CN101775839A - Rainwater penetrating-discharging integrated ecological system - Google Patents

Rainwater penetrating-discharging integrated ecological system Download PDF

Info

Publication number
CN101775839A
CN101775839A CN 201010125078 CN201010125078A CN101775839A CN 101775839 A CN101775839 A CN 101775839A CN 201010125078 CN201010125078 CN 201010125078 CN 201010125078 A CN201010125078 A CN 201010125078A CN 101775839 A CN101775839 A CN 101775839A
Authority
CN
China
Prior art keywords
penetration
gutter
inspection well
permeable
infiltration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010125078
Other languages
Chinese (zh)
Other versions
CN101775839B (en
Inventor
王耀堂
龙晨程
刘鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA ARCHITECTURE DESIGN INSTITUTE CO., LTD.
Original Assignee
China Architecture Design and Research Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Architecture Design and Research Group Co Ltd filed Critical China Architecture Design and Research Group Co Ltd
Priority to CN2010101250788A priority Critical patent/CN101775839B/en
Publication of CN101775839A publication Critical patent/CN101775839A/en
Application granted granted Critical
Publication of CN101775839B publication Critical patent/CN101775839B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a rainwater penetrating-discharging integrated ecological system, which comprises penetration inspection wells distributed on the ground of residential areas, penetration drainage ditches which are in a network shape and connected on all the penetration inspection wells and transversal connecting pipes between the penetration inspection wells and the penetration drainage ditches. Permeable holes are formed on the side walls and at the bottoms of the penetration inspection wells, a gravel layer is laid in the peripheries of the penetration inspection wells, a layer of permeable geotextile is laid in the peripheries of the gravel layer, wellheads of the penetration inspection wells are provided with dirt-catching and sewage-blocking baskets therein and permeable well covers are covered on the wellheads; permeable holes are formed on the side walls of the penetration drainage ditches, the peripheries of the penetration drainage ditches are provided with the gravel layer, the peripheries of the gravel layers are provided with a layer of permeable geotexile, and the top parts of the penetration drainage ditches are covered with grate covers of the drainage ditches. The invention has the advantages of simple design principle and convenient construction. The invention can save water consumption, reduce rainwater runoff in a city and relieve municipal drainage pressure, thereby not only realizing early draining of rainwater, purifying water, but also realizing the penetration of rainwater, conserving underground water source and beautifying the peripheral ecological environment.

Description

Rain penetration-discharging integrated ecological system
Technical field
The present invention relates to a kind of system that utilizes of rainwater resource, the rainwater resource of particularly building the sub-district utilizes system.
Background technology
In the city, the rainwater that drops to ground or roofing directly is disposed to the municipal drainage pipe network through the grate gutter inlet on ground or the ditch on ground, has strengthened the rainfall runoff in city like this, has increased the discharge pressure of city planting ductwork.Especially pull down and remove a building for reconstruction on a large scale in current city, in the upsurge in construction of a large amount of newly-built sub-districts, buried storm sewer need be laid in many newly-built sub-districts, and docks with existing municipal drainage pipe network, this has more increased the load of existing municipal drainage pipe network.And on the other hand, because that most of rainwater fails to reflux is underground, the groundwater table in the city reduces year by year significantly, and the minimizing of underground water source makes the city become withered isolated island, has worsened urban ecological environment.
At present, the way that some head it offs are arranged is that the rainwater of setting up rainwater collecting pit and non-osmosis type in the building sub-district is collected pipe network, the rainwater of collecting is recharged to underground as sub-district afforestation water through behind the sedimentation and filtration, but for the effect that reaches smooth draining and infiltration and prevent that pipe network from stopping up, ground need be provided with more rainwater inspection well, link to each other with short pipeline between well and the well, and the quantity of rainwater inspection well is too much, not only can increase the cost of cell infrastructures, and can influence the landscape effect on ground, and directly the rainfall load that can cause in the pond to be born with the pipeline connection is big, also can't reach good osmotic effect.What is more, attacks suddenly when raining heavyly when running into, because impeded drainage at short notice, a large amount of rainwater and road surface foreign material pour in inlet for stom water, just cause easily that inlet for stom water stops up and local low-lying land area water is dark excessively, cause the regional traffic paralysis, even the rain big flood evil in zone occurs.To sum up, existing way generally just adopts the means or the local penetration utilization of discharging fully or recovery fully to rainwater, does not still have a kind of rain penetration-discharging integrated system of maturation, and this problem needs to be resolved hurrily.
?
Summary of the invention
The purpose of this invention is to provide a kind of rain penetration-discharging integrated ecological system, solve that existing rain penetration, exhaust system structure are owed rationally, the bad technical problem of osmotic effect.
For achieving the above object, the present invention adopts following technical scheme:
This rain penetration-discharging integrated ecological system, comprise the penetration inspection well that is distributed in building ground, sub-district, be network and be connected in the infiltration gutter of each penetration inspection well and the transverse connecting pipe between the two, the sidewall and the bottom surface of described penetration inspection well are distributed with permeable hole, the periphery of penetration inspection well is laid with layer of gravel, the periphery of layer of gravel is equipped with the permeable geotextiles of one deck, be provided with in the well head of penetration inspection well and block the dirty dirty basket that cuts, be stamped permeable well lid on the well head; The sidewall in described infiltration gutter is distributed with permeable hole, and infiltration periphery, gutter is laid with layer of gravel, and the layer of gravel periphery is equipped with the permeable geotextiles of one deck, and the gutter grating is stamped at the top in infiltration gutter, and the gutter grating is concordant with ground.
Between the described adjacent penetration inspection well infiltration gutter the gradient of laying be 0.01~0.02, each penetration inspection well lay the gradient from high to low.
The described penetration inspection well that lays gradient lowest part is connected with municipal drainage pipe network or rainwater collecting pit by gutter.
Described penetration inspection well and infiltration gutter are the resin concrete material.
The opening diameter of the permeable hole on described penetration inspection well and the infiltration gutter is 8~10mm, percent opening 1.5~3%.
Be equipped with the permeable geotextiles of one deck between the periphery in described penetration inspection well and infiltration gutter and the layer of gravel.
Described transverse connecting pipe is the plastic pipe of HDPE material, and the junction in transverse connecting pipe and penetration inspection well sidewall and infiltration gutter is equipped with gusset plate.
The cross section in described infiltration gutter is the U-shaped structure, and wide is 100~600mm, and the bottom comers place in infiltration gutter has collet, and the length of every gutter grating is 600~1000mm.
Described blocking dirty cut dirty basket and is the dirty basket of blocking of stainless steel, and the peripheral closure of blocking dirty basket has non-woven geotextile.
The described dirt basket that blocks is infundibulate, is distributed with water-permeable passage on its sidewall.
Compared with prior art the present invention has following characteristics and beneficial effect:
Rainwater utilization of the present invention has using water wisely and alleviates water resources crisis, rain penetration increase underground water content, improves region environment, reduces and slow down multi-functionals such as rain-water drainage amount, reduction Urban Storm Flood disaster.The present invention makes the storm-water drainage that drops to ground or roofing to rain penetration-discharging integrated ecological system, a part of water yield is stored, permeated to rainwater by infiltration gutter, penetration inspection well, the rainwater that has little time to permeate enters city planting ductwork again, alternative traditional storm sewer of this system and inlet for stom water, rainwater inspection well, adopt the infiltration open drain to realize that rainwater is collected, discharging, save the ground rainwater mouth, reduce ground rainwater manhole quantity, thereby improved building sub-district ground landscape effect.Reduce traditional buried storm sewer, can reduce the difficulty of laying of outdoor pipe network.The harm of having avoided traditional storm sewer to cause because of obstruction can be conveniently cleaned and manage in infiltration possession, gutter face draining.The resin concrete material is all adopted in penetration inspection well and infiltration gutter, has water passing capacity and ring stiffness preferably preferably, has infiltration function simultaneously, can play the effect of initial stage filtration, purification to rainwater.
Design principle of the present invention is simple, easy construction, but using water wisely, reduce the urban rainwater runoff, alleviate municipal drainage pressure, can realize that the initial stage of rainwater is cut dirt, purify water, can realize the infiltration of rainwater again, conserve underground water source and beautify ecological environment on every side, unnecessary rainwater normally can also be discharged, have the drain function of conventional gutter, effect with killing three birds with one stone is a kind of rainwater to be utilized mode and means better.The present invention is fit to the moderate building sub-district rainwater utilization system of scale, and whole system is a whole set of complete set device product.In concrete engineering, what and project scale of rain penetration amount, storage capacity, discharge value etc. needs to calculate according to " building and sub-district rainwater utilization engineering legislation " to be determined.
Description of drawings
The present invention will be further described in detail below in conjunction with accompanying drawing.
Fig. 1 is the structural representation of longitudinal section of the present invention.
Fig. 2 is the structural representation in cross section of the present invention.
Fig. 3 is the structural representation that infiltration detects the well cross section.
Fig. 4 is the structural representation of permeable well lid.
Fig. 5 be block dirty cut dirty basket structural representation.
Fig. 6 is the structural representation in infiltration gutter.
Reference numeral: 1-penetration inspection well, 2-infiltration gutter, 3-transverse connecting pipe, 4-permeable hole, 5-layer of gravel, the permeable geotextiles of 6-, the permeable well lid of 7-, 8-gutter grating, 9-block dirty dirty basket, 10-water-permeable passage, 11-gusset plate, the 12-collet of cutting.
The specific embodiment
Embodiment is referring to Fig. 1, shown in Figure 2, this rain penetration-discharging integrated ecological system, comprise be distributed in the building ground, sub-district penetration inspection well 1, be infiltration gutter 2 and the transverse connecting pipe between the two 3 that network is connected in each penetration inspection well, the sidewall of described penetration inspection well 1 and bottom surface are distributed with permeable hole 4, the periphery of penetration inspection well is laid with layer of gravel 5, the periphery of layer of gravel is equipped with the permeable geotextiles 6 of one deck, be provided with in the well head of penetration inspection well 1 and block the dirty dirty basket 9 that cuts, be stamped permeable well lid 7 on the well head; The sidewall in described infiltration gutter 2 is distributed with permeable hole, and infiltration periphery, gutter is laid with layer of gravel, and the layer of gravel periphery is equipped with the permeable geotextiles of one deck, and the gutter grating 8 concordant with ground is stamped at the top in infiltration gutter.
Between the described adjacent penetration inspection well infiltration gutter 2 the gradient of laying be 0.01~0.02, each penetration inspection well lay the gradient from high to low.The penetration inspection well 1 that lays gradient lowest part is connected with municipal drainage pipe network or rainwater collecting pit by gutter.
The resin concrete material is all adopted in described penetration inspection well 1 and infiltration gutter 2.The opening diameter of the permeable hole 4 on penetration inspection well 1 and the infiltration gutter 2 is 8~10mm, percent opening 1.5~3%.
Referring to shown in Figure 3, described transverse connecting pipe 3 is the plastic pipe of HDPE material, and the junction in transverse connecting pipe and penetration inspection well sidewall and infiltration gutter is equipped with gusset plate 11.
Referring to shown in Figure 5, described blocking dirty cut dirty basket for the dirty basket of blocking of stainless steel, is shaped as infundibulate, is distributed with water-permeable passage 10 on its sidewall.The peripheral closure of blocking dirty basket has non-woven geotextile.
Referring to shown in Figure 6, the cross section in described infiltration gutter 2 is the U-shaped structure, and wide is 100~600mm, and the length of every gutter grating 8 is 600~1000mm.The gutter grating can be hollow out shape or grill-shaped, and its permeable hole also can need be designed to alphabetical shape, literal shape or various pattern form by surrounding environment except that the bar shaped of routine, circle.The length in every section infiltration gutter 2 can be more than 2 meters, and the upper edge in infiltration gutter 2 is L shaped, two edge symmetries, so that embed the gutter grating, the bottom comers place in infiltration gutter 2 has the collet 12 of strengthening usefulness.
The course of work of the present invention: rainwater drops to ground earlier, on the roof, conflux and laggardly go into to permeate in the facility, in the penetration inspection well, hold back by cutting dirty frame earlier, filter, rainwater is filled in the layer of gravel after filtering, the infiltration that does not stop simultaneously, constantly carry out with rainfall, rainwater is on the increase, rainwater oozes under while storing, the delivery port that unnecessary rainwater will cover the penetration inspection well enters the infiltration gutter, rainwater is stored in the infiltration gutter again subsequently, under ooze, and the like to next penetration inspection well, the i.e. storage that in whole infiltration-discharging one, does not stop, infiltration is when loading above the maximum amount of rainfall of this system, system just is discharged into the downstream city planting ductwork with unnecessary rainwater, or enters in the rainwater collecting pit and recycle.

Claims (10)

1. rain penetration-discharging integrated ecological system, it is characterized in that: comprise the penetration inspection well (1) that is distributed in building ground, sub-district, be the infiltration gutter (2) that network is connected in each penetration inspection well, and the transverse connecting pipe between the two (3), the sidewall of described penetration inspection well (1) and bottom surface are distributed with permeable hole (4), the periphery of penetration inspection well is laid with layer of gravel (5), the periphery of layer of gravel is equipped with the permeable geotextiles of one deck (6), be provided with in the well head of penetration inspection well (1) and block the dirty dirty basket (9) that cuts, be stamped permeable well lid (7) on the well head; The sidewall in described infiltration gutter (2) is distributed with permeable hole, and infiltration periphery, gutter is laid with layer of gravel, and the layer of gravel periphery is equipped with the permeable geotextiles of one deck, and gutter grating (8) is stamped at the top in infiltration gutter, and gutter grating (8) is concordant with ground.
2. rain penetration-discharging integrated ecological system according to claim 1 is characterized in that: the gradient of laying of permeating gutter (2) between the described adjacent penetration inspection well is 0.01~0.02, each penetration inspection well lay the gradient from high to low.
3. rain penetration-discharging integrated ecological system according to claim 1 is characterized in that: the described penetration inspection well (1) that lays gradient lowest part is connected with municipal drainage pipe network or rainwater collecting pit by gutter.
4. rain penetration-discharging integrated ecological system according to claim 2 is characterized in that: described penetration inspection well (1) and infiltration gutter (2) are the resin concrete material.
5. rain penetration-discharging integrated ecological system according to claim 2 is characterized in that: the opening diameter of the permeable hole (4) on described penetration inspection well (1) and the infiltration gutter (2) is 8~10mm, percent opening 1.5~3%.
6. rain penetration-discharging integrated ecological system according to claim 2 is characterized in that: be equipped with the permeable geotextiles of one deck (6) between the periphery in described penetration inspection well (1) and infiltration gutter (2) and the layer of gravel (5).
7. rain penetration-discharging integrated ecological system according to claim 2, it is characterized in that: described transverse connecting pipe (3) is the plastic pipe of HDPE material, the junction in transverse connecting pipe and penetration inspection well sidewall and infiltration gutter is equipped with gusset plate (11).
8. rain penetration-discharging integrated ecological system according to claim 2, it is characterized in that: the cross section in described infiltration gutter (2) is the U-shaped structure, wide is 100~600mm, the bottom comers place in infiltration gutter (2) has collet (12), and the length of every gutter grating (8) is 600~1000mm.
9. rain penetration-discharging integrated ecological system according to claim 2 is characterized in that: described blocking dirty cut dirty basket and is the dirty basket of blocking of stainless steel, and the peripheral closure of blocking dirty basket has non-woven geotextile.
10. rain penetration-discharging integrated ecological system according to claim 9 is characterized in that: the described dirty basket (9) that blocks is distributed with water-permeable passage (10) for infundibulate on its sidewall.
CN2010101250788A 2010-03-16 2010-03-16 Rainwater penetrating-discharging integrated ecological system Expired - Fee Related CN101775839B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101250788A CN101775839B (en) 2010-03-16 2010-03-16 Rainwater penetrating-discharging integrated ecological system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101250788A CN101775839B (en) 2010-03-16 2010-03-16 Rainwater penetrating-discharging integrated ecological system

Publications (2)

Publication Number Publication Date
CN101775839A true CN101775839A (en) 2010-07-14
CN101775839B CN101775839B (en) 2012-08-22

Family

ID=42512410

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101250788A Expired - Fee Related CN101775839B (en) 2010-03-16 2010-03-16 Rainwater penetrating-discharging integrated ecological system

Country Status (1)

Country Link
CN (1) CN101775839B (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101891350A (en) * 2010-07-21 2010-11-24 河海大学 Overflowing rain sewage on-site elimination stepped ecological sewage control structure
CN102359148A (en) * 2011-10-14 2012-02-22 济南大学 Circular self-seepage recharge well head assembly
CN102900146A (en) * 2012-09-28 2013-01-30 董文艺 Gutter inlet with functions of peak clipping and scrubbing
CN103255831A (en) * 2013-05-23 2013-08-21 四川大学 Rainwater pipeline capable of being permeated by ground water
CN103669232A (en) * 2012-09-03 2014-03-26 东北林业大学 Pressure water seepage road drainage shaft
CN104294905A (en) * 2014-10-31 2015-01-21 北京建筑大学 Pervious concrete pavement system with filter material well
CN105484340A (en) * 2016-01-18 2016-04-13 济南黄河路桥工程公司 Rainstorm overflow well with rainwater seepage function
CN105714910A (en) * 2016-01-29 2016-06-29 周克珍 Portable initial rainwater collecting and purifying water seeping device
CN105839771A (en) * 2016-04-05 2016-08-10 北京建筑大学 Intercepting-type rainwater grate
CN107326997A (en) * 2017-09-05 2017-11-07 长沙理工大学 One kind is used to handle road Initial Runoff and rainwater recycling system
CN109577450A (en) * 2018-12-29 2019-04-05 中关村海绵城市工程研究院有限公司 A kind of rainwater infiltration row's integrated apparatus
CN110998039A (en) * 2017-06-02 2020-04-10 迈克尔·约翰·温 Improved liquid run-off disposal system
CN111608253A (en) * 2020-06-15 2020-09-01 泉州台商投资区忆品茶业有限公司 Rainwater collection device is used in gardens
CN113152203A (en) * 2021-05-13 2021-07-23 中国十九冶集团有限公司 Drainage system for landscaping engineering and construction method thereof
CN115030291A (en) * 2022-06-21 2022-09-09 上海市城市建设设计研究总院(集团)有限公司 Pipe gallery access & exit with initiative waterproof, cut dirty and drainage function

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10311082A (en) * 1997-05-14 1998-11-24 Haneda Hume Pipe Co Ltd Penetrating structure
CN2887986Y (en) * 2005-09-02 2007-04-11 北京泰宁科创科技有限公司 Penetrating catch basin
JP3148921U (en) * 2008-12-19 2009-03-05 株式会社ホクコン Rain water filter
CN201817851U (en) * 2010-03-16 2011-05-04 中国建筑设计研究院 Rainwater ecological utilization system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10311082A (en) * 1997-05-14 1998-11-24 Haneda Hume Pipe Co Ltd Penetrating structure
CN2887986Y (en) * 2005-09-02 2007-04-11 北京泰宁科创科技有限公司 Penetrating catch basin
JP3148921U (en) * 2008-12-19 2009-03-05 株式会社ホクコン Rain water filter
CN201817851U (en) * 2010-03-16 2011-05-04 中国建筑设计研究院 Rainwater ecological utilization system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《中国给水排水》 20071231 赵世明 等 建筑与小区雨水利用工程规模的分析 84-87 第23卷, 第24期 *
《建筑给排水》 20100110 龙晨程 等 雨水渗透-排放一体系统性能测试试验研究 146-150 第36卷, 第1期 *

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101891350A (en) * 2010-07-21 2010-11-24 河海大学 Overflowing rain sewage on-site elimination stepped ecological sewage control structure
CN102359148A (en) * 2011-10-14 2012-02-22 济南大学 Circular self-seepage recharge well head assembly
CN102359148B (en) * 2011-10-14 2013-05-15 济南大学 Circular self-seepage recharge well head assembly
CN103669232A (en) * 2012-09-03 2014-03-26 东北林业大学 Pressure water seepage road drainage shaft
CN102900146B (en) * 2012-09-28 2016-01-20 深圳市万木水务有限公司 A kind of inlet for stom water with peak clipping dirty removal capacities
CN102900146A (en) * 2012-09-28 2013-01-30 董文艺 Gutter inlet with functions of peak clipping and scrubbing
CN103255831A (en) * 2013-05-23 2013-08-21 四川大学 Rainwater pipeline capable of being permeated by ground water
CN103255831B (en) * 2013-05-23 2014-07-09 四川大学 Rainwater pipeline capable of being permeated by ground water
CN104294905A (en) * 2014-10-31 2015-01-21 北京建筑大学 Pervious concrete pavement system with filter material well
CN105484340A (en) * 2016-01-18 2016-04-13 济南黄河路桥工程公司 Rainstorm overflow well with rainwater seepage function
CN105714910A (en) * 2016-01-29 2016-06-29 周克珍 Portable initial rainwater collecting and purifying water seeping device
CN105839771A (en) * 2016-04-05 2016-08-10 北京建筑大学 Intercepting-type rainwater grate
CN110998039A (en) * 2017-06-02 2020-04-10 迈克尔·约翰·温 Improved liquid run-off disposal system
CN107326997A (en) * 2017-09-05 2017-11-07 长沙理工大学 One kind is used to handle road Initial Runoff and rainwater recycling system
CN109577450A (en) * 2018-12-29 2019-04-05 中关村海绵城市工程研究院有限公司 A kind of rainwater infiltration row's integrated apparatus
CN111608253A (en) * 2020-06-15 2020-09-01 泉州台商投资区忆品茶业有限公司 Rainwater collection device is used in gardens
CN113152203A (en) * 2021-05-13 2021-07-23 中国十九冶集团有限公司 Drainage system for landscaping engineering and construction method thereof
CN115030291A (en) * 2022-06-21 2022-09-09 上海市城市建设设计研究总院(集团)有限公司 Pipe gallery access & exit with initiative waterproof, cut dirty and drainage function

Also Published As

Publication number Publication date
CN101775839B (en) 2012-08-22

Similar Documents

Publication Publication Date Title
CN101775839B (en) Rainwater penetrating-discharging integrated ecological system
CN106284588B (en) A kind of rainwater treatment and stocking system available for sponge city
CN105089302B (en) A kind of Rain Garden system for the shunting of community's rainwater, peak clipping and ecological purification
CN204919757U (en) Rainwater normal position purifies repair system
KR101410194B1 (en) First rainwater induction pipe construction with bridge and equipment for decrease non-point pollution sources including the construction
CN108104247B (en) Mixed flow non-concave biological detention pool with initial rainwater discarding function
CN211898784U (en) Sunken greenery patches drainage structures that sponge city was used
CN205012441U (en) Rainwater infiltration - discharges integrative device
CN110042724B (en) Rainwater collecting, utilizing and discharging system for sponge facilities in collapsible loess area
CN209686564U (en) A kind of small sponge urban ecology rainwater storage cell system
CN201817851U (en) Rainwater ecological utilization system
CN107905331A (en) Stagnant system is oozed in a kind of self-cleaning of sponge city
CN109797839A (en) A kind of efficient pollution cutting device of urban road inlet for stom water and cut dirty operating method
CN204898828U (en) Rainwater conserves - restores integrative device
CN203174754U (en) Rainwater permeable-type overflow well
CN106165568B (en) It is a kind of for purifying the stepped concave herbaceous field of surface rain runoff
CN105484340A (en) Rainstorm overflow well with rainwater seepage function
CN206428785U (en) It is a kind of to remove the Multifunctional rain management and control facility become silted up
CN104294905A (en) Pervious concrete pavement system with filter material well
CN216195095U (en) Sponge city rainwater recycling device
CN205773956U (en) Sewage percolation purification system
CN205475583U (en) Stormwater overflow well with rain water leakage function
CN214460937U (en) Rainwater garden structure of traffic hub
CN213358503U (en) Natural bank slope protective structure based on sponge city idea
CN211421345U (en) Biological detention belt system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA ARCHITECTURE DESIGN INSTITUTE CO., LTD.

Free format text: FORMER OWNER: CHINA INSTITUTE OF BUILDING STANDARD DESIGN + RESEARCH

Effective date: 20150710

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150710

Address after: 100044 Beijing City, the number of cars on the main street, Xicheng District

Patentee after: CHINA ARCHITECTURE DESIGN INSTITUTE CO., LTD.

Address before: 100044 Beijing City, the number of cars on the main street, Xicheng District

Patentee before: China Architecture Design & Research Institute

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120822

Termination date: 20170316