CN101824818A - 在吹填过程中用真空预压法加固吹填软粘土的方法 - Google Patents

在吹填过程中用真空预压法加固吹填软粘土的方法 Download PDF

Info

Publication number
CN101824818A
CN101824818A CN 201010167656 CN201010167656A CN101824818A CN 101824818 A CN101824818 A CN 101824818A CN 201010167656 CN201010167656 CN 201010167656 CN 201010167656 A CN201010167656 A CN 201010167656A CN 101824818 A CN101824818 A CN 101824818A
Authority
CN
China
Prior art keywords
soft clay
hydraulic
filled soft
hydraulically
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010167656
Other languages
English (en)
Other versions
CN101824818B (zh
Inventor
王开明
尹林涛
付长宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Coastal Zone Engineering Co., Ltd.
Original Assignee
王开明
尹林涛
付长宏
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 王开明, 尹林涛, 付长宏 filed Critical 王开明
Priority to CN2010101676564A priority Critical patent/CN101824818B/zh
Publication of CN101824818A publication Critical patent/CN101824818A/zh
Application granted granted Critical
Publication of CN101824818B publication Critical patent/CN101824818B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

一种在吹填过程中用真空预压法加固吹填软粘土的方法,该方法是先在已有软粘土或吹填软粘土上人工插入4-5m长的排水板,排水板的上端与一排水系统相连接,所述的排水系统又与一透水管相连接,然后可在所述软粘土上进行吹填软粘土;对所述软粘土进行吹填软粘土时,可分块吹填并在已达要求厚度的吹填软粘土上再铺排水系统,并使其与所述的透水管相连接;所述的排水系统包括一与排水板的上端相连接的水平排水板以及与所述水平排水板相连接的一主排水板组成,所述的主排水板与所述透水管相连接;本发明可以一次真空预压处理较厚的吹填软粘土,可利用上层吹填软粘土为下层或原有吹填软粘土的荷载,使下层吹填软粘土及早开始固结,及早消除沉降量,可以充分利用吹填过程中的合理安排进行插、铺排水板,节省时间;省钱、降低能耗。

Description

在吹填过程中用真空预压法加固吹填软粘土的方法
技术领域
本发明涉及的是一种在吹填土过程中采用真空预压法进行加固吹填软粘土的方法,属于地基处理工程技术领域。
背景技术
目前,对吹填软粘土的处理方法有多种,但主要是预压法:即设法在吹填软粘土中插入排水通道,一般用塑料排水板,以下简称排水板,再在其上施加压力或真空预压,使吹填软粘土中的水分通过各排水通道排出吹填软粘土之外,减少吹填软粘土的含水量,从而提高吹填软粘土的承载力特征值,减少压缩性,即减少今后建构筑物的沉降量,改善吹填软粘土的物理力学特性,达到在其上进行各建构筑物的安全,但上述地基处理方法存在着费时、费钱等缺陷。
通常为了在吹填软粘土中插入排水板需等待吹填软粘土有一定的强度,再进行地基处理,约需二年时间(进行自然风干),再进行地基处理;虽然现在也有一些直排式真空预压法加固软土地基的技术,它可减少等待时间、且用了些滤管后无需砂垫层,但处理软粘土厚度基本上在3m左右,且需多根真空滤管与插入软土中的排水板相连结,再进行真空预压,当需要处理10m左右的软土厚度时需二次插入长的排水板并进行二次真空预压,即第一次真空预压使吹填软粘土稍有强度以便可走行插排水板的机械,且真空管与上端排水板直接相连费时、又不易保证质量,虽有了很大的进步,但是费时、费钱的;且加固深度小,不能根据需要深度进行加固处理。
发明内容
本发明的目的在于克服现有技术存在的不足,而提供一种在吹填过程中用真空预压法加固吹填软粘土的方法,它可以一次真空预压处理较厚吹填软粘土,提高工效,省时、省钱、降低能耗等。
本发明的目的是通过如下技术方案来完成的,该方法是先在已有软粘土或吹填软粘土上人工插入4-5m长的排水板,排水板的上端与一排水系统相连接,所述的排水系统又与一透水管相连接,然后可在所述软粘土上进行吹填软粘土。
本发明对所述软粘土进行吹填软粘土时,可分块吹填并在已达要求厚度的吹填软粘土上再铺排水系统,并使其与所述的透水管相连接。
所述的排水系统包括一与排水板的上端相连接的水平排水板以及与所述水平排水板相连接的一主排水板组成,所述的主排水板与所述透水管相连接。
所述的透水管内放入有潜水泵,并通过该潜水泵将透水管内的水抽走,这样层层向上处理,达到吹填高度后,再铺一层排水系统,并与透水管相联接后再进行真空预压,依次进行。
本发明可以一次真空预压处理较厚的吹填软粘土,且根据情况一般可处理10-15m厚左右的吹填软粘土,它可利用上层吹填软粘土为下层或原有吹填软粘土的荷载,使已有软粘土及下层吹填软粘土极早开始固结,极早消除沉降量,也就是可以多利用廉价的吹填土作为回填料;并且可降低围埝高度;利用潜水泵抽水功效比真空泵或射流泵效率高的特点,降低能耗;可单独进行真空(即真空与抽水功能分离,从而达到省能);可以充分利用吹填过程中的合理安排施工排水系统,节省时间;本发明虽然在吹填前或过程中要进行一些人工施工排水系统,但一次真空预压处理比二次真空预压处理省时、省钱、省能耗。
附图说明
图1是本发明的平面结构示意图。
具体实施方式
下面将结合附图对本发明做详细的介绍:如附图所示,本发明所述的在吹填软粘土的过程中进行真空预压法加固吹填软粘土的方法是:先在已有软粘土(如有)或吹填软粘土上人工插入4-5m长左右的排水板1,并与排水系统相联接,排水系统与透水管5相连接,然后可在所述软粘土上进行吹填软粘土,当达到要求厚度时,再施工一层排水系统。
本发明所述的排水系统包括一与排水板的上端相连接的水平排水板以及与所述水平排水板相连接的一主排水板组成,所述的主排水板与所述透水管相连接。
图中所示的排水板1的上端与一水平排水板3相连接,所述的水平排水板3又与一主排水板4相连接并通过该主排水板4与一透水管5相连接,然后可在所述软粘土上进行吹填软粘土。
所述的吹填软粘土时可分块吹填并在已达要求厚度的吹填软粘土上水平再铺一第二排水板6,使其与所述主排水板4相连接;该主排水板4与所述的透水管5相连接。
所述的透水管5内放入有潜水泵7,并通过该潜水泵7将透水管5内
Figure GSA00000112745900021
样层层向上处理,达到吹填高度后,再铺一第三排水板8,该第三排水板8再与主排水板4相连接,再进行真空预压,依次进行。
本发明可以一次真空预压处理较厚的吹填软粘土,且根据情况一般可处理软粘土厚度10-15m左右,它可利用上层吹填软粘土为下层或原有吹填软粘土的荷载,使下层吹填软粘土极早开始固结,极早消除沉降量,也就是可以多利用廉价的吹填土作为回填料;并且可降低围埝高度;利用潜水泵抽水功效比真空泵或射流泵效率高的特点,降低能耗;可以充分利用吹填过程中的合理安排进行排水系统,节省时间。

Claims (5)

1.一种在吹填软粘土的过程中进行真空预压法加固吹填软粘土的方法,其特征在于该方法是先在已有软粘土或吹填软粘土上人工插入4-5m长的排水板,排水板的上端与一排水系统相连接,所述的排水系统又与一透水管相连接,然后可在所述软粘土上进行吹填软粘土。
2.根据权利要求1所述的真空预压法加固吹填软粘土的方法,其特征在于对所述软粘土进行吹填软粘土时,可分块吹填并在已达要求厚度的吹填软粘土上再铺排水系统,并使其与所述的透水管相连接。
3.根据权利要求1或2所述的真空预压法加固吹填软粘土的方法,其特征在于所述的排水系统包括-与排水板的上端相连接的水平排水板以及与所述水平排水板相连接的一主排水板组成,所述的主排水板与所述透水管相连接。
4.根据权利要求1或2所述的真空预压法加固吹填软粘土的方法,其特征在于所述的透水管内放入有潜水泵,并通过该潜水泵将透水管内的水抽走,这样层层向上处理,达到吹填高度后,再铺一层排水系统,并与透水管相联接后再进行真空预压,依次进行。
5.根据权利要求3所述的真空预压法加固吹填软粘土的方法,其特征在于所述的透水管内放入有潜水泵,并通过该潜水泵将透水管内的水抽走,这样层层向上处理,达到吹填高度后,再铺一层排水系统,并与透水管相联接后再进行真空预压,依次进行。
CN2010101676564A 2010-05-10 2010-05-10 在吹填过程中用真空预压法加固吹填软粘土的方法 Active CN101824818B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101676564A CN101824818B (zh) 2010-05-10 2010-05-10 在吹填过程中用真空预压法加固吹填软粘土的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101676564A CN101824818B (zh) 2010-05-10 2010-05-10 在吹填过程中用真空预压法加固吹填软粘土的方法

Publications (2)

Publication Number Publication Date
CN101824818A true CN101824818A (zh) 2010-09-08
CN101824818B CN101824818B (zh) 2012-11-28

Family

ID=42688971

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101676564A Active CN101824818B (zh) 2010-05-10 2010-05-10 在吹填过程中用真空预压法加固吹填软粘土的方法

Country Status (1)

Country Link
CN (1) CN101824818B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277794A (zh) * 2018-03-16 2018-07-13 中铁二十局集团第六工程有限公司 一种吹填软土地基真空动力固结复合排水系统
CN108442356A (zh) * 2018-03-16 2018-08-24 中铁二十局集团第六工程有限公司 吹填软土地基真空动力固结复合排水系统的施工工艺
CN109208577A (zh) * 2018-09-30 2019-01-15 华中科技大学 一种水平真空预压联合电渗加固吹填软土的设备及方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1158932A (zh) * 1997-03-07 1997-09-10 天津市水利科学研究所 低位真空预压软土地基加固抬高法
CN1172191A (zh) * 1997-07-18 1998-02-04 付长宏 一种吹填软粘土的排水加固方法
CN101270571A (zh) * 2007-03-20 2008-09-24 张伯谦 分层自重、预压排水固结联合强夯软土地基加固方法
CN101560762A (zh) * 2009-05-13 2009-10-21 天津城市建设学院 真空预压改进技术方法
CN101672031A (zh) * 2009-09-24 2010-03-17 中交一航局第四工程有限公司 网状排水垫层替代满铺砂垫层施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1158932A (zh) * 1997-03-07 1997-09-10 天津市水利科学研究所 低位真空预压软土地基加固抬高法
CN1172191A (zh) * 1997-07-18 1998-02-04 付长宏 一种吹填软粘土的排水加固方法
CN101270571A (zh) * 2007-03-20 2008-09-24 张伯谦 分层自重、预压排水固结联合强夯软土地基加固方法
CN101560762A (zh) * 2009-05-13 2009-10-21 天津城市建设学院 真空预压改进技术方法
CN101672031A (zh) * 2009-09-24 2010-03-17 中交一航局第四工程有限公司 网状排水垫层替代满铺砂垫层施工方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277794A (zh) * 2018-03-16 2018-07-13 中铁二十局集团第六工程有限公司 一种吹填软土地基真空动力固结复合排水系统
CN108442356A (zh) * 2018-03-16 2018-08-24 中铁二十局集团第六工程有限公司 吹填软土地基真空动力固结复合排水系统的施工工艺
CN109208577A (zh) * 2018-09-30 2019-01-15 华中科技大学 一种水平真空预压联合电渗加固吹填软土的设备及方法

Also Published As

Publication number Publication date
CN101824818B (zh) 2012-11-28

Similar Documents

Publication Publication Date Title
CN100516375C (zh) 双真空预压及动力挤密法联合加固软土地基方法
CN101250868B (zh) 降水预压联合动力固结深层加固法
CN107190727B (zh) 一种新型排水固结系统及方法
CN103321206B (zh) 一种高有机质含量河湖疏浚吹填土堆场排水工艺
CN107326891B (zh) 一种软土地基排水固结系统及方法
CN103924576A (zh) 一种细粒尾矿加筋堆积坝智能控制立体排渗真空预压法
CN106988295B (zh) 利用多种地基处理方法进行污泥脱水与固化的处理方法及其处理设备
CN102296589A (zh) 一种井点抽水控制群管虹吸的地基降排水方法
CN103031834B (zh) 一种吹填造陆软质地基的低位真空预压快速加固方法
CN102322054B (zh) 超软土浅表层间歇性强抽排水结合短期晾晒的处理方法
CN201165659Y (zh) 直排式真空预压法加固软土地基结构
CN101235634A (zh) 双向真空预压吹填软土地基处理方法
CN102220757A (zh) 超软弱土浅表层空间排水固结快速处理方法
CN101824818B (zh) 在吹填过程中用真空预压法加固吹填软粘土的方法
CN204456064U (zh) 一种无砂增压式软基快速排水系统
CN202007402U (zh) 一体式轻井塑排降水井点管
CN103215945B (zh) 非均质场地软土地基立体式组合动力排水固结系统和方法
CN108842724B (zh) 一种细粒尾矿及高浓度不分选尾矿快速筑坝方法
CN103437338B (zh) 疏干井结合气压劈裂加固吹填土地基施工方法
CN203307829U (zh) 一种用于地下工程防水设施的外盲沟
CN1158932A (zh) 低位真空预压软土地基加固抬高法
CN101413262A (zh) 土工布滤管真空预压法地基处理排水结构
CN107268364A (zh) 在吹填土地基上充泥袋构建道路的施工方法
CN106638554A (zh) 软黏土地基的处理方法
CN102912787B (zh) 粉细砂垫层滤管加密的真空预压方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Free format text: FORMER OWNER: YIN LINTAO FU CHANGHONG

Effective date: 20120925

Owner name: TIANJIN COASTAL ZONE ENGINEERING CO., LTD.

Free format text: FORMER OWNER: WANG KAIMING

Effective date: 20120925

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 200052 CHANGNING, SHANGHAI TO: 300384 NANKAI, TIANJIN

TA01 Transfer of patent application right

Effective date of registration: 20120925

Address after: 300384 Huayuan Industrial Zone Tianjin City Road No. 8, No. 1.

Applicant after: Tianjin Coastal Zone Engineering Co., Ltd.

Address before: 200052 room 1703, happy road, happy building, Shanghai, Changning District

Applicant before: Wang Kaiming

Applicant before: Yin Lintao

Applicant before: Fu Changhong

C14 Grant of patent or utility model
GR01 Patent grant