同步探测方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101858209A CN101858209A (zh) | 2010-10-13 |
CN101858209B true CN101858209B (zh) | 2013-04-03 |
Family
ID=42944342
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010101360542A Expired - Fee Related CN101858209B (zh) | 2010-03-26 | 2010-03-26 | 底板岩层裂隙分布同步探测方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101858209B (zh) |
Families Citing this family (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102155213B (zh) * | 2011-04-08 | 2013-06-05 | 中煤科工集团西安研究院 | 矿井采动裂隙的动态检测方法 |
CN102220866B (zh) * | 2011-04-17 | 2013-09-18 | 山东科技大学 | 深部煤巷冲击地压卸压与加固协同防治方法 |
CN102445710B (zh) * | 2011-12-31 | 2013-08-21 | 山东科技大学 | 一种用于覆岩导水裂隙带监测系统的探测钻进装置 |
CN103015996B (zh) * | 2012-12-31 | 2014-03-19 | 中国石油大学(华东) | 钻前预测高陡构造地层漏失速率的方法 |
CN103643918B (zh) * | 2013-12-20 | 2016-01-20 | 北京大地高科煤层气工程技术研究院 | 一种针对奥陶系灰岩矿区的寻找及防止矿井渗水的方法 |
CN106545328A (zh) * | 2014-10-24 | 2017-03-29 | 中国石油大学(华东) | 一种探测射孔孔眼位置并清洗孔眼的方法 |
CN104632075B (zh) * | 2014-12-16 | 2016-09-21 | 山东科技大学 | 一种用于覆岩裂隙探测的钻测一体化系统及方法 |
CN105003255B (zh) * | 2015-06-25 | 2017-09-01 | 山东科技大学 | 底板采动破坏带多段封堵同步测漏方法 |
CN106248911B (zh) * | 2016-09-27 | 2018-05-11 | 西安科技大学 | 一种单动力源双通道围岩采动裂隙探测系统 |
CN106777117B (zh) * | 2016-12-15 | 2020-04-03 | 南京师范大学 | 一种水平岩层构造地貌的自动识别方法 |
CN107092583A (zh) * | 2017-04-13 | 2017-08-25 | 安徽理工大学 | 一种基于冲洗液消耗量的岩石裂隙发育程度分析方法 |
CN111772483B (zh) * | 2020-06-30 | 2022-03-25 | 中车青岛四方机车车辆股份有限公司 | 饮水机的控制方法及装置 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2002095188A1 (en) * | 2001-05-22 | 2002-11-28 | Mærsk Olie Og Gas A/S | A method of controlling the direction of propagation of injection fractures in permeable formations |
CN1710425A (zh) * | 2005-06-01 | 2005-12-21 | 于海湧 | 围岩裂隙扫描探测仪 |
CN101245706A (zh) * | 2007-07-03 | 2008-08-20 | 中国矿业大学(北京) | 煤与瓦斯共采三维模拟实验台 |
CN101581234A (zh) * | 2009-06-29 | 2009-11-18 | 张平松 | 煤层采动顶底板岩层变形与破坏井下综合测试方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2334904A1 (en) * | 2008-08-08 | 2011-06-22 | Altarock Energy, Inc. | Method for testing an engineered geothermal system using one stimulated well |
-
2010
- 2010-03-26 CN CN2010101360542A patent/CN101858209B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2002095188A1 (en) * | 2001-05-22 | 2002-11-28 | Mærsk Olie Og Gas A/S | A method of controlling the direction of propagation of injection fractures in permeable formations |
CN1710425A (zh) * | 2005-06-01 | 2005-12-21 | 于海湧 | 围岩裂隙扫描探测仪 |
CN101245706A (zh) * | 2007-07-03 | 2008-08-20 | 中国矿业大学(北京) | 煤与瓦斯共采三维模拟实验台 |
CN101581234A (zh) * | 2009-06-29 | 2009-11-18 | 张平松 | 煤层采动顶底板岩层变形与破坏井下综合测试方法 |
Non-Patent Citations (4)
Title |
---|
李俊斌.注水实验法探测导水裂隙带高度.《煤炭技术》.2004,(第2期),第77-79页. * |
杜广森 * |
熊晓英 * |
王岩等.保护层开采后周围煤岩体采动裂隙分布规律的研究.《煤矿安全》.2008,(第1期),第11-14页. * |
Also Published As
Publication number | Publication date |
---|---|
CN101858209A (zh) | 2010-10-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101858209B (zh) | 底板岩层裂隙分布同步探测方法 | |
CN103075149B (zh) | 下行超深钻孔快速测定煤层瓦斯压力的方法及其装置 | |
CN103742129B (zh) | 松软煤层钻孔测定煤层瓦斯压力的方法 | |
CN103075148B (zh) | 上向远距离钻孔快速测定煤层瓦斯压力的方法及其装置 | |
CN103217131B (zh) | 一种围岩松动圈的测试方法及测试设备 | |
CN102817619B (zh) | 隧道内探测无水和有水溶腔的组合超前钻探方法 | |
CN105806418A (zh) | 一种水库滑坡多场信息现场监测系统及其施工方法 | |
CN103015984A (zh) | 套管高压封孔法测定煤层瓦斯压力的方法 | |
CN201671622U (zh) | 煤矿覆岩导水裂缝带仰孔观测仪 | |
CN110107284B (zh) | 一种通过水压探测导水裂隙带高度的钻测系统及方法 | |
CN110056342B (zh) | 一种钻孔注气判定蹬空开采可行性的注气装置及方法 | |
CN104373118A (zh) | 钻孔有效抽采半径的测定方法 | |
CN104500042B (zh) | 含水煤岩下行钻孔瓦斯压力观测系统的测定方法 | |
CN104179491A (zh) | 井下岩体裂隙钻孔超声波探测装置和系统 | |
CN104405372A (zh) | 一种基于高位钻孔流量的测试采场覆岩竖三带高度方法 | |
CN105093349A (zh) | 一种实测巷道顶板内部裂隙发展发育规律的方法 | |
CN103147741B (zh) | 基于钻孔气体漏失量的煤层巷旁卸压带宽度测定方法 | |
CN103161499B (zh) | 井下煤层突出危险区域划分方法 | |
CN108918823B (zh) | 隧道突水突泥洞内涌泥淤积长度的预测方法 | |
Khave | Delineating subterranean water conduits using hydraulic testing and machine performance parameters in TBM tunnel post-grouting | |
CN217681857U (zh) | 一种用于煤层顶板岩层变形监测的压水装置 | |
CN101886543A (zh) | 煤层采空区裂隙带分段注水观测用探管 | |
CN201526309U (zh) | 地下水文观测孔 | |
KR102017208B1 (ko) | 천부 가스전의 천부 가스 생산 장치 | |
CN103089247A (zh) | 富含水煤系地层瓦斯压力测试装备及方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130403 |
|
CF01 | Termination of patent right due to non-payment of annual fee |