CN101838971A CN200910047666A CN200910047666A CN101838971A CN 101838971 A CN101838971 A CN 101838971A CN 200910047666 A CN200910047666 A CN 200910047666A CN 200910047666 A CN200910047666 A CN 200910047666A CN 101838971 A CN101838971 A CN 101838971A
Authority
CN
China
Prior art keywords
steel member
steering block
line
external
drag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910047666A
Other languages
Chinese (zh)
Other versions
CN101838971B (en
Inventor
张保和
刘耀武
李传平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI GIANT PRESTRESSING ENGINEERING Co Ltd
Original Assignee
SHANGHAI GIANT PRESTRESSING ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI GIANT PRESTRESSING ENGINEERING Co Ltd filed Critical SHANGHAI GIANT PRESTRESSING ENGINEERING Co Ltd
Priority to CN2009100476661A priority Critical patent/CN101838971B/en
Publication of CN101838971A publication Critical patent/CN101838971A/en
Application granted granted Critical
Publication of CN101838971B publication Critical patent/CN101838971B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to a construction method for carrying out external prestressing strengthening on a bridge by a transverse tensioning method, which is mainly characterized in that both ends of the external drag line of parallel steel wires are fixed, a prestressing tensioning space needs not to be reserved, thus the drag line can be arranged at the two ends of a bridge structure as much as possible to obtain the best prestressing strengthening effect; by transversely tensioning the movable steel member of a steering block by utilizing a jack, the steel member slides along a direction vertical to the axis of a beam body to apply prestressing; and smaller equipment can be adopted to obtain the prestressing effect the same as that obtained by the traditional tensioning method, and the construction is more simple.

Description

Use transverse tensioning method to carry out worker's method of bridge external prestressing strengthening
Technical field
The present invention relates to a kind of worker's method of using transverse tensioning method to carry out the bridge external prestressing strengthening, particularly at using parallel wire stay to carry out the construction technology that the bridge external prestressing is reinforced.
Background technology
When adopting the external prestressing technology to carry out bridge strengthening, usually running into the difficult problem of a constructing operation, is exactly the stretch-draw space problem of drag-line.For the consolidation effect that obtains, when arranging drag-line, always wish the two ends of drag-line are arranged near the end of bridge as far as possible, so that make the whole beam of striding all be subjected to the prestressing force effect that brings by drag-line as much as possible.And reality often, and all there are bridge pier or abutment or continuous span in each two ends of striding bridge, and this just makes when stay cable end carries out stretching construction do not have enough spaces to be used to install tensioning equipment, makes tensioning construction to realize.Perhaps, just the stretch-draw end need be moved a certain distance toward span centre,, satisfy the needs in stretch-draw space to sacrifice prestressed consolidation effect in order to carry out stretch-draw at the simply supported beam beam-ends.Therefore need badly a kind of need not, easy construction effective in the stretch-draw of the two ends of drag-line, prestressed reinforcement apply the prestressing force new technology.
Summary of the invention
The objective of the invention is to overcome method for applying prestressing force in the existing external prestressing strengthening and have requirement stretch-draw space, drag-line two ends, sacrificed prestressed consolidation effect thus, the invention provides a kind of brand-new transverse tensioning method external prestressing strengthening construction technology, finely solved an above-mentioned difficult problem.
To achieve these goals, a kind of use transverse tensioning method of the present invention worker's method of carrying out the bridge external prestressing strengthening mainly comprises following construction sequence:
(1) according to the requirement of reinforcing design drawing, carry out the external drag-line of parallel steel wire, fixed end anchoring steel member, the batch production of the movable steel member of steering block anchoring steel member and steering block is made;
(2) is connected with steering block anchoring steel member according to the requirement of design drawing plantation fixed end anchoring steel member and use high-strength screw rod, install and fix end anchoring steel member and steering block anchoring steel member, also temporary fixed steering block activity steel member is installed; The movable steel member of steering block is prepared to promote;
(3) the movable steel member lifting of steering block is in place, and is temporarily fixed on the steering block anchoring steel member;
(4) the external drag-line of parallel steel wire is installed, by regulating the nut of two fixed end anchorings of the external drag-line of parallel steel wire steel member, with the external drag-line length adjustment of steel wire to designing requirement;
(5) remove the temporary fixed of the movable steel member of steering block, the external drag-line of steel wire is in place;
(6) stretch-draw reaction frame and stretch-draw jack are installed in the position under the movable steel work of steering block, prepare the external drag-line of steel wire is laterally applied prestressing force;
(7) start oil pump, jack tension, by the movable steel member of stretch-draw steering block, make the movable steel member of steering block along moving perpendicular to beam body axis direction, the external drag-line elongation of steel wire produces prestressing force, and transverse stretching stops stretch-draw to designing requirement Suo Li;
(8) placement is supported the steel pad and is tightened the perpendicular positioning nut, it is held out against support the steel pad, thereby keep the tensile state of the external drag-line of steel wire;
(9) jack oil return, the Suo Li of the external drag-line of steel wire passes to steering block anchoring steel member by the movable steel member of steering block, finally passes to bridge construction;
(10) remove jack and stretch-draw reaction frame, the external drag-line of steel wire two ends anchoring steel member is smeared anti-corrosive grease, and the protection block is installed, and the transverse tensioning method strengthening construction is finished.
Benefit of the present invention is by adopting transverse tensioning method to apply prestressing force, has overcome the needs of traditional method for applying prestressing force existence for the stretch-draw space, sacrifices the way of prestressed consolidation effect.The employing of transverse tensioning method can all be arranged to fixed end with the drag-line two ends, and as far as possible near the end of bridge construction, this method can obtain best prestressed reinforcement effect; By adopting the mode anchoring of parallel wire stay chill casting anchor and perpendicular positioning nut check, make this system minimum in the loss of prestress of pulling anchor cable stage; In addition, transverse tensioning method makes drag-line obtain the required stretching force of same prestressing force to significantly reduce than conventional method, and construction equipment is lighter and handier, and the flexible and convenient more of constructing is a kind of high efficiency construction.
Description of drawings
Fig. 1, transverse tensioning method construction schematic diagram
Fig. 2, step (2) construction state diagram
Fig. 3, step (3) construction state diagram
Fig. 4, step (5) construction state diagram
Fig. 5, step (6) construction state diagram
Fig. 6, step (7) construction state diagram
Fig. 7, step (8) construction state diagram
Fig. 8, step (9) construction state diagram
Fig. 9, step (10) construction state diagram
Concrete construction technology
Before introducing concrete construction technology, earlier the construction principle of transverse tensioning method is done individual briefly introducing, " transverse tensioning method " as its name suggests, is exactly the job practices of transverse stretching, and its construction principle as shown in Figure 1.The beam body is in no loading status during state A, and the beam body is subjected to load action during state B, produces amount of deflection; External tendon is fixed on beam body two ends during state C; During state D external tendon is carried out transverse stretching, make beam body amount of deflection reduce.This job practices is similar to " archery of drawing a bow ".When we carried out transverse stretching to prestressed cable, external tendon just produced pulling force, this with can obtain same effect by conventional method stretch-draw longitudinally.
Below worker's method of the present invention is further elaborated.Transverse tensioning method guy system of the present invention, form by fixed end, steering block and parallel wire stay three parts, wherein two of drag-line fixed end structures and traditional parallel wire stay is the same, the key technology that realizes transverse tensioning method is the structure of steering block, steering block is made up of steering block anchoring steel member 3 and the movable steel member 4 of steering block, wherein the movable steel member 4 of steering block can vertically move along the guide groove of steering block anchoring steel member 3, and can control the prestressed level that applies by the position of the movable steel member 4 of perpendicular positioning nut 7,8 adjusting steering blocks.
It is as follows that the present invention uses transverse tensioning method to carry out the step of bridge external prestressing strengthening:
(1), carries out the external drag- line 1,2 of parallel steel wire according to the requirement of reinforcing design drawing; The batch production of the movable steel member 4 of fixed end anchoring steel member, steering block anchoring steel member 3 and steering block is made;
(2) be connected with steering block anchoring steel member according to the requirement of design drawing plantation fixed end anchoring steel member and use high-strength screw rod; Install and fix end anchoring steel member and steering block anchoring steel member 3, install and the movable steel member 4 of temporary fixed steering block, the movable steel member 4 of steering block is prepared to promote;
(3) movable steel member 4 liftings of steering block are in place, and are temporarily fixed on the steering block anchoring steel member 3;
(4) the external drag- line 1,2 of steel wire is installed, promptly by fixed end anchoring steel work with the two ends of secured in parallel and the beam body of external prestressing to be performed respectively, the two ends of the external drag- line 1,2 of steel wire, and regulate external drag- line 1,2 length of steel wire to the preceding estimating position of stretch-draw;
(5) remove the temporary fixed of the movable steel member 4 of steering block, the external drag-line of steel wire is in place;
(6) stretch-draw reaction frame 5 and stretch-draw jack 6 are installed in the position under the movable steel work 4 of steering block, prepare the external drag- line 1,2 of steel wire is laterally applied prestressing force;
(7) start oil pump, jack 6 stretch-draw, by the movable steel member 4 of stretch-draw steering block, make the movable steel member 4 of steering block along moving perpendicular to beam body axis direction, external drag- line 1,2 elongations of steel wire produce prestressing force, transverse stretching stops stretch-draw to designing requirement Suo Li;
(8) placement is supported steel pad 9,10 and is tightened perpendicular positioning nut 7,8, it is held out against support steel pad 9,10, thereby keep the tensile state of the external drag- line 1,2 of steel wire;
(9) jack returns 6 oil, and the Suo Li of the external drag- line 1,2 of steel wire passes to steering block anchoring steel member 3 by the movable steel member 4 of steering block, finally passes to bridge construction;
(10) remove jack 6 and reaction frame 5; The fixed end ground tackle at the external drag-line of steel wire 1,2 two ends is smeared anti-corrosive grease, and the protection block is installed, and the transverse tensioning method strengthening construction is finished.

Claims (2)

1. worker's method of using transverse tensioning method to carry out the bridge external prestressing strengthening, it is characterized in that: described worker's method comprises following steps:
(1) according to the requirement of reinforcing design drawing, carry out the external drag-line of parallel steel wire, fixed end anchoring steel member, the batch production of the movable steel member of steering block anchoring steel member and steering block is made;
(2) is connected with steering block anchoring steel member according to the requirement of design drawing plantation fixed end anchoring steel member and use high-strength screw rod, install and fix end anchoring steel member and steering block anchoring steel member, also temporary fixed steering block activity steel member is installed; The movable steel member of steering block is prepared to promote;
(3) the movable steel member lifting of steering block is in place, and is temporarily fixed on the steering block anchoring steel member;
(4) the external drag-line of parallel steel wire is installed, by regulating the nut of two fixed end anchorings of the external drag-line of parallel steel wire steel member, with the external drag-line length adjustment of steel wire to designing requirement;
(5) remove the temporary fixed of the movable steel member of steering block, the external drag-line of steel wire is in place;
(6) stretch-draw reaction frame and stretch-draw jack are installed in the position under the movable steel work 4 of steering block, prepare the external drag-line of steel wire is laterally applied prestressing force;
(7) start oil pump, jack tension, by the movable steel member of stretch-draw steering block, make the movable steel member of steering block along moving perpendicular to beam body axis direction, the external drag-line elongation of steel wire produces prestressing force, and transverse stretching stops stretch-draw to designing requirement Suo Li;
(8) placement is supported the steel pad and is tightened the perpendicular positioning nut, it is held out against support the steel pad, thereby keep the tensile state of the external drag-line of steel wire;
(9) jack oil return, the Suo Li of the external drag-line of steel wire passes to steering block anchoring steel member by the movable steel member of steering block, finally passes to bridge construction;
(10) remove jack and stretch-draw reaction frame, the external drag-line of steel wire two ends anchoring steel member is smeared anti-corrosive grease, and the protection block is installed, and the transverse tensioning method strengthening construction is finished.
2. use transverse tensioning method according to claim 1 carries out worker's method of bridge external prestressing strengthening, its feature also is: fixed end all is arranged at step (2) and (3) parallel wire stay two ends, need not to reserve the prestressed stretch-draw space, thereby drag-line can be arranged in as far as possible the two ends of bridge construction, obtain the optimum prestress consolidation effect; Step (6) and (7) are by the movable steel member of jack transverse stretching steering block, make this member along sliding perpendicular to beam body axis direction, apply prestressing force, can adopt smaller and more exquisite equipment to obtain the same prestressing force effect of traditional stretching method, it is more lightly easy to construct.
CN2009100476661A 2009-03-17 2009-03-17 Construction method for carrying out external prestressing strengthening on bridge by transverse tensioning method Expired - Fee Related CN101838971B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100476661A CN101838971B (en) 2009-03-17 2009-03-17 Construction method for carrying out external prestressing strengthening on bridge by transverse tensioning method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100476661A CN101838971B (en) 2009-03-17 2009-03-17 Construction method for carrying out external prestressing strengthening on bridge by transverse tensioning method

Publications (2)

Publication Number Publication Date
CN101838971A true CN101838971A (en) 2010-09-22
CN101838971B CN101838971B (en) 2012-05-23

Family

ID=42742615

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100476661A Expired - Fee Related CN101838971B (en) 2009-03-17 2009-03-17 Construction method for carrying out external prestressing strengthening on bridge by transverse tensioning method

Country Status (1)

Country Link
CN (1) CN101838971B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587296A (en) * 2012-02-21 2012-07-18 朔黄铁路发展有限责任公司 Self-balancing external prestressing strengthening method for bridge structure
CN106381816A (en) * 2016-09-08 2017-02-08 河北省高速公路青银管理处 Repairing and processing method for corrosion expansion type breakage of bridge member reinforcing bars
CN106638334A (en) * 2016-12-30 2017-05-10 河南省交通规划设计研究院股份有限公司 Novel external prestressing strengthening device and construction method thereof
CN107571392A (en) * 2017-09-27 2018-01-12 中建三局基础设施工程有限公司 A kind of beam making bench for the construction of transverse tensioning method prestressing force prefabricated small box girder
CN110130234A (en) * 2019-05-07 2019-08-16 东南大学 A kind of novel bridge reinforcement system and its construction method
CN110761203A (en) * 2018-07-25 2020-02-07 上海同济检测技术有限公司 Pre-stressed tension-type reinforcing method for transverse connection of juxtaposed T-shaped beams
CN113047186A (en) * 2021-03-24 2021-06-29 华东交通大学 Bridge reinforcing apparatus
CN114892549A (en) * 2022-05-24 2022-08-12 重庆达力索缆科技有限公司 Expansion filling type external prestress CFRP material reinforcing system and construction method thereof

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003293323A (en) * 2002-03-29 2003-10-15 Topy Ind Ltd Reinforcement structure of continuous girder bridge
CN1519433A (en) * 2003-01-24 2004-08-11 深圳市海川实业股份有限公司 Aramid fiber rope in engineering application for reinforcing external prestressing bridge
CN1740445A (en) * 2005-09-23 2006-03-01 重庆交通学院 External pre-stress reinforcing structure for common hollow reinforced concrete slab beam
CN201169752Y (en) * 2007-12-20 2008-12-24 中铁大桥勘测设计院有限公司 Steel structure anchoring steering system of external prestress for reinforcing old bridge
CN101215824B (en) * 2008-01-07 2010-06-09 重庆交通大学 External transverse tension prestressing force device for regulating and controlling large-span continuous steel bridge post deflection

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587296B (en) * 2012-02-21 2013-12-25 朔黄铁路发展有限责任公司 Self-balancing external prestressing strengthening method for bridge structure
CN102587296A (en) * 2012-02-21 2012-07-18 朔黄铁路发展有限责任公司 Self-balancing external prestressing strengthening method for bridge structure
CN106381816B (en) * 2016-09-08 2019-01-18 河北省高速公路青银管理处 The repair process method of bridge member rebar corrosion class breakage
CN106381816A (en) * 2016-09-08 2017-02-08 河北省高速公路青银管理处 Repairing and processing method for corrosion expansion type breakage of bridge member reinforcing bars
CN106638334A (en) * 2016-12-30 2017-05-10 河南省交通规划设计研究院股份有限公司 Novel external prestressing strengthening device and construction method thereof
CN106638334B (en) * 2016-12-30 2018-07-24 河南省交通规划设计研究院股份有限公司 A kind of external prestressing strengthening device and its construction method
CN107571392A (en) * 2017-09-27 2018-01-12 中建三局基础设施工程有限公司 A kind of beam making bench for the construction of transverse tensioning method prestressing force prefabricated small box girder
CN110761203A (en) * 2018-07-25 2020-02-07 上海同济检测技术有限公司 Pre-stressed tension-type reinforcing method for transverse connection of juxtaposed T-shaped beams
CN110761203B (en) * 2018-07-25 2021-10-01 上海同济检测技术有限公司 Pre-stressed tension-type reinforcing method for transverse connection of juxtaposed T-shaped beams
CN110130234A (en) * 2019-05-07 2019-08-16 东南大学 A kind of novel bridge reinforcement system and its construction method
CN113047186A (en) * 2021-03-24 2021-06-29 华东交通大学 Bridge reinforcing apparatus
CN113047186B (en) * 2021-03-24 2022-08-30 华东交通大学 Bridge reinforcing apparatus
CN114892549A (en) * 2022-05-24 2022-08-12 重庆达力索缆科技有限公司 Expansion filling type external prestress CFRP material reinforcing system and construction method thereof
CN114892549B (en) * 2022-05-24 2024-05-14 重庆达力索缆科技有限公司 Expansion filling type external prestress CFRP material reinforcing system and construction method thereof

Also Published As

Publication number Publication date
CN101838971B (en) 2012-05-23

Similar Documents

Publication Publication Date Title
CN101838971B (en) Construction method for carrying out external prestressing strengthening on bridge by transverse tensioning method
KR101171039B1 (en) Partially and fully earth-anchored cable-stayed bridge using main span prestressing appratus and construction method for the same
CN101215824B (en) External transverse tension prestressing force device for regulating and controlling large-span continuous steel bridge post deflection
CN102864742B (en) Anchor device of first sliding and then fixing type combined steel anchor boxes of cable stayed bridge and construction method thereof
CN203007856U (en) External prestressing reinforcement system for hollow slab girder bridge
CN102535743B (en) Unbonded prestressed steel concrete beam
KR101065217B1 (en) Tension device for tension and retension
CN207862749U (en) A kind of novel combination type sunpender
CN102409619B (en) Method for improving cross integrity of bridge deck structure of multi-girder type combined small box girder bridge
CN114541776B (en) Stay cable lifting and tensioning conversion device and construction method thereof
CN105544415A (en) Concrete bridge reinforcing method and structure
CN109750791A (en) A kind of assembled large overhanging steel structure
CN101845795B (en) Cable-stayed cradle of adjustment-free cable tension long platform in construction of cable-stayed bridge
CN103306495B (en) Wooden construction truncated cylinder reinforced construction method
CN1272512C (en) Mixed-tensioning process made pre-tensioning mansard prestressed concrete member and construction method thereof
KR101165572B1 (en) Middle span plate girder bridge and construction method thereof
JP5716117B1 (en) Hinge reinforcement method and reinforcement structure for existing girder bridge
CN203741729U (en) Pre-stress supporting system used for bridge incremental launching construction method
CN106758827A (en) Chevron shaped prestressed concrete pre-tensioned method Bridge Erector and application method
KR100707726B1 (en) B-cable long span using principle of a bow and constructing method thereof
KR20110099189A (en) Structural girder using a loading anchor system for girder and bridge construction method using the same
CN109972531B (en) External prestressing device for improving temporary support span of bailey beam
CN202830763U (en) Firstly-sliding and secondarily-fixed type combined steel anchor box anchor device for cable-stayed bridge
CN206071088U (en) The system of prestress rope integrative consolidation board wall
CN112663504B (en) Moving device for anchoring prestressed steel beams

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120523

Termination date: 20160317

CF01 Termination of patent right due to non-payment of annual fee