CN101761263A - 风力发电通信塔 - Google Patents

风力发电通信塔 Download PDF

Info

Publication number
CN101761263A
CN101761263A CN200910157046A CN200910157046A CN101761263A CN 101761263 A CN101761263 A CN 101761263A CN 200910157046 A CN200910157046 A CN 200910157046A CN 200910157046 A CN200910157046 A CN 200910157046A CN 101761263 A CN101761263 A CN 101761263A
Authority
CN
China
Prior art keywords
tower
wind power
communication tower
antenna
communication
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910157046A
Other languages
English (en)
Inventor
徐华刚
邹福来
熊晓荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dy-Link Engineering & Technology Co Ltd
Original Assignee
Dy-Link Engineering & Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dy-Link Engineering & Technology Co Ltd filed Critical Dy-Link Engineering & Technology Co Ltd
Priority to CN200910157046A priority Critical patent/CN101761263A/zh
Publication of CN101761263A publication Critical patent/CN101761263A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Support Of Aerials (AREA)
  • Wind Motors (AREA)

Abstract

一种风力发电通信塔,它主要由风力发电机组和安装有天线安装支架的通信塔组成,所述的通信塔的塔顶上安装有所述的风力发电机组;所述的通信塔为由多段塔节通过内法兰连接而成的悬臂单管结构构成,所述的天线安装支架被安装在所述通信塔的塔身上,并装有天线抱杆,在该天线安装支架上安装有通信传输天线;所述的通信塔塔体内部安装有上人爬梯,同时内壁四周布有均匀的天线馈线、电线及数据线安装夹;所述的通信塔塔体顶部设置有用于安装风力发电机组的安装接口;它通过风力发电通信塔的集成系统功能为通信基站提供外部动力源和通信天线的支撑作用,无需外部的动力源供给,实现节能减排和科技创新。

Description

风力发电通信塔
技术领域
本发明涉及一种用于无线通信用的风力发电通信塔,一种将风力发电机组与通信塔结合在一起的通信设备,属于通信设备技术领域。
背景技术
现有技术中,为保证网络覆盖要求,运营商主要采用通过建设通信塔,在该塔上安装通信传输设备来实现;同时风力发电塔也要求有足够高的塔筒将风力发电机组支撑到一定高度,方可正常运行。但目前两种设备各自独立安装,因此资源浪费严重,需要征用更多的安装设备用土地。
另外在边远山区无市电接入的情况,而要专门建设通信基站,其成本相当高,主要因为解决其动力源问题,需投入大量资金建设基础设施;再次,在我国连续发生洪水、雪灾和地震后,建设超级基站为解决在外部条件险恶情况下的通信问题成为难题。
发明内容
本发明的目的在于克服现有技术存在的不足,而提供一种将风力发电机组与通信塔结合起来,使用同一个高耸的塔体,以同时满足风力发电机组和通信设备支撑的双重功能的风力发电通信塔,它能让风力发电机组所发的电能提供给通信基站使用,这样既减少了土地征用,又运用了可再生能源,符合国家的可持续发展战略。
本发明的目的是通过如下技术方案来完成的,它主要由风力发电机组和安装有天线安装支架的通信塔组成,所述的通信塔的塔顶上安装有所述的风力发电机组。
所述的通信塔为由多段塔节通过内法兰连接而成的悬臂单管结构构成,所述的天线安装支架被安装在所述通信塔的塔身上,并装有天线抱杆,在该天线安装支架上安装有通信传输天线。
所述的通信塔塔体内部安装有上人爬梯,同时内壁四周布有均匀的天线馈线、电线及数据线安装夹。
所述的通信塔塔体顶部设置有用于安装风力发电机组的安装接口。
所述的通信塔塔体上位于所述天线安装支架下方安装有景观平台;所述的塔体顶部以下1.5米以内安装有用于风力发电机组安装和维护的安装检修平台。
人们所知的风能是一种清洁的可再生能源,风力发电是风能利用的主要形式,也是新能源中技术最成熟最具规模开发条件和商业化发展前景的发电方式之一。风力发电正在世界上形成一股热潮,因为风力发电没有燃料问题,也不会产生辐射或空气污染。
通过风力发电通信塔的集成系统功能为通信基站提供外部动力源和通信天线的支撑作用,无需外部的动力源供给,实现节能减排和科技创新。
另外如采用风力发电为基站解决动力源问题,则可为为在边远地区建设通信基站大大降低建设成本;同时也为超级基站提供建设条件,成为一种行之有效的选择,因为其可通过自身的风力发电解决运行问题,可在外部条件险恶情况下独立运行。
附图说明
图1是本发明的结构示意图。
具体实施方式
下面将结合附图对本发明作详细的介绍:图1所示,本发明主要由风力发电机组1和安装有天线安装支架2的通信塔3组成,所述的通信塔3的塔顶上安装有所述的风力发电机组1,由于现有的风力发电机组的技术已经相当成熟,因此所述的风力发电机组可为现有公知风力发电机组的任意合适的一种。
图中所示的通信塔3为由多段塔节4通过内法兰连接而成的悬臂单管结构组成,所述的天线安装支架2被安装在所述通信塔3的塔身上,并装有天线抱杆,在该天线安装支架2上安装有通信传输天线5。
所述的通信塔3塔体内部安装有上人爬梯,同时内壁四周布有均匀的天线馈线、电线及数据线安装夹。
所述的通信塔3塔体顶部设置有用于安装风力发电机组1的安装接口。
所述的通信塔3塔体上位于所述天线安装支架2下方安装有景观平台6;所述的塔体顶部以下1.5米以内安装有用于风力发电机组1安装和维护的安装检修平台7。
本发明通过在通信景观造型塔顶部增加风力发电机组,降低或调整原通信设备平台标高,使风力发电通信塔同时满足风力机运行和通信支撑功能。
本发明的实施细节如下:
1、通信塔3顶部安装有风力发电机组的接口法兰,用于安装风力发电机组1,但由于普通通信塔顶部较粗,但风力发电机组的法兰较小,故其顶部安装转换法兰;
2、为便于风力发电机组安装和维护,在塔顶部以下1.5米以内,安装检修平台7;
3、在塔身中段合适位置安装天线支架2,并装有天线抱杆,为天线安装提供位置;
4、为便于天线安装和维护,在天线安装支架2下方安装景观平台6,满足外在通信塔的景观需求,同时满足实用性需要;
5、保证维护人员在塔体内爬行,则将各塔节4设计成统一锥度,外表面在同一直线上,同时塔体内安装内爬梯、照明设施,塔顶开有通风孔;
6、根据人体学系统设计原理,为确保维护人员在塔内爬行的安全性,将塔顶的最小顶开直径限定在600mm。

Claims (5)

1.一种风力发电通信塔,它主要由风力发电机组和安装有天线安装支架的通信塔组成,其特征在于所述的通信塔(3)的塔顶上安装有所述的风力发电机组(1)。
2.根据权利要求1所述的风力发电通信塔,其特征在于所述的通信塔(3)为由多段塔节(4)通过内法兰连接而成的悬臂单管结构构成,所述的天线安装支架(2)被安装在所述通信塔(3)的塔身上,并装有天线抱杆,在该天线安装支架(2)上安装有通信传输天线(5)。
3.根据权利要求2所述的风力发电通信塔,其特征在于所述的通信塔(3)塔体内部安装有上人爬梯,同时内壁四周布有均匀的天线馈线、电线及数据线安装夹。
4.根据权利要求1或2或3所述的风力发电通信塔,其特征在于所述的通信塔(3)塔体顶部设置有用于安装风力发电机组(1)的安装接口。
5.根据权利要求4所述的风力发电通信塔,其特征在于所述的通信塔(3)塔体上位于所述天线安装支架(2)下方安装有景观平台(6);所述的塔体顶部以下1.5米以内安装有用于风力发电机组(1)安装和维护的安装检修平台(7)。
CN200910157046A 2009-12-31 2009-12-31 风力发电通信塔 Pending CN101761263A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910157046A CN101761263A (zh) 2009-12-31 2009-12-31 风力发电通信塔

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910157046A CN101761263A (zh) 2009-12-31 2009-12-31 风力发电通信塔

Publications (1)

Publication Number Publication Date
CN101761263A true CN101761263A (zh) 2010-06-30

Family

ID=42492633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910157046A Pending CN101761263A (zh) 2009-12-31 2009-12-31 风力发电通信塔

Country Status (1)

Country Link
CN (1) CN101761263A (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101942921A (zh) * 2010-08-19 2011-01-12 北京梅泰诺通信技术股份有限公司 风光互补型新能源通信塔
CN106049960A (zh) * 2016-05-30 2016-10-26 江苏铭远杆塔有限公司 碳纤维锥形杆通信塔
CN106049958A (zh) * 2016-05-27 2016-10-26 江苏铭远杆塔有限公司 太阳能发电通信塔
US9705684B2 (en) 2013-12-16 2017-07-11 At&T Mobility Ii Llc Systems, methods, and computer readable storage device for delivering power to tower equipment
CN110492227A (zh) * 2019-07-25 2019-11-22 惠州电力勘察设计院有限公司 电力杆塔的通信天线安装支架
CN114482676A (zh) * 2022-01-26 2022-05-13 浙江八方电信有限公司 一种具有风力发电机的通信塔
CN114856283A (zh) * 2022-06-01 2022-08-05 中国通信建设集团设计院有限公司 一种一体化节能通信塔的设计方法
CN115288506A (zh) * 2022-08-12 2022-11-04 中国电信股份有限公司 一种通讯基站塔
CN118450388A (zh) * 2024-04-15 2024-08-06 中国联合网络通信有限公司广东省分公司 一种海洋风机网络全覆盖系统

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101942921A (zh) * 2010-08-19 2011-01-12 北京梅泰诺通信技术股份有限公司 风光互补型新能源通信塔
US9705684B2 (en) 2013-12-16 2017-07-11 At&T Mobility Ii Llc Systems, methods, and computer readable storage device for delivering power to tower equipment
US9929867B2 (en) 2013-12-16 2018-03-27 At&T Mobility Ii Llc Systems, methods, and computer readable storage device for delivering power to tower equipment
US10164780B2 (en) 2013-12-16 2018-12-25 At&T Mobility Ii Llc Systems, methods, and computer readable storage device for delivering power to tower equipment
CN106049958A (zh) * 2016-05-27 2016-10-26 江苏铭远杆塔有限公司 太阳能发电通信塔
CN106049960A (zh) * 2016-05-30 2016-10-26 江苏铭远杆塔有限公司 碳纤维锥形杆通信塔
CN110492227A (zh) * 2019-07-25 2019-11-22 惠州电力勘察设计院有限公司 电力杆塔的通信天线安装支架
CN114482676A (zh) * 2022-01-26 2022-05-13 浙江八方电信有限公司 一种具有风力发电机的通信塔
CN114856283A (zh) * 2022-06-01 2022-08-05 中国通信建设集团设计院有限公司 一种一体化节能通信塔的设计方法
CN114856283B (zh) * 2022-06-01 2023-07-18 中国通信建设集团设计院有限公司 一种一体化节能通信塔的设计方法
CN115288506A (zh) * 2022-08-12 2022-11-04 中国电信股份有限公司 一种通讯基站塔
CN118450388A (zh) * 2024-04-15 2024-08-06 中国联合网络通信有限公司广东省分公司 一种海洋风机网络全覆盖系统

Similar Documents

Publication Publication Date Title
CN101761263A (zh) 风力发电通信塔
CN102130451B (zh) 分布式电站系统
CN202359843U (zh) 节能通信基站
CN201893434U (zh) 嵌入式有源一体化天线
CN103503270A (zh) 自然能源收集和分配的方法、系统及设备
US20100230975A1 (en) Vertical-Axis Wind Power Turbine System
CN101769088A (zh) 设有风力发电装置的单管通信塔
CN102561745A (zh) 组装式风光互补自供电通信基站
CN204494283U (zh) 道路照明装置
CN101572965A (zh) 顶升式移动基站
CN202706299U (zh) 加油站双坡式光伏雨棚
CN201635461U (zh) 风力发电通信塔
CN205081747U (zh) 一种可安装光伏发电支架的电杆
CN203684766U (zh) 环保节能型便携式基站
CN102995930A (zh) 一种风光互补塔房一体化基站
CN211958782U (zh) 适用于海上风电场和有人海岛的综合能源系统
CN202249000U (zh) 一种塔房结构的风光互补一体化基站
CN109763689A (zh) 一种设置有太阳能发电装置的单管通信塔
CN203769406U (zh) 高度可调的无线专网设备杆塔支架
CN102843070A (zh) 光伏高效节能发电装置
CN201237134Y (zh) 一种风光互补路灯
CN206023658U (zh) 信号发射塔独立供能系统
WO2011063582A1 (zh) 太阳能、风力发电场并网发电系统
CN201910751U (zh) 油气田站场太阳能电控一体化设备
CN205476766U (zh) 一种风光发电通讯塔

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20100630