CN101806054B - 高速公路下伏房柱式采空区稳定性评价方法 - Google Patents
高速公路下伏房柱式采空区稳定性评价方法 Download PDFInfo
- Publication number
- CN101806054B CN101806054B CN2010101381411A CN201010138141A CN101806054B CN 101806054 B CN101806054 B CN 101806054B CN 2010101381411 A CN2010101381411 A CN 2010101381411A CN 201010138141 A CN201010138141 A CN 201010138141A CN 101806054 B CN101806054 B CN 101806054B
- Authority
- CN
- China
- Prior art keywords
- goaf
- face
- inspection
- land
- top board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101381411A CN101806054B (zh) | 2010-04-02 | 2010-04-02 | 高速公路下伏房柱式采空区稳定性评价方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101381411A CN101806054B (zh) | 2010-04-02 | 2010-04-02 | 高速公路下伏房柱式采空区稳定性评价方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101806054A CN101806054A (zh) | 2010-08-18 |
CN101806054B true CN101806054B (zh) | 2011-04-27 |
Family
ID=42607997
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010101381411A Active CN101806054B (zh) | 2010-04-02 | 2010-04-02 | 高速公路下伏房柱式采空区稳定性评价方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101806054B (zh) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102330423B (zh) * | 2011-07-20 | 2014-04-09 | 山西潞安矿业(集团)有限责任公司 | 一种采空区上新建铁路地基稳定性的评价方法 |
CN102418513B (zh) * | 2011-08-19 | 2013-03-20 | 山西省交通规划勘察设计院 | 公路采空区处治效果检测方法 |
CN106940364B (zh) * | 2017-01-24 | 2021-02-26 | 国网山西省电力公司阳泉供电公司 | 煤矿采空区架空输电线路标准深厚比的计算方法及装置 |
CN107503795B (zh) * | 2017-08-29 | 2019-06-14 | 西安科技大学 | 一种回采巷道底板破坏范围的确定方法 |
CN107942380A (zh) * | 2017-10-23 | 2018-04-20 | 太原理工大学 | 一种考虑垮落带采空区的计算机数值模拟方法 |
CN109800508B (zh) * | 2019-01-22 | 2023-04-07 | 石家庄铁道大学 | 嵌岩桩桩端的空洞顶板厚度的计算方法及终端设备 |
CN113216967B (zh) * | 2021-05-28 | 2024-01-26 | 西安科技大学 | 浅埋近距房柱式采空区下相邻工作面相向安全开采方法 |
CN116104538B (zh) * | 2023-03-16 | 2023-10-10 | 山东省地质矿产勘查开发局第五地质大队(山东省第五地质矿产勘查院) | 基于矿区地层稳定性勘察的采空区快速达稳方法 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100522328B1 (ko) * | 2003-09-25 | 2005-10-18 | 한국건설기술연구원 | 유해 중금속 성분을 함유한 발파암버럭의 안정화 처리방법 |
CN101684631B (zh) * | 2008-09-28 | 2012-07-04 | 铁道部第三勘测设计院岩土工程总公司 | 运营路基安全状态快速无损检测方法 |
CN101538861A (zh) * | 2009-04-21 | 2009-09-23 | 中国科学院武汉岩土力学研究所 | 公路边坡稳定性分级评估方法 |
-
2010
- 2010-04-02 CN CN2010101381411A patent/CN101806054B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN101806054A (zh) | 2010-08-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101806054B (zh) | 高速公路下伏房柱式采空区稳定性评价方法 | |
Yang et al. | Ground subsidence and surface cracks evolution from shallow-buried close-distance multi-seam mining: a case study in Bulianta coal mine | |
Zhao et al. | Study of the rock mass failure process and mechanisms during the transformation from open-pit to underground mining based on microseismic monitoring | |
CN110135030B (zh) | 一种采空区地表沉降的预测方法 | |
Al Heib et al. | Analysis of the historical collapse of an abandoned underground chalk mine in 1961 in Clamart (Paris, France) | |
Li et al. | Ground movements caused by deep underground mining in Guan-Zhuang iron mine, Luzhong, China | |
CN104951615A (zh) | 一种路堑边坡模糊层次风险评估方法 | |
Wei et al. | Experiment and numerical simulation of overburden and surface damage law in shallow coal seam mining under the gully | |
Strzalkowski | Proposal of predicting formation of sinkholes with an exemplary application | |
CN109918697A (zh) | 一种矿井冲击地压强度的预测方法及装置 | |
Coşar | Application of rock mass classification systems for future support design of the Dim Tunnel near Alanya | |
Xia et al. | Investigation of the ground movement due to underground mining at the Jinshandian Iron Mine in China | |
Tymoshchuk et al. | Hydro and geomechanical stability assessment of the bund wall bottom slope of the Dniprovsk tailing dump | |
CN106815679A (zh) | 一种采煤沉陷区地块地表建设光伏电站适宜性评估方法 | |
CN109918696A (zh) | 一种冲击地压强度等级的分类方法及装置 | |
CN102758459A (zh) | 岩溶塌陷区输电线路塔基的加固方法 | |
Peng et al. | Floor failure and roadway deformation induced by contiguous coal seams mining at Huopu Mine | |
Ning et al. | Evolution law of floor fracture zone above a confined aquifer using backfill replacement mining technology | |
Wu et al. | Research of the Shape of Pressure Arch in Layered Rock Mass Based on the Protodyakonov's Theory | |
Lin et al. | Analysis of stability of mud inrush induced by fillings sliding failure in karst cave based on the simplified Bishop method and its application | |
Ramdane et al. | Differential settlements of cylindrical steel storage tanks: case of the marine terminal of Bejaia | |
Zhang et al. | Orthogonal array analysis of overburden failure due to mining of multiple coal seams | |
Sankey et al. | Tall wall mechanically stabilized earth applications | |
Yang et al. | Analysis on deformation failure and structural mechanical characteristics of multistage loess slope supported by frame structure with anchors | |
Tschuchnigg | Optimization of a deep foundation with diaphragm wall panels employing 3D FE analysis |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20160222 Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16 Patentee after: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD. Address before: 610031 Ma Jia 10, Huayuan Road, Sichuan, Chengdu Patentee before: China Railway Erju Co., Ltd. Patentee before: China Railway Erju Co., Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan Patentee after: China Railway No. 2 Engineering Group Co., Ltd. Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD. |