CN101763572A - Task overall distribution system - Google Patents
Task overall distribution system Download PDFInfo
- Publication number
- CN101763572A CN101763572A CN200810235140A CN200810235140A CN101763572A CN 101763572 A CN101763572 A CN 101763572A CN 200810235140 A CN200810235140 A CN 200810235140A CN 200810235140 A CN200810235140 A CN 200810235140A CN 101763572 A CN101763572 A CN 101763572A
- Authority
- CN
- China
- Prior art keywords
- task
- operating software
- software
- distribution system
- database
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention relates to a task overall distribution system, which is characterized in that: the system, on the basis of the traditional task flow target management software, takes a task as a unit and applies principles of overall planning to automatic sorting and machining of a plurality of tasks according to different schemes such as priority and generate a task schedule. The system has three basic components including client operating software, server operating software and a database, wherein the client operating software and the server operating software have a client interface and a data access component respectively; and the database has a personnel information table which records personnel information, a task table which records task information, a task distributing scheme table which records distribution scheme information and a task performance table which records task performance. The task overall distribution system makes a breakthrough in the traditional task flow target management software, focuses more on the improvement on the working efficiency of the personnel and is used in the execution of tasks requiring the concentrated main time and energy of the personnel.
Description
Technical field
The present invention relates to a kind of task overall distribution system, particularly, the present invention relates to a kind of is unit with the task on original task flow management by objective basis of software, utilization plan as a whole to learn principle with a plurality of tasks according to different schemes such as degree of priority, automatically sort, arrange in pairs or groups, and generate task scheduling scheduling table.
Background technology
Object management system, be a kind of comprehensive be center and system management mode focusing on people with work.It is in a tissue by the upper management personnel with the managerial personnel of subordinate, and with employee's organizational goal of coming together to formulate jointly, and its specific each department, each level, each member's there that is deployed into tissue, maintain close ties with mutually with each unit of organization internal, department, level and member's responsibility achievement, stipulate the way to manage of cover systemizations such as each unit, department, level and member's contribution and incentive payment clearly.Because the task object management software can tasks clear, form excitation, self-management, control are effective, brings many remarkable facilities to the user, is applied rapidly.
Yet, though existing task object management software makes unit management high efficiency more, standardization and scientific, but existing task flow management by objective software does not have the task refinement arranges function, the decomposition of task and formulation still need the people for carrying out, this just need reasonably arrange according to the order of importance and emergency of each task the subtask after the refinement, the employee receives task at every turn and will spend a lot of times to go to consider to concern between each task, and the plyability between the task, if arrange the imappropriate task serial that may cause walking abreast to carry out, the generation of this situation, not only waste the time, but also influenced work efficiency.
Development along with enterprise, work efficiency has become the standard of employee's integration capability of valuation of enterprise, so much task in the existing task flow management by objective software, all need the user reasonably to arrange, this will spend many time and efforts to do the previous work of these tasks before beginning because the task arrangement rationally whether directly can influence its work efficiency.So, what most of enterprise staff more wished to take hand is a ready-made task scheduling scheduling table, as long as carried out according to the task above the table, how more time and energy flower are handled on each task, rather than spent in to do today and do what tomorrow on what these problem.The employee if the progress according to schedule on the program carry out just can finishing the work efficiently with the minimum time.Obviously, existing office automation software does not often possess such function, can not satisfy requirement of enterprise.
Summary of the invention
The objective of the invention is to: at the deficiency of above prior art existence, proposing a kind of the support with the task on original task flow management by objective basis of software is that unit utilization operational research principle realizes the reasonable overall arrangement of task, thereby the demand of enterprise's high-efficient development is satisfied in better system Task Progress scheme of arrangement.
In order to reach above purpose, task overall distribution system of the present invention needs following assembly:
Client operating software---be used for carrying out mutual software terminal system with client;
Database---be used for the data message that storage system will write down.
More than two assemblies form by following each widgets:
Client operating software is made up of following assembly:
Client end interface---be used for carrying out the mutual of input and output with the user of system;
MDAC---in order to the data of accessing database;
Database consists of the following components:
Person chart---record enterprise staff basic data wherein has a field be called TaskTable, record be these personnel that will finish with task lists that finished;
Task list--the task of each personnel's correspondence of-record; This table generates when the personnel of increasing newly automatically, and the table name name form is " a Task+ job number ", as: TaskHR0023;
Allocative decision table--the standard of-logger task allocation criterion, the user can be self-defined as required, as: by urgency level, significance level, delay task or the like;
Task performance table---record's historic task performance;
The user uses step to be:
Step 1: use client operating software, newly-built some personal informations comprise personnel's job number, name, sex or the like, client operating software will be called MDAC and the project essential information be saved in the repertory of database, generate the task data sheet of this personnel's correspondence simultaneously;
Step 2: use client operating software, newly-built some task overall allocative decision information, comprise classification numbering, title, effect, formula, founder or the like, client operating software will be called MDAC and task overall allocative decision information will be saved in the Task Distribution scheme table of database;
Step 3: use client operating software, newly-built some tasks comprise numbering, task definition, pool scheme, start time, required time, previous task or the like; Client operating software will be called MDAC and the task essential information will be saved in the task list of database;
Step 4: if task can be proceeded to decompose, can decompose some subtasks of generation on the basis of this task, client operating software will be called MDAC and the subtask essential information will be saved in the task list of database;
Step 5: the task that selection will be planned as a whole, function is planned as a whole in operation, and system forms whole task planning schedule table at the appointed time, and client operating software will be called MDAC and the subtask essential information will be saved in the task list of database;
So, the user can't rationally arrange each subtask to influence in the worry of work efficiency thereby needn't tangle under the heavy situation of task, and the arrangement of task is generated by system automatically according to the idea of oneself fully.The speed of development of the individual's of Ti Gaoing work efficiency and enterprise greatly.
Embodiment
Embodiment one
With .Net Framework3.5 is platform, adopt the C/S framework, use Microsoft VisualStudio2008 SDK (Software Development Kit) to develop software, use database management tools SqlServer2005 special-purpose on the market, the needed database of the system that sets up adopts WPF as the interface development technology.Concrete mode is:
Client operating software is made up of following assembly:
Client operating software---be used for carrying out mutual software terminal system with client;
Database---be used for the data message that storage system will write down.
More than two assemblies form by following each widgets:
Client operating software is made up of following assembly:
Client end interface---be used for carrying out the mutual of input and output with the user of system;
MDAC---in order to the data of accessing database;
Database consists of the following components:
Person chart---record enterprise staff basic data wherein has a field be called TaskTable, record be these personnel that will finish with task lists that finished;
Task list--the task of each personnel's correspondence of-record; This table generates when the personnel of increasing newly automatically, and the table name name form is " a Task+ job number ", as: TaskHR0023;
Allocative decision table--the standard of-logger task allocation criterion, the user can be self-defined as required, as: by urgency level, significance level, delay task or the like;
Task performance table---record's historic task performance;
The user uses step to be:
Step 1: use client operating software, newly-built some personal informations comprise personnel's job number, name, sex or the like, client operating software will be called MDAC and the project essential information be saved in the repertory of database, generate the task data sheet of this personnel's correspondence simultaneously;
Step 2: use client operating software, newly-built some task overall allocative decision information, comprise classification numbering, title, effect, formula, founder or the like, client operating software will be called MDAC and task overall allocative decision information will be saved in the Task Distribution scheme table of database;
Step 3: use client operating software, newly-built some tasks comprise numbering, task definition, pool scheme, start time, required time, previous task or the like; Client operating software will be called MDAC and the task essential information will be saved in the task list of database;
Step 4: if task can be proceeded to decompose, can decompose some subtasks of generation on the basis of this task, client operating software will be called MDAC and the subtask essential information will be saved in the task list of database;
Step 5: the task that selection will be planned as a whole, function is planned as a whole in operation, and system forms whole task planning schedule table at the appointed time, and client operating software will be called MDAC and the subtask essential information will be saved in the task list of database;
In addition to the implementation, the present invention can also have other embodiments.All employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop on the protection domain of requirement of the present invention.
Claims (5)
1. task overall distribution system, it is characterized in that: can be on original task flow management by objective basis of software be unit with the task, utilization pool principle according to different schemes such as degree of priority, sorts a plurality of tasks automatically, arranges in pairs or groups, and generates task scheduling scheduling table
2. according to the described task overall distribution system of claim 1, need client operating software, server end operating software and three assemblies of database.
3. according to the described task overall distribution system of claim 2, it is characterized in that: described database is database management tools Sq1Server2005 special-purpose on the market.
4. according to the described task overall distribution system of claim 3, it is characterized in that: software adopts the C/S framework.
5. according to the described task overall distribution system of claim 4, it is characterized in that: system interface adopts the WPF technology
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200810235140A CN101763572A (en) | 2008-11-14 | 2008-11-14 | Task overall distribution system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200810235140A CN101763572A (en) | 2008-11-14 | 2008-11-14 | Task overall distribution system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101763572A true CN101763572A (en) | 2010-06-30 |
Family
ID=42494728
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200810235140A Pending CN101763572A (en) | 2008-11-14 | 2008-11-14 | Task overall distribution system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101763572A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103065233A (en) * | 2011-10-21 | 2013-04-24 | 镇江金软计算机科技有限责任公司 | Plan schedule arrangement setting system based on operational research theory |
CN103092827A (en) * | 2012-12-31 | 2013-05-08 | 武汉传神信息技术有限公司 | Method for multi-strategy interpreter manuscript automatic matching |
CN103150620A (en) * | 2011-12-07 | 2013-06-12 | 徐翔 | Project decomposition processing method and system |
CN104731565A (en) * | 2013-12-19 | 2015-06-24 | 霍尼韦尔国际公司 | Task scheduling system and method for checking monitoring video records |
CN109377012A (en) * | 2018-09-26 | 2019-02-22 | 中国航天员科研训练中心 | A kind of dynamic man-machine function allocation system and unmanned plane |
CN115345462A (en) * | 2022-08-09 | 2022-11-15 | 航天神舟智慧系统技术有限公司 | Task overall planning and merging method and system for provincial administration |
CN117391388A (en) * | 2023-11-09 | 2024-01-12 | 北京易华录信息技术股份有限公司 | Task distribution method and platform based on cloud computing |
-
2008
- 2008-11-14 CN CN200810235140A patent/CN101763572A/en active Pending
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103065233A (en) * | 2011-10-21 | 2013-04-24 | 镇江金软计算机科技有限责任公司 | Plan schedule arrangement setting system based on operational research theory |
CN103150620A (en) * | 2011-12-07 | 2013-06-12 | 徐翔 | Project decomposition processing method and system |
CN103092827A (en) * | 2012-12-31 | 2013-05-08 | 武汉传神信息技术有限公司 | Method for multi-strategy interpreter manuscript automatic matching |
CN103092827B (en) * | 2012-12-31 | 2016-08-17 | 武汉传神信息技术有限公司 | The method of many strategy interpreter's contribution Auto-matchings |
CN104731565A (en) * | 2013-12-19 | 2015-06-24 | 霍尼韦尔国际公司 | Task scheduling system and method for checking monitoring video records |
CN109377012A (en) * | 2018-09-26 | 2019-02-22 | 中国航天员科研训练中心 | A kind of dynamic man-machine function allocation system and unmanned plane |
CN115345462A (en) * | 2022-08-09 | 2022-11-15 | 航天神舟智慧系统技术有限公司 | Task overall planning and merging method and system for provincial administration |
CN117391388A (en) * | 2023-11-09 | 2024-01-12 | 北京易华录信息技术股份有限公司 | Task distribution method and platform based on cloud computing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101763572A (en) | Task overall distribution system | |
Lönngren et al. | Aggregated construction supply chains: success factors in implementation of strategic partnerships | |
CN103714403A (en) | Task management system | |
Gibbons et al. | Task-specific human capital | |
Raudberget | Practical applications of set-based concurrent engineering in industry | |
CN104616098A (en) | Task management method and system | |
CN103065233A (en) | Plan schedule arrangement setting system based on operational research theory | |
Piri et al. | Developing a new model for simultaneous scheduling of two grand projects based on game theory and solving the model with Benders decomposition | |
Pan et al. | Solving manpower scheduling problem in manufacturing using mixed-integer programming with a two-stage heuristic algorithm | |
Altmann | Unions’ Policies Towards New Technologies in the 1980s–An Example from the Metal Industry 1 | |
JP2001216428A (en) | Centralized management system for labor safety information | |
Wahyudin et al. | Resource allocation model to find optimal allocation of workforce, material, and tools in an aircraft line maintenance | |
Günther et al. | A comparison of three heuristics on a practical case of sub-daily staff scheduling | |
CN105761014A (en) | Portable task management system | |
Dong et al. | Modelling and implementation of manufacturing direct labour allocation: a case study in semiconductor production operations | |
Tan et al. | Implementation of a YAWL work-list handler based on the resource patterns | |
Bing-hai et al. | Agent-based decision support system for dynamic scheduling of a flexible manufacturing system | |
Wang et al. | A web-based integrated process planning and scheduling system | |
CN102542413A (en) | Workflow system and free and fixed workflow constructing and operating method | |
Zhang et al. | Equipment scheduling problem under disruptions in mail processing and distribution centres | |
Bernhardt | Task management tools for the structural engineer | |
Long et al. | Analysis of Priority Decision Rules Using MCDM Approach for A Dual-Resource Constrained Flexible Job Shop Scheduling by Simulation Method | |
Pastor et al. | Job assignment | |
Jaafari et al. | A proposed mathematical model to improve workforce scheduling at maintenance Department of Rabigh Independent Power Plant | |
Salimifard et al. | Managing Time and Resources of Construction Projects Using Colored Petri Nets and a Genetic Algorithm |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20100630 |