CN101807985A - Datacenter centralization control switching method and system - Google Patents

Datacenter centralization control switching method and system Download PDF

Info

Publication number
CN101807985A
CN101807985A CN 201010116438 CN201010116438A CN101807985A CN 101807985 A CN101807985 A CN 101807985A CN 201010116438 CN201010116438 CN 201010116438 CN 201010116438 A CN201010116438 A CN 201010116438A CN 101807985 A CN101807985 A CN 101807985A
Authority
CN
China
Prior art keywords
server
address
script
configuration file
waiting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010116438
Other languages
Chinese (zh)
Other versions
CN101807985B (en
Inventor
侯维栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bank of Communications Co Ltd
Industrial Bank Co Ltd
Original Assignee
Bank of Communications Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bank of Communications Co Ltd filed Critical Bank of Communications Co Ltd
Priority to CN2010101164388A priority Critical patent/CN101807985B/en
Publication of CN101807985A publication Critical patent/CN101807985A/en
Application granted granted Critical
Publication of CN101807985B publication Critical patent/CN101807985B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Data Exchanges In Wide-Area Networks (AREA)
  • Hardware Redundancy (AREA)

Abstract

The invention relates to a datacenter centralization control switching method and a system. The method comprises the following steps that: a switching command is received, the switching command at least appoints a pair of servers which are arranged in two data centers; by managing IP address, a server stopping script is executed on a server to be stopped; IP alerting script is executed on at least a pair of servers according to the switching command, and the IP address which is produced by the pair of servers is switched from the server to be stopped to the server to be started; the primary-secondary relationship of a consistency group of the pair of servers in an intelligent memory is exchanged; and by managing the IP address, the applied script of the server is executed on the server to be started. By adopting handoff management script and the intra-city memory data synchronism, the server in the large-scale opening system is automatically switched from the main production center to an intra-city backup center to run, and the high-reliable, high-efficient and high-controllable globalization switching management is provided.

Description

Centralized control changing method of a kind of data center and system
Technical field
The present invention relates to computer networking technology, particularly about centralized control changing method of a kind of data center and system.
Background technology
The calamity of open system is equipped with administrative skill and generally local high availability cluster (Cluster) framework is expanded and formed, its primary structure framework is the resource group that the storage at two data centers, main frame (HOST), logical volume, application program is defined into Cluster, utilizes the local Cluster high-availability mechanism of class to carry out calamity and is equipped with management.Relevant mainstream technology implementation has HACMP/XD-PPRC and the HACMP/XD-GLVM of IBM, and the VCS/GCO of Symantec etc.
Expand and realize because of above solution all is based on high availability Cluster framework, so in the face of extensive and when having the calamity of the application system of crisscross complex relationship to be equipped with handover management, there is bigger limitation, if define Cluster too huge on the one hand, to cause Cluster complicated to safeguarding, thereby influence the availability of production environment, if be defined as a plurality of Cluster on the other hand, then owing to can't carry out mutual between a plurality of Cluster, so can not carry out unified management, thereby be unable to cope with logical relation numerous and disorderly between the application system.
Prior art can only solve the switching problem of single cover HOST or single cover Cluster, and switching time and complexity are along with the quantity linear growth of open system, and hundreds of switchings individual or thousands of HOST become infeasible.
Summary of the invention
The invention provides the centralized control changing method of a kind of data center, described method is used for the master of at least one pair of server at two the data centers-relation of being equipped with is exchanged, described two data centers respectively comprise an intelligence memory and multiple servers, lay respectively at and have relation one to one between the server at described two data centers, and the consistency group and the corresponding logical storage area of every pair of server in the intelligence memory that lays respectively at two data centers, have been defined, every station server has a service IP address and a unique management ip address, every pair of server timesharing uses same production IP address as the service IP address, described method comprises: receive switching command, specify at least one pair of to lay respectively at the server at described two data centers in the described switching command; By management ip address, treating to carry out the inactive script of server on the inactive server; On described at least one pair of server, carry out IP according to described switching command and revise script, the production IP address of described at least one pair of server is switched to waiting that enabling server uses by the server of waiting to stop using; Master-inferior the relation of the consistency group of described at least one pair of server in intelligence memory is exchanged; By management ip address, waiting to enable the script of carrying out the startup of server application on the server.
The embodiment of the invention also provides a kind of data center centralized control switched system, described system comprises: two data centers, respectively comprise: multiple servers, be used to accept control, carry out and switch script, lay respectively at and have relation one to one between the server at described two data centers, every station server has a service IP address and a unique management ip address, and every pair of server timesharing uses same production IP address as the service IP address; Intelligence memory, be connected in the described server of place data center and the intelligence memory of another data center, the consistency group of every pair of server and corresponding logical storage area have one to one been defined between two data centers in the intelligence memory at two data centers, described intelligence memory is accepted control, switches the master-inferior relation in the corresponding consistency group; The switching controls machine, be connected in the server of place data center and the described server and the intelligence storage of intelligence memory and another data center, be used to receive switching command, according to described switching command specified server management ip address one to one, the control specified server is carried out IP and is revised script, the server use is enabled by treating that inactive server switches to waiting in the production IP address of at least one pair of server, and control the master-inferior relation in the corresponding consistency group of described two intelligence memories switching.
The present invention adopted the handover management script, with technology such as city storage level data sync, script executing engines, server in the extensive open system is switched to the operation of the backup center in city from the automation of the main production center fast, highly reliable, high efficiency, high controlled globalize handover management are provided.
Description of drawings
In order to be illustrated more clearly in the embodiment of the invention or technical scheme of the prior art, to do to introduce simply to the accompanying drawing of required use in embodiment or the description of the Prior Art below, apparently, accompanying drawing in describing below only is some embodiments of the present invention, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the flow chart of the centralized control changing method of data center in the embodiment of the invention;
Fig. 2 is the flow chart of the centralized control changing method of data center in the embodiment of the invention;
Fig. 3 is the flow chart of the centralized control changing method of data center in the embodiment of the invention;
Fig. 4 is the structure chart of the centralized control switched system of data center in the embodiment of the invention;
Fig. 5 is the structure chart of the centralized control switched system of data center in the embodiment of the invention;
Fig. 6 is the structure chart of the centralized control switched system of data center in the embodiment of the invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the invention, the technical scheme in the embodiment of the invention is clearly and completely described, obviously, described embodiment only is the present invention's part embodiment, rather than whole embodiment.Based on the embodiment among the present invention, those of ordinary skills belong to the scope of protection of the invention not making the every other embodiment that is obtained under the creative work prerequisite.
The invention provides the centralized control changing method of a kind of data center, described method is used for the master of at least one pair of server at two data centers (master data center and preliminary data the center)-relation of being equipped with is exchanged, described two data centers respectively comprise an intelligence memory and multiple servers, lay respectively at and have relation one to one between the server at described two data centers, and the consistency group STgroup and the corresponding logical storage area of every pair of server in the intelligence memory that lays respectively at two data centers, have been defined, every station server has a service IP address and a unique management ip address, and every pair of server timesharing uses same production IP address as the service IP address.
The server at master data center for example is the n station server of HOST (H1) to HOST (Hn), and the external Storage S that is stored as at master data center has defined each server logical memory block, master data center among the Storage S; The server at preliminary data center then is HOST (H1 ') to the n station server of HOST (Hn '), and the external Storage S ' that is stored as at preliminary data center has defined each server logical memory block, preliminary data center among the Storage S '.According to techniques well known as can be known; so-called STgroup group is LUN (the Logical Unit Number of intelligence memory disk; LUN) notion of aspect; to be distributed on the LUN on Storage S and the Storage S '; definition becomes a consistency group; if one of them LUN can't carry out write operation, the write operation of other LUN also will be failed in then organizing hereto, thereby realize the consistency protection for the data of a storage LUN group.Two intelligent storages in the embodiment of the invention can be by intensive multiplexed optical wave (Dense Wavelength DivisionMultiplexing, DWDM) network connects and realizes the disk synchronization replication, the server of each data center can pass through the storage area network network, and (Storage Area Network, SAN) intelligence memory with the notebook data center is connected.As shown in Figure 1, the centralized control changing method of described data center comprises:
Step S101: receive switching command, specify at least one pair of to lay respectively at the server at described two data centers in the described switching command;
Step S102:, treating to carry out the inactive script of server on the inactive server by management ip address;
Step S103: on described at least one pair of server, carry out IP according to described switching command and revise script, the production IP address of described at least one pair of server is switched to waiting that enabling server uses by the server of waiting to stop using;
Step S104: the master-inferior relation of the consistency group of described at least one pair of server in intelligence memory is exchanged;
Step S105:, waiting to enable the script of carrying out the startup of server application on the server by management ip address.
Below be that HOST (H1) is switched to HOST (H1 ') is that example describes with the switching command of in step S101, receiving.Each server of data center has two IP addresses: one is the service IP address that is used to provide service, and another is the management ip address that is used to accept to manage control.The inactive script of server is pre-stored in each server.
Among the step S102, treat that inactive server HOST (H1) receives the instruction of carrying out the inactive script of server, then HOST (H1) can carry out the inactive script of server, stops its application service.
After step S102 stops to treat the service of inactive server HOST (H1), comprise that also the control hardware supervisor console calls the hardware resource management script, treat the server HOST that enables (H1 ') and carry out the adjustment (comprising start-stop, resource adjustment etc.) of hardware view (as integrated circuit board, CPU, internal memory), for example the control hardware supervisor console calls the hardware resource management script work CPU of HOST (H1 ') is adjusted into 4 by 1.
As shown in Figure 2, on described at least one pair of server, carry out IP according to described switching command among the step S103 and revise script, the production IP address of described at least one pair of server is switched to waiting that enabling server uses and can further comprise by the server of waiting to stop using:
Step S1031: by the described management address IPH1-MGT that waits to enable server HOST (H1 '), wait to enable server HOST (H1 ') and go up and carry out IP and revise script described, revising the order of script can have nothing in common with each other for different operating system IP, for example adopt the ifconfig order to realize change IP address in AIX operating system, corresponding production IP address is revised as in described service IP address of waiting to enable server HOST (H1 '), i.e. the shared production IP address of HOST (H1) and HOST (H1 ').Comprise also in this step that HOST (H1) discharges external storage, the access limit of LUN among the Storage S that it is corresponding discharges, for example AIX operating system is at first carried out umount order releasing document system, execution fuser order confirms that application has discharged the right to use, afterwards the disk volume group is carried out the varyoff order, finish the release of external storage.
Step S1032: by described management ip address the IPH1 '-MGT that treats inactive server HOST (H1), go up execution IP at the described server HOST (H1) that waits to stop using and revise script, the IP address of awaiting orders is revised as in the described service IP address of inactive server HOST (H1) for the treatment of.
Switching script can for example be " .sh " file, below is revised as the IP address of awaiting orders for the service IP address that will treat inactive server by producing the IP address:
It is 136 management ip address that # judges whether to exist back three
netstat-in|grep-v?lo0|grep-v″link#″|awk′{print?$1,″″,$4}′|grep″136.″>/dev/null
if[$?=0]
then
If the # management ip address exists, extract management IP address then, with behind the management ip address 3 change 173 back assignment into and give network interface card, be that the service IP address of network interface card be the IP address of awaiting orders by producing the IP address switchover, and point out and finish switching
MANAGE_IP=`netstat-in|grep-v?lo0|grep-v″link#″|awk′{print$1,″″,$4}′|grep″136.″|awk′{print?$2}′`
EXCHANGE_IP=`echo?$MANAGE_IP|sed′s/^136/173/g′`
chdev-l?$SRV_ENT-a?netaddr=$EXCHANGE_IP>/dev/null
if[$?=0]
then
echo″0080-Change?$SRV_ENT?IP?successfully.″
# judges that IP switches whether success, and with message notifying, if failure then withdraw from
CURRENT_IP=`netstat-in|grep-v?lo0|grep-v″link#″|grep″^$SRV_ENT″|sed-n′1p′|awk′{print?$4}′`
echo″The?current?IP?is${CURRENT_IP}.″
else
echo″Fail?to?change?$SRV_ENT?IP.″
echo″1080-Fail?to?change?$SRV_ENT?IP?and?fail?tochange?$SRV_ENT?state?to?down.″
exit?117
If # can not find management ip address, then with message notifying and withdraw from
fi
else
echo″Could?not?find?management?IP.″
echo″1080-Fail?to?change?$SRV_ENT?IP?and?fail?to?change$SRV_ENT?state?to?down.″
exit?117
Behind the # handover success network card status is made as down
fi
chdev-l?$SRV_ENT-a?state=down>/dev/null
if[$?=0]
then
echo″0081-Change?$SRV_ENT?state?to?down?successfully.″
else
echo″1081-Fail?to?change?$SRV_ENT?state?to?down.″
exit?117
fi
exit?0
Among the step S104, primary and secondary among HOST (H1) and HOST (H1 ') the consistency group STgroupH1-H1 ' in intelligence memory Storage S and Storage S ' concerned exchange, the logical storage area of HOST among the StorageS ' (H1 ') is set to master (primary) memory block of STgroupH1-H1 ', the logical storage area of the HOST among the Storage S (H1) be set to STgroupH1-H1 ' from (secondary) memory block.All can there be the definition of each STgroup among Storage S and the Storage S ', to lead-inferior two consistency LUN group, definition becomes a pair of pair relation, the switching of so-called primary and secondary relation is meant the exchange of the primary and secondary relation of two consistency LUN groups in a pair of pair, the LUN of main end can read and write, and the LUN of inferior end can only passive and synchronously duplicate main end data, this technology is that prior art repeats no more.Storage S connects HOST (H1) by LUN is arranged, go up at HOST (H1), HOST (H1 ') by management ip address and to carry out the script that switches primary and secondary relation among the STgroupH1-H1 ', thereby modification is stored in the definition of the STgroupH1-H1 ' among Storage S, the Storage S '.
Management ip address IPH1 '-MGT by HOST (H1 ') among the step S105 goes up and carries out the script that startup of server is used waiting to enable server HOST (H1 ').
IP revises script and also calls corresponding configuration file, comprises in the configuration file that IP revises the related parameter of script, for example IP, route etc.As shown in Figure 3, before step S101, method of the present invention also can comprise:
Step S001: carry out server and check script, check server in the active/standby data center (for example HOST (H1), HOST (H1 ')) IP, route, SNA (Systems Network Architecture), use start-stop script, disk, file system etc., generate configuration file.
Step S002: with the configuration file that generates be pre-stored in server in the active/standby data center (for example HOST (H1), HOST (H1 ')) the respective standard configuration file compare, if it is inconsistent, standard configuration file can be backed up, to generate configuration file then and cover the primary standard configuration file, as new standard configuration file.
After step S105, also can wait to enable server HOST (H1 ') and go up the application verification script of carrying out at different application described, whether the state of application system of checking HOST (H1 ') according to return value normal, if checking not by point out the attendant of application system to get involved.
The present invention also provides a kind of data center centralized control switched system, described system comprises: two data centers (master data center and preliminary data center), as shown in Figure 4, described data center respectively comprises: multiple servers 401, be used to accept control, carry out and switch script, lay respectively at and have relation one to one between the server at described two data centers, every station server has a service IP address and a unique management ip address, and every pair of server timesharing uses same production IP address as the service IP address; Intelligence memory 402, be connected in the described server 401 of place data center and the intelligence memory 402 of another data center, the consistency group of every pair of server and corresponding logical storage area have one to one been defined between two data centers in the intelligence memory at two data centers, described intelligence memory 402 is accepted control, switches the master-inferior relation in the corresponding consistency group; Switching controls machine 403, be connected in the server of place data center and the described server and the intelligence storage of intelligence memory and another data center, be used to receive switching command, according to described switching command specified server management ip address one to one, the control specified server is carried out IP and is revised script, the server use is enabled by treating that inactive server switches to waiting in the production IP address of at least one pair of server, and control the master-inferior relation in the corresponding consistency group of described two intelligence memories switching.
Disposed a switching controls machine 401 respectively at the master data center with the city backup center in the system that the embodiment of the invention provides, the role of two switching controls machines 401 is identical, for guaranteeing the consistency of switching flow and control, synchronization has only a switching controls machine 401 to carry out work, assigns switching controls to a switching controls machine 401 for each and instructs.Can adopt script executing engine technology in the embodiment of the invention, manage the script carried out on a plurality of Client (server 401) centralizedly by Server (switching controls machine 403) with Client/Server framework.Intelligence memory 402 in the embodiment of the invention has storage level data sync copy function, two can only memory 402 according to corresponding relation and the definition of consistency group of the good LUN of predefined, realize duplicating for server 401 transparent data sync.
As shown in Figure 5, described switching controls machine 403 comprises: command reception unit 4031 is used to receive switching command; IP switch unit 4032 is connected in described command reception unit, be used for according to described switching command specified server management ip address one to one, the control specified server is carried out IP and is revised script; Bank switching unit 4033 is connected in described command reception unit, is used for controlling master-inferior relation that described two intelligence memories switch the consistency group corresponding with given server.
Described IP switch unit 4032 can further comprise: first switches subelement, be used for the management ip address of waiting to enable server by described, carry out IP and revise script described wait to enable on the server, corresponding production IP address is revised as in the described service IP address of enabling server of waiting; Second switches subelement, is used for the management address by the described server of waiting to stop using, and carries out IP and revise script on the described server of waiting to stop using, and the corresponding IP address of awaiting orders is revised as in the service IP address of the described server of waiting to stop using.
As shown in Figure 5, described switching controls machine 403 also comprises: application verification unit 4034, carry out the application verification script waiting to enable on the server, whether normal in inspection if waiting to enable the state of application system of server according to return value, if undesired then point out the attendant of application system to get involved.
Described IP switch unit 4032 Control Servers are carried out and are also called the configuration file that IP revises script when IP revises script, comprise in the described configuration file that IP revises the related parameter of script, described switching controls machine 403 also comprises: configuration file inspection unit 4035, be used to carry out server and check script, check in master data center and the preliminary data environmental parameter of server in the heart, generate configuration file; Configuration file updating block 4036, be connected in described configuration file inspection unit, being used for configuration file that will generate and the respective standard configuration file that is pre-stored in master data center and preliminary data central server compares, if it is inconsistent, standard configuration file is backed up, then the configuration file that generates is covered the primary standard configuration file, as new standard configuration file.
Be the centralized control switched system of the data center that provides in embodiment of the invention structure chart more specifically as Fig. 6.The master of at least one pair of server at described data center (master data center and preliminary data the center)-relation of being equipped with is exchanged, described two data centers respectively comprise an intelligence memory and multiple servers, lay respectively at and have relation one to one between the server at described two data centers, and in the intelligence memory that lays respectively at two data centers, defined the consistency group of every pair of server.The server at master data center for example is the n station server of HOST (H1) to HOST (Hn), and the external Storage S that is stored as at master data center has defined each server logical memory block, master data center among the Storage S; The server at preliminary data center then is HOST (H1 ') to the n station server of HOST (Hn '), and the external Storage S ' that is stored as at preliminary data center has defined each server logical memory block, preliminary data center among the Storage S '.Two intelligent storages in the embodiment of the invention can be by intensive multiplexed optical wave (Dense Wavelength Division Multiplexing, DWDM) network connects and realizes the disk synchronization replication, the server of each data center can pass through the storage area network network, and (Storage AreaNetwork, SAN) intelligence memory with the notebook data center is connected.The switching controls machine at a data center can connect the server and the intelligence memory of another data center by management LAN.Described system also comprises: HMC (HMC (R), HMC (R ')), be connected in the server at switching controls machine and two data centers, be used for after treating to carry out the inactive script of server on the inactive server, draw together the control hardware supervisor console and call the hardware resource management script, treat the server of enabling and carry out hardware adjustment.
The present invention adopted the handover management script, with technology such as city storage level data sync, script executing engines, server in the extensive open system is switched to the operation of the backup center in city from the automation of the main production center fast, highly reliable, high efficiency, high controlled globalize handover management are provided.
Above-described embodiment; purpose of the present invention, technical scheme and beneficial effect are further described; institute is understood that; the above only is the specific embodiment of the present invention; and be not intended to limit the scope of the invention; within the spirit and principles in the present invention all, any modification of being made, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (11)

1. centralized control changing method of data center, it is characterized in that, described method is used for the master of at least one pair of server at two the data centers-relation of being equipped with is exchanged, described two data centers respectively comprise an intelligence memory and multiple servers, lay respectively at and have relation one to one between the server at described two data centers, and the consistency group and the corresponding logical storage area of every pair of server in the intelligence memory that lays respectively at two data centers, have been defined, every station server has a service IP address and a unique management ip address, every pair of server timesharing uses same production IP address as the service IP address, and described method comprises:
Receive switching command, specify at least one pair of to lay respectively at the server at described two data centers in the described switching command;
By management ip address, treating to carry out the inactive script of server on the inactive server;
On described at least one pair of server, carry out IP according to described switching command and revise script, the production IP address of described at least one pair of server is switched to waiting that enabling server uses by the server of waiting to stop using;
Master-inferior the relation of the consistency group of described at least one pair of server in intelligence memory is exchanged;
By management ip address, waiting to enable the script of carrying out the startup of server application on the server.
2. the method for claim 1, it is characterized in that, describedly on described at least one pair of server, carry out IP according to described switching command and revise script, the production IP address of described at least one pair of server is switched to waiting to enable server by the server of waiting to stop using use and further comprise:
By the described management ip address of waiting to enable server, carry out IP and revise script described wait to enable on the server, corresponding production IP address is revised as in the described service IP address of enabling server of waiting;
By the described management address for the treatment of inactive server, on the described server of waiting to stop using, carry out IP and revise script, the IP address of awaiting orders of correspondence is revised as in the described service IP address of inactive server for the treatment of.
3. the method for claim 1 is characterized in that, describedly also comprises after carrying out the script that startup of server uses waiting to enable on the server:
Carry out the application verification script described wait to enable on the server, whether normal in inspection if waiting to enable the state of application system of server according to return value, if undesired then point out the attendant of application system to get involved.
4. the method for claim 1 is characterized in that, Control Server is carried out when IP revises script and also called the configuration file that IP revises script, comprises in the described configuration file that IP revises the related parameter of script, also comprises before described reception switching command:
Carry out server and check script, check in master data center and the preliminary data environmental parameter of server in the heart, generate configuration file;
Configuration file that generates and the respective standard configuration file that is pre-stored in master data center and the preliminary data central server are compared, if it is inconsistent, with the standard configuration file backup, then the configuration file that generates is covered the primary standard configuration file, as new standard configuration file.
5. the method for claim 1 is characterized in that, after treating to carry out the inactive script of server on the inactive server, comprises that also the control hardware supervisor console calls the hardware resource management script, treats the server of enabling and carries out hardware adjustment.
6. centralized control switched system of data center is characterized in that described system comprises:
Two data centers respectively comprise:
Multiple servers, be used to accept control, carry out and switch script, lay respectively at and have relation one to one between the server at described two data centers, every station server has a service IP address and a unique management ip address, and every pair of server timesharing uses same production IP address as the service IP address;
Intelligence memory, be connected in the described server of place data center and the intelligence memory of another data center, the consistency group of every pair of server and corresponding logical storage area have one to one been defined between two data centers in the intelligence memory at two data centers, described intelligence memory is accepted control, switches the master-inferior relation in the corresponding consistency group;
The switching controls machine, be connected in the server of place data center and the described server and the intelligence storage of intelligence memory and another data center, be used to receive switching command, according to described switching command specified server management ip address one to one, the control specified server is carried out IP and is revised script, the server use is enabled by treating that inactive server switches to waiting in the production IP address of at least one pair of server, and control the master-inferior relation in the corresponding consistency group of described two intelligence memories switching.
7. the centralized control switched system of data center as claimed in claim 6 is characterized in that, described switching controls machine comprises:
The command reception unit is used to receive switching command;
The IP switch unit is connected in described command reception unit, be used for according to described switching command specified server management ip address one to one, the control specified server is carried out IP and is revised script;
The bank switching unit is connected in described command reception unit, is used for controlling master-inferior relation that described two intelligence memories switch the consistency group corresponding with given server.
8. the centralized control switched system of data center as claimed in claim 7 is characterized in that, described IP switch unit comprises:
First switches subelement, is used for the management ip address of waiting to enable server by described, described wait to enable carry out IP on the server and revise script, corresponding production IP address is revised as in the described service IP address of enabling server of waiting;
Second switches subelement, is used for the management address by the described server of waiting to stop using, and carries out IP and revise script on the described server of waiting to stop using, and the corresponding IP address of awaiting orders is revised as in the service IP address of the described server of waiting to stop using.
9. the centralized control switched system of data center as claimed in claim 6 is characterized in that, described switching controls machine also comprises:
The application verification script is carried out waiting to enable on the server in the application verification unit, and whether normal in inspection if waiting to enable the state of application system of server according to return value, if undesired then point out the attendant of application system to get involved.
10. the centralized control switched system of data center as claimed in claim 6, it is characterized in that, described IP switch unit Control Server is carried out and is also called the configuration file that IP revises script when IP revises script, comprise in the described configuration file that IP revises the related parameter of script, described switching controls machine also comprises:
The configuration file inspection unit is used to carry out server and checks script, checks in master data center and the preliminary data environmental parameter of server in the heart, generates configuration file;
The configuration file updating block, be connected in described configuration file inspection unit, being used for configuration file that will generate and the respective standard configuration file that is pre-stored in master data center and preliminary data central server compares, if it is inconsistent, standard configuration file is backed up, then the configuration file that generates is covered the primary standard configuration file, as new standard configuration file.
11. the centralized control switched system of data center as claimed in claim 6 is characterized in that described system also comprises:
HMC, be connected in the server at described switching controls machine and two data centers, be used for after treating to carry out the inactive script of server on the inactive server, drawing together the control hardware supervisor console and calling the hardware resource management script, treat the server of enabling and carry out hardware adjustment.
CN2010101164388A 2010-03-03 2010-03-03 Datacenter centralization control switching method and system Active CN101807985B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101164388A CN101807985B (en) 2010-03-03 2010-03-03 Datacenter centralization control switching method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101164388A CN101807985B (en) 2010-03-03 2010-03-03 Datacenter centralization control switching method and system

Publications (2)

Publication Number Publication Date
CN101807985A true CN101807985A (en) 2010-08-18
CN101807985B CN101807985B (en) 2012-11-28

Family

ID=42609610

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101164388A Active CN101807985B (en) 2010-03-03 2010-03-03 Datacenter centralization control switching method and system

Country Status (1)

Country Link
CN (1) CN101807985B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102972010A (en) * 2012-08-17 2013-03-13 华为技术有限公司 Switch method, apparatus and system for virtual application dual-machine in cloud environment
CN103501338A (en) * 2013-09-30 2014-01-08 华为技术有限公司 Lock recovery method, equipment and network file system
US8892728B2 (en) 2011-07-21 2014-11-18 Hewlett-Packard Development Company, L.P. Automatic zone-based management of a data center
CN105022681A (en) * 2014-04-22 2015-11-04 中国移动通信集团江西有限公司 Method and system for implementing disaster tolerance emergency switching
CN105471597A (en) * 2014-08-07 2016-04-06 中兴通讯股份有限公司 Installing method, uninstalling method, installing device and uninstalling device for network disaster recovery system
CN107515823A (en) * 2017-08-16 2017-12-26 郑州云海信息技术有限公司 A kind of method for generating configuration file
CN108460160A (en) * 2018-03-29 2018-08-28 武汉斗鱼网络科技有限公司 Inserting method, device, terminal and the storage medium of database instance
CN110166524A (en) * 2019-04-12 2019-08-23 陆金所(上海)科技服务有限公司 Switching method, device, equipment and the storage medium of data center
CN111049689A (en) * 2019-12-25 2020-04-21 中国银联股份有限公司 Data center switching method and device
CN112118130A (en) * 2020-08-25 2020-12-22 通号城市轨道交通技术有限公司 Self-adaptive distributed cache master/standby state information switching method and device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1859136A (en) * 2006-02-27 2006-11-08 华为技术有限公司 Charging system and charging method
CN1976496A (en) * 2006-12-25 2007-06-06 华为技术有限公司 Method for exchanging node and accessing user data
US20070244937A1 (en) * 2006-04-12 2007-10-18 Flynn John T Jr System and method for application fault tolerance and recovery using topologically remotely located computing devices
CN201584980U (en) * 2010-03-03 2010-09-15 交通银行股份有限公司 Data centre centralized control switching system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1859136A (en) * 2006-02-27 2006-11-08 华为技术有限公司 Charging system and charging method
US20070244937A1 (en) * 2006-04-12 2007-10-18 Flynn John T Jr System and method for application fault tolerance and recovery using topologically remotely located computing devices
CN1976496A (en) * 2006-12-25 2007-06-06 华为技术有限公司 Method for exchanging node and accessing user data
CN201584980U (en) * 2010-03-03 2010-09-15 交通银行股份有限公司 Data centre centralized control switching system

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8892728B2 (en) 2011-07-21 2014-11-18 Hewlett-Packard Development Company, L.P. Automatic zone-based management of a data center
US9448899B2 (en) 2012-08-17 2016-09-20 Huawei Technologies Co., Ltd. Method, apparatus and system for switching over virtual application two-node cluster in cloud environment
CN102972010B (en) * 2012-08-17 2015-03-25 华为技术有限公司 Switch method, apparatus and system for virtual application dual-machine in cloud environment
CN102972010A (en) * 2012-08-17 2013-03-13 华为技术有限公司 Switch method, apparatus and system for virtual application dual-machine in cloud environment
CN103501338A (en) * 2013-09-30 2014-01-08 华为技术有限公司 Lock recovery method, equipment and network file system
CN103501338B (en) * 2013-09-30 2017-04-05 华为技术有限公司 A kind of lock restoration methods, equipment and NFS
CN105022681B (en) * 2014-04-22 2017-11-21 中国移动通信集团江西有限公司 A kind of method and system for realizing the emergent switching of disaster tolerance
CN105022681A (en) * 2014-04-22 2015-11-04 中国移动通信集团江西有限公司 Method and system for implementing disaster tolerance emergency switching
CN105471597A (en) * 2014-08-07 2016-04-06 中兴通讯股份有限公司 Installing method, uninstalling method, installing device and uninstalling device for network disaster recovery system
CN105471597B (en) * 2014-08-07 2019-05-24 中兴通讯股份有限公司 Installation, discharging method and the peace Loading-dumping device of network management disaster tolerance system
CN107515823A (en) * 2017-08-16 2017-12-26 郑州云海信息技术有限公司 A kind of method for generating configuration file
CN108460160A (en) * 2018-03-29 2018-08-28 武汉斗鱼网络科技有限公司 Inserting method, device, terminal and the storage medium of database instance
CN108460160B (en) * 2018-03-29 2021-03-12 武汉斗鱼网络科技有限公司 Off-line method, device, terminal and storage medium of database instance
CN110166524A (en) * 2019-04-12 2019-08-23 陆金所(上海)科技服务有限公司 Switching method, device, equipment and the storage medium of data center
CN111049689A (en) * 2019-12-25 2020-04-21 中国银联股份有限公司 Data center switching method and device
CN112118130A (en) * 2020-08-25 2020-12-22 通号城市轨道交通技术有限公司 Self-adaptive distributed cache master/standby state information switching method and device
CN112118130B (en) * 2020-08-25 2023-07-21 通号城市轨道交通技术有限公司 Self-adaptive distributed cache active-standby state information switching method and device

Also Published As

Publication number Publication date
CN101807985B (en) 2012-11-28

Similar Documents

Publication Publication Date Title
CN101807985B (en) Datacenter centralization control switching method and system
CN201584980U (en) Data centre centralized control switching system
US11294699B2 (en) Dynamically scaled hyperconverged system establishing minimum supported interoperable communication protocol between clusters in a cluster group
EP1370945B1 (en) Failover processing in a storage system
JP5102901B2 (en) Method and system for maintaining data integrity between multiple data servers across a data center
US7143167B2 (en) Method and system for managing high-availability-aware components in a networked computer system
US8862928B2 (en) Techniques for achieving high availability with multi-tenant storage when a partial fault occurs or when more than two complete faults occur
US6598174B1 (en) Method and apparatus for storage unit replacement in non-redundant array
CN102655460B (en) Redundancy backup method and system of production server
CN108234306A (en) Network equipment, network method and computer readable storage medium
CN111162941B (en) Method for automatically managing virtual IP (Internet protocol) in Kubernetes environment
CN108234302A (en) Keep the consistency in the distributed operating system of network equipment
US8082344B2 (en) Transaction manager virtualization
CN1366242A (en) Method for implementing dual-system standby
CN112434008A (en) Distributed database upgrading method, device and medium
KR19990043986A (en) Business take over system
JP2000099359A5 (en)
CN111400285A (en) MySQ L data fragment processing method, apparatus, computer device and readable storage medium
CN107483257B (en) Application system deployment method and architecture based on X86 and ARM mixed environment
CN111342995B (en) Synchronization device, method and server system
CN102279882B (en) Method and system for controlling access in cluster system
US9083618B2 (en) Centralized backup system and backup method for an homogeneous real-time system at different locations
CN115987989B (en) Method for expanding cloud virtual network in common system
US20050022056A1 (en) Access by distributed computers to a same hardware resource
CN108874411A (en) A kind of method and related system of system infrastructure upgrading

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant