CN101781937A - Ice-resisting and strengthening reconstruction method of existing power transmission tower - Google Patents

Ice-resisting and strengthening reconstruction method of existing power transmission tower Download PDF

Info

Publication number
CN101781937A
CN101781937A CN 201010121884 CN201010121884A CN101781937A CN 101781937 A CN101781937 A CN 101781937A CN 201010121884 CN201010121884 CN 201010121884 CN 201010121884 A CN201010121884 A CN 201010121884A CN 101781937 A CN101781937 A CN 101781937A
Authority
CN
China
Prior art keywords
tower
power transmission
transmission tower
ice
resisting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010121884
Other languages
Chinese (zh)
Other versions
CN101781937B (en
Inventor
谢强
李颖
张勇
钱之银
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
East China Power Test and Research Institute Co Ltd
Original Assignee
Tongji University
East China Power Test and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University, East China Power Test and Research Institute Co Ltd filed Critical Tongji University
Priority to CN2010101218848A priority Critical patent/CN101781937B/en
Publication of CN101781937A publication Critical patent/CN101781937A/en
Application granted granted Critical
Publication of CN101781937B publication Critical patent/CN101781937B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)
  • Electric Cable Installation (AREA)

Abstract

The invention belongs to the technical field of power transmission devices, and specifically discloses an ice-resisting and strengthening reconstruction method of an existing power transmission tower. The method comprises the following steps of: increasing the number of diaphragms properly in the height range of the power transmission tower to improve the overall rigidity and stability of the existing power transmission tower; and enlarging the cross sectional area in the weak positions of the power transmission tower based on different tower shapes to improve the local bearing capacity. In consideration of the structural safety of the power transmission tower during on-site construction, the invention also provides a construction method for strengthening. The invention has the advantages of simple and convenient design and construction, low steel consumption and obvious effect, and can be widely used in the ice-resisting and strengthening reconstruction of the existing power transmission tower so as to improve the rigidity of the power transmission tower and reduce the serious social loss caused by the destruction of the power transmission tower in cold weather.

Description

Ice-resisting and strengthening reconstruction method of existing power transmission tower
Technical field
The invention belongs to the transmission facility technical field, be specifically related to the power transmission tower strengthening reconstruction and the job practices of a kind of power system important structure-electric power pylon opposing ice loading.
Background technology
On January 10th, 2008 beginning, the most of area of southern china have suffered the severe snow sleet of the fifty year return period weather that congeals.The destruction that bad weather has caused very big degree to disaster area electric power, communication, highway, railway and urban lifeline facility, life has caused great inconvenience to the people's ordinary production, has brought huge economy and property loss to country.In the middle of this ice and snow disaster, power system is disaster-stricken the most serious, a large amount of power transmission tower subjects to severe risks of damage, influence the hugest, and indirect influence some other industry, as railway transportation and urban water supply.Historically, 1954 in November, 2006, China takes place 35 kilovolts and above electric pressure is larger and cause the electrical network icing disaster case of certain consequence to have more than 86 examples.According to the existing designed high voltage power transmission iron tower ubiquity body of the tower tabula face of electric power line pole tower design discipline less this problem is set.In this case, the local vibration shape of iron tower structure is very serious, under the dynamic action of wind, if evoke the local vibration shape, probably causes the dynamic buckling of structure to destroy.Static Calculation also shows do not have the diagonal brace of the tower section of tabula face to have very large outer distortion to take place.The considerable damage of power transmission tower has proved absolutely the deficiency of existing power transmission tower aspect structure design in ice damage, and it is a problem that urgently will solve at present that existing power transmission tower is carried out ice-resisting and strengthening reconstruction.And for this problem, because external this type of accident is very rare, to the present still blank of its reinforcement means.The present invention is based on a large amount of tests and computational analysis and proposed a kind of very effective ice-resisting and strengthening reconstruction method that is used for existing electric power pylon.
Summary of the invention
The object of the present invention is to provide a kind of convenient, fast construction effective, cheap ice-resisting and strengthening reconstruction and job practices to existing electric power pylon.
Ice-resisting and strengthening that is used for existing power transmission tower and job practices that the present invention proposes, its step comprise to be estimated the anti-ice performance of existing iron tower, sets up the tabula face according to estimating the appropriate location of supporting in the body of the tower middle and lower part, to strengthen the integral rigidity of electric power pylon; In addition, also at different turriforms, the weak easily unstability rod member of tower head and cross-arm place of electric power pylon is reinforced.
The anti-ice performance safety evaluatio of existing electric power pylon is according to certain standard and method (ready-made method is arranged), calculates the rigidity situation of electric power pylon, and whether according to calculating, it is reasonable at first will to estimate its tabula face setting, and whether globality meets the demands.
For the tabula face very few iron tower structure is set, need carries out the strengthening reconstruction design, mainly undertaken by setting up the tabula face to it.The diaphragm face set up the place, plan-position that four one-levels that the position is positioned at the body of the tower sections support intersection points, the tabula face of setting up itself must be that a geometry unchanged body transmits horizontal shear to reach whole, rationalizes the effect of distributing shearing.The design of geometry unchanged body can be with reference to existing related specifications.The cross-sectional sizes that the existing rod member in tabula face place can be set as required of choosing of tabula face is carried out standardized designs, and its form as shown in Figure 3.Because tabula face geometry itself is constant, it can support the one-level on four planes of body of the tower integral body of formation constrained each other, avoids the one-level support node that big deformity out of plane takes place; In this simultaneously, the outer direction of face that is supported on the tabula face also plays the effect of supporting the tabula face, avoids the tabula face that distortion and vertical motion outside the excessive face take place outside face.Between diaphragm face and one-level support two mutually near plane orthogonal in constraint mutually, support each other, formed the integral body of a common holding capacity.
In order to satisfy the integral rigidity requirement, after body of the tower has been set up the diaphragm face, because the original little support of having removed tabula face annex, make that the length of intersection point that one-level supports and the diaphragm surface member between the body of the tower master material is excessive, unstability takes place than excessive in long thin (directly) easily.Therefore need set up some little diagonal braces, these diagonal braces are different with the direction of original diagonal brace.These little diagonal brace one ends are supported on the quartile of diaphragm face, an other end be connected with diagonal brace or main material (as accompanying drawing 2).
Find by a large amount of computational analysiss and test: after suitably increasing the tabula face, the overall performance of structure can be greatly improved, the local vibration shape at body of the tower diagonal brace position disappears, and the face outer displacement of tower section diagonal brace can significantly be reduced, and has reduced the possibility of the outer unstability of face.Setting up this transformation reinforcement means of tabula face is very effective for strengthening the anti-ice of electric power pylon performance.
The existence of tabula face makes the anti-ice of electric power pylon lower middle portion body of the tower performance obtain very significantly strengthening.For the tower head of directly bearing ground wire and conductor load and cross-arm, according to the difference of turriform, unstable failure takes place owing to stressed bigger in tower head and some rod member of cross-arm place easily under ice load.Therefore need take to set up reinforcement measures such as diagonal brace or increase bar cross section size to these rod members.
Two reinforcement measures that the present invention proposes, full-scope safeguards integral rigidity, torsional property and the local strength of power transmission tower integral body from the tower head to the body of the tower, make electric power pylon can bear bigger icing load and be unlikely to lose bearing capacity.The present invention designs uniqueness, and construction is simple, and effect is remarkable, and the anti-ice that can be widely used in existing electric power pylon is transformed in the stabilization works.
Description of drawings
The structure chart of Fig. 1 electric power pylon.
Fig. 2 tabula is provided with the position diagram.
Fig. 3 tabula face form schematic diagram.Wherein, (a) being matrix pattern, (b) for matrix pattern adds diagonal brace, is that double-deck square frame shape adds the diagonal brace between bilayer (c).
Iron tower schematic diagram when Fig. 4 does not set up little support.
Fig. 5 sets up little support back iron tower schematic diagram.
Number in the figure: 1,2 is the cross section that needs reinforcement, and 3 is the little diagonal brace adjacent with cross section, and 4 for adding the position of little diagonal brace, and 5 is cross section member, and 6 is tower head, and 7 is cross-arm, and 8 is body of the tower.
The specific embodiment
Below in conjunction with accompanying drawing and specific embodiment the present invention is described in further details.
Electric power pylon for the area that is subject to the icing influence needs reinforcement and transforms at first carries out structural analysis to it and determines to increase the tabula face in what position.For body of the tower structure as shown in Figure 2, computational analysis show 1,2 promptly two one-levels place, plan-position of supporting infalls increase the deformity out of plane that the tabula face can suppress the local vibration shape and obviously reduce to support.To choosing of these two position tabula faces,, choose as the form in the accompanying drawing 3 according to the size of tabula face size.Because each rod member is stressed all less in the tabula face, the existence of tabula face mainly is for the control structure globality, so the selection of diagonal angle steel dimensions do not need to calculate, only need to satisfy structure requires and design discipline in for the control requirement of rod member slenderness ratio.
According to the drawing of existing iron tower, obtain the size in cross section 1,2.According to the size in cross section 1,2, choose the form of rational tabula face.Simultaneously, consider the construction requirement of tabula face, the little diagonal brace adjacent with the tabula face (as in the accompanying drawing 2 3) need be removed, tower after the dismounting as shown in Figure 4, the length of removing the later tabula surface member 5 of little support as seen from Figure 4 is long, easy unstability, therefore need to increase some little diagonal brace positions shown in the accompanying drawing 54, one end is supported on the quartile of diaphragm face, an other end is connected with diagonal brace or main material, like this can be so that the common coordinative role of tabula face and diagonal brace, globality is stronger, and reduces the calculated length of diagonal brace.The cross section selection principle of little diagonal brace, only needs to satisfy and constructs requirement by long thin (directly) ratio control with tabula face situation.Choose and to transfer to processing factory's blanking after the member section size of tabula face and improved little diagonal brace and make.The monolateral connection of bolt is all adopted in all connections, accomplishes fluently screw in processing factory, only need carry out assembly unit at the construction field (site), is easy to site operation, and is simple.
Sequence of construction need be strictly observed during tabula face site operation, and certain meteorological condition need be satisfied.Can make that the calculated length of main material and one-level diagonal brace increases, the flexing load reduces owing to remove original secondary diagonal brace, thus this work must under little landscape condition, carry out (force 3 wind below) and while can only to four faces of body of the tower one by one face operate; After removing original secondary diagonal brace, begin to install the member (as member 5 in the accompanying drawing 4) that the tabula face connects the body of the tower one side; Improved secondary diagonal brace is installed afterwards, and the link position of secondary diagonal brace and body of the tower can be used the left screw of having removed of diagonal brace; After the member transformation for the treatment of four faces of body of the tower installs, carry out the installation of other members of tabula face again.All bolted construction qualities need meet the regulation in the existing delivery receiving acceptance rules.When tabula face strengthening reconstruction need be carried out in the position that has two or more one-levels to support with one side, must construct successively from top to bottom, can not construct simultaneously to two positions.

Claims (4)

1. the ice-resisting and strengthening reconstruction method of an existing power transmission tower is characterized in that concrete steps are as follows: the anti-ice performance that has iron tower now is estimated, set up the tabula face according to estimating the appropriate location of supporting in the body of the tower middle and lower part, to strengthen the integral rigidity of power transmission tower; In addition, also at different turriforms, the weak easily unstability rod member of tower head and cross-arm place of electric power pylon is reinforced; Wherein:
Four one-levels of body of the tower sections that are positioned at the described tabula face of setting up support the place, plan-position of intersection point, and this cross section itself is a geometry unchanged body, and this tabula face forms an integral body with the mutual constraint of one-level support of four faces of body of the tower.
2. the ice-resisting and strengthening reconstruction method of existing power transmission tower according to claim 1, after it is characterized in that having increased described tabula face, also need to set up some little diagonal braces, an end of these little diagonal braces is supported on the quartile place of described tabula face, and the other end is supported on one-level diagonal brace or the main material.
3. the ice-resisting and strengthening reconstruction method of existing power transmission tower according to claim 1 is characterized in that the measure of setting up diagonal brace or increasing the bar cross section size is adopted in the reinforcing of the weak easily unstability rod member of tower head and cross-arm place.
4. the ice-resisting and strengthening reconstruction method of existing power transmission tower according to claim 1 is characterized in that the job site wind speed below 3 grades, and rod member is installed and removed in the work progress needs to observe following order:
To four faces of body of the tower one by one face operate; After removing original secondary diagonal brace, begin to install the member that the tabula face connects the body of the tower one side; Improved secondary diagonal brace is installed afterwards, and the link position of secondary diagonal brace and body of the tower can be used the left screw of having removed of diagonal brace; After the member transformation for the treatment of four faces of body of the tower installs, carry out the installation of other members of tabula face again.
CN2010101218848A 2010-03-11 2010-03-11 Ice-resisting and strengthening reconstruction method of existing power transmission tower Expired - Fee Related CN101781937B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101218848A CN101781937B (en) 2010-03-11 2010-03-11 Ice-resisting and strengthening reconstruction method of existing power transmission tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101218848A CN101781937B (en) 2010-03-11 2010-03-11 Ice-resisting and strengthening reconstruction method of existing power transmission tower

Publications (2)

Publication Number Publication Date
CN101781937A true CN101781937A (en) 2010-07-21
CN101781937B CN101781937B (en) 2011-05-25

Family

ID=42522083

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101218848A Expired - Fee Related CN101781937B (en) 2010-03-11 2010-03-11 Ice-resisting and strengthening reconstruction method of existing power transmission tower

Country Status (1)

Country Link
CN (1) CN101781937B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535874A (en) * 2012-01-11 2012-07-04 同济大学 Wind resistance and reinforcement transformation method of high-voltage and superhigh-voltage power transmission line iron tower
CN102767293A (en) * 2012-08-07 2012-11-07 广东电网公司佛山供电局 Strengthening method for power transmission tower on hazardous area of landslide
CN104746894A (en) * 2015-03-27 2015-07-01 中冶天工上海十三冶建设有限公司 Modularized detaching construction method for large air separator cold box
CN105389436A (en) * 2015-11-16 2016-03-09 国网山东省电力公司电力科学研究院 Charged reinforcing and strengthening method for power transmission tower
CN105952239A (en) * 2016-06-21 2016-09-21 山东大学 Reinforcement device for preventing flexural-torsional buckling of angle steel for iron towers
CN113032878A (en) * 2021-03-24 2021-06-25 贵州电网有限责任公司 Anti-icing and disaster-reducing design method capable of repairing iron tower
CN113982358A (en) * 2021-11-09 2022-01-28 贵州电网有限责任公司 Improvement method for improving icing torsional rigidity of clamp type old line iron tower

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4435489A1 (en) * 1994-10-04 1996-04-11 Abb Patent Gmbh Exchange of main diagonal strut of power-line pylon using auxiliary girder
CN2909652Y (en) * 2006-05-31 2007-06-06 北京国电华北电力工程有限公司 Co-tower double-loop compact linear transmission pylon
JP2008261145A (en) * 2007-04-12 2008-10-30 Kansai Electric Power Co Inc:The Method of reinforcing hollow steel pipes of power transmission steel tower
CN101404399A (en) * 2008-11-17 2009-04-08 云南省电力设计院 Heavy ice area dual-loop co-column suspension type power transmission iron tower
CN101463667A (en) * 2009-01-16 2009-06-24 天津市电力公司 Reinforcing means for power transmission iron tower
CN201362979Y (en) * 2009-01-16 2009-12-16 天津市电力公司 Reinforcing structure for power transmission iron tower

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4435489A1 (en) * 1994-10-04 1996-04-11 Abb Patent Gmbh Exchange of main diagonal strut of power-line pylon using auxiliary girder
CN2909652Y (en) * 2006-05-31 2007-06-06 北京国电华北电力工程有限公司 Co-tower double-loop compact linear transmission pylon
JP2008261145A (en) * 2007-04-12 2008-10-30 Kansai Electric Power Co Inc:The Method of reinforcing hollow steel pipes of power transmission steel tower
CN101404399A (en) * 2008-11-17 2009-04-08 云南省电力设计院 Heavy ice area dual-loop co-column suspension type power transmission iron tower
CN101463667A (en) * 2009-01-16 2009-06-24 天津市电力公司 Reinforcing means for power transmission iron tower
CN201362979Y (en) * 2009-01-16 2009-12-16 天津市电力公司 Reinforcing structure for power transmission iron tower

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535874A (en) * 2012-01-11 2012-07-04 同济大学 Wind resistance and reinforcement transformation method of high-voltage and superhigh-voltage power transmission line iron tower
CN102767293A (en) * 2012-08-07 2012-11-07 广东电网公司佛山供电局 Strengthening method for power transmission tower on hazardous area of landslide
CN104746894A (en) * 2015-03-27 2015-07-01 中冶天工上海十三冶建设有限公司 Modularized detaching construction method for large air separator cold box
CN105389436A (en) * 2015-11-16 2016-03-09 国网山东省电力公司电力科学研究院 Charged reinforcing and strengthening method for power transmission tower
CN105389436B (en) * 2015-11-16 2018-08-17 国网山东省电力公司电力科学研究院 A kind of power transmission tower electrification reinforcement and strengthening method
CN105952239A (en) * 2016-06-21 2016-09-21 山东大学 Reinforcement device for preventing flexural-torsional buckling of angle steel for iron towers
CN105952239B (en) * 2016-06-21 2018-01-09 山东大学 The anti-bending unstability bracing means of steel tower corner iron
CN113032878A (en) * 2021-03-24 2021-06-25 贵州电网有限责任公司 Anti-icing and disaster-reducing design method capable of repairing iron tower
CN113982358A (en) * 2021-11-09 2022-01-28 贵州电网有限责任公司 Improvement method for improving icing torsional rigidity of clamp type old line iron tower

Also Published As

Publication number Publication date
CN101781937B (en) 2011-05-25

Similar Documents

Publication Publication Date Title
CN101781937B (en) Ice-resisting and strengthening reconstruction method of existing power transmission tower
CN101463667A (en) Reinforcing means for power transmission iron tower
CN102535874A (en) Wind resistance and reinforcement transformation method of high-voltage and superhigh-voltage power transmission line iron tower
CN104481178A (en) Composite material substation structure
CN201172984Y (en) Combined fender bracket for concrete pole
WO2011029311A1 (en) Method for vertically grounding and leading down from outer side of composite material pole tower and pole tower thereof.
CN201362979Y (en) Reinforcing structure for power transmission iron tower
CN101255773A (en) H-shaped steel for electrified railroad contact network pillar as well as preparation technique thereof
CN205296831U (en) Supporting type that bears joist that uses of support is buckled to socket joint type dish
CN101555732B (en) Tension-compression main material type electric power pylon
CN205296966U (en) Transmission line iron tower
CN113266192A (en) Bracing wire reinforcing method for tower body of self-supporting power transmission tower
CN201110804Y (en) Multifunctional experimental bench
CN201813068U (en) Distribution structure of support tubular bus leading and incoming equipment of ultra-high voltage main transformer incoming lines
CN102966257A (en) 750kV composite material cross arm
CN202081689U (en) Alternating-current ultrahigh voltage single-tower dual-loop terminal tower
CN213898375U (en) Pole tower in-situ lifting device
CN201372598Y (en) Super-high voltage transmission tower with reinforced concrete structure
CN104746932A (en) Pressure weight type roof communication tower and mounting method
CN206908240U (en) A kind of High aititude transformer station 330kV power distribution equipments bilayer outlet structure
CN204645800U (en) A kind of power transmission tower
CN202090662U (en) Alternating current extra-high voltage same-tower and dual-loop strain tower
CN201507140U (en) Composite material pole tower
CN205617879U (en) Transmission line salvagees overhead line pole
CN204457038U (en) A kind of substation framework crossbeam cantilevered structure and truss

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110525

Termination date: 20140311