CN101825531B - 一种用于诱导混凝土裂缝的控制方法 - Google Patents
一种用于诱导混凝土裂缝的控制方法 Download PDFInfo
- Publication number
- CN101825531B CN101825531B CN 201019026031 CN201019026031A CN101825531B CN 101825531 B CN101825531 B CN 101825531B CN 201019026031 CN201019026031 CN 201019026031 CN 201019026031 A CN201019026031 A CN 201019026031A CN 101825531 B CN101825531 B CN 101825531B
- Authority
- CN
- China
- Prior art keywords
- crack
- concrete sample
- concrete
- lvdt
- control method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201019026031 CN101825531B (zh) | 2010-02-05 | 2010-02-05 | 一种用于诱导混凝土裂缝的控制方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201019026031 CN101825531B (zh) | 2010-02-05 | 2010-02-05 | 一种用于诱导混凝土裂缝的控制方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101825531A CN101825531A (zh) | 2010-09-08 |
CN101825531B true CN101825531B (zh) | 2012-09-05 |
Family
ID=42689574
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201019026031 Active CN101825531B (zh) | 2010-02-05 | 2010-02-05 | 一种用于诱导混凝土裂缝的控制方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101825531B (zh) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103196717B (zh) * | 2013-03-07 | 2015-07-29 | 同济大学 | 一种能精确定位充填型预制裂隙的类岩石试样模具 |
CN103175721B (zh) * | 2013-03-18 | 2015-04-08 | 浙江大学 | 制作混凝土试件自然裂缝的装置 |
CN103728169B (zh) * | 2014-01-06 | 2015-09-09 | 宁波工程学院 | 大刚度钢筋混凝土试件裂缝宽度控制仪及其裂缝制定方法 |
CN104457549B (zh) * | 2014-11-18 | 2017-07-07 | 中冶建筑研究总院有限公司 | 一种裂缝宽度自动监测装置 |
CN107402152B (zh) * | 2017-08-02 | 2023-03-14 | 深圳大学 | 用于预制水泥基试件裂缝的方法、预制试件和预制系统 |
CN109521186A (zh) * | 2018-11-30 | 2019-03-26 | 华南理工大学 | 一种探究裂缝自修复动力学的测试方法 |
CN110426256A (zh) * | 2019-08-01 | 2019-11-08 | 南京工程学院 | 一种用于制备带裂混凝土试件的三棱锥夹具及制备方法 |
CN115290409A (zh) * | 2022-08-03 | 2022-11-04 | 燕山大学 | 一种钢筋混凝土试件裂缝诱导与定量表征方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2857009Y (zh) * | 2005-07-13 | 2007-01-10 | 同济大学 | 混凝土约束收缩试验装置 |
CN201072334Y (zh) * | 2007-08-28 | 2008-06-11 | 北京光电技术研究所 | 自动裂缝测量仪 |
CN100523808C (zh) * | 2006-10-26 | 2009-08-05 | 上海交通大学 | 混凝土圆柱体试件劈拉渗透试验持载装置 |
-
2010
- 2010-02-05 CN CN 201019026031 patent/CN101825531B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2857009Y (zh) * | 2005-07-13 | 2007-01-10 | 同济大学 | 混凝土约束收缩试验装置 |
CN100523808C (zh) * | 2006-10-26 | 2009-08-05 | 上海交通大学 | 混凝土圆柱体试件劈拉渗透试验持载装置 |
CN201072334Y (zh) * | 2007-08-28 | 2008-06-11 | 北京光电技术研究所 | 自动裂缝测量仪 |
Non-Patent Citations (3)
Title |
---|
JP特开2008-216051A 2008.09.18 |
张林等.碾压混凝土断裂试验研究.《水利学报》.2001,(第05期),45-49. * |
朱腾华等.大理岩抗拉强度的离散性及与厚度的关系.《焦作工学院学报(自然科学版)》.2003,第22卷(第6期), * |
Also Published As
Publication number | Publication date |
---|---|
CN101825531A (zh) | 2010-09-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101825531B (zh) | 一种用于诱导混凝土裂缝的控制方法 | |
Long et al. | Why assess the properties of near-surface concrete? | |
Hakala et al. | Estimating the transversely isotropic elastic intact rock properties for in situ stress measurement data reduction: a case study of the Olkiluoto mica gneiss, Finland | |
Mahal et al. | Using digital image correlation to evaluate fatigue behavior of strengthened reinforced concrete beams | |
Santos et al. | Development of a laser roughness analyser to predict in situ the bond strength of concrete-to-concrete interfaces | |
KR100729994B1 (ko) | 터널 라이닝에 대한 섹션 시험장치 및 시험방법 | |
Proverbio | Evaluation of deterioration in reinforced concrete structures by AE technique | |
Biscaia et al. | Stainless steel bonded to concrete: an experimental assessment using the DIC technique | |
Vidya Sagar et al. | Laboratory investigations on cracking in reinforced concrete beams using on-line acoustic emission monitoring technique | |
Grouve et al. | Delamination detection with fibre Bragg gratings based on dynamic behaviour | |
Ferdinand et al. | Applications of fiber Bragg grating sensors in the composite industry | |
CN104198095B (zh) | 一种混凝土梁预应力值和预应力损失监测方法 | |
Boulay et al. | Real-time evolution of electrical resistance in cracking concrete | |
Jørgensen | Adhesive joints in wind turbine blades | |
Zani et al. | Load testing and structural monitoring of a reinforced concrete mid-century bridge | |
CN103175747B (zh) | 路面抗反射裂缝能力的测试方法及其测试设备 | |
CN108169002A (zh) | 一种测试钢-混凝土组合梁徐变特性的缩尺试验模型及方法 | |
Han | Role of NDE in quality control during construction of concrete infrastructures on the basis of service life design | |
CN113155732A (zh) | 高强钢绞线网增强ecc与混凝土界面性能测试方法 | |
Veidt et al. | Non-destructive evaluation (NDE) of aerospace composites: structural health monitoring of aerospace structures using guided wave ultrasonics | |
Jin et al. | Mechanism of subordinate peak skewing of FBG sensor during cracks propagation monitoring on aluminum alloy structure | |
Hejll | Structural health of bridges: monitor, assess and retrofit | |
Goggins et al. | Real-time monitoring of a hybrid precast and in situ concrete flat slab system | |
Castaneda et al. | Field test method for residual stress in plain concrete pavements and structures | |
Mehrkar-Asl | Concrete stress relief coring: theory and practice |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Free format text: FORMER OWNER: BOTE NEW MATERIAL CO., LTD., JIANGSU Effective date: 20140430 Owner name: JIANGSU SUBOTE NEW MATERIAL CO., LTD. Free format text: FORMER OWNER: JAINGSU ACADEMY OF BUILDING RESEARCH CO., LTD. Effective date: 20140430 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 210018 NANJING, JIANGSU PROVINCE TO: 211103 NANJING, JIANGSU PROVINCE |
|
TR01 | Transfer of patent right |
Effective date of registration: 20140430 Address after: 211103, No. 59 West Wan An Road, Jiangning District, Jiangsu, Nanjing Patentee after: Jiangsu Subute New Materials Co., Ltd. Address before: 210018 No. 12 West Beijing Road, Jiangsu, Nanjing Patentee before: Jiangsu Provincial Architectural Science Institute Ltd. Patentee before: Jiangsu Bote New Materials Co., Ltd. |
|
CP02 | Change in the address of a patent holder |
Address after: No.6 shuiyougang, Gulou District, Nanjing City, Jiangsu Province 210013 Patentee after: JIANGSU SUBOTE NEW MATERIALS Co.,Ltd. Address before: 211103, No. 59 West Wan An Road, Jiangning District, Jiangsu, Nanjing Patentee before: JIANGSU SUBOTE NEW MATERIALS Co.,Ltd. |
|
CP02 | Change in the address of a patent holder |