CN101845964B - Loading conveying line used for mine laneway - Google Patents

Loading conveying line used for mine laneway Download PDF

Info

Publication number
CN101845964B
CN101845964B CN2010101718478A CN201010171847A CN101845964B CN 101845964 B CN101845964 B CN 101845964B CN 2010101718478 A CN2010101718478 A CN 2010101718478A CN 201010171847 A CN201010171847 A CN 201010171847A CN 101845964 B CN101845964 B CN 101845964B
Authority
CN
China
Prior art keywords
mine
bucket
bridge conveyor
oil cylinder
base assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010101718478A
Other languages
Chinese (zh)
Other versions
CN101845964A (en
Inventor
张佃龙
张广文
马明国
郭念波
张宝西
崔庆林
陈勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yankuang Group Corp Ltd
Original Assignee
Yankuang Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yankuang Group Corp Ltd filed Critical Yankuang Group Corp Ltd
Priority to CN2010101718478A priority Critical patent/CN101845964B/en
Publication of CN101845964A publication Critical patent/CN101845964A/en
Application granted granted Critical
Publication of CN101845964B publication Critical patent/CN101845964B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Framework For Endless Conveyors (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention provides the technical scheme of a loading conveying line used for a mine laneway. The invention is characterized in that a bucket loading machine used for the mine laneway is connected with a bridge type reversed loading machine, an unloading end of the bridge type reversed loading machine is connected with out-conveying equipment, the bucket loading machine used for the mine laneway is provided with a base assembly provided with a hydraulic pedrail walking mechanism, a chain scrapping plate conveyer driven by hydraulic pressure is arranged on the base assembly, the front end of the base assembly is provided with a portal frame which spans across the conveyer, the upper part of the portal frame is provided with a rotary hinging and connecting seat driven by a rotary oil cylinder, a rotary disc is connected with the rotary hinging and connecting seat, the rotation of the rotary disc is driven by the rotary oil cylinder, a large arm and a large arm oil cylinder are hinged on the rotary disc, a small arm and a small arm oil cylinder are hinged on the large arm, a digging bucket and a digging bucket oil cylinder are hinged on the small arm, a crushing device is also arranged in the small arm, a control table, an operator chair and an output connecting frame are also arranged on the base assembly, and the out-conveying equipment can be a belt conveyer or a shuttle-type mine car or a plurality of groups of mine cars.

Description

A kind of loading conveying line used for mine laneway
Technical field:
What the present invention relates to is a kind of mine working driving Transport Machinery, especially a kind of loading conveying line used for mine laneway.
Background technology:
In the prior art; Technique known is the raking loader that uses in the present domestic rock roadway in coal mine tunneling construction, and this raking loader must be fixed and could move in use; Therefore construction is extremely dumb in the tunnel; Nor can form the complete production line that loads and carry, and will transporting through the rubble that explosion produces, this is the existing in prior technology weak point.
Summary of the invention:
The object of the invention is exactly not enough to existing in prior technology; And a kind of technical scheme of loading conveying line used for mine laneway is provided; This scheme adopts and can connect bridge conveyor at the bucket loader of used for mine laneway flexible operation; The unloading end of bridge conveyor connects as the many groups mine car that transports the belt conveyer of equipment or the shuttle car that can on shuttle car is walked guide rail, walk or can on mine car is walked guide rail, walk, the loading that formation can move flexibly and carry a complete production line.
This programme is realized through following technical measures: the characteristics of this programme have loader of dredging bucket for roadways of mine to connect bridge conveyor, and the unloading end of bridge conveyor connects the equipment that transports; Described loader of dredging bucket for roadways of mine has a base assembly that has the hydraulic pressure creeper undercarriage; On described base assembly, be equipped with one by hydraulically powered chain scraper transport, the portal frame across this transport arranged, the revolution even hinge block is housed on the top of portal frame at the front end of base assembly; The revolution even hinge block is driven and can be turned round around vertical axis by angling cylinder; Be connected with rotating disc with the revolution even hinge block, rotating disc is driven and can be rotated around horizontal axis by rotary oil cylinder, on this rotating disc, is hinged with the big arm oil cylinder of big arm and the big arm motion of control; On big arm, be hinged with the forearm oil cylinder of forearm and the motion of control forearm; On forearm, be hinged with the bucket cylinder of bucket and control bucket motion, also be provided with breaker in described forearm, also have console and operator seat in a side of described base assembly upper conveyor; In addition, the output link that connects bridge conveyor at the rear portion of base assembly in addition; The described equipment that transports can be belt conveyer or the shuttle car that can on shuttle car is walked guide rail, walk or the many groups mine car that can on mine car is walked guide rail, walk.The concrete characteristics of this programme also have, and the breaker in the said forearm is that the Hydraulic pick guide rail is housed in forearm, in the Hydraulic pick guide rail, have by the flexible Hydraulic pick of Hydraulic pick telescopic oil cylinder control Hydraulic pick.Described loader of dredging bucket for roadways of mine is connected with bridge conveyor, is that the output link that passes through on bearing pin and the bucket loader of bridge conveyor is hinged.The unloading end of said bridge conveyor with as transporting being connected between the belt conveyer of equipment, be that the elevating conveyor support wheel of bridge conveyor unloading end is seated in belt conveyer and carries on the section guide rail.The unloading end of said bridge conveyor with as transporting being connected between the shuttle car of equipment, be that the elevating conveyor support wheel of bridge conveyor unloading end is seated in the shuttle car top on the guide rail.The unloading end of said bridge conveyor with as transporting being connected between many groups mine car of equipment, be that the elevating conveyor support wheel of bridge conveyor unloading end is seated on the mine car upper rall.
The beneficial effect of this programme can be learnt according to the narration to such scheme; Because in this scheme, have loader of dredging bucket for roadways of mine to connect bridge conveyor, the unloading end of bridge conveyor connects as the many groups mine car that transports the belt conveyer of equipment or the shuttle car that can on shuttle car is walked guide rail, walk or can on mine car is walked guide rail, walk.Described loader of dredging bucket for roadways of mine has a base assembly that has walking mechanism; A transport is housed on described base assembly; Front end at the base assembly has the portal frame across this transport; The revolution even hinge block that is driven by angling cylinder is housed on the top of portal frame, is connected with the rotating disc that rotates by rotary oil cylinder driven in rotation dish, on this rotating disc, be hinged with big arm and big arm oil cylinder with the revolution even hinge block; On big arm, be hinged with forearm and forearm oil cylinder; On forearm, be hinged with bucket and bucket cylinder, in described forearm, also be provided with breaker, on described base assembly, also have console, operator seat and output link.This structure; Because the bucket loader has the walking mechanism of self and transport just can make things convenient for and operation neatly, and the rubble that is produced by explosion in the tunnel is loaded on the transport, is added with revolution even hinge block and rotating disc again; Big arm can rotate along horizontal axis and vertical axis; Breaker is arranged again in forearm, the bucket on the forearm can be moved along bottom, two lateral walls and the top board of mine working, and can repair and handle bottom, two lateral walls and the top board in tunnel.On the rear portion of bucket loader output link, connect bridge conveyor; Unloading end at bridge conveyor connects as the many groups mine car that transports the belt conveyer of equipment or the shuttle car that can on shuttle car is walked guide rail, walk or can on mine car is walked guide rail, walk again; This just can be loaded into the bucket of the rubble in the tunnel with the bucket loader in the transport of self; Transport is transported to rubble on the bridge conveyor that is connected with the bucket loader again; Bridge conveyor is transported to be attached thereto various with rubble again and transports on the equipment; By the equipment that transports rubble is transported outside the tunnel loading that formation can move flexibly and carry a complete production line again.This shows that the present invention compared with prior art has outstanding substantive distinguishing features and obvious improvement, the beneficial effect of its enforcement also is conspicuous.
Description of drawings:
Fig. 1 is the structural representation of first specific embodiment of the present invention.
Fig. 2 is the structural representation of second specific embodiment of the present invention.
Fig. 3 is the structural representation of the 3rd specific embodiment of the present invention.
Among the figure, 1 is bucket, and 2 is bucket cylinder, and 3 is forearm, and 4 is the forearm oil cylinder, and 5 is big arm; 6 is big arm oil cylinder, and 7 is rotating disc, and 8 is rotary oil cylinder, and 9 are the revolution hinged seat, and 10 is angling cylinder, and 11 is portal frame; 12 is operating desk, and 13 is the base assembly, and 14 is walking mechanism, and 15 is transport, and 16 is operator seat, and 17 are the output link; 18 is bridge conveyor, and 19 is the elevating conveyor support wheel, and 20 for belt conveyer carries the section guide rail, and 21 is belt conveyer, and 22 is guide rail in the shuttle car top; 23 is shuttle car, and 24 are shuttle car walking guide rail, and 25 is the mine car upper rall, and 26 is many group mine cars, and 27 are mine car walking guide rail.
The specific embodiment:
For clearly demonstrating the technical characterstic of this programme, below through three specific embodiment, and combine its accompanying drawing, this programme is set forth.
First specific embodiment can be found out through accompanying drawing 1; It is hinged through bearing pin and bridge conveyor 18 that the loading conveying line used for mine laneway of this programme has loader of dredging bucket for roadways of mine to pass through the output link 17 at bucket loader rear portion; The unloading end of bridge conveyor 18 connects as the belt conveyer 21 that transports equipment; Being connected between the unloading end of said bridge conveyor 18 and the belt conveyer 21 is that the elevating conveyor support wheel 19 of bridge conveyor 18 unloading ends is seated in belt conveyer and carries on the section guide rail 20.Described loader of dredging bucket for roadways of mine has a base assembly 13 that has hydraulic pressure creeper undercarriage 14; On described base assembly 13, be equipped with one by hydraulically powered chain scraper transport 15; Front end at base assembly 13 has the portal frame 11 across this transport 15, and the revolution even hinge block 9 that is driven by angling cylinder 10 is housed on the top of portal frame 11, and the revolution even hinge block can turn round around vertical axis; Be connected with rotating disc 7 with revolution even hinge block 9; Rotating disc 7 is driven by rotary oil cylinder 8 rotating disc 7 can be rotated around horizontal axis, on this rotating disc 7, is hinged with the big arm oil cylinder 6 of big arm 5 and big arm 5 motions of control, on big arm 5, is hinged with the forearm oil cylinder 4 of forearm 3 and 3 motions of control forearm; On forearm 3, be hinged with the bucket cylinder 2 of bucket 1 and 1 motion of control bucket; Also be provided with breaker in described forearm 3, this breaker is that the Hydraulic pick guide rail is housed in forearm 3, in the Hydraulic pick guide rail, has by the flexible Hydraulic pick of Hydraulic pick telescopic oil cylinder control Hydraulic pick.Side at described base assembly 13 upper conveyors 15 also has console 12 and operator seat 16.
Second specific embodiment can be found out through accompanying drawing 2; It is hinged through bearing pin and bridge conveyor 18 that the loading conveying line used for mine laneway of this programme has loader of dredging bucket for roadways of mine to pass through the output link 17 at bucket loader rear portion; It is the shuttle car 23 that can on shuttle car is walked guide rail 24, walk that the unloading end of bridge conveyor 18 connects as what transport equipment; Being connected between the unloading end of said bridge conveyor 18 and the shuttle car 23 is that the elevating conveyor support wheel 19 of bridge conveyor 18 unloading ends is seated in the shuttle car top on the guide rail 22.The structure of described loader of dredging bucket for roadways of mine is identical with loader of dredging bucket for roadways of mine in first specific embodiment.
The 3rd specific embodiment can be found out through accompanying drawing 3; It is hinged through bearing pin and bridge conveyor 18 that the loading conveying line used for mine laneway of this programme has loader of dredging bucket for roadways of mine to pass through the output link 17 at bucket loader rear portion; It is the many groups mine car 26 that can on mine car is walked guide rail 27, walk that the unloading end of bridge conveyor 18 connects as what transport equipment; Being connected between the unloading end of said bridge conveyor 18 and the many group mine cars 26 is that the elevating conveyor support wheel 19 of bridge conveyor 18 unloading ends is seated on the mine car upper rall 25.The structure of described loader of dredging bucket for roadways of mine is identical with loader of dredging bucket for roadways of mine in first specific embodiment.
The present invention is not limited in the above-mentioned specific embodiment, and the variation that those of ordinary skills make in essential scope of the present invention, remodeling, interpolation or replacement also should belong to protection scope of the present invention.

Claims (6)

1. loading conveying line used for mine laneway is characterized in that: have loader of dredging bucket for roadways of mine to connect bridge conveyor, the unloading end of bridge conveyor connects the equipment that transports; Described loader of dredging bucket for roadways of mine has a base assembly that has the hydraulic pressure creeper undercarriage; On described base assembly, be equipped with one by hydraulically powered chain scraper transport, the portal frame across this transport arranged, the revolution even hinge block is housed on the top of portal frame at the front end of base assembly; The revolution even hinge block is driven and can be turned round around vertical axis by angling cylinder; Be connected with rotating disc with the revolution even hinge block, rotating disc is driven and can be rotated around horizontal axis by rotary oil cylinder, on this rotating disc, is hinged with the big arm oil cylinder of big arm and the big arm motion of control; On big arm, be hinged with the forearm oil cylinder of forearm and the motion of control forearm; On forearm, be hinged with the bucket cylinder of bucket and control bucket motion, in described forearm, also be provided with breaker, also have console and operator seat in a side of described base assembly upper conveyor; In addition, the output link that connects bridge conveyor at the rear portion of base assembly in addition; The described equipment that transports is belt conveyer or the shuttle car that can on shuttle car is walked guide rail, walk or the many groups mine car that can on mine car is walked guide rail, walk.
2. loading conveying line according to claim 1 is characterized in that: the breaker in the said forearm is that the Hydraulic pick guide rail is housed in forearm, in the Hydraulic pick guide rail, has by the flexible Hydraulic pick of Hydraulic pick telescopic oil cylinder control Hydraulic pick.
3. loading conveying line according to claim 1 and 2 is characterized in that: described loader of dredging bucket for roadways of mine is connected with bridge conveyor, is that the output link that passes through on bearing pin and the bucket loader of bridge conveyor is hinged.
4. loading conveying line according to claim 1; It is characterized in that: the unloading end of said bridge conveyor with as transporting being connected between the belt conveyer of equipment, be that the elevating conveyor support wheel of bridge conveyor unloading end is seated in belt conveyer and carries on the section guide rail.
5. loading conveying line according to claim 1 is characterized in that: the unloading end of said bridge conveyor with as transporting being connected between the shuttle car of equipment, be that the elevating conveyor support wheel of bridge conveyor unloading end is seated in the shuttle car top on the guide rail.
6. loading conveying line according to claim 1 is characterized in that: the unloading end of said bridge conveyor with as transporting being connected between many groups mine car of equipment, be that the elevating conveyor support wheel of bridge conveyor unloading end is seated on the mine car upper rall.
CN2010101718478A 2010-05-14 2010-05-14 Loading conveying line used for mine laneway Active CN101845964B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101718478A CN101845964B (en) 2010-05-14 2010-05-14 Loading conveying line used for mine laneway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101718478A CN101845964B (en) 2010-05-14 2010-05-14 Loading conveying line used for mine laneway

Publications (2)

Publication Number Publication Date
CN101845964A CN101845964A (en) 2010-09-29
CN101845964B true CN101845964B (en) 2012-05-23

Family

ID=42770753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101718478A Active CN101845964B (en) 2010-05-14 2010-05-14 Loading conveying line used for mine laneway

Country Status (1)

Country Link
CN (1) CN101845964B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619558A (en) * 2012-04-23 2012-08-01 上海大屯能源股份有限公司 Rock roadway rapid excavation and gangue elimination system and gangue elimination method
CN106348038A (en) * 2016-11-03 2017-01-25 泰安科创矿山设备有限公司 Biomass fuel loading device
CN109209372B (en) * 2018-10-25 2021-03-02 山东东山新驿煤矿有限公司 Fully-mechanized excavating parallel operation method using crawler shuttle-type mine car

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3501509A1 (en) * 1985-01-18 1986-07-24 Müller GmbH Herne Pumpen-Maschinen-Stahlbau, 4690 Herne Conveying device for roadway drivage in underground mining
CN87212109U (en) * 1987-08-20 1988-10-26 王永阁 Muti-function walking type loader
CN2137717Y (en) * 1992-07-23 1993-07-07 湘潭矿业学院 Shifting conveyer for transport of tunnel-digging
RU2230906C1 (en) * 2003-01-27 2004-06-20 Открытое акционерное общество "Копейский машиностроительный завод" Mining combine
CN201071720Y (en) * 2007-04-29 2008-06-11 河北神风重型机械有限公司 Drum-type open continuous miner

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3501509A1 (en) * 1985-01-18 1986-07-24 Müller GmbH Herne Pumpen-Maschinen-Stahlbau, 4690 Herne Conveying device for roadway drivage in underground mining
CN87212109U (en) * 1987-08-20 1988-10-26 王永阁 Muti-function walking type loader
CN2137717Y (en) * 1992-07-23 1993-07-07 湘潭矿业学院 Shifting conveyer for transport of tunnel-digging
RU2230906C1 (en) * 2003-01-27 2004-06-20 Открытое акционерное общество "Копейский машиностроительный завод" Mining combine
CN201071720Y (en) * 2007-04-29 2008-06-11 河北神风重型机械有限公司 Drum-type open continuous miner

Also Published As

Publication number Publication date
CN101845964A (en) 2010-09-29

Similar Documents

Publication Publication Date Title
WO2018228217A1 (en) Complementary transportation and support system used after rapid excavation
CN201087428Y (en) Bucket type transloader
CN103388346B (en) All-in-one is loaded in mining excavation
CN212359776U (en) Multifunctional hard rock tunneling integrated machine
CN101824984B (en) Loader of dredging bucket for roadways of mine
CN107130656A (en) Mine underground bores anchor broken rock integrated digging formula loading machine
CN101845964B (en) Loading conveying line used for mine laneway
CN103243749A (en) Crushing and loading bottom ripping machine for coal mine
CN201679026U (en) Bucket loading machine used for mine roadway
CN103233734A (en) Efficient multi-function backhoe loader with hole and rock drilling function
CN102587907B (en) Two-arm gangue discharge system
CN202108509U (en) Rock loading machine in mining area
CN101934939A (en) Track-type scraping conveyor
CN204851264U (en) Shaft construction is slagged tap and is dug all -in -one with grabbing
CN102383449B (en) Digging loader
CN207229100U (en) Loading conveyer and coal mining transport system
CN203222832U (en) Crushing and loading dinting machine for coal mine
CN201062364Y (en) Digging stowage conveyer
CN102381558A (en) Loading machine for mining strip mine
CN101434347A (en) Continuous track raking loader
CN202578694U (en) Double-arm waste rock discharging system
CN102808431A (en) Double-arm excavator
CN103485787A (en) Self-moving reversed loader for mining working surface of open-pit mine
CN208763654U (en) Three-level telescopic arm tunneling machine
CN203403907U (en) Crawler-type coal slime clearing and excavating machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
C56 Change in the name or address of the patentee

Owner name: LIUZHOU WULING BMW AUTOMOBILE AIR CONDITIONING CO.

Free format text: FORMER NAME: LIUZHOU WULING YITONG AUTOMOBILE AIR CONDITIONER CO., LTD.

CB03 Change of inventor or designer information

Inventor after: Zhang Dianlong

Inventor after: Zhang Guangwen

Inventor after: Ma Mingguo

Inventor after: Guo Nianbo

Inventor after: Zhang Baoxi

Inventor after: Cui Qinglin

Inventor after: Chen Yong

Inventor before: Zhang Dianlong

C14 Grant of patent or utility model
GR01 Patent grant