CN101856780A - Bailey truss pin forge piece manufacturing process and die manufacture - Google Patents

Bailey truss pin forge piece manufacturing process and die manufacture Download PDF

Info

Publication number
CN101856780A
CN101856780A CN200910061533A CN200910061533A CN101856780A CN 101856780 A CN101856780 A CN 101856780A CN 200910061533 A CN200910061533 A CN 200910061533A CN 200910061533 A CN200910061533 A CN 200910061533A CN 101856780 A CN101856780 A CN 101856780A
Authority
CN
China
Prior art keywords
die
forging
blank
steel
truss pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910061533A
Other languages
Chinese (zh)
Inventor
余新华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN200910061533A priority Critical patent/CN101856780A/en
Publication of CN101856780A publication Critical patent/CN101856780A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to a Bailey part truss pin forging process capable of saving steel materials and production cost and used for a steel structural bridge and particularly provides a novel process and a related die. A step surface and a directional groove of a workpiece are formed by pressing in one step. The novel process comprises the following steps of: firstly, manufacturing a high-strength close type die by using alloy hot die steel, and installing the die on a die forging machine; heating a blank to about 1200 DEG C, placing the blank into the die for pressing forming in one step so that the related dimension of the blank meets the requirements of design; finishing in place by using a lathe and drilling after cooling; and feeding for heat treatment, quenching and galvanization so as to manufacture a finished product. The invention changes the cutting machining of the traditional process into forging and pressing forming, saves the steel materials of 0.9 kg per product and the machining time of 20 minutes, reduces the material cost by 25 percent, and greatly enhances the production efficiency.

Description

Shellfish thunder sheet truss pin forge piece manufacturing process and Mold Making
Technical field
The present invention is a bridge steel structure with a kind of product Forging Technology (annotate: this product is a shellfish thunder sheet truss pin) that can strengthen steel bridge bonding strength and rigidity on the shellfish thunder chip part.
Background technology
The traditional production method of this product is: smooth bar is formed through lathe car system, and steel consumption is excessive, has increased production cost.
Summary of the invention
For the consumption that saves material, reduce its production cost, the invention provides a kind of novel process and mould the disposable compacting of workpiece is formed.Its concrete technical scheme is as follows:
At first make a cover high strength closed molds and be installed on the die forging machine with alloy mold heat steel, then used round steel is heated to 1200 ℃, the compression moulding of die forging machine of packing into, make forging reach designing requirement (needing steel rough turn and required consumption all to save tradition), be finished product behind the finish turning.The present invention saves steel 25% than every of traditional processing mode.
Description of drawings
Fig. 1 be shellfish thunder sheet truss pin shaping mould (1, for truss pin moulding upper mould, 2, be truss pin shaping mould counterdie).
Fig. 2 is shellfish thunder sheet truss pin (3, for truss pin part).

Claims (2)

1. a new steel structure bridge shellfish thunder sheet is with truss pin Forging Technology:
Its technical process is: after the truss pin material of required forging was heated to 1200 ℃, the shaping mould compression moulding on die forging machine of packing into put in place through the lathe finish turning again, boring, and heat treatment is finished product after zinc-plated.
2. mould one cover that supporting this technology is made.
CN200910061533A 2009-04-08 2009-04-08 Bailey truss pin forge piece manufacturing process and die manufacture Pending CN101856780A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910061533A CN101856780A (en) 2009-04-08 2009-04-08 Bailey truss pin forge piece manufacturing process and die manufacture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910061533A CN101856780A (en) 2009-04-08 2009-04-08 Bailey truss pin forge piece manufacturing process and die manufacture

Publications (1)

Publication Number Publication Date
CN101856780A true CN101856780A (en) 2010-10-13

Family

ID=42943064

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910061533A Pending CN101856780A (en) 2009-04-08 2009-04-08 Bailey truss pin forge piece manufacturing process and die manufacture

Country Status (1)

Country Link
CN (1) CN101856780A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106736290A (en) * 2016-12-26 2017-05-31 重庆创精温锻成型有限公司 The preparation method of automobile DCT automatic transmission clutch propeller boss

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106736290A (en) * 2016-12-26 2017-05-31 重庆创精温锻成型有限公司 The preparation method of automobile DCT automatic transmission clutch propeller boss

Similar Documents

Publication Publication Date Title
CN101402163A (en) Bearing ferrule workblank triple external member smithing and molding process
CN101695739A (en) Forging process of large tee and large skew tee
CN102009565A (en) Steel ring integral wheel rim
CN104191181A (en) Magnesium alloy wheel forging-spinning composite forming method
CN101758149B (en) Rotator shaft residual material-free obliquely and transversely rolling method and special mold
CN104148428B (en) A kind of cold-extrusion shaping method of axial symmetry rod head part
CN102248381A (en) Method for processing lathe spindle
CN101850399A (en) Process method for forging brake cam of automobile
CN102974676B (en) Method for pressing conical cover reinforcing ribs
KR20130050492A (en) A manufacturing method of a cylinder-cover for a large-sized engine
CN203265502U (en) Hot forging device for transmission shaft joint fork with horizontal fork part
CN205200435U (en) A forge hot mould for double cam axle spare
CN101596572B (en) Technological method for producing axle case reinforcing ring
CN102989989B (en) Forging process of heavy truck steering knuckle
CN201997666U (en) Production line for forging and moulding three bearing ring blanks at a time
CN101856780A (en) Bailey truss pin forge piece manufacturing process and die manufacture
CN102581568A (en) Processing method of big cylinder bottom of hydraulic support
CN101172326A (en) Method for producing angle pin casing tube
CN203592100U (en) Primary forging die body of transmission shaft spline shaft horizontal forging die
CN202212516U (en) Novel die for forging spline shaft head of transmission shaft
CN101890624A (en) Method for processing eccentric shaft
CN201592226U (en) Special die for non-scrap cross wedge rolling of revolving shafts
CN102989939A (en) Design method of integral automobile steering knuckle vertical forging blank
CN101934297A (en) Suspended hot extrusion forming method for blanks
CN101612639A (en) Bailey female forge piece manufacturing process and Mold Making

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20101013