CN101806148A - Construction method for concrete beam with U-shaped steel bar connecting joints - Google Patents

Construction method for concrete beam with U-shaped steel bar connecting joints Download PDF

Info

Publication number
CN101806148A
CN101806148A CN 201010134828 CN201010134828A CN101806148A CN 101806148 A CN101806148 A CN 101806148A CN 201010134828 CN201010134828 CN 201010134828 CN 201010134828 A CN201010134828 A CN 201010134828A CN 101806148 A CN101806148 A CN 101806148A
Authority
CN
China
Prior art keywords
groove
shaped steel
steel bar
construction method
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010134828
Other languages
Chinese (zh)
Inventor
于国家
刘亚非
仓恒芳
杨安东
贺鲁杰
王翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Dadi Construction Group Co Ltd
Original Assignee
Nanjing Dadi Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Dadi Construction Group Co Ltd filed Critical Nanjing Dadi Construction Group Co Ltd
Priority to CN 201010134828 priority Critical patent/CN101806148A/en
Publication of CN101806148A publication Critical patent/CN101806148A/en
Pending legal-status Critical Current

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention relates to a construction method for concrete beam with U-shaped steel bar connecting nodes. In the method, two ends of a precast frame beam are respectively provided with a groove; reserved steel bars on the end parts of the precast frame beam are only in the grooves; a temporary support frame is erected; U-shaped steel bars are put into the grooves of the precast frame beam; the back cut of each U-shaped steel bar is provided with a steel bar which is clamped in the groove; and beam-column joint steel bars are bound and concrete is cast into the grooves, so the U-shaped steel bars make the beams and columns connected into a whole. The construction method solves the problems that connected beams are easily corroded, the pretightening and loosening are needed on large stress occasions, the cost of monitoring and maintenance at later stage is high, equipment has large volume and is difficult to move, the construction cannot be carried out in a narrow space or without a crane, the qualification rate of joints is low, the power consumption is high and the like in a bolt connecting method and a welding connecting method. The construction method has the advantages of excellent earthquake resistance, construction period conservation by 50 percent, quality guarantee, low cost and revolving material conservation.

Description

Construction method for concrete beam with U-shaped steel bar connecting joints
Technical field
The present invention relates to a kind of new concrete structure main body construction method, particularly a kind of construction method for concrete beam with U-shaped steel bar connecting joints.
Background technology
Before the present invention, in building operations, what general concrete prefabricated frame construction beam column connected employing is nothing but two kinds of methods, and a kind of is the bolt method of attachment, and another kind is the method for being welded to connect.These two kinds of connected modes all have significant disadvantages: place, bolted slit has the generation of corrosion easily, lost efficacy thereby cause to connect, and stressed bigger occasion need carry out pretension and locking, and later stage monitoring, maintenance cost are bigger; The equipment volume that is welded to connect is bigger, moves inconvenience, narrow space or do not have crane and can not construct, and the joint qualification rate is low, and power consumption is bigger, and higher to operator's technical requirements, and influenced by workman's technical level bigger for welding quality in the operation.
Summary of the invention
Purpose of the present invention just is to overcome above-mentioned defective, and a kind of construction method for concrete beam with U-shaped steel bar connecting joints is provided.
Technical scheme of the present invention is:
Construction method for concrete beam with U-shaped steel bar connecting joints, its major technique step is:
(1) at precast frame beam two ends groove is set respectively, precast frame beam end reserved steel bar is only in groove;
(2) before the lifting of precast frame beam, set up interim bracing frame earlier, and can regulate interim bracing frame height;
(3) the U-shaped reinforcing bar is put into the groove of precast frame beam, added a reinforcing bar and be stuck in the middle of the groove in that the U-shaped reinforcing bar is suitable for reading, then colligation bean column node reinforcing bar as distribution bar;
(4) fluid concrete is to design elevation in groove, and the U-shaped reinforcing bar links into an integrated entity beam, post.
Advantage of the present invention is that with effect the job practices that adopts U-shaped reinforcing bar node to be connected precast beam, post has following advantage:
1, adopting the concrete beam and column node of U-shaped steel bar connecting joints is rigid joint, and anti-seismic performance is superior, is suitable for the mode that is articulated and connected that surpasses highly far away.
2, member can be produced in factory in advance, and directly install the job site, for beam end two reserved steel bar of routine, adopts the groove type bean column node, and reinforcing bar is reserved in the groove, and the duration can save 50%;
3, compare with traditional cast-in-place structural, this kind connected mode adopts millwork production, has changed the mode of on-the-spot armrest industry control system quality, the product quality guarantee that more is easy to get, hard outer beautiful, good endurance in the member, all common quality defects that can effectively avoid cast-in-place structural to bring;
4, adopt the concrete beam with U-shaped steel bar connecting joints, the scene only needs colligation U-shaped reinforcing bar, simple installation, and construction quality is easy to control, and this connected mode cost is lower than by manual welding connecting mode about 30%;
5, do not need template substantially, support and reduce more than 50%, save the circulation material total amount and reach 60%-80%;
6, reduce job site wet trade amount, help environmental protection, alleviate noise pollution, site operation is civilization more, satisfies the trend of national development low-carbon economy fully.
Job practices of the present invention is reliable, effective, economical, firm.
Other advantages of the present invention and effect will go on to say below.
Description of drawings
Fig. 1--structural principle schematic diagram of the present invention.
The specific embodiment
As shown in Figure 1:
Precast frame beam 2 two ends are provided with groove 3, and U-shaped reinforcing bar 4 is placed in the groove 3, utilize U-shaped reinforcing bar 4 that precast frame beam 2 and post 1 are linked together by fluid concrete.
The job practices explanation:
Hoisting prefabricated Vierendeel girder 2 is in place, and U-shaped reinforcing bar 4 is put into the groove 3 of precast frame beam 2, and placing of concrete links into an integrated entity U-shaped reinforcing bar 4 and post 1.
At precast frame beam 2 two ends groove 3 is set respectively, beam end reserved steel bar (anchor rib) only limits to not expose in the groove 3, with convenient on-the-spot the installation;
Before the lifting of precast frame beam, set up interim support earlier, and regulate bearing height, to guarantee the in place accurate of precast frame beam according to the control absolute altitude;
U-shaped reinforcing bar 4 is put into the groove 3 of precast frame beam 2, for guarantee U-shaped reinforcing bar 4 positions accurately, add a reinforcing bar and be stuck in the middle of the groove 3 in that U-shaped reinforcing bar 4 is suitable for reading, then colligation bean column node reinforcing bar as distribution bar;
It is moistening that pouring groove 3 concrete should shift to an earlier date 24 hours and water, and adopts the high grade microdilatancy pea gravel concreten and the vibration compacting of being sure to, and concreting utilizes the U-shaped reinforcing bar that beam, post are linked into an integrated entity to design elevation.

Claims (1)

1.U the construction method for concrete beam of shape steel bar connecting joints, its step is:
(1) at precast frame beam two ends groove is set respectively, precast frame beam end reserved steel bar is only in groove;
(2) before the lifting of precast frame beam, set up interim bracing frame earlier, and can regulate interim bracing frame height;
(3) the U-shaped reinforcing bar is put into the groove of precast frame beam, added a reinforcing bar and be stuck in the middle of the groove in that the U-shaped reinforcing bar is suitable for reading, then colligation bean column node reinforcing bar as distribution bar;
(4) fluid concrete is to design elevation in groove, and the U-shaped reinforcing bar links into an integrated entity beam, post.
CN 201010134828 2010-03-29 2010-03-29 Construction method for concrete beam with U-shaped steel bar connecting joints Pending CN101806148A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010134828 CN101806148A (en) 2010-03-29 2010-03-29 Construction method for concrete beam with U-shaped steel bar connecting joints

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010134828 CN101806148A (en) 2010-03-29 2010-03-29 Construction method for concrete beam with U-shaped steel bar connecting joints

Publications (1)

Publication Number Publication Date
CN101806148A true CN101806148A (en) 2010-08-18

Family

ID=42608085

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010134828 Pending CN101806148A (en) 2010-03-29 2010-03-29 Construction method for concrete beam with U-shaped steel bar connecting joints

Country Status (1)

Country Link
CN (1) CN101806148A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103046746A (en) * 2012-12-03 2013-04-17 成军 Construction method of conversion beam reinforcing bars for tall building structure
CN103195172A (en) * 2013-04-16 2013-07-10 东南大学 Beam-column joint structure of prefabricated concrete frame
CN104164920A (en) * 2014-07-23 2014-11-26 南京长江都市建筑设计股份有限公司 Bottom steel bar connecting structure of key groove node precast frame beam
CN105625572A (en) * 2016-02-29 2016-06-01 东南大学 Prefabricated prestressed concrete frame beam-column joint making disparate use of high performance materials
CN105649203A (en) * 2016-02-29 2016-06-08 东南大学 Prefabricated prestressed concrete frame beam column joint with U-shaped steel bar and sleeves

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3613325A (en) * 1969-07-10 1971-10-19 Yee Alfred A Concrete construction
US3867805A (en) * 1972-05-18 1975-02-25 Kajima Corp Method of forming joint construction of precast concrete columns and beams
CN1502756A (en) * 2002-11-22 2004-06-09 钟肇鸿 Beam column node structure for building frame and construction method
CN2918572Y (en) * 2006-07-17 2007-07-04 福州大学 Beam-column connected node employed in building frame
CN101492918A (en) * 2008-01-24 2009-07-29 华东建筑设计研究院有限公司 Beam column node for base pit engineering of topdown construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3613325A (en) * 1969-07-10 1971-10-19 Yee Alfred A Concrete construction
US3867805A (en) * 1972-05-18 1975-02-25 Kajima Corp Method of forming joint construction of precast concrete columns and beams
CN1502756A (en) * 2002-11-22 2004-06-09 钟肇鸿 Beam column node structure for building frame and construction method
CN2918572Y (en) * 2006-07-17 2007-07-04 福州大学 Beam-column connected node employed in building frame
CN101492918A (en) * 2008-01-24 2009-07-29 华东建筑设计研究院有限公司 Beam column node for base pit engineering of topdown construction method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103046746A (en) * 2012-12-03 2013-04-17 成军 Construction method of conversion beam reinforcing bars for tall building structure
CN103046746B (en) * 2012-12-03 2014-01-29 江苏通州四建集团有限公司 Construction method of conversion beam reinforcing bars for tall building structure
CN103195172A (en) * 2013-04-16 2013-07-10 东南大学 Beam-column joint structure of prefabricated concrete frame
CN103195172B (en) * 2013-04-16 2015-09-09 东南大学 A kind of prefabrication and assembly construction concrete frame beam-column connection structure
CN104164920A (en) * 2014-07-23 2014-11-26 南京长江都市建筑设计股份有限公司 Bottom steel bar connecting structure of key groove node precast frame beam
CN105625572A (en) * 2016-02-29 2016-06-01 东南大学 Prefabricated prestressed concrete frame beam-column joint making disparate use of high performance materials
CN105649203A (en) * 2016-02-29 2016-06-08 东南大学 Prefabricated prestressed concrete frame beam column joint with U-shaped steel bar and sleeves
CN105625572B (en) * 2016-02-29 2018-05-15 东南大学 Distinctiveness uses the precast prestressed concrete frame bean column node of high performance material
CN105649203B (en) * 2016-02-29 2018-07-17 东南大学 Precast prestressed concrete frame bean column node with U-shaped muscle and sleeve

Similar Documents

Publication Publication Date Title
CN204023778U (en) The connected node of prefabricated assembled concrete beam column
CN108951886B (en) Prefabricated assembled concrete anti-seismic node
CN204185755U (en) A kind of Wavelike steel webplate post-stressed concrete T beam
CN201826325U (en) Foundation structure of tower crane
CN210857510U (en) Beam tenon-and-mortise joint unit and connector of beam tenon-and-mortise joint unit and profile steel concrete beam
CN102477781A (en) Integrally assembled steel-concrete superposed component and manufacturing method thereof
CN101806148A (en) Construction method for concrete beam with U-shaped steel bar connecting joints
CN111962952A (en) Steel tube concrete column-H-shaped steel beam-steel support-pi-shaped connecting piece combined type center pillar bottom node and manufacturing method
CN103437493B (en) Connecting node of prefabricated reinforced concrete beam and construction method of connecting node
CN107355008B (en) Prefabricated connection structure and method for newly added concrete filled steel tubular column and existing structure
CN204112525U (en) Band perps precast shear wall structure in strong concrete precast frame
CN202969410U (en) SCOPE type pipe tower foundation
CN203755443U (en) Assembly integrated type overlapping frame structure
CN102953344B (en) Climbing cone type triangular cantilever bracket
CN203200745U (en) Underground continuous wall's reinforcement support in reverse construction method construction
CN103790176A (en) Embedded short limb column structure and construction method thereof
CN204023777U (en) The connected node of prefabricated assembled concrete beam column
CN206928427U (en) A kind of dry type assembled ECC protective layer node structures
CN103758208B (en) Assembled integral composite frame structure
CN106978908B (en) Embedded prestress assembly type frame reinforcing structure with shearing mild steel damper
CN203440993U (en) Connection joint of prefabricated reinforced concrete beam
CN211548015U (en) Prefabricated assembled steel-concrete composite beam
CN111962950A (en) Steel tube concrete column-H-shaped steel beam-steel support-Pi-shaped connecting piece combined type corner column middle node and manufacturing method
CN111962951A (en) Steel tube concrete column-H-shaped steel beam-steel support-Pi-shaped connecting piece combined type corner column bottom node and manufacturing method
CN203701386U (en) Steel-structure floor slab group

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20100818