CN101761031A - Continuous and perpendicular lifting apparatus for large segmental bridge floor beam - Google Patents

Continuous and perpendicular lifting apparatus for large segmental bridge floor beam Download PDF

Info

Publication number
CN101761031A
CN101761031A CN 200810044180 CN200810044180A CN101761031A CN 101761031 A CN101761031 A CN 101761031A CN 200810044180 CN200810044180 CN 200810044180 CN 200810044180 A CN200810044180 A CN 200810044180A CN 101761031 A CN101761031 A CN 101761031A
Authority
CN
China
Prior art keywords
bridge floor
operating platform
floor beam
continuous
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200810044180
Other languages
Chinese (zh)
Other versions
CN101761031B (en
Inventor
顾海欢
茅卫生
金东华
焦常科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Foundation Engineering Group Co Ltd
Original Assignee
FOUNDATION ENGINEERING Co OF SHANGHAI CITY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FOUNDATION ENGINEERING Co OF SHANGHAI CITY filed Critical FOUNDATION ENGINEERING Co OF SHANGHAI CITY
Priority to CN 200810044180 priority Critical patent/CN101761031B/en
Publication of CN101761031A publication Critical patent/CN101761031A/en
Application granted granted Critical
Publication of CN101761031B publication Critical patent/CN101761031B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to a continuous and perpendicular lifting apparatus for a large segmental bridge floor beam, comprising a bearing bracket, a hydraulic jack lifting system, a rope reel and fairlead device and an operating platform. The bearing bracket consists of a main head beam, an upright column, a tension bar, an inclined support and a link rod element; the operating platform is arranged on the main head beam; the jack lifting system and the rope reel and fairlead device corresponding to the position of the jack are arranged on the operating platform; the bottom of the bearing bracket is fixedly connected with a sharing beam which is fixed on the upright column by a high-strength bolt. The apparatus adopts the permanent upright column as a foundation, so that the number of the temporary structures is reduced greatly; the lifting bracket is used as a device capable of being used cyclically, so that greater economic benefit is created. The synchronous lifting operation of the hydraulic jack is controlled by the computer, and the lifted component is lifted stably and continuously to the right position; and the control course is precise and safe. The invention meets the construction requirements of perpendicularly lifting the large segment of the whole span bridge floor beam in the beam construction.

Description

Continuous and perpendicular lifting apparatus for large segmental bridge floor beam
Technical field
The present invention relates to bridge floor beam perpendicular lifting apparatus in a kind of bridge construction, especially a kind of continuous and perpendicular lifting apparatus that is installed on the pier stud top.
Background technology
At present, along with greatly developing and the continuous progress of construction technology method of construction machinery, in the large-scale steel structure installation, from ground vertical-lift, high-altitude method in place multiple choices are arranged, can adopt that large lifting equipments such as mobile crane, crawler crane, straddle truck lift, walking, operation such as in place.But when the lifting structure scale of construction, tonnage during all above some levels, especially in bridge construction to whole vertical-lift operation of striding bridge floor beam, because bridge floor beam structural plan size is big, the scale of construction and tonnage are big, take all factors into consideration economy and safety, the hanging method of the existing main equipment of above-mentioned employing is inapplicable, must consider that a kind of satisfied construction of design, the reliable lifting means of technology carry out the whole lifting of big sections.
Summary of the invention
The present invention puts in order the vertical-lift construction needs of striding the big sections of bridge floor beam for satisfying in the bridge construction, and a kind of continuous and perpendicular lifting apparatus for large segmental bridge floor beam based on column Dun Ding is provided.
For achieving the above object, technical scheme of the present invention is: a kind of continuous and perpendicular lifting apparatus for large segmental bridge floor beam, comprise the carrying support, the hydraulic jack Hoisting System, rope dish and fairlead device, operating platform, the carrying support is made up of head girder, column, pull bar, diagonal brace and contact rod member, be provided with operating platform above the head girder, be furnished with on the operating platform jack Hoisting System and with corresponding rope dish of the layout of jack and fairlead device, the carrying frame bottom adopts high-strength bolt to be fixedly connected on the branch spreader beam that is fixed on the column.
Each operating platform of contact rod member is welded by H shaped steel or channel-section steel.
The hydraulic jack Hoisting System comprises hydraulic jack, has logic control, position synchronization control function, realizes the computer control hydraulic synchronizing lifting system of steady lifting, decline and the Long-distance Control of member.
The rope dish is by steel pipe manufacturing, and links to each other with the supporting leg that is installed on cradle top surface by roller bearing; Fairlead is made by channel-section steel, vertically enters jack inner chamber behind the unwrapping wire through the steel strand of fairlead in the rope dish.
The direction across bridge of operating platform is provided with the safe string bag, and the platform bottom periphery is provided with baseboard, and the platform panel is made by checkered steel plate.
The invention has the beneficial effects as follows: this device utilizes permanent column as the basis, greatly reduces the temporary structure consumption, and this lifting support can be used as a kind of appliance arrangement, can recycle, and has created bigger economic benefit; And utilize the computer control hydraulic jack to promote operation synchronously, lifting member can be promoted steadily, continuously in place, process control accurately, safety.Can satisfy whole vertical-lift construction needs of striding the big sections of bridge floor beam in the bridge construction.
Description of drawings
Fig. 1 is a structural representation of the present invention.
The specific embodiment
Below in conjunction with specific embodiment, further set forth the embodiment of patent of the present invention.Should be understood that these embodiment only to be used to patent of the present invention is described and be not used in the restriction patent of the present invention scope.Should be understood that in addition those skilled in the art can make various changes or modifications the present invention after the content of having read patent instruction of the present invention, these equivalent form of values fall within the application's appended claims institute restricted portion equally.
As shown in Figure 1, continuous and perpendicular lifting apparatus for large segmental bridge floor beam of the present invention comprises carrying support 1; Hydraulic jack Hoisting System 2; Rope dish and fairlead device 3; Operating platform 4.
Be provided with operating platform 4 above the head girder of carrying support 1, be furnished with on the operating platform 4 jack Hoisting System 2 and with corresponding rope dish of the layout of jack and fairlead device 3, carrying support 1 bottom adopts high-strength bolt to be fixedly connected on the branch spreader beam 5 that is fixed on the column 6.
(1) carrying support
Carrying support 1 is the core of whole lifting appliance.Entire bracket adopts full steel structure, and end face is arranged the jack Hoisting System, and the bottom adopts high-strength bolt M24 bolt to be fixed on the branch spreader beam 6.Carrying support 1 main stressed member adopts the steel plate weldment, and contact rod member and operating platform 4 adopt H shaped steel or channel-section steel welding.Each support frame mainly contains head girder, column, pull bar, diagonal brace and contact rod member and forms.
(2) hydraulic jack Hoisting System
The Hoisting System 2 main LSD200 type hydraulic jack that adopt Liuzhou OVM realize promoting synchronously by computer control.Computer control hydraulic synchronizing lifting system is made up of control system (computer and sensor), load bearing system (steel strand and jack), dynamical system (hydraulic power unit) etc.The computer synchronous control system has logic control, position synchronization control function, can realize steady lifting, decline and the Long-distance Control of member.
Every cover lifting appliance configuration 2 cover hydraulic jack Hoisting System 2 realize promoting synchronously control by one group of synchronous control system again.
(3) rope dish and fairlead device
On the operating platform 4 of support 1 end face, arrange two lasso trick dishes and fairlead device 3, corresponding with the layout of jack.By this covering device, realize promoting and transfer in the process, the take-up of steel strand 7 and unwrapping wire operation.The rope dish adopts steel pipe manufacturing, links to each other with the supporting leg that is installed on cradle top surface by roller bearing; Fairlead adopts channel-section steel to make, and is fixed in cradle top surface, and the position should be in the position of jack correspondence, guarantees that steel strand vertically enter the jack inner chamber behind the unwrapping wire in the rope dish.
(4) operating platform
Placement operations pin hand platform 4 on carrying support 1, equipment such as hydrant cart, the platform direction across bridge is provided with the safe string bag, avoids falling object from high altitude, and the platform bottom periphery is provided with baseboard, and the platform panel adopts checkered steel plate.
With the Min Pu bridge is example, and end bay steel work one is put in order and striden big sections planar dimension is 43.6m * 52.5m * 11.7m, heavily about 960 tons.Existing hanging device is all inapplicable, adopts continuous and perpendicular lifting apparatus for large segmental bridge floor beam of the present invention, has solved this difficult problem effectively, and concrete steps are:
(1) large segmental bridge floor beam 8 to be hoisted is located in column 6 intermediate lift position;
(2) at four column 6 tops bridge floor beam continuous and perpendicular lifting apparatus of the present invention is installed.
(3) promote continuously by four lifting appliances, eight hydraulic jack, the bridge floor beam lifting is put in place.
Facts have proved that easy construction of the present invention greatly reduces cost, be worth recommending.

Claims (5)

1. continuous and perpendicular lifting apparatus for large segmental bridge floor beam, comprise carrying support (1), hydraulic jack Hoisting System (2), rope dish and fairlead device (3), operating platform (4), it is characterized in that, described carrying support (1) is by the head girder, column, pull bar, diagonal brace and contact rod member are formed, be provided with operating platform (4) above the head girder, be furnished with on the operating platform (4) hydraulic jack Hoisting System (2) and with corresponding rope dish of the layout of jack and fairlead device (3), carrying support (1) bottom adopts high-strength bolt to be fixedly connected on the branch spreader beam (5) that is fixed on the column (6).
2. continuous and perpendicular lifting apparatus for large segmental bridge floor beam according to claim 1 is characterized in that, described each operating platform of contact rod member is welded by H shaped steel or channel-section steel.
3. continuous and perpendicular lifting apparatus for large segmental bridge floor beam according to claim 1, it is characterized in that, described hydraulic jack Hoisting System (2) comprises hydraulic jack, have logic control, position synchronization control function, realize the computer control hydraulic synchronizing lifting system of steady lifting, decline and the Long-distance Control of member.
4. continuous and perpendicular lifting apparatus for large segmental bridge floor beam according to claim 1, it is characterized in that, described rope dish is by steel pipe manufacturing, and link to each other with the supporting leg that is installed on cradle top surface by roller bearing, fairlead is made by channel-section steel, vertically enters jack inner chamber behind the unwrapping wire through the steel strand (7) of fairlead in the rope dish.
5. continuous and perpendicular lifting apparatus for large segmental bridge floor beam according to claim 1 is characterized in that, the direction across bridge of described operating platform (4) is provided with the safe string bag, and the platform bottom periphery is provided with baseboard, and the platform panel is made by checkered steel plate.
CN 200810044180 2008-12-24 2008-12-24 Continuous and perpendicular lifting apparatus for large segmental bridge floor beam Active CN101761031B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200810044180 CN101761031B (en) 2008-12-24 2008-12-24 Continuous and perpendicular lifting apparatus for large segmental bridge floor beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200810044180 CN101761031B (en) 2008-12-24 2008-12-24 Continuous and perpendicular lifting apparatus for large segmental bridge floor beam

Publications (2)

Publication Number Publication Date
CN101761031A true CN101761031A (en) 2010-06-30
CN101761031B CN101761031B (en) 2012-07-18

Family

ID=42492400

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200810044180 Active CN101761031B (en) 2008-12-24 2008-12-24 Continuous and perpendicular lifting apparatus for large segmental bridge floor beam

Country Status (1)

Country Link
CN (1) CN101761031B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101886369A (en) * 2010-07-06 2010-11-17 中建八局基础设施建设有限公司 Beam erecting method
CN102094389B (en) * 2009-12-14 2013-04-24 上海市基础工程有限公司 Separable large-section truss girder hydraulic lifting device
CN107130517A (en) * 2017-04-23 2017-09-05 中建三局基础设施工程有限公司 It is a kind of fine-tuning from lifting closure mould bases base apparatus and its operating method
CN107522121A (en) * 2017-09-01 2017-12-29 中交第二公路工程局有限公司 A kind of steel strand wires line winding guide and steel strand wires rope-winding method side by side
CN110080108A (en) * 2019-04-10 2019-08-02 四川雅康高速公路有限责任公司 It unites for falling boom support and falling girder system in tunnel
CN110106787A (en) * 2019-04-10 2019-08-09 四川雅康高速公路有限责任公司 Bridge falls beam construction method between tunnel
US10534338B2 (en) 2015-08-20 2020-01-14 Siemens Aktiengesellschaft Method for generating a switching sequence in an industrial system, and device
CN114214941A (en) * 2021-09-08 2022-03-22 中交武汉港湾工程设计研究院有限公司 Reverse lifting equipment for mounting separated suspension bridge steel beam and construction method thereof

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2644489Y (en) * 2003-06-09 2004-09-29 上海市基础工程公司 Hoisting machine for main deck of bridge

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102094389B (en) * 2009-12-14 2013-04-24 上海市基础工程有限公司 Separable large-section truss girder hydraulic lifting device
CN101886369A (en) * 2010-07-06 2010-11-17 中建八局基础设施建设有限公司 Beam erecting method
CN101886369B (en) * 2010-07-06 2012-11-07 中建八局基础设施建设有限公司 Beam erecting method
US10534338B2 (en) 2015-08-20 2020-01-14 Siemens Aktiengesellschaft Method for generating a switching sequence in an industrial system, and device
CN107130517A (en) * 2017-04-23 2017-09-05 中建三局基础设施工程有限公司 It is a kind of fine-tuning from lifting closure mould bases base apparatus and its operating method
CN107522121A (en) * 2017-09-01 2017-12-29 中交第二公路工程局有限公司 A kind of steel strand wires line winding guide and steel strand wires rope-winding method side by side
CN107522121B (en) * 2017-09-01 2023-09-22 中交第二公路工程局有限公司 Steel strand wire winding guide device and steel strand wire side-by-side winding method
CN110080108A (en) * 2019-04-10 2019-08-02 四川雅康高速公路有限责任公司 It unites for falling boom support and falling girder system in tunnel
CN110106787A (en) * 2019-04-10 2019-08-09 四川雅康高速公路有限责任公司 Bridge falls beam construction method between tunnel
CN114214941A (en) * 2021-09-08 2022-03-22 中交武汉港湾工程设计研究院有限公司 Reverse lifting equipment for mounting separated suspension bridge steel beam and construction method thereof
CN114214941B (en) * 2021-09-08 2024-03-26 中交武汉港湾工程设计研究院有限公司 Inverted lifting equipment for installing steel girder of separated suspension bridge and construction method thereof

Also Published As

Publication number Publication date
CN101761031B (en) 2012-07-18

Similar Documents

Publication Publication Date Title
CN101761031B (en) Continuous and perpendicular lifting apparatus for large segmental bridge floor beam
CN103882811A (en) Bridge floor crane for cable-stayed bridge
CN101537976B (en) Dual-tower-mast giant self-lifting crane and following-carrying lifting method thereof
CN104060844A (en) Sliding device and lifting device for truss frame of steel structural transfer floor of the high-rise building and construction method thereof
CN101892736B (en) High altitude moving hanging basket construction method
CN105484162B (en) Suspension bridge construction stiff girder secondary on the bank swings moving device and method
CN103086279A (en) Vertical transportation construction method for building construction
CN205557339U (en) From climbing formula pier stud template elevating gear
CN102080357A (en) Integrated beam-falling device and method for steel pipe pier bailey beam cast-in-place bracket
CN105692470A (en) Internal climbing tower crane and operating method thereof
CN201376848Y (en) Large-scale double-tower automatic-elevation hoisting equipment
CN202519975U (en) Reciprocating slip form platform
CN103774841A (en) Track type sliding formwork device
CN204282843U (en) The sliding hoisted in position device of steel girder erection in a kind of stiffness combination construction
CN203654191U (en) Device for stay cable to be lifted on bridge
CN207277197U (en) A kind of operating platform suitable for the installation of high pier Wavelike steel webplate cantilever
CN105317031B (en) A kind of ship lift main equipment room bridge main beam hanging method
CN205369040U (en) Suspension bridge is under construction on bank stiffening beam secondary and is swung and move device
CN201598570U (en) Cable-stayed bridge cableway erecting equipment
CN214329956U (en) Ring rail hoisting device for curtain wall installation
CN101664963B (en) Multifunctional operating platform for large-volume prestressed concrete box girder tensioning
CN201952736U (en) Auxiliary pier movable bracket for assisting invariable-amplitude beam erecting crane in erecting steel box girder
CN108059088B (en) Method and device for deflection turning and transposition of carrying pole Liang Kongzhong of slot erecting machine
CN101922257B (en) Derrick erected by positioning three pairs of holding poles in straight shape
CN206328690U (en) A kind of big discrepancy in elevation, large span stiff skeleton external wrapping concrete template construction equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI FOUNDATION ENGINEERING GROUP CO., LTD.

Free format text: FORMER NAME: SHANGHAI FOUNDATION ENGINEERING CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 200433 Yangpu District, Shanghai Star Road, No. 231

Patentee after: Shanghai Foundation Engineering Group Co., Ltd.

Address before: 200433 Yangpu District, Shanghai Star Road, No. 231

Patentee before: Shanghai Foundation Engineering Co., Ltd.