CN101834468B - 智能变电站辅助生产系统的协调联动方法 - Google Patents

智能变电站辅助生产系统的协调联动方法 Download PDF

Info

Publication number
CN101834468B
CN101834468B CN2010101214300A CN201010121430A CN101834468B CN 101834468 B CN101834468 B CN 101834468B CN 2010101214300 A CN2010101214300 A CN 2010101214300A CN 201010121430 A CN201010121430 A CN 201010121430A CN 101834468 B CN101834468 B CN 101834468B
Authority
CN
China
Prior art keywords
station
production system
goose
coordination
transformer substation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010101214300A
Other languages
English (en)
Other versions
CN101834468A (zh
Inventor
孙纯军
褚农
鲁东海
胡淼龙
洪幼江
王哲
苏麟
秦华
浦知新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guo Wang Xinjiang Power Co
Economic and Technological Research Institute of State Grid Xinjiang Electric Power Co Ltd
China Energy Engineering Group Jiangsu Power Design Institute Co Ltd
Original Assignee
Jiangsu Electric Power Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Electric Power Design Institute filed Critical Jiangsu Electric Power Design Institute
Priority to CN2010101214300A priority Critical patent/CN101834468B/zh
Publication of CN101834468A publication Critical patent/CN101834468A/zh
Application granted granted Critical
Publication of CN101834468B publication Critical patent/CN101834468B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种智能变电站辅助生产系统的协调联动方法,其特征在于,包括以下步骤:1)建立映射关系;2)捕获并解析GOOSE报文;3)根据映射关系找到与GOOSE事件相关的传感器,通过多传感器协调感知及图像复核确认该事件;4)调用该事件相关控制函数,实现切换视频通道、启动或闭锁终端设备完成协调联动;5)采用IEC61850协议,通过网络向远方集控站发送事件处理报告,并接受远方集控站值班人员发出的人工干预指令。本发明方法使得变电站所有辅助生产设备均能自动协调联动,减少了人工干预,同时采用多传感器协同感知及智能图像识别技术保证无误判误动,达到了对变电站辅助生产系统实行智能运行管理的目的。

Description

智能变电站辅助生产系统的协调联动方法
技术领域
本发明涉及一种智能变电站内图像监视、安全警卫、火灾报警、消防、给排水、采暖通风等各辅助生产系统内部及相互之间协调联动的方法,属于电气技术领域。
背景技术
目前变电站配置的图像监视、安全警卫、火灾报警、消防、给排水、采暖通风等辅助生产系统大多数是各自独立的、不具备对话功能的小型自动化装置,各装置与终端设备、装置与装置之间都不能联动,需要人工来关注、理解和处理各装置的信息。虽然有部分辅助生产系统采用硬接点连接方式实现了简单的联动,但存在着联动智能化程度低、易受传感器故障及环境干扰导致误联动等缺点。
智能变电站要求对辅助生产系统实现智能运行管理,通过辅助生产系统的协调联动,减少人工干预,自动判出各类异常情况,执行判断结果,消除异常情况造成的影响。
全站采用IEC61850通信协议是智能变电站的主要特点之一,日渐成熟的智能传感器网为变电站辅助生产系统中种类繁多的前端数据采集提供了全新的手段。在智能变电站中利用智能传感器网实现辅助生产系统的前端数据采集与控制,对影响变电站运行的因素实施全方位的智能监控,同时采用IEC61850通信协议实现各辅助生产系统内部及相互之间的协调联动及信息远传,可以达到对智能变电站辅助生产系统实行“智能监测、智能判断、智能联动、智能管理”要求。
发明内容
本发明所要解决的技术问题是提供一种可以对智能变电站辅助生产系统实现智能运行管理,减少人工干预,自动判出各类异常情况并执行判断结果,消除异常情况的方法。
为解决上述技术问题,本发明提供一种智能变电站辅助生产系统的协调联动方法,所述智能变电站辅助生产系统包括变电站图像监视子系统,变电站安全警卫子系统,变电站火灾报警及消防子系统以及变电站GIS室SF6泄漏在线监测子系统;其特征在于,包括以下步骤:
1)将变电站辅助生产系统分为三层,第一层为远方集控站管理主机,第二层为站内控制主机,第三层为由智能传感器网组成的变电站各辅助生产子系统,并采用智能变电站的通信标准IEC61850协议将这三层设备统一于一个大的系统之中;
2)建立各智能传感器的编号及各预置位与代表GOOSE事件内容的GOOSE变量列表成员之间的映射关系;
3)站内控制主机捕获并解析GOOSE报文;
4)根据映射关系找到与GOOSE事件相关的传感器,通过多传感器协调感知及图像复核确认该事件;
5)调用该事件相关控制函数,实现切换视频通道、启动或闭锁终端设备完成包括数据储存、发送事件报告及报警在内的协调联动;
6)采用IEC61850协议,通过网络向远方集控站发送事件处理报告,并接受远方集控站值班人员发出的人工干预指令;
其中,在所述步骤3)、4)中,采用软件编程方式预置各种GOOSE事件的控制函数,当站内控制主机捕获并解析GOOSE报文后,按照所述映射关系调用相关控制函数,当多种事件同时发生时,按照程序预先设定的优先级自动处理。
本发明所达到的有益效果:
本发明方法使得变电站所有辅助生产设备均能自动协调联动,减少了人工干预,同时采用多传感器协同感知及智能图像识别技术保证无误判误动,达到了对变电站辅助生产系统实行智能运行管理的目的。
附图说明
图1为智能变电站辅助生产系统三层架构示意图;
图2为实现协调联动的主程序结构框图;
图3为防入侵协调联动实例流程图;
图4为温湿度控制协调联动实例流程图;
图5为给排水控制协调联动实例流程图;
图6为SF6泄漏在线监控协调联动实例流程图。
具体实施方式
下面结合附图对本发明作进一步的说明。本发明方法将变电站辅助生产系统分为三层,第一层为远方集控站管理主机,第二层为站内主机,第三层为由智能传感器网的组成变电站各辅助生产子系统,并采用IEC61850协议将这三层设备统一于一个大的系统之中(如图1所示)。
远方集控站管理主机及站内控制主机均由工作站、数据库及相应软件组成。辅助生产子系统包括以下六个子系统:
变电站图像监视子系统;
变电站安全警卫子系统;
变电站火灾报警及消防子系统;
变电站采暖通风子系统;
变电站给排水子系统;
变电站GIS室SF6泄漏在线监测子系统。
智能变电站辅助生产系统的协调联动方法,步骤如下:
1)建立各智能传感器的编号及各预置位与代表GOOSE事件内容的GOOSE变量列表成员之间的映射关系;
2)站内控制主机捕获并解析GOOSE报文;
3)根据映射关系找到与GOOSE事件相关的传感器,通过多传感器协调感知及图像复核确认该事件;
4)调用该事件相关控制函数,实现切换视频通道、启动或闭锁终端设备(风机、空调、排水泵、消防设施等)、完成数据储存、发送事件报告及报警等一系列协调联动,当多种事件同时发生时,控制主机按照预先设定的优先级自动处理;
5)采用IEC61850协议,通过网络向远方集控站发送事件处理报告,并接受远方集控站值班人员发出的人工干预指令。
协调联动功能及各种GOOSE事件的控制函数均采用软件编程实现(程序结构框图如图2所示),当多种事件同时发生时,按照程序预先设定的优先级自动处理。
利用智能变电站辅助生产系统的协调联动方法举例如下:
当振动传感器检测到变电站围墙上有入侵目标时,站内控制主机根据映射关系调用相关控制函数,控制图像传感器转向入侵目标并进行识别,若在夜间同时打开照明灯,当确认为非法入侵时,将首先通过喇叭对入侵目标发出口头警告,若警告无效将启动脉冲电子围栏将入侵目标驱赶下去,从而保证变电站的安全。上述协调联动实例流程如图3所示。
采用无线温湿度传感器监测变电站内各节点的温湿度情况,根据室内外温湿度情况自动控制通风系统和空调系统的运行模式,满足温湿度控制要求,当烟感探头检测到火灾信号后,通过温度传感器及图像传感器复核确认再启动消防设备灭火,同时闭锁通风系统防止火灾蔓延。上述协调联动实例流程如图4所示。
采用无线水浸传感器和有线水位传感器,对变电站内积水情况进行实时监测,根据监测结果自动实现积水排放,同时协同图像传感器查看现场情况,多传感器融合水位监测,确保变电站电气设备的安全运行。上述协调联动实例流程如图5所示。
对户内GIS变电站,采用SF6气体传感器准确实现SF6气体漏点定位,与图像监视系统智能联动,并自动发出报警信号,同时启动通风系统通风换气,若此时同时有火灾报警信号则自动与消防系统联动,闭锁通风系统防止火灾蔓延。上述协调联动实例流程如图6所示。
以上实施例不以任何方式限定本发明,凡是对以上实施例采用等同替换或等效变换方式做出的其它改进与应用,都属于本发明的保护范围。

Claims (1)

1.一种智能变电站辅助生产系统的协调联动方法,所述智能变电站辅助生产系统包括变电站图像监视子系统,变电站安全警卫子系统,变电站火灾报警及消防子系统以及变电站GIS室SF6泄漏在线监测子系统;其特征在于,所述协调联动方法包括以下步骤:
1)将变电站辅助生产系统分为三层,第一层为远方集控站管理主机,第二层为站内控制主机,第三层为由智能传感器网组成的变电站各辅助生产子系统,并采用智能变电站的通信标准IEC61850协议将这三层设备统一于一个大的系统之中;
2) 建立各智能传感器的编号及各预置位与代表GOOSE事件内容的GOOSE变量列表成员之间的映射关系;
3)站内控制主机捕获并解析GOOSE报文;
4)根据映射关系找到与GOOSE事件相关的传感器,通过多传感器协调感知及图像复核确认该事件;
5)调用该事件相关控制函数,实现切换视频通道、启动或闭锁终端设备完成包括数据储存、发送事件报告及报警在内的协调联动;
6) 采用IEC61850协议,通过网络向远方集控站发送事件处理报告,并接受远方集控站值班人员发出的人工干预指令;
其中,在所述步骤3)、4)中,采用软件编程方式预置各种GOOSE事件的控制函数,当站内控制主机捕获并解析GOOSE报文后,按照所述映射关系调用相关控制函数,当多种事件同时发生时,按照程序预先设定的优先级自动处理。
CN2010101214300A 2010-03-10 2010-03-10 智能变电站辅助生产系统的协调联动方法 Expired - Fee Related CN101834468B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101214300A CN101834468B (zh) 2010-03-10 2010-03-10 智能变电站辅助生产系统的协调联动方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101214300A CN101834468B (zh) 2010-03-10 2010-03-10 智能变电站辅助生产系统的协调联动方法

Publications (2)

Publication Number Publication Date
CN101834468A CN101834468A (zh) 2010-09-15
CN101834468B true CN101834468B (zh) 2011-12-21

Family

ID=42718436

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101214300A Expired - Fee Related CN101834468B (zh) 2010-03-10 2010-03-10 智能变电站辅助生产系统的协调联动方法

Country Status (1)

Country Link
CN (1) CN101834468B (zh)

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101964547A (zh) * 2010-10-29 2011-02-02 广东电网公司电力科学研究院 电网监控系统
CN102088167A (zh) * 2010-11-19 2011-06-08 江苏省电力设计院 用于改善变电站设备运行环境的控制系统
CN102065284A (zh) * 2010-12-29 2011-05-18 广东电网公司电力科学研究院 实现电网可视化操作的方法及系统
CN102611195A (zh) * 2011-01-25 2012-07-25 华北电网有限公司 电力系统的监控方法、装置及系统
CN102183939A (zh) * 2011-05-27 2011-09-14 江苏凯达电力科技有限公司 一种变电站室内环境安全智能控制系统
CN102820702B (zh) * 2011-06-07 2016-08-31 北京华电通达科技有限公司 变电站管理系统
CN103312032A (zh) * 2012-03-14 2013-09-18 国家电网公司 变电站辅助设备的监控系统
CN103514648B (zh) * 2013-09-24 2016-01-27 上海人民电力设备股份有限公司 安全闭锁程序装置
CN103683506B (zh) * 2013-12-05 2015-05-06 江苏省电力公司电力科学研究院 一种电力系统变电站综合一体化联动安全系统
CN104079871A (zh) * 2013-12-29 2014-10-01 国家电网公司 视频处理方法
CN104092996A (zh) * 2014-07-18 2014-10-08 云南电网公司大理供电局 一种基于变电站遥控视频联动方法
CN104330675B (zh) * 2014-11-17 2017-02-22 国家电网公司 基于多元时间序列的变电设备在线监测分析系统及其方法
CN108415275A (zh) * 2018-01-31 2018-08-17 国网上海市电力公司 一种适用于变电站排水泵的远程监控系统
CN109245308A (zh) * 2018-11-01 2019-01-18 常州思贝尔电能科技有限公司 一种基于变电站综合监控系统的联动告警方法
CN109888914B (zh) * 2019-01-08 2020-10-30 许昌许继软件技术有限公司 一种变电站主辅联动方法及装置
CN115102145B (zh) * 2022-05-19 2023-08-11 国网湖南省电力有限公司 设备的联动策略共享方法、装置、终端及可读存储介质
CN114825644B (zh) * 2022-06-21 2022-09-09 成都双赢产业生态园有限公司 系统保护节能型变压器及其管控装置和管控方法

Also Published As

Publication number Publication date
CN101834468A (zh) 2010-09-15

Similar Documents

Publication Publication Date Title
CN101834468B (zh) 智能变电站辅助生产系统的协调联动方法
CN102651160B (zh) 监控中心、双向报警系统及双向报警方法
CN104052151B (zh) 变电站智能辅助综合监控与d5000综合联动平台
CN102063116B (zh) 楼宇信息综合管理系统及方法
CN102298374B (zh) 智能住宅控制系统及其控制方法
CN103488154A (zh) 一种变电站运行环境远程综合监控系统及其联动控制方法
CN102436235A (zh) 室内环境安全智能控制系统
CN102819249B (zh) 电力隧道联动控制系统及控制方法
CN206992800U (zh) 一种物联网的智能变电站的监测系统
CN203803011U (zh) 一种消防设施监测管理物联网系统
CN202257255U (zh) 室内环境安全智能控制系统
CN111145482A (zh) 一种消防指挥控制系统
CN105931419B (zh) 一种住宅智能安全防护系统
CN103310579B (zh) 基于ZigBee无线通信的电力火灾复合探测装置
CN104133510A (zh) 变电站室内环境远程监控系统
CN104375485A (zh) 一种用于变配电安全生产的辅助监控系统及其监控方法
CN107633639A (zh) 一种火灾报警与防控装置
CN104639910B (zh) 一种电力系统基于变电站运行状态的场景自动巡检系统
CN105212549A (zh) 易燃有毒有害品智能储存柜
CN112233368A (zh) 一种综合安防管理平台
CN102128162A (zh) 压缩机远程监控系统及其监控方法
CN105528853B (zh) 集消防和安防功能一体的家用火灾报警控制器及控制方法
CN112284450A (zh) 一种基于mems的配电站环境状态监测及自动化运维系统
CN203870453U (zh) 一种配电房环境监测系统
CN107633643A (zh) 一种变电站监控预警系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID XINJIANG ELECTRIC POWER CO., LTD. ECONO

Effective date: 20150130

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Sun Chunjun

Inventor after: Su Lin

Inventor after: Kang Yuhan

Inventor after: Wang Lei

Inventor after: Qin Hua

Inventor after: Pu Zhixin

Inventor after: Chu Nong

Inventor after: Che Yong

Inventor after: Lu Donghai

Inventor after: Hu Miaolong

Inventor after: Wang Xiujiang

Inventor after: Peng Shengjiang

Inventor after: Hong Youjiang

Inventor after: Wang Zhe

Inventor before: Sun Chunjun

Inventor before: Chu Nong

Inventor before: Lu Donghai

Inventor before: Hu Miaolong

Inventor before: Hong Youjiang

Inventor before: Wang Zhe

Inventor before: Su Lin

Inventor before: Qin Hua

Inventor before: Pu Zhixin

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: SUN CHUNJUN CHU NONG LU DONGHAI HU MIAOLONG HONG YOUJIANG WANG ZHE SU LIN QIN HUA PU ZHIXIN TO: SUN CHUNJUN CHU NONG CHE YONG LU DONGHAI HU MIAOLONG WANG XIUJIANG PENG SHENGJIANG HONG YOUJIANG WANG ZHE SU LIN KANG YUHAN WANG LEI QIN HUA PU ZHIXIN

TR01 Transfer of patent right

Effective date of registration: 20150130

Address after: 210009 Gulou District, Jiangsu, Nanjing new model road, No. 5

Patentee after: Jiangsu Electric Power Designing Institute

Patentee after: Guo Wang Xinjiang power company

Patentee after: ECONOMIC TECHNOLOGY RESEARCH INSTITUTE, STATE GRID XINJIANG ELECTRIC POWER CO., LTD.

Address before: 210009 Gulou District, Jiangsu, Nanjing new model road, No. 5

Patentee before: Jiangsu Electric Power Designing Institute

C56 Change in the name or address of the patentee

Owner name: CHINA ENERGY ENGINEERING GROUP JIANGSU ELECTRIC PO

Free format text: FORMER NAME: JIANGSU ELECTRIC POWER DESIGNING INST.

CP01 Change in the name or title of a patent holder

Address after: 210009 Gulou District, Jiangsu, Nanjing new model road, No. 5

Patentee after: Chinese energy construction group Jiangsu Prov. Power Design Inst Co., Ltd

Patentee after: Guo Wang Xinjiang power company

Patentee after: ECONOMIC TECHNOLOGY RESEARCH INSTITUTE, STATE GRID XINJIANG ELECTRIC POWER CO., LTD.

Address before: 210009 Gulou District, Jiangsu, Nanjing new model road, No. 5

Patentee before: Jiangsu Electric Power Designing Institute

Patentee before: Guo Wang Xinjiang power company

Patentee before: ECONOMIC TECHNOLOGY RESEARCH INSTITUTE, STATE GRID XINJIANG ELECTRIC POWER CO., LTD.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111221

Termination date: 20200310