CN101762712B - Molten steel sample transporting cylinder - Google Patents

Molten steel sample transporting cylinder Download PDF

Info

Publication number
CN101762712B
CN101762712B CN2009102297261A CN200910229726A CN101762712B CN 101762712 B CN101762712 B CN 101762712B CN 2009102297261 A CN2009102297261 A CN 2009102297261A CN 200910229726 A CN200910229726 A CN 200910229726A CN 101762712 B CN101762712 B CN 101762712B
Authority
CN
China
Prior art keywords
appearance
appearance tube
molten steel
tube
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009102297261A
Other languages
Chinese (zh)
Other versions
CN101762712A (en
Inventor
崔志远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANTONG BEICHENG SCIENCE & TECHNOLOGY ENTREPRENEURIAL MANAGEMENT CO., LTD.
Original Assignee
张琳
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 张琳 filed Critical 张琳
Priority to CN2009102297261A priority Critical patent/CN101762712B/en
Publication of CN101762712A publication Critical patent/CN101762712A/en
Application granted granted Critical
Publication of CN101762712B publication Critical patent/CN101762712B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Casting Support Devices, Ladles, And Melt Control Thereby (AREA)
  • Investigating And Analyzing Materials By Characteristic Methods (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

The invention relates to a molten steel sample transporting cylinder comprising a sample cylinder (1), a blocking plate (3), a support (4), sliding plates (7), a positioning plate (8) and a direction block (9). The upper side surface of the sample cylinder (1) is provided with an opening; the blocking plate (3) is in sealed contact with the sample cylinder (1); the support (4) is fixedly connected with the sample cylinder (1); the blocking plate (3) is in threaded connection with the support (4) by screws; two ends of the lower side surface of the sample cylinder (1) are provided with the sliding plates (7), and the sliding plates (7) is rotationally connected with the sample cylinder (1); the front side surface of the rotating shaft of the sliding plate (7) on the front end is provided with the direction block (9), and the direction block (9) is fixedly connected with rotating shaft; the lower side surface of the sample cylinder (1) at the rear of the rotating shaft of the sliding plate (7) on the front end is provided with the positioning plate (8), and the positioning plate (8) is fixedly connected with the sample cylinder (1); the cross section of the direction block (9) is in the shape of a semicircle; the part where the positioning plate (8) contacts the direction block (9) is provided with a semicircular concave part which corresponds to the direction block (9); and a gap is left between the positioning plate (8) and the direction block (9). Therefore, the molten steel is not easy to overflow.

Description

Molten steel sample transporting cylinder
One, technical field
The present invention relates to a kind of molten steel sample transporting cylinder, especially a kind of molten steel sample transporting cylinder that is adapted to big section steel works.
Two, background technology
When smelting molten steel, through analyzing the composition and the content of molten steel, to control what or other parameter of the raw material when smelting again, thereby guarantee the quality of molten steel, the chemical examination of the molten steel when therefore smelting is a crucial step; And during existing big section steel works molten steel sampling, use sampler barrel, again through the air sample transporting device; Be sent to molten steel in the laboratory; And existing sampler barrel all is to be provided with opening at end face, is using the plug sealing, because the temperature of molten steel is high; Plug can not be fine the sealing of end face opening, and molten steel is overflowed; Just be placed on sampler barrel in the wind channel tube simultaneously, sampler barrel is side rotation easily in wind channel tube, and the molten steel in making overflows more easily.
Three, summary of the invention
In order to overcome above-mentioned technical disadvantages, the purpose of this invention is to provide a kind of molten steel sample transporting cylinder, molten steel more is difficult for overflowing.
For achieving the above object, the technical scheme that the present invention takes is: include appearance tube, closure plate, bearing, sliding panel, location-plate and direction piece; The appearance tube is set to cylindrical and is provided with the cavity that fills molten steel in it; Appearance tube upper side is provided with opening; The opening of appearance tube is provided with closure plate, and closure plate is set to touch enclosure-type with an appearance socket joint and connects, and bearing is arranged on the appearance tube upper side and is set to and kind tin is fixedly connected; Bearing is provided with threaded hole; Closure plate is set to through screw rod and bearing thread connection, is provided with sliding panel and sliding panel at the two ends of the downside of appearance tube and is set to rotate with the appearance tube and connects, and the leading flank on the rotation axis of the sliding panel of front end is provided with the direction piece that is fixedly connected with it; The downside of the appearance tube of the back survey of the rotation axis of the sliding panel of front end is provided with the location-plate that is fixedly connected with the appearance tube; The xsect of direction piece is set to semicircle, and the position that location-plate contacts with the direction piece is provided with and the corresponding half-round recessed of direction piece, is provided with between location-plate and the direction piece to make sliding panel rotate the gap of an angle.
Pour molten steel in the cavity of appearance tube, rotating screw bolt makes the opening of closure plate sealing appearance tube, is put into the appearance tube in the wind channel tube; Sliding panel contacts with the air channel tube wall, under location-plate and the effect of direction piece, and appearance tube easy motion; After arriving the laboratory; Take out the appearance tube, rotating screw bolt is opened closure plate, pours out molten steel again; Because appearance tube upper side is provided with opening, has avoided being provided with opening and molten steel being overflowed easily at appearance tube end face; Owing to used sliding panel that the appearance tube is moved in wind channel tube, the appearance tube is fixed with air channel tube wall contact point simultaneously, avoided appearance tube side to rotate; Therefore molten steel more is difficult for overflowing.
The present invention has designed, and a sidewall of the opening of appearance tube is provided with open slot and closure plate is arranged in the open slot of appearance tube.Make the better tightness between closure plate and the appearance tube, also avoided rocking of closure plate simultaneously.
The present invention has designed, and the top of appearance tube is set to taper.Make a kind tube receive to such an extent that resistance is little, motion is more steadily with quick.
The present invention has designed, and the downside of sliding panel is set to circular arc.Improved the movement velocity of appearance tube.
The present invention has designed, and also includes thermal insulator, is provided with vacuum chamber in the wall body of appearance tube, and thermal insulator is arranged on the lateral surface of appearance tube and is set to and tin is fixedly connected with appearance.Avoid solidifying of molten steel.
The present invention has designed, and also includes funnel, and an appearance tube upper side is provided with opening and is provided with funnel and funnel is set to be fixedly connected with the appearance tube at opening.When pouring into and pour out molten steel, more convenient.
The present invention has designed, and also includes the promotion wing, and the rear end face of appearance tube is provided with the promotion wing that is fixedly connected with it, and the cross section that promotes the wing is set to swallow-tail form.Shorten the time of chemical examination, avoided the rollover of appearance tube.
Four, description of drawings
Accompanying drawing is a synoptic diagram of the present invention.
Five, embodiment
Accompanying drawing is one embodiment of the present of invention, specifies present embodiment in conjunction with accompanying drawing, includes appearance tube 1, funnel 2, closure plate 3, bearing 4, promotes the wing 5, thermal insulator 6, sliding panel 7, location-plate 8 and direction piece 9; Appearance tube 1 is set to cylindrical and is provided with the cavity that fills molten steel in it; The top of appearance tube 1 is set to be provided with vacuum chamber in taper and its wall body; Thermal insulator 6 is arranged on the lateral surface of appearance tube 1 and is set to and is fixedly connected with appearance tin 1; Appearance tube 1 upper side is provided with opening and is provided with funnel 2 and funnel 2 is set to be fixedly connected with appearance tube 1 at opening, and the opening of appearance tube 1 is provided with closure plate 3, and a sidewall of the opening of appearance tube 1 is provided with in the open slot that open slot and closure plate 3 be arranged on appearance tube 1 and closure plate 3 is set to connect with appearance 1 a contact seal formula; Bearing 4 is arranged on appearance tube 1 upper side and is set to and is fixedly connected with appearance tin 1; Bearing 4 is provided with threaded hole, and closure plate 3 is set to through screw rod and bearing 4 thread connection, is provided with sliding panel 7 and sliding panel 7 at the two ends of the downside of appearance tube 1 and is set to connect with 1 rotation of appearance tube; Leading flank on the rotation axis of the sliding panel 7 of front end is provided with the direction piece 9 that is fixedly connected with it; The downside of the appearance tube 1 of the back survey of the rotation axis of the sliding panel 7 of front end is provided with the location-plate 8 that is fixedly connected with appearance tube 1, and the xsect of direction piece 9 is set to semicircle, and the position that location-plate 8 contacts with direction piece 9 is provided with and direction piece 9 corresponding half-round recessed; Be provided with between location-plate 8 and the direction piece 9 and make sliding panel 7 rotate the gap of an angle; The downside of sliding panel 7 is set to circular arc, and the rear end face of appearance tube 1 is provided with the promotion wing 5 that is fixedly connected with it, and the cross section that promotes the wing 5 is set to swallow-tail form.
Pour molten steel in the cavity of appearance tube 1, rotating screw bolt makes the opening of closure plate 3 sealing appearance tubes 1, is put into appearance tube 1 in the wind channel tube; Sliding panel 7 contacts with the air channel tube wall, under location-plate 8 and direction piece 9 act on, and appearance tube 1 easy motion; After arriving the laboratory; Take out appearance tube 1, rotating screw bolt is opened closure plate 3, pours out molten steel again.
When using this enforcement, because a sidewall of the opening of appearance tube 1 is provided with open slot and closure plate 3 is arranged in the open slot of appearance tube 1; Make the better tightness between closure plate 3 and the appearance tube 1, also avoided rocking of closure plate 3 simultaneously.Because the top of appearance tube 1 is set to taper; Make a kind tube 1 receive to such an extent that resistance is little, motion is more steadily with quick.Because the downside of sliding panel 7 is set to circular arc; Reduced the contact area of sliding panel 7, improved the movement velocity of appearance tube 1 with appearance tube 1 inwall.Owing to be provided with vacuum chamber in the wall body of appearance tube 1, thermal insulator 6 is arranged on the lateral surface of appearance tube 1 and is set to and is fixedly connected with appearance tin 1; Make slower that the temperature of molten steel reduces, avoid solidifying of molten steel.Owing to designed funnel 2; When pouring into and pour out molten steel, more convenient.Owing to designed the promotion wing 5; The wind-force that appearance tube 1 is received is bigger, and the motion of appearance tube 1 is faster, has shortened the time of chemical examination, owing to promote the stabilization of the wing 5, has avoided the rollover of appearance tube 1 simultaneously.

Claims (7)

1. molten steel sample transporting cylinder; Include appearance tube (1); Appearance tube (1) is set to cylindrical and is provided with the cavity that fills molten steel in it, it is characterized in that: also include closure plate (3), bearing (4), sliding panel (7), location-plate (8) and direction piece (9); Appearance tube (1) upper side is provided with opening; The opening of appearance tube (1) is provided with closure plate (3); Closure plate (3) is set to connect with appearance tube (1) contact seal formula; Bearing (4) is arranged on appearance tube (1) upper side and is set to and is fixedly connected with appearance tin (1), and bearing (4) is provided with threaded hole, and closure plate (3) is set to through screw rod and bearing (4) thread connection; Be provided with sliding panel (7) and sliding panel (7) is set to rotate with appearance tube (1) and connects at the two ends of the downside of appearance tube (1); Leading flank on the rotation axis of the sliding panel of front end (7) is provided with the direction piece (9) that is fixedly connected with it, and the downside of the appearance tube (1) of the back survey of the rotation axis of the sliding panel of front end (7) is provided with the location-plate (8) that is fixedly connected with appearance tube (1), and the xsect of direction piece (9) is set to semicircle; The position that location-plate (8) contacts with direction piece (9) is provided with and the corresponding half-round recessed of direction piece (9), is provided with between location-plate (8) and the direction piece (9) to make sliding panel (7) rotate the gap of an angle.
2. molten steel sample transporting cylinder according to claim 1; It is characterized in that: a sidewall of the opening of appearance tube (1) is provided with open slot and closure plate (3) is arranged in the open slot of appearance tube (1).
3. molten steel sample transporting cylinder according to claim 1; It is characterized in that: the top of appearance tube (1) is set to taper.
4. molten steel sample transporting cylinder according to claim 1; It is characterized in that: the downside of sliding panel (7) is set to circular arc.
5. according to claim 1,2,3 or 4 described molten steel sample transporting cylinders; It is characterized in that: also include thermal insulator (6), be provided with vacuum chamber in the wall body of appearance tube (1), thermal insulator (6) is arranged on the lateral surface of appearance tube (1) and is set to be fixedly connected with appearance tin (1).
6. according to claim 1,2,3 or 4 described molten steel sample transporting cylinders; It is characterized in that: also include the promotion wing (5), the rear end face of appearance tube (1) is provided with the promotion wing (5) that is fixedly connected with it, and the cross section that promotes the wing (5) is set to swallow-tail form.
7. molten steel sample transporting cylinder according to claim 5; It is characterized in that: also include the promotion wing (5), the rear end face of appearance tube (1) is provided with the promotion wing (5) that is fixedly connected with it, and the cross section that promotes the wing (5) is set to swallow-tail form.
CN2009102297261A 2009-10-28 2009-10-28 Molten steel sample transporting cylinder Expired - Fee Related CN101762712B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009102297261A CN101762712B (en) 2009-10-28 2009-10-28 Molten steel sample transporting cylinder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009102297261A CN101762712B (en) 2009-10-28 2009-10-28 Molten steel sample transporting cylinder

Publications (2)

Publication Number Publication Date
CN101762712A CN101762712A (en) 2010-06-30
CN101762712B true CN101762712B (en) 2012-11-14

Family

ID=42494002

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009102297261A Expired - Fee Related CN101762712B (en) 2009-10-28 2009-10-28 Molten steel sample transporting cylinder

Country Status (1)

Country Link
CN (1) CN101762712B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108918200B (en) * 2018-07-29 2021-02-09 上海城建职业学院 Water quality testing sampling device
CN116495148B (en) * 2023-06-29 2023-09-05 常州科德水处理成套设备股份有限公司 Online sampling device of water treatment facilities

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2337552Y (en) * 1998-05-29 1999-09-08 钟玉铁 Liquid steel sampler
CN2653480Y (en) * 2003-11-07 2004-11-03 王喜云 Molten steel sampler
CN101543882A (en) * 2009-05-14 2009-09-30 石宏帅 Automatic ladle drainage device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2337552Y (en) * 1998-05-29 1999-09-08 钟玉铁 Liquid steel sampler
CN2653480Y (en) * 2003-11-07 2004-11-03 王喜云 Molten steel sampler
CN101543882A (en) * 2009-05-14 2009-09-30 石宏帅 Automatic ladle drainage device

Also Published As

Publication number Publication date
CN101762712A (en) 2010-06-30

Similar Documents

Publication Publication Date Title
CN101762712B (en) Molten steel sample transporting cylinder
CN203672702U (en) Sample pond for solid ablation with laser
CN2854554Y (en) Molten steel samping device for continuous casting tundish
CN219495703U (en) Multipoint sampler for powdery veterinary drug feed
CN203941033U (en) Movable type cleaning molten steel sampler in smelting procedure
CN212206714U (en) Sampler of pharmaceutical equipment
CN211785351U (en) Automatic ion meter chromatograph of sample
CN217156650U (en) Waste liquid conductivity detector for co-processing of cement kiln
CN214200693U (en) Dual-purpose food detection sampling equipment of solid-liquid
CN206648844U (en) A kind of metallurgical cinder sampler
CN206772630U (en) A kind of chemical powder sampling is visited
CN206095762U (en) Melt two -way swing mechanism of furnace for model machine
CN201795942U (en) Molten steel immersed type vacuum fixed quick sampler for oxygen and nitrogen
CN201740670U (en) Molten steel sampling device
CN209941066U (en) Aluminum smelting furnace with aluminum liquid sampling and returning structure
CN210347225U (en) Novel medical science inspection micro sampler
CN208795545U (en) A kind of metallurgical cinder sampler
CN209102439U (en) A kind of stokehold sample sampler
CN217006475U (en) Automatic sampling device for powder
CN216421049U (en) Durable steel ladle
CN201803866U (en) Molten steel sampler
CN213689074U (en) Sampling device for chemical process detection
CN202272265U (en) Sample accommodating bottle for rotary thin film in drying oven
CN110314757A (en) Biological experiment sample dismembyator
CN217392441U (en) Centrifugal tube capable of accelerating dissolution of solid powder in reagent

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: ZHAN YILIN

Free format text: FORMER OWNER: ZHANG LIN

Effective date: 20121107

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121107

Address after: 271000, Shandong, Tai'an province Taishan District Youth northbound first, Tai'an one, 2012, one high (1) classes

Patentee after: Zhan Yilin

Address before: 271000, 5, building 6, building 3, Tai'an District, Taishan District, Shandong, 602

Patentee before: Zhang Lin

ASS Succession or assignment of patent right

Owner name: NANTONG ASIA SHIP HEAVY INDUSTRY CO., LTD.

Free format text: FORMER OWNER: ZHAN YILIN

Effective date: 20131203

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 271000 TAIAN, SHANDONG PROVINCE TO: 226000 NANTONG, JIANGSU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20131203

Address after: 226000, Nantong, Gangzha, Jiangsu Province, Nantong shipbuilding supporting industrial zone, No. 28, along Hong Kong Road

Patentee after: Nantong sub Ship Heavy Industry Co Ltd

Address before: 271000, Shandong, Tai'an province Taishan District Youth northbound first, Tai'an one, 2012, one high (1) classes

Patentee before: Zhan Yilin

TR01 Transfer of patent right

Effective date of registration: 20181016

Address after: 226000 639 north outer ring road, Nantong, Jiangsu

Patentee after: NANTONG BEICHENG SCIENCE & TECHNOLOGY ENTREPRENEURIAL MANAGEMENT CO., LTD.

Address before: 226000 Jiangsu province Nantong Gangzha District Nantong ship matching Industrial Concentration Area No. 28 along the Hong Kong Road.

Patentee before: Nantong sub Ship Heavy Industry Co Ltd

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121114

Termination date: 20201028

CF01 Termination of patent right due to non-payment of annual fee