Street cleaner's multifunctional environmental-friendly ship equipment waterborne and method thereof
Technical field
The present invention relates to a kind of street cleaner's environmental protection ship waterborne, relate in particular to a kind of street cleaner's multifunctional environmental-friendly ship equipment waterborne and method thereof.
Background technology
It is global problem that blue-green algae breaks out.The lake nutrient laden day by day seriously is to cause blue algae growth and the major cause of breaking out, and global warming, water temperature rising also are the inducements that blue-green algae breaks out simultaneously.As long as the lake nutrient concentration pollutes even cut off external source fully for a long time in the higher level fluctuation, as long as conditions such as temperature, current, illumination are suitable, blue-green algae breaks out probably on a large scale.Even this phenomenon under the condition of taking very strict control measures, still can continue 3-5 even longer time, this trend can't change in the short time.So the blue-green algae in lake is administered and ecological recovery is a long-term process.
Large-scale blue-green alga bloom was broken out in important waters such as Chinese yunnan Dian Chi, Taihu Lake, Jiangsu in succession in recent years.Serious environment pollution endangers the drinking-water water source on the one hand; Brought great influence to tourist industry on the other hand.Especially Taihu Lake is as the important potable water earth surface water source in Wuxi, and blue algae bloom causes the Wuxi that the water crisis takes place.How to alleviate even eliminate blue-green algae and pollute, become a problem that presses for solution.
The eutrophication in lake has been the gesture that bad old practices die hard at present, wants in the short time, thoroughly to solve the blue-green algae problem, all goes back the ripe good method of neither one both at home and abroad.
It is very general that the blue-green algae phenomenon takes place storehouse, large-area lake water body, and blue-green algae is all taken place in many lakes both domestic and external.Body eutrophication is meant nutriments such as nitrogen that admittance in lake, reservoir and the river is too much and phosphorus, and the eco design of water body and function are changed, and causes algae particularly unusual breeding growth and the blue-green alga bloom phenomenon that occurs of blue-green algae.When blue-green alga bloom is serious; The water surface forms thick bluish-green water bloom; Give off an unpleasant smell, not only destroyed aquatic ecosystem in a healthy and balanced way, and the drinking water safety of humans and animals has been constituted serious threat because of frustule discharges multiple algae toxin after breaking.
At present, the frequency of freshwater lake blue-green alga bloom generation is serious day by day in the world.In the past, lake blue algae is main with the manual work salvaging, stacks formation secondary pollution easily behind the elsewhere.World-class technical barriers such as the algae separated form water that Yixing environmental protection science and technology research and development centre of Nanjing University relates to the blue-green algae salvor, concentrated mummification are assaulted; They and Jiangsu Ding Ze Environmental Projects Inc. unite tackling key problem; Only used more than 30 day test and research, obtained important breakthrough with regard to the gordian technique that makes " blue algae dewatering is used belt filter press ".After " blue algae dewatering is used belt filter press " sucked green algae water, the way that adopts composite flocculation was discharged through concentrating press filtration the initial gross separation of algae water then with clear water, form the algal biscuit of mummification simultaneously.The birth of this technical achievement is that the mechanization of blue-green algae fishing operation is laid a good foundation.At present, Jiangsu Ding Ze has accomplished the production and the place in operation of first batch of equipment.The expert thinks, this salvor of blue-green algae is efficiently salvaged blue-green algae, be at present the most directly, the most effectively, fast speed blue-green algae improvement method.
But above-mentioned technical achievement exists, and hull is huge, complex process, equipment heaviness and the low shortcoming of treatment effeciency, especially can only merely handle blue-green algae and can only handle the blue-green algae layer in other words.
Summary of the invention
The object of the invention just is to overcome the shortcoming and defect that prior art exists, and a kind of street cleaner's multifunctional environmental-friendly ship equipment waterborne and method thereof are provided.
Design philosophy of the present invention:
The present invention is the pseudo-cavity that utilizes compression failure blue-green algae cell, removes water-surface blue-green algae fast thereby make blue-green algae lose essential buoyancy, blue-green algae is adsorbed in the diatom earth human body and is sunken to lakebed; The 2nd, utilize the agent of diatom earth enhanced flocculation that the nitrogen in the lake, phosphorus and organic matter are adsorbed the back automatic sedimentation in lakebed, reach the purpose of rapid cleaning lake water denitrogenation dephosphorization.
Specifically:
One, multifunctional environmental-friendly ship equipment (abbreviation equipment)
1, overall
This equipment comprises hull and hull hoisting ring;
Hull be provided with inhale algae groove, filtering tank, coolant inlet pipe, coolant outlet pipe, remove the algae feed screw, centrifugal pump of vertical axis, static mixer, pressure surge tank, backflow safety valve, Air compressor, Air compressor freeing pipe, elevator elevator, spray gun, denitrogenation are scaled feed screw, diesel-engine generator, exhaust, air inlet pipe and drain hose;
Inhale the front end that the algae groove is fixed on hull, filtering tank is installed on the base plate of hull front end bottom, and coolant inlet pipe one end connects inhales the algae groove, and the other end is connected with the cylindrical shell top of filtering tank through inlet valve; Coolant outlet pipe one end is connected with the cylindrical shell bottom of filtering tank through flowing water Valve; The coolant outlet pipe other end is connected with the water inlet of centrifugal pump of vertical axis; The water outlet of centrifugal pump of vertical axis is connected with the import of static mixer; The outlet of static mixer is connected with the import of pressure surge tank, and the outlet of pressure surge tank is connected with the import of backflow safety valve, and the outlet of backflow safety valve is connected through hull and lake water;
Air compressor is fixed on the afterbody of hull, is connected successively before and after Air compressor, freeing pipe, air quick coupling and the spray gun;
Be fixed on the middle winch of hull afterbody and be connected with the up-down channel-section steel through steel rope, on the up-down channel-section steel, be connected with spray gun, spray gun is provided with air quick coupling and material quick coupling;
The denitrogenation that is fixed on the hull afterbody feed screw of scaling is connected with aggregate tube through spiral tube, and aggregate tube is connected with the material quick coupling of spray gun through the discharging flexible pipe.
Its principle of work is:
1, fore removes blue-green algae
Blue-green algae lake water gets into through inhaling the algae groove that the centrifugal pump of vertical axis supercharging is laggard goes into static mixer; Can blue-green algae lake water and diatom earth enhanced flocculation agent mixing be got into pressure surge tank again; Make pseudo-cavity collapse under the 0.4MPa pressure of blue-green algae in pressure surge tank and adsorbed by the agent of diatom earth enhanced flocculation; Lake water is separated with blue-green algae (by the blue-green algae of diatom earth blue-green algae flocculant parcel); Lake water and diatom earth blue-green algae flocculant directly enter the processing of promptly having accomplished in the lake blue-green algae through the backflow safety valve simultaneously, and diatom earth blue-green algae flocculant parcel blue-green algae is sunken to lakebed voluntarily.
2, stern denitrogenation dephosphorization
The Air compressor pressurized air is upwards discharged high pressure air from stern-on lake water bottom by spray gun and is promoted water body to flow oxygenation in lake water; The agent of diatom earth enhanced flocculation is sucked spray gun discharges in lake water; With the agent of diatom earth enhanced flocculation and nitrogenous, phosphorus and organic lake water aeration rapid mixing; The agent of diatom earth enhanced flocculation has unique effect to the nitrogen in the lake water, phosphorus, and this flocculant is water quality more than four types as long as just mix with lake water and can remove nitrogen, phosphorus fast with bad five types of water quality lifting; Diatom earth enhanced flocculation agent meeting in lakebed, reaches the purpose of rapid cleaning lake water denitrogenation dephosphorization with the nitrogen in the lake, phosphorus and organic matter absorption back automatic sedimentation after lake water and the diatom earth aeration rapid mixing.
Two, multi-functional environment-protection method
1, fore removes the blue-green algae method
Fore removes the blue-green algae method and comprises the following steps:
1. preceding in advance the preparation
(centrifugal pump start before) need be closed all valves of filtering tank before driving, and opens air discharging channel, filtering tank water filled with diving pump from filtering tank bottom discharge passage, and the method for inspection is: looking air discharging channel has water to overflow to be as the criterion;
2. inhale algae
Since when blue-green algae breaks out on a large scale, the surface layer of water zone that blue-green algae suspends and accumulates in underwater 0-200mm with colony's mode, and blue-green algae is handled the environmental protection ship and removes the suction algae efficient that algae efficient is decided by to inhale the algae mouth; Through test of many times, designed suction algae groove (circle behind a kind of the place ahead, pre-large post-small corrosion-resistant steel or glass-felt plastic funnel structure); Water outlet adopts steel pipe, and mounted valve, regulates the pressure that blue-green algae is handled the environmental protection ship, dominant discharge.
3. mix and exert pressure
After blue-green algae lake water adds diatom earth blue-green algae flocculant, squeeze into static mixer (8) rapid mixing through centrifugal pump (7), this commingled water gets into the pressure surge tank pressurization again;
4. precipitate
Backflow safety valve rated pressure is 0.4-0.5MPa; Backflow safety valve fwd blue-green algae lake water pressure is 0.4-0.5MPa; The pressure of the blue-green algae lake water that the backflow of backflow safety valve is flowed out is normal pressure, and the blue-green algae (by the blue-green algae of diatom earth blue-green algae flocculant parcel) that flows in the lake can be precipitated voluntarily;
5. dosing
The reinforced of diatom earth blue-green algae flocculant is that feed screw is carried out, and diatom earth blue-green algae flocculant gets into from hopper, and the screw rod propelling through feed screw gets into filtering tank through charging valve and feed pipe;
6. impurity is handled
Swim in all foreign material such as the leaf of lake surface, short branch, discarded plastic product after sucking filtering tank; Under these foreign material under the effect of upper sieve plate can be tackled; Need handle after filtering tank is filled: (filtering tank generally designs two; Be used alternatingly) close all valves of filtering tank before handling and only open sluicing valve, the pressurized air of Air compressor is got into from air intake branch dewater, utilize compression machine to squeeze subsequently; Open the following big flange of filtering tank, the impurity that squeezes into cake extrudes through the below of filtering tank.
2, stern denitrogenation dephosphorization method
Stern denitrogenation dephosphorization method comprises the following steps:
1. the Air compressor pressurized air is upwards discharged high pressure air from stern-on lake water bottom by spray gun and is promoted water body to flow;
2. the Air compressor pressurized air is upwards discharged high pressure air oxygenation to lake water from stern-on lake water bottom by spray gun;
3. the Air compressor pressurized air is upwards discharged high pressure air from stern-on lake water bottom by spray gun and can the agent of diatom earth enhanced flocculation be sucked spray gun and to lake water, discharge;
4. the Air compressor pressurized air upwards discharge high pressure air from stern-on lake water bottom by spray gun can be with the agent of diatom earth enhanced flocculation and nitrogenous, phosphorus and organic lake water aeration rapid mixing;
5. the agent of diatom earth enhanced flocculation has unique effect to the nitrogen in the lake water, phosphorus, and this flocculant is water quality more than four types as long as just mix with lake water and can reduce nitrogen, phosphorus fast with bad five types of water quality lifting;
6. diatom earth enhanced flocculation agent meeting is adsorbed the back automatic sedimentation in lakebed with the nitrogen in the lake, phosphorus and organic matter after lake water and the diatom earth aeration rapid mixing, reaches the purpose of rapid cleaning lake water denitrogenation dephosphorization.
The present invention has advantage and good effect:
1, this device structure is simple, compact, operates steadily, and fore removes blue-green algae and stern denitrogenation dephosphorization efficient is high.
2, the water body top layer blue-green algae of treated mistake obviously reduces, and water quality detection is the result show, the expeditious measures when the present invention can be used as the outburst of blue-green algae large tracts of land;
3, diatom earth is applied to city water body in lake recovery technique, be the most cheap, the most effective, most effective, effect is best, repair the fastest and effective technology.
Description of drawings
Fig. 1 .1 is the structural representation (main looking) of this equipment;
Fig. 1 .2 is the structural representation (overlooking) of this equipment.
Fig. 2 .1 is a structural representation (main looking) of inhaling the algae groove;
Fig. 2 .2 is a structural representation (side-looking) of inhaling the algae groove;
Fig. 3 is the structural representation of spray gun;
Fig. 4 is pseudo-cavity pressure scheme drawing, wherein:
The concentration of C-gas dissolved water;
The P-hydrostatic;
Po-liquid level pressure is generally local barometric pressure Pa;
The cell turgor that Ps-cell liquid and surrounding environment seepage flow potential difference cause;
Gaseous tension in the pseudo-cavity of Pt-.
The specific embodiment
Specify below in conjunction with accompanying drawing and embodiment:
One, multifunctional environmental-friendly ship equipment (abbreviation equipment)
1, overall
Like Fig. 1 .1,1.2, this equipment comprises hull 1) and hull hoisting ring 20;
Hull 1 be provided with inhale algae groove 2, filtering tank 3, coolant inlet pipe 4, coolant outlet pipe 5, remove algae feed screw 6, centrifugal pump of vertical axis 7, static mixer 8, pressure surge tank 9, backflow safety valve 10, Air compressor 11, Air compressor freeing pipe 12, elevator elevator 13, spray gun 14, denitrogenation are scaled feed screw 15, diesel-engine generator 16, freeing pipe 17, air inlet pipe 18 and drain hose 19;
Inhale the front end that algae groove 2 is fixed on hull 1, filtering tank 3 is installed on the base plate of hull 1 front end bottom, and coolant inlet pipe 4 one ends connect inhales algae groove 2, and the other end is connected with cylindrical shell 3.5 tops of filtering tank 3 through inlet valve 4.1; Coolant outlet pipe 5 one ends are connected with cylindrical shell 3.5 bottoms of filtering tank 3 through flowing water Valve 5.1; Coolant outlet pipe 5 other ends are connected with the water inlet of centrifugal pump of vertical axis 7; The water outlet of centrifugal pump of vertical axis 7 is connected with the import of static mixer 8; The outlet of static mixer 8 is connected with the import of pressure surge tank 9, and the outlet of pressure surge tank 9 is connected with the import of backflow safety valve (10), and the outlet of backflow safety valve (10) is connected through hull (1) and lake water;
Air compressor 11 is fixed on the afterbody of hull 1, and Air compressor 11, freeing pipe 12, air quick coupling 14.1 and spray gun 14 front and back are connected successively;
Be fixed on hull 1 afterbody middle winch 13 and be connected with up-down channel-section steel 13.1 through steel rope, on up-down channel-section steel 13.1, be connected with spray gun 14, spray gun (14) is provided with air quick coupling 14.1 and material quick coupling 14.2;
The denitrogenation that the is fixed on hull 1 afterbody feed screw 15 of scaling is connected with aggregate tube 15.2 through spiral tube 15.1, and aggregate tube 15.2 is connected with the material quick coupling 14.2 of spray gun 14 through discharging flexible pipe 15.3.
2, functional component
1) hull 1
Hull 1 is made up of operator's compartment 1.1, stern chamber 1.2, hull propelling unit 1.3, stern rudder 1.4 and diesel engine for boats 1.5; Operator's compartment 1.1 is arranged on the front end of hull 1; On the quarter chamber 1.2 is provided with hull propelling unit 1.3 and rudder for ship 1.4; On the quarter the bottom of chamber 1.2 is provided with diesel engine for boats 1.5, and diesel engine for boats 1.5 is the power that hull (1) advances.
2) inhale algae groove 2
Like Fig. 2 .1,2.2, inhale the front end that algae groove 2 is fixed on hull 1, be corrosion-resistant steel funnel structure round, pre-large post-small behind a kind of the place ahead, be connected with coolant inlet pipe 4 through flange, its function is big mouthful and sucks blue-green algae lake water.
3) filtering tank 3
Like Fig. 1 .1,1.2, filtering tank 3 by upper cover 3.1, go up big flange 3.2, go up active sieve plate 3.3, centre pipe 3.4, cylindrical shell 3.5, down movable big flange 3.6, fixed screen deck 3.7, low head 3.8 and last hydraulic actuating cylinder 3.9 are formed down;
Its annexation is:
Upper cover 3.1, upward big flange 3.2, cylindrical shell 3.5, following movable big flange 3.6 are connected up and down with low head 3.8 successively;
Be provided with hydraulic actuating cylinder 3.9 on centre pipe 3.4 and two platforms on upper cover 3.1 tops;
Be provided with active sieve plate 3.3 on cylindrical shell 3.5 tops, be provided with fixed screen deck 3.7 down on low head 3.8 tops.
The principle of work of filtering tank 3 is:
The blue-green algae lake water that gets into filtering tank 3 has a large amount of scum silica frost (leaf, tree root, weeds etc.), filtering tank 3 main descums.This scum silica frost is extruded by hydraulic actuating cylinder 3.9 after filtering tank 3 squeezing, dehydration form a blob of slag and is entered in the lake.
4) coolant inlet pipe 4
Belong to parts commonly used.
5) coolant outlet pipe 5
Belong to parts commonly used.
6) remove algae feed screw 6
Removing algae feed screw 6 is a kind of conveyers by quantitative input pressed powder, and the adjusting of the amount of feeding belongs to approved product by variable-frequency motor control.
7) centrifugal pump of vertical axis 7
Belong to approved product; Its function is to inhale blue-green algae lake water and supercharging.
8) static mixer 8
Belong to approved product; Its function is that the agent of diatom earth enhanced flocculation is mixed with blue-green algae lake water.
9) pressure surge tank 9
Belong to approved product; Its function is to keep rated pressure.
10) the backflow safety valve 10
Belong to approved product; Its function is a control presssure.
11) Air compressor 11
Belong to approved product; Its function provides pressurized air.
12) the Air compressor freeing pipe 12
Belong to parts commonly used.
13) the elevator elevator 13
Belong to approved product; On elevator elevator 13, be connected with up-down channel-section steel 13.1.
Its function is to regulate the height of spray gun 14 in lake water.
14) spray gun 14
Like Fig. 3, spray gun 14 belongs to approved product; Spray gun 14 is provided with air quick coupling 14.1 and material quick coupling 14.2.
Its function is with air or diatom earth enhanced flocculation agent suction and sprays as in the lake.
15) denitrogenation dephosphorization feed screw 15
Be a kind of conveyer by quantitative input pressed powder, the adjusting of the amount of feeding belongs to approved product by variable-frequency motor control.
16) diesel-engine generator 16
Belong to approved product; Its function is generating.
17) freeing pipe 17
Belong to parts commonly used.
18) air inlet pipe 18
Belong to parts commonly used.
19) drain hose 19
Belong to parts commonly used.
20) the hull hoisting ring 20
Belong to parts commonly used.
Two, the principle of work of multi-functional environment-protection method
Blue-green algae breaks out, and is that flow rate of water flow is slow excessively because eutrophication is comparatively serious in the water body, and water exchange capacity is little.
Like Fig. 5, research shows, has air bag in the blue-green algae cell, has gas in the air bag.Air bag is piled up by numerous cylindrical bubbles and forms, and people are the pseudo-cavity of these bubble called afters.It mainly acts on is for cell buoyancy to be provided.The pseudo-cavity of blue-green algae is to be taper by its two ends that protein constitutes, middle for cylindrical hollow, be filled with the cell inner structure of gas; Wall thickness is 2nm only, wide 45-110nm, and long 100-800nm or longer does not wait.
Pseudo-cavity characteristic:
1) has hydrophobic inner surface, can stop hydrone to get into, and gas molecule can freely spread turnover.
2) have rigidity, when pseudo-cavity increased 0.1MPa at the pressure that bears, its volume only dwindled 1/1000.
As long as pseudo-cavity does not break, just can buoyancy be provided for blue-green algae.Can be found out by the blue-green algae characteristic, want to remove the buoyancy that blue-green algae will be destroyed blue-green algae, the algae on design water body top layer (0-200mm) removes the pressurization of blue-green algae system through fore, destroys blue-green algae air bag and eucaryotic cell structure, reduces cell buoyancy, impels blue-green algae to sink.When removing the work of phytem system, water inlet sucks the blue-green algae cell suspension on top layer, removes the pressure of phytem system generation the group of the blue-green algae in the water is broken up; And make the balloon rupture of blue-green algae cell; Cytoclasis through diatom earth enhanced flocculation agent absorption, is discharged through water outlet more then; Sink in the water body, reach purpose except that algae.
According to noted earlier, generally about 100nm, therefore can get the ruined pressure of blue-green algae is about 0.4MPa to the blue-green algae diameter.Show that through the blue-green algae pressure test when pressure during greater than 0.4MPa, algae can be precipitated rapidly, explains that blue-green algae air bag and eucaryotic cell structure are destroyed.Therefore the minimum working pressure power of confirming the pressure chamber is 0.4MPa.The pressure chamber is realized by force lift and backflow safety valve, can satisfy minimum working pressure power.
Diatom earth (clay mineral) blue-green algae flocculant is the fabulous rare natural material of absorption blue-green algae, not only has higher usefulness, and the source is sufficient; With low cost; Nontoxic pollution-free, also less to the influence that non-algal tufa is biological, be considered to a kind of natural polycoagulant of administering algal tufa.The big 50-60m of diatom earth blue-green algae flocculant specific surface area
2/ g can be adsorbed on blue-green algae in its human body and is sunken to lakebed.
Blue-green algae is adsorbed in the diatom earth human body and is sunken to lakebed this be of the present invention one big characteristic:
One of which can also can discharge noxious gas harm water body by lot of consumption lakebed dissolved oxygen if be sunken to lakebed after blue-green algae is vanished separately, just can not endangered water body by diatom earth absorption parcel at present
Its two, diatom earth is sunken to the eutrophy-nitrogen that can block the sunlight of bed mud in the lake behind the lakebed and cause bed mud, phosphorus and is not released out, the growth of blue-green algae will be curbed like this.
As everyone knows, " blue-green alga bloom " be lake water by the sign of gross pollution, be the serious eutrophication of water body and cause the principal element of blue algae bloom, eradicate blue-green algae and must set about from eutrophication.For this reason, main task of the present invention is exactly the denitrogenation dephosphorization, fundamentally roots out the material base of blue-green algae existence, bad five types of lake water is handled rising to four types more than the water quality, and handling blue-green algae is the side production of street cleaner's environmental protection ship waterborne.
Three, test results
Street cleaner's environmental protection ship waterborne (3000) type
The load carrying ability of hull 1 is about 50T;
Centrifugal pump 7 flows are 565m
3/ h is applicable to 1000-3000 ten thousand side waters;
Inhale the circle behind the place ahead that is shaped as of algae groove 2,500*500-2000*2000, material is corrosion-resistant steel or glass-felt plastic.
Denitrogenation dephosphorization ability is: 12000m
3/ h;
The ability of removing blue-green algae is: 3000m
2/ h.