CN101838732A - Energy efficient fixture method for anchor nail - Google Patents

Energy efficient fixture method for anchor nail Download PDF

Info

Publication number
CN101838732A
CN101838732A CN201010195923A CN201010195923A CN101838732A CN 101838732 A CN101838732 A CN 101838732A CN 201010195923 A CN201010195923 A CN 201010195923A CN 201010195923 A CN201010195923 A CN 201010195923A CN 101838732 A CN101838732 A CN 101838732A
Authority
CN
China
Prior art keywords
anchor
steel plate
nails
anchor nails
anchoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201010195923A
Other languages
Chinese (zh)
Other versions
CN101838732B (en
Inventor
田发禹
李楠
郑剑辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wisdri Wuhan Wis Industrial Furnace Co Ltd
Original Assignee
Wisdri Wuhan Wis Industrial Furnace Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wisdri Wuhan Wis Industrial Furnace Co Ltd filed Critical Wisdri Wuhan Wis Industrial Furnace Co Ltd
Priority to CN2010101959239A priority Critical patent/CN101838732B/en
Publication of CN101838732A publication Critical patent/CN101838732A/en
Application granted granted Critical
Publication of CN101838732B publication Critical patent/CN101838732B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

The invention relates to an energy efficient fixture method for anchor nails. The method is as follows: welding an anchor L-shaped steel plate (2) on a furnace shell, fixing the anchor nails by anchor nuts before the installation of an anchor steel plate (5), and then installing the anchor steel plate (5) on the anchor L-shaped steel plate (2) through a bolt and nut fastener (3) to finish the installation of a row of anchor nails; installing the next row of anchor nails according to above steps until the whole furnace is filled up, and then installing refractory fibre (6) to realize that the refractory fibre (6) is fixed on the furnace wall (1) of a vertical continuous annealing furnace. In the invention, the carbon steel anchor L-shaped steel plate is adopted, and a carbon steel welding rod can be used for welding, thereby saving welding lost; only two connection points for a plurality of anchor nails are arranged on the furnace shell, thus reducing the number of a heat bridge, reducing heat loss and saving energy consumption; and the invention also has the advantages of saving labor cost, improving the fixing quality of the anchor nails and improving working efficiency.

Description

The fixing means that anchor nails is energy-saving
Technical field
The present invention relates to the refractory materials fixed network, particularly relate to a kind of energy-saving fixing means of anchor nails that is used for the vertical continuous annealing furnace refractory ceramic fibre.
2, the application of refractory ceramic fibre in vertical annealing furnace
Background technology
In the Large Scale and Continuous annealed wire, the annealing furnace that is disposed is generally vertical continuous annealing furnace, it mainly is made of preheating section, heating zone, slow cooling section, fast cold section, overaging section, cold section eventually, shrend, and its length generally can reach about 150 meters, highly reaches about 24 meters.Vertical continuous annealing furnace is mainly used in the rolling back recrystallization annealing of cold rolled strip, eliminates cold hardening, and the strip steel annealing volume of excellent performance, great surface quality is provided for building, household electrical appliances, automobile and other industries.
Continuous annealing line in process of production, need according to frequent conversion kind of the production program and specification, variant production kind annealing temperature requires different, become specification or become the stable state that can produce qualified product in the kind process and reach another kind of annealing curve rapidly from a kind of annealing curve stable state for reaching, this just requires annealing furnace to have good thermal response ability.
The vertical continuous annealing technology is because of output is big, the production kind obtains development at full speed entirely.In order to cut down the consumption of energy and to guarantee that good surface properties, the thermal insulation technology of annealing furnace are to cut down the consumption of energy and influence one of important factor of strip surface quality.
In the insulation design of vertical continuous annealing furnace, adopt refractory fibre usually as heat preserving and insulating material.Refractory fibre fixing added by anchor nails generally that this conventional fixed method of nut realizes: furnace shell is installed after check finishes, and beginning is rule on furnace shell, finds out the installation site of anchor nails, by special welding gun anchor nails directly is welded on the furnace shell then.
Traditional anchor nails consolidated form referring to Fig. 2, the steps include:
The first step, setting-out location on furnace wall steel plate 1 earlier;
Second step, adopt special-purpose anchoring welding gun that single-ended threaded anchor nails 11 is welded on the furnace wall steel plate 1, in filling whole stove, begin to install refractory fibre 6 then, and fix with middle card 7, anchoring nut 10, pad 9, interior lining panel 8 assemblies, realize with refractory fibre 6 be fixed on the furnace wall steel plate 1 of vertical continuous annealing furnace.
There is following problem in above-mentioned traditional anchor nails consolidated form:
1. cost height: because of anchor nails is a stainless steel, furnace shell is a carbon steel, and this anchor nails welding must be adopted stainless steel electrode.
2. poor welding quality: generally directly anchor nails is welded on the furnace shell at the scene by special welding gun.This Type of Welding is insecure, often just has a large amount of anchor nails to come off in the process of welding.
3. inefficiency: need spend great amount of manpower and time at the scene welds and handles the bad anchor nails of welding quality.
4. energy consumption height: because of anchor nails One's name is legion in the annealing furnace, form easily bigger " heat bridge ", calorific loss is very big.
Summary of the invention
Technical problem to be solved by this invention is: provide a kind of anchor nails energy-saving fixing means, so that solve the problem that traditional anchor nails consolidated form exists.
The technical scheme that the present invention solves its technical problem employing is: earlier anchoring L shaped steel plate is welded on the furnace shell, after before anchor plate is installed, just anchor nails being fixed by the anchoring nut, by the bolt and nut fastening piece anchor plate is installed on the anchoring L template then, anchor nails in a row has so just installed; According to above step next row's anchor nails is installed, in filling whole stove, refractory fibre is installed then, realize refractory fibre is fixed on the furnace wall steel plate of vertical continuous annealing furnace.
The present invention compares with traditional anchor nails consolidated form has following main beneficial effect:
One. adopt the anchoring L shaped steel plate of carbon steel material, its welding adopts Carbon Steel Covered Electrode to get final product, thereby saves welding cost.
They are two years old. and adopt anchoring L shaped steel plate to be welded on scheme on the furnace shell, be installed to again on the anchoring L shaped steel plate anchor plate just can be fixed anchor nails before installation by the anchoring nut after, thus raising anchor nails fixed mass.
They are three years old. and employing anchoring L shaped steel plate is welded on the scheme on the furnace shell, can make a plurality of anchor nails have only two tie points on furnace shell, has reduced the quantity of " heat bridge ", thereby has reduced calorific loss, energy efficient.
They are four years old. and only need a spot ofly manually just can install rapidly at the scene, and not need to handle the bad anchor nails installation quality of welding quality that exists in the prior art, thereby improve working efficiency and saved labour turnover.
They are five years old. owing to have above-mentioned plurality of advantages, use is worth promoting.
Description of drawings
Fig. 1 is the energy-saving machine made schematic diagram of anchor nails of the present invention.
Fig. 2 is the schematic diagram of the present anchor nails conventional fixed form that adopts.
Among the figure: 1. furnace wall steel plate; 2. anchoring L shaped steel plate; 3. bolt and nut fastening piece; 4. the anchor nails of TBE (threaded both ends) and anchoring nut assembly; 5. anchor plate; 6. refractory fibre; 7. middle card; 8. interior lining panel; 9. pad; 10. anchoring nut; 11. single-ended threaded anchor nails.
Embodiment
The fixing means that anchor nails provided by the invention is energy-saving, this method is: earlier anchoring L shaped steel plate 2 is welded on the furnace shell, after before anchor plate 5 is installed, just anchor nails being fixed by the anchoring nut, by bolt and nut fastening piece 3 anchor plate 5 is installed on the anchoring L template 2 then, anchor nails in a row has so just installed; Next row's anchor nails is installed in filling whole stove according to above step, refractory fibre 6 is installed then, realize refractory fibre 6 is fixed on the furnace wall steel plate 1 of vertical continuous annealing furnace.
Referring to Fig. 1, the present invention adopts the method that may further comprise the steps:
The first step, welding anchoring L shaped steel plate 2 on furnace wall steel plate 1 earlier;
In second step, before anchor plate 5 is installed, a plurality of anchor nails are fixed on the anchor plate spare 5; Anchor nails is the anchor nails and the anchoring nut assembly 4 of TBE (threaded both ends);
In the 3rd step, anchor nails couples together anchoring L shaped steel plate 2 and anchor plate 5 by bolt and nut fastening piece 3 after installing on the anchor plate 5 again; Anchor nails in a row has just installed.
Next row's anchor nails is installed in filling whole stove according to above step, refractory fibre 6 is installed then, realize refractory fibre 6 is fixed on the furnace wall steel plate 1 of vertical continuous annealing furnace.
In the described the first step, adopt Carbon Steel Covered Electrode that anchoring L shaped steel plate 2 is welded on the furnace wall steel plate 1.
Described anchoring L shaped steel plate 2 can be made by carbon steel.
Described anchor plate 5 can be made by carbon steel.

Claims (6)

1. fixing means that anchor nails is energy-saving, it is characterized in that earlier anchoring L shaped steel plate (2) being welded on the furnace shell, after before anchor plate (5) is installed, just anchor nails being fixed by the anchoring nut, by bolt and nut fastening piece (3) anchor plate (5) is installed on the anchoring L template (2), anchor nails in a row has so just installed again; According to above step next row's anchor nails is installed, in filling whole stove, refractory fibre (6) is installed then, realize refractory fibre (6) is fixed on the furnace wall steel plate (1) of vertical continuous annealing furnace.
2. method according to claim 1 is characterized in that adopting the method that may further comprise the steps:
The first step goes up welding anchoring L shaped steel plate (2) at furnace wall steel plate (1) earlier;
In second step, anchor plate (5) is preceding to be fixed on a plurality of anchor nails on the anchor plate (5) installing;
In the 3rd step, anchor nails couples together anchoring L shaped steel plate (2) and anchor plate (5) by bolt and nut fastening piece (3) after installing on the anchor plate (5) again; Anchor nails in a row has just installed;
Next row's anchor nails is installed in filling whole stove according to above step, refractory fibre (6) is installed then, realize refractory fibre (6) is fixed on the furnace wall steel plate (1) of vertical continuous annealing furnace.
3. method according to claim 2 is characterized in that in the described the first step, adopts Carbon Steel Covered Electrode that anchoring L shaped steel plate (2) is welded on the furnace wall steel plate (1).
4. method according to claim 2 is characterized in that described anchor nails adopts the anchor nails and the anchoring nut assembly (4) of TBE (threaded both ends).
5. method according to claim 1 is characterized in that described anchoring L shaped steel plate (2) made by carbon steel.
6. method according to claim 1 is characterized in that described anchor plate (5) made by carbon steel.
CN2010101959239A 2010-06-09 2010-06-09 Energy efficient fixture method for anchor nail Expired - Fee Related CN101838732B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101959239A CN101838732B (en) 2010-06-09 2010-06-09 Energy efficient fixture method for anchor nail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101959239A CN101838732B (en) 2010-06-09 2010-06-09 Energy efficient fixture method for anchor nail

Publications (2)

Publication Number Publication Date
CN101838732A true CN101838732A (en) 2010-09-22
CN101838732B CN101838732B (en) 2012-01-25

Family

ID=42742406

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101959239A Expired - Fee Related CN101838732B (en) 2010-06-09 2010-06-09 Energy efficient fixture method for anchor nail

Country Status (1)

Country Link
CN (1) CN101838732B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102312077A (en) * 2011-09-06 2012-01-11 中冶南方(武汉)威仕工业炉有限公司 Fixing device and method for refractory material in strip steel heat treatment furnace
CN102560027A (en) * 2012-01-18 2012-07-11 中冶南方(武汉)威仕工业炉有限公司 Resistance belt fixing device in vertical annealing furnace
CN112059476A (en) * 2020-08-20 2020-12-11 中冶天工集团有限公司 Method for mounting fluke in heating furnace
CN113943855A (en) * 2021-10-21 2022-01-18 马鞍山钢铁股份有限公司 Radiation screen structure of cold rolling vertical continuous annealing furnace

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2572098Y (en) * 2002-09-29 2003-09-10 摩根热陶瓷(上海)有限公司 Module anchor
CN201215323Y (en) * 2008-06-11 2009-04-01 鞍山市德旺耐火工程有限公司 Dew point corrosion prevention energy-conserving type heating-furnace liner

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2572098Y (en) * 2002-09-29 2003-09-10 摩根热陶瓷(上海)有限公司 Module anchor
CN201215323Y (en) * 2008-06-11 2009-04-01 鞍山市德旺耐火工程有限公司 Dew point corrosion prevention energy-conserving type heating-furnace liner

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《山西建筑》 20041231 张鹏飞 再加热炉炉顶耐火纤维模块施工技术 103-104 1-6 第30卷, 第23期 2 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102312077A (en) * 2011-09-06 2012-01-11 中冶南方(武汉)威仕工业炉有限公司 Fixing device and method for refractory material in strip steel heat treatment furnace
CN102560027A (en) * 2012-01-18 2012-07-11 中冶南方(武汉)威仕工业炉有限公司 Resistance belt fixing device in vertical annealing furnace
CN112059476A (en) * 2020-08-20 2020-12-11 中冶天工集团有限公司 Method for mounting fluke in heating furnace
CN113943855A (en) * 2021-10-21 2022-01-18 马鞍山钢铁股份有限公司 Radiation screen structure of cold rolling vertical continuous annealing furnace

Also Published As

Publication number Publication date
CN101838732B (en) 2012-01-25

Similar Documents

Publication Publication Date Title
CN101838732B (en) Energy efficient fixture method for anchor nail
CN201607125U (en) Heating and insulating device of electric heating industrial furnace
CN201704375U (en) Fixing part used for refractory fibers in vertical annealing furnace
CN110455082B (en) Module structure wall body of high-temperature heating furnace and installation method
CN201574185U (en) Fixing device for refractory fibers in vertical annealing furnace
CN202972377U (en) Submerged arc furnace smoke thermal insulation pipe
CN202350522U (en) Fixer of fireproof material in band steel thermal treatment furnace
CN201605736U (en) Anti-cold bridge node of steel structural roof
CN201574529U (en) Buried-shirts roof plate longitudinally-connecting structure
CN202267360U (en) Heating and heat preservation device of electro-thermal industrial furnace
CN202176879U (en) Thermal insulating structure for steel structure crane beam
CN206093359U (en) Thermal -insulated fixed festival of steam direct -burried pipeline low energy consumption type
CN205590747U (en) Electric heating furnace
CN203719406U (en) High temperature furnace long in service life
CN207035836U (en) A kind of top construction of pyrometallurgy stove
CN201574184U (en) Heat insulation structure for furnace bottom of vertical type continuous annealing furnace
CN203582902U (en) Furnace body of low-temperature annealing pit-type resistance furnace
CN204718408U (en) The wrapping of heater for rolling steel floor tube is with exempting to weld anchorage clip
CN106288777A (en) A kind of metallized pellet reduction is special tank truck
CN202246581U (en) Furnace wall plate outer wall structure of ethylene cracking furnace
CN212003844U (en) Novel crimping device for lining plate of large ingot casting heating furnace
CN202214844U (en) Sandwich insulation board for reinforced concrete shear wall
CN209584314U (en) A kind of charging tray supporting mechanism and heat-treatment furnace
CN203011143U (en) Coating structure of alumina fiber composite module for high temperature furnace
CN220659206U (en) Ladle is crossed and is striden car ladle lid

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120125

Termination date: 20150609

EXPY Termination of patent right or utility model