CN101846450A - Installation method of big gear ring of rotary kiln - Google Patents

Installation method of big gear ring of rotary kiln Download PDF

Info

Publication number
CN101846450A
CN101846450A CN 201010206949 CN201010206949A CN101846450A CN 101846450 A CN101846450 A CN 101846450A CN 201010206949 CN201010206949 CN 201010206949 CN 201010206949 A CN201010206949 A CN 201010206949A CN 101846450 A CN101846450 A CN 101846450A
Authority
CN
China
Prior art keywords
ring
rotary kiln
installation
bull gear
centering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010206949
Other languages
Chinese (zh)
Inventor
薛更生
贾志军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Aluminum Corp of China Ltd
Original Assignee
Aluminum Corp of China Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aluminum Corp of China Ltd filed Critical Aluminum Corp of China Ltd
Priority to CN 201010206949 priority Critical patent/CN101846450A/en
Publication of CN101846450A publication Critical patent/CN101846450A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses an installation method of a big gear ring of a rotary kiln, which relates to rotary kiln installation, big gear ring replacement or installation method after turn-over repair in aluminum oxide, building material, nonferrous metal and metallurgical industries. The invention is characterized in that the installation process comprises the steps of preassembling the big gear ring and a lower shell ring thereof, aligning and installing integrally after connecting the big gear ring and the lower shell ring into a whole body. In the method, a large-tonnage jack-up plate rotary kiln body mechanism does not need to be arranged, and barrel and gear ring deflection alignment is carried out directly via an auxiliary transmission system. The invention shortens construction period, increases the installation accuracy of the large ring gear, improves the working environment for constructors and relieves labor intensity.

Description

A kind of installation method of big gear ring of rotary kiln
Technical field
A kind of installation method of big gear ring of rotary kiln relates to a kind of aluminium oxide, building materials, coloured, metallurgy industry rotary kiln installation, big gear ring replacement or turn-over and repairs the back installation method.
Background technology
Bull gear is one of rotary kiln critical piece, and in the rotary kiln installation process, the installation of bull gear is an important step, its required precision height, complex process.At present, the bull gear method is installed mainly contains two kinds, the one, parts are installed: be with cylinder of rotary kiln install centering good after, again two half-ring gears are distinguished installation centering in place, its advantage is to install after cylindrical shell is linked to be integral body, and shortcoming is to be difficult to guarantee its circularity and installation accuracy; The 2nd, integral installation: in advance the two half rings group to becoming whole, whole circle installation centering in place.Its advantage is to guarantee gear ring circularity, and shortcoming is to be linked to be at cylindrical shell must be enclosed within advance on the shell ring before whole, setting face arrange fixing.
More than two kinds the bull gear methods are installed all will be after the cylindrical shell butt joint connects, by large-tonnage elevator assembly pulley is set, dish rotary kiln body is measured centering to all (replacing) cylindrical shell central straight dimensions, coil again the rotary kiln body to bull gear axially and radial beat centering repeatedly, wherein many instruments and measure to be set.Last fixing spring plate and cylindrical shell become integral body (riveted joint or welding).Only bull gear is installed or is changed subitem and needs 6 days durations at least, and because dish rotary kiln running body instability adds the kiln axon to play, bull gear centering precision is difficult to guarantee.Consume a large amount of manpower and materials simultaneously.
Summary of the invention
Purpose of the present invention is exactly the deficiency that exists at above-mentioned prior art, and providing a kind of can effectively shorten the rotary kiln installation and maintenance duration, improves the installation method of the big gear ring of rotary kiln of installation accuracy.
The objective of the invention is to be achieved through the following technical solutions.
A kind of installation method of big gear ring of rotary kiln, it is characterized in that its installation process be in advance with bull gear and its down shell ring assembling, centering, be connected to an integral body after, carry out integral installation again.
The installation method of a kind of big gear ring of rotary kiln of the present invention, it is characterized in that described with bull gear and its down shell ring assembling, centering, be connected to holistic process bull gear carried out with its time vertical placing on the assembly platform of shell ring.
The installation method of a kind of big gear ring of rotary kiln of the present invention, it is characterized in that being provided with between two parties on the described assembly platform newel, being provided with one on newel can be around the horizon bar of newel rotation, at the scriber that is provided with setting-out on the bull gear pitch circle on the horizon bar, be used for the radially dial gauge device of centering, centralized positioning of bull gear.
Adopt method of the present invention, in advance with bull gear and its down shell ring assembling, centering, be connected to an integral body after, carry out integral installation again, large-tonnage lifting dish rotary kiln body mechanism need be set, directly on assembly platform, carry out cylindrical shell and gear ring beat centering.Can effectively shorten the rotary kiln site operation duration, improve the bull gear installation accuracy.
Description of drawings
The structural representation of the assembly platform that Fig. 1 uses for the method for the present invention institute right to use.
Fig. 2 is the vertical view of Fig. 1.
1 is scriber among the figure, and setting-out on the bull gear pitch circle is used for radially centering (centralized positioning) of bull gear; 2 is the dial gauge device, is used for radially centering (centralized positioning) of shell ring; 3 for horizontal column is that rotating shaft is faced and arranged column, top that bearing is housed, and horizontal centering cross bar is that central pivot point is rotated with it; The 4th, shell ring; The 5th, bull gear; The 6th, latch plate; The 7th, support bull gear and face and arrange (having jack, removable and fixing bull gear); The 8th, assembly platform.
The specific embodiment
A kind of installation method of big gear ring of rotary kiln, its installation process be in advance with bull gear and its down shell ring assembling, centering, be connected to an integral body after, carry out integral installation again; With bull gear and its down shell ring assembling, centering, be connected to holistic process bull gear carried out on the assembly platform with its time vertical placing of shell ring; Be provided with a newel on the described assembly platform between two parties, being provided with one on newel can at the scriber that is provided with setting-out on the bull gear pitch circle on the horizon bar, be used for the radially dial gauge device of centering, centralized positioning of bull gear around the horizon bar of newel rotation.
The concrete operations step is as follows:
1. make bull gear centering assembly platform.
2. bull gear and following shell ring thereof are detected the school circle respectively.
3. centering rotating shaft and instrument are set.Be ready to Work tools such as spirit level and jack.
4. bull gear and shell ring level are reached radially levelling capturing.
5. mounting spring plate, fixing spring plate and shell ring are an integral body.
6. adopt large-tonnage lifting equipment to carry out integral hoisting.
7. adopt the assisted deceleration machine to drive big pinion mate cylindrical shell and carry out smart centering.
8. set up measuring table, measure bull gear and axially reach the circular runout value, the centering by shell ring both sides docking port under it makes bull gear axially reach the circular runout value and meets installation specification.
9. welding shell ring both sides circumferential weld is finished the bull gear mounting process.
Method of the present invention is placed on bull gear assembling that overhaul (installations) is preceding to be carried out, and maximum 2 days of on-the-spot installation can shift to an earlier date 4 days durations.And the precision height, improve workmen's operating environment simultaneously and reduce labor intensity, it is considerable to create economic benefit.
Embodiment
Two half-turn structures of the many employings of big gear ring of rotary kiln link together with the counterpart screw, tangentially are fixed on the kiln body by latch plate; Concrete implementation step is as follows:
1. set up a square assembly platform, the length of side is greater than bull gear diameter 2m.
2. the restraining of bull gear connecting cylinder is done to use machine tooling, must guarantee that its circularity meets the requirements, and the shell ring both ends of the surface are vertical.And utilize machining tool at periphery center line and latch plate installation site two circumferences up and down that draw.
3. bull gear assembling school is round
3.1 with the platform center is the center of circle, marks the inside and outside circle of cylindrical shell cylindrical and bull gear end with planing, and is beneficial to the parts Primary Location.
3.2 bull gear is lain on the operation platform, and cleaning counterpart faying face burr connects counterpart screw and fastening, till meeting the requirements with the clearance gauge inspection.Select 12 points, measure pitch diameter, guarantee that its circularity is no more than 1mm.Adopt steel pipe and jack to proofread and correct to the old gear ring of dismounting or the ellipse and the local deformation of new gear ring appearance, reach the drawing requirement until deviation from circular from.
3.3 the latch plate correspondence is contained on the gear ring with bolt with articulation hole, latch plate is temporarily fixed on the gear ring with iron wire.
4. the shell ring centering is in place
4.1 shell ring is put on the platform scribing position, finds perpendicularity and levelness.Utilize ceiling hammer method centering just, make shell ring vertical; Utilizing spirit level to reach the standard grade with the latch plate installation is that benchmark carries out the smart centering of shell ring level (measure 12 points of circumference and make its absolute altitude unanimity).
Face with rotating shaft and arrange 4.2 centering is installed at the platform center, column must be vertical, and the bearing clearance will suit, and can guarantee that horizontal centering cross bar rotates flexibly, and it is had axially and radial beat.
4.3 utilize the dial gauge on the horizontal centering cross bar, make shell ring radial location (shell ring center face arrange the column center to overlap) with centering, its concentricity is no more than 0.5mm.
4.4 temporary fixed shell ring is on assembly platform.
5. the bull gear centering is in place
5.1 the bull gear level is centering just: under the bull gear jack is set, it is highly tentatively put in place, by calculating, reaching the standard grade with the installation of shell ring outer round surface latch plate is benchmark, measures its levelness of absolute altitude centering, error≤0.2mm by spirit level.
5.2 bull gear is first centering radially: utilize jack etc. to face to arrange by ruler make the bull gear pitch circle apart from one week of cylindrical shell cylindrical distance equate.
5.3 essence is looked for the gear ring installation site: utilize spirit level to measure plane absolute altitude on the bull gear once more, to bull gear levelness centering, precision≤0.2mm; Use radially centering of rotating shaft scriber (at gear ring pitch circle upper drawing circle), its concentricity is no more than 0.5mm.Centering back well pads, fills up the jail to bull gear, is fixed on the assembly platform with angle bar.
6. mounting spring plate
6.1 trip spring plate tie wire, the cleaning drum surface fits tightly on the cylindrical shell circular arc (attention pressing spring plate wants symmetry to press) with pressing plate with the latch plate arc surface.Tighten gear ring and latch plate coupling nut.At last latch plate and cylindrical shell point are welded into one.
6.2 require boring riveted joint or directly welding according to drawing, making latch plate and shell ring is an integral body.
7. the pre-assembly integral hoisting of bull gear
7.1 two ends connect cylinder roundness inspection and school circle, so that cylindrical shell butt joint.
7.2 utilize the lifting of lifting facility, group is to connecting shell ring.Pinion and accessory drive system are installed.
7.3 kiln body central straight dimension is carried out smart centering.
8. bull gear is measured centering
Bull gear is installed is measured support, utilize dial gauge to detect the axial and radial beat of bull gear, adjust shell ring both sides connector repeatedly, the radial and axial jitter values of bull gear is met the requirements.
9. weld the cylindrical shell circumferential weld.

Claims (3)

1. the installation method of a big gear ring of rotary kiln, it is characterized in that its installation process be in advance with bull gear and its down shell ring assembling, centering, be connected to an integral body after, carry out integral installation again.
2. the installation method of a kind of big gear ring of rotary kiln according to claim 1, it is characterized in that described with bull gear and its down shell ring assembling, centering, be connected to holistic process bull gear carried out with its time vertical placing on the assembly platform of shell ring.
3. the installation method of a kind of big gear ring of rotary kiln according to claim 1, it is characterized in that being provided with between two parties on the described assembly platform newel, being provided with one on newel can be around the horizon bar of newel rotation, at the scriber that is provided with setting-out on the bull gear pitch circle on the horizon bar, be used for the radially dial gauge device of centering, centralized positioning of bull gear.
CN 201010206949 2010-06-13 2010-06-13 Installation method of big gear ring of rotary kiln Pending CN101846450A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010206949 CN101846450A (en) 2010-06-13 2010-06-13 Installation method of big gear ring of rotary kiln

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010206949 CN101846450A (en) 2010-06-13 2010-06-13 Installation method of big gear ring of rotary kiln

Publications (1)

Publication Number Publication Date
CN101846450A true CN101846450A (en) 2010-09-29

Family

ID=42771156

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010206949 Pending CN101846450A (en) 2010-06-13 2010-06-13 Installation method of big gear ring of rotary kiln

Country Status (1)

Country Link
CN (1) CN101846450A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425799A (en) * 2011-11-16 2012-04-25 北京机电院高技术股份有限公司 Method and device for removing rotary kiln coke
CN104390452A (en) * 2014-11-21 2015-03-04 广西鱼峰水泥股份有限公司 Kiln turning method for rotary kiln large-gear precise alignment
CN104567345A (en) * 2013-10-27 2015-04-29 青岛德固特节能装备股份有限公司 Up-to-standard end face run-out mounting method of large rolling ring of carbon black drying machine
CN105115294A (en) * 2015-08-23 2015-12-02 安徽芜湖海螺建筑安装工程有限责任公司 Gear ring replacement and kiln body edge turning method for cement clinker rotary kiln
CN108055864A (en) * 2015-09-15 2018-05-18 奥图泰(芬兰)公司 It is used to support the support device of the cylindrical furnace of the rotatable stove of supporting item compared with stove
CN113883991A (en) * 2021-10-27 2022-01-04 上海二十冶建设有限公司 Method for detecting in-place flatness of gear ring of bale rotary table

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2746338Y (en) * 2004-11-15 2005-12-14 贵阳铝镁设计研究院 Connection structore of rotary kiln tangential spring plate and cylinder
CN201012475Y (en) * 2007-03-28 2008-01-30 中国第二十冶金建设公司 Big gear centering adjusting device
CN201373665Y (en) * 2008-11-25 2009-12-30 中信重工机械股份有限公司 Large gear ring device of rotary kiln

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2746338Y (en) * 2004-11-15 2005-12-14 贵阳铝镁设计研究院 Connection structore of rotary kiln tangential spring plate and cylinder
CN201012475Y (en) * 2007-03-28 2008-01-30 中国第二十冶金建设公司 Big gear centering adjusting device
CN201373665Y (en) * 2008-11-25 2009-12-30 中信重工机械股份有限公司 Large gear ring device of rotary kiln

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《有色金属工业科技创新--中国有色金属学会第七届学术年会论文集》 2008 贾志军 回转窑大齿圈与筒节预组装整体吊装新工艺 , 2 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425799A (en) * 2011-11-16 2012-04-25 北京机电院高技术股份有限公司 Method and device for removing rotary kiln coke
CN104567345A (en) * 2013-10-27 2015-04-29 青岛德固特节能装备股份有限公司 Up-to-standard end face run-out mounting method of large rolling ring of carbon black drying machine
CN104567345B (en) * 2013-10-27 2017-01-18 青岛德固特节能装备股份有限公司 Up-to-standard end face run-out mounting method of large rolling ring of carbon black drying machine
CN104390452A (en) * 2014-11-21 2015-03-04 广西鱼峰水泥股份有限公司 Kiln turning method for rotary kiln large-gear precise alignment
CN104390452B (en) * 2014-11-21 2016-08-24 广西鱼峰水泥股份有限公司 The rotary kiln method of rotary kiln gear wheel essence centering
CN105115294A (en) * 2015-08-23 2015-12-02 安徽芜湖海螺建筑安装工程有限责任公司 Gear ring replacement and kiln body edge turning method for cement clinker rotary kiln
CN108055864A (en) * 2015-09-15 2018-05-18 奥图泰(芬兰)公司 It is used to support the support device of the cylindrical furnace of the rotatable stove of supporting item compared with stove
CN108055864B (en) * 2015-09-15 2019-12-06 奥图泰(芬兰)公司 support device for supporting a cylindrical furnace body of a furnace rotatable relative to a support of the furnace
CN113883991A (en) * 2021-10-27 2022-01-04 上海二十冶建设有限公司 Method for detecting in-place flatness of gear ring of bale rotary table

Similar Documents

Publication Publication Date Title
CN101846450A (en) Installation method of big gear ring of rotary kiln
CN102444209A (en) Building steel-column foundation lengthening bolt and lengthening method thereof
CN103801921A (en) Kiln shell mounting method for vertical shaft kiln
CN108020083A (en) A kind of large-scale rotary hearth furnace installation method
CN113070557B (en) Hole forming device and hole forming method for pipe wall of steel pipe pile
CN102717232A (en) Manufacturing method for half liner in head sheave of large-sized elevator
CN108213960B (en) Annular cooler revolving frame machining tool and annular cooler revolving frame machining method
CN111411621A (en) Ship lift safety mechanism gap adjusting device and adjusting method thereof
CN101852547A (en) Rotary kiln heavy gear ring repairing method
CN108049639B (en) Method for connecting ring crane rail bearing beam and bracket
CN203003494U (en) Turntable slewing structure of machine tool
CN104786002A (en) Maintenance method and device for slewing bearing part of gantry crane
CN101831916A (en) Method for mounting large-size sleeve bolt framework in combined type
CN113996882A (en) Large-scale tower equipment and tower-attached pipeline installation method
CN108801180B (en) Method for centering and aligning vertical speed reducer and roll box
CN210703369U (en) Sectional type steel pipe ring welding frock
CN210147354U (en) Assembly welding tool for bucket elevator barrel
CN100366854C (en) Method for structuring sightseeing tower from H type steel and method for manufacturing H type steel structure
CN210395423U (en) Tower machine basis installation positioner
CN108825898B (en) Novel curved surface connecting flange and processing method thereof
CN111575438B (en) Mounting method of full-suspension four-point meshing type super-large converter
CN204678270U (en) For the stationary fixture that steel-structure factory building ceiling lighting is installed
CN114083229B (en) Method for manufacturing annular thick plate magnet yoke
CN219767330U (en) Hydraulic tool for bearing assembly
CN216245957U (en) Quick detection device of coal-winning machine walking case screw position

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication