CN101856780A - Bailey truss pin forge piece manufacturing process and die manufacture - Google Patents
Bailey truss pin forge piece manufacturing process and die manufacture Download PDFInfo
- Publication number
- CN101856780A CN101856780A CN200910061533A CN200910061533A CN101856780A CN 101856780 A CN101856780 A CN 101856780A CN 200910061533 A CN200910061533 A CN 200910061533A CN 200910061533 A CN200910061533 A CN 200910061533A CN 101856780 A CN101856780 A CN 101856780A
- Authority
- CN
- China
- Prior art keywords
- die
- forging
- blank
- steel
- truss pin
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention relates to a Bailey part truss pin forging process capable of saving steel materials and production cost and used for a steel structural bridge and particularly provides a novel process and a related die. A step surface and a directional groove of a workpiece are formed by pressing in one step. The novel process comprises the following steps of: firstly, manufacturing a high-strength close type die by using alloy hot die steel, and installing the die on a die forging machine; heating a blank to about 1200 DEG C, placing the blank into the die for pressing forming in one step so that the related dimension of the blank meets the requirements of design; finishing in place by using a lathe and drilling after cooling; and feeding for heat treatment, quenching and galvanization so as to manufacture a finished product. The invention changes the cutting machining of the traditional process into forging and pressing forming, saves the steel materials of 0.9 kg per product and the machining time of 20 minutes, reduces the material cost by 25 percent, and greatly enhances the production efficiency.
Description
Technical field
The present invention is a bridge steel structure with a kind of product Forging Technology (annotate: this product is a shellfish thunder sheet truss pin) that can strengthen steel bridge bonding strength and rigidity on the shellfish thunder chip part.
Background technology
The traditional production method of this product is: smooth bar is formed through lathe car system, and steel consumption is excessive, has increased production cost.
Summary of the invention
For the consumption that saves material, reduce its production cost, the invention provides a kind of novel process and mould the disposable compacting of workpiece is formed.Its concrete technical scheme is as follows:
At first make a cover high strength closed molds and be installed on the die forging machine with alloy mold heat steel, then used round steel is heated to 1200 ℃, the compression moulding of die forging machine of packing into, make forging reach designing requirement (needing steel rough turn and required consumption all to save tradition), be finished product behind the finish turning.The present invention saves steel 25% than every of traditional processing mode.
Description of drawings
Fig. 1 be shellfish thunder sheet truss pin shaping mould (1, for truss pin moulding upper mould, 2, be truss pin shaping mould counterdie).
Fig. 2 is shellfish thunder sheet truss pin (3, for truss pin part).
Claims (2)
1. a new steel structure bridge shellfish thunder sheet is with truss pin Forging Technology:
Its technical process is: after the truss pin material of required forging was heated to 1200 ℃, the shaping mould compression moulding on die forging machine of packing into put in place through the lathe finish turning again, boring, and heat treatment is finished product after zinc-plated.
2. mould one cover that supporting this technology is made.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910061533A CN101856780A (en) | 2009-04-08 | 2009-04-08 | Bailey truss pin forge piece manufacturing process and die manufacture |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910061533A CN101856780A (en) | 2009-04-08 | 2009-04-08 | Bailey truss pin forge piece manufacturing process and die manufacture |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101856780A true CN101856780A (en) | 2010-10-13 |
Family
ID=42943064
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200910061533A Pending CN101856780A (en) | 2009-04-08 | 2009-04-08 | Bailey truss pin forge piece manufacturing process and die manufacture |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101856780A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106736290A (en) * | 2016-12-26 | 2017-05-31 | 重庆创精温锻成型有限公司 | The preparation method of automobile DCT automatic transmission clutch propeller boss |
-
2009
- 2009-04-08 CN CN200910061533A patent/CN101856780A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106736290A (en) * | 2016-12-26 | 2017-05-31 | 重庆创精温锻成型有限公司 | The preparation method of automobile DCT automatic transmission clutch propeller boss |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101402163A (en) | Bearing ferrule workblank triple external member smithing and molding process | |
CN101695739A (en) | Forging process of large tee and large skew tee | |
CN102009565A (en) | Steel ring integral wheel rim | |
CN104191181A (en) | Magnesium alloy wheel forging-spinning composite forming method | |
CN101758149B (en) | Rotator shaft residual material-free obliquely and transversely rolling method and special mold | |
CN104148428B (en) | A kind of cold-extrusion shaping method of axial symmetry rod head part | |
CN102248381A (en) | Method for processing lathe spindle | |
CN101850399A (en) | Process method for forging brake cam of automobile | |
CN102974676B (en) | Method for pressing conical cover reinforcing ribs | |
KR20130050492A (en) | A manufacturing method of a cylinder-cover for a large-sized engine | |
CN203265502U (en) | Hot forging device for transmission shaft joint fork with horizontal fork part | |
CN205200435U (en) | A forge hot mould for double cam axle spare | |
CN101596572B (en) | Technological method for producing axle case reinforcing ring | |
CN102989989B (en) | Forging process of heavy truck steering knuckle | |
CN201997666U (en) | Production line for forging and moulding three bearing ring blanks at a time | |
CN101856780A (en) | Bailey truss pin forge piece manufacturing process and die manufacture | |
CN102581568A (en) | Processing method of big cylinder bottom of hydraulic support | |
CN101172326A (en) | Method for producing angle pin casing tube | |
CN203592100U (en) | Primary forging die body of transmission shaft spline shaft horizontal forging die | |
CN202212516U (en) | Novel die for forging spline shaft head of transmission shaft | |
CN101890624A (en) | Method for processing eccentric shaft | |
CN201592226U (en) | Special die for non-scrap cross wedge rolling of revolving shafts | |
CN102989939A (en) | Design method of integral automobile steering knuckle vertical forging blank | |
CN101934297A (en) | Suspended hot extrusion forming method for blanks | |
CN101612639A (en) | Bailey female forge piece manufacturing process and Mold Making |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20101013 |