CN101742576B - Method and device for recovering reserved GBR load - Google Patents

Method and device for recovering reserved GBR load Download PDF

Info

Publication number
CN101742576B
CN101742576B CN 200810225719 CN200810225719A CN101742576B CN 101742576 B CN101742576 B CN 101742576B CN 200810225719 CN200810225719 CN 200810225719 CN 200810225719 A CN200810225719 A CN 200810225719A CN 101742576 B CN101742576 B CN 101742576B
Authority
CN
China
Prior art keywords
reserved gbr
gbr load
message
bearing
quality
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 200810225719
Other languages
Chinese (zh)
Other versions
CN101742576A (en
Inventor
陆伟
胡伟华
周汉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CN 200810225719 priority Critical patent/CN101742576B/en
Publication of CN101742576A publication Critical patent/CN101742576A/en
Application granted granted Critical
Publication of CN101742576B publication Critical patent/CN101742576B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

The embodiment of the invention provides a method and a device for recovering a reserved GBR load. The method comprises that: an MME receives message related to a terminal; after determining to recover the reserved GBR load of the terminal, the MME sends first indication message which carries information for recovering the reserved GBR load to a PDN GW to indicate the PDN GW to recover a core network side load corresponding to the reserved GBR load; and the MME sends second indication message which carries service quality information to a base station to indicate the base station to recover an S1 interface load and a wireless side load corresponding to the reserved GBR load according to the service quality information. The embodiment of the invention can successfully recover the reserved GBR load, and meets the requirement of receiving the reserved GBR load.

Description

Recover method and the device of reserved GBR load
Technical field
The present invention relates to the network communications technology field, be specifically related to recover method, mobile management network element, grouped data network gateway and the terminal equipment of reserved GBR load.
Background technology
In the UMTS Terrestrial radio access network (E-UTRAN) of UMTS Terrestrial radio access network (UTRAN) and evolution, can exist and be in the GBR carrying that keeps attitude, as in E-UTRAN, discharge because user's inactivity (User inactivity) causes the S1 interface, make the GBR carrying be in the reservation attitude; For another example, in UTRAN, because discharging, the Iu interface make conversation class and the GBR carrying of stream class be in the reservation attitude.
In present practical application, there is the demand of recovering to be in reserved GBR load, yet, how to make to be in the GBR carrying recovery that keeps attitude, do not have at present clear and definite regulation.
How recovering to be in the GBR carrying that keeps attitude is a technical problem that needs to be resolved hurrily.
Summary of the invention
Embodiment of the present invention provides method and the device that recovers reserved GBR load, can successfully recover to be in the GBR carrying that keeps attitude.
A kind of method of recovering reserved GBR load that embodiment of the present invention provides comprises:
Mobile management network element MME receives the message relevant to terminal;
After described MME determines and need to recover the reserved GBR load of described terminal, send to grouped data network gateway PDNGW and carry the first Indication message that recovers reserved GBR load information, recover core-network side carrying corresponding to this reserved GBR load with indication PDN GW, described MME sends the second Indication message that carries quality of service information to the base station, recover S1 interface bearing corresponding to this reserved GBR load and wireless side carrying to indicate the base station according to described quality of service information.
Embodiment of the present invention also provides a kind of method of recovering reserved GBR load, comprising:
PDN GW receives the request bearing resource and revises message, and the described request bearing resource is revised message and revised message for the request bearing resource that transmits due to terminal triggering bearing resource modification process;
After described PDN GW revises message and determines needs the reserved GBR load of described terminal is recovered according to the described request bearing resource, determine the quality of service information of described reserved GBR load, and trigger the dedicated bearing modification process of revising service quality, be in corresponding core-network side carrying and S1 interface bearing and the wireless side carrying of described reserved GBR load of the terminal of Idle state or connected state to utilize described bearing modification flow process to recover.
Embodiment of the present invention also provides a kind of method of recovering reserved GBR load, comprising:
The downlink data packet of PDN GW receiving terminal;
After described PDN GW determines the reserved GBR load that is carried as described terminal corresponding to this downlink data packet, determine the quality of service information of described reserved GBR load, and trigger the dedicated bearing modification process of revising service quality, be in corresponding core-network side carrying and S1 interface bearing and the wireless side carrying of described reserved GBR load of the terminal of Idle state or connected state to utilize described bearing modification flow process to recover.
The mobile management network element that embodiment of the present invention provides comprises:
The first receiver module is used for receiving the message relevant to terminal;
First recovers judge module, is used for judging whether and need to the reserved GBR load of described terminal being recovered;
First recovers module, be used for first recover judge module determine need to recover the reserved GBR load of described terminal after, send to PDN GW and carry the first Indication message that recovers reserved GBR load information, recover core-network side carrying corresponding to this reserved GBR load with indication PDN GW, and send the second Indication message that carries quality of service information to the base station, recover S1 interface bearing corresponding to this reserved GBR load and wireless side carrying to indicate the base station according to described quality of service information.
The another kind of grouped data network gateway that the embodiment of the present invention provides comprises:
The second receiver module is used for receiving bearing resource and revises message, and described bearing resource is revised message and revised message for the bearing resource that transmits due to terminal triggering bearing resource modification process;
Second recovers judge module, is used for revising message according to described bearing resource and judges whether that needs recover the reserved GBR load of described terminal;
Second recovers module, be used for second recover judge module determine need to recover the reserved GBR load of described terminal after, trigger the dedicated bearing modification process of revising service quality, be in corresponding core-network side carrying and S1 interface bearing and the wireless side carrying of described reserved GBR load of the terminal of Idle state or connected state to utilize described bearing modification flow process to recover.
The another kind of grouped data network gateway that the embodiment of the present invention provides comprises:
The 3rd receiver module is for the downlink data packet of receiving terminal;
The 3rd recovers judge module, is used for judging whether carrying corresponding to described downlink data packet is the reserved GBR load of described terminal;
The 3rd recovers module, be used for after described the 3rd recovery judge module is determined the reserved GBR load that is carried as described terminal corresponding to this downlink data packet, trigger the dedicated bearing modification process of revising service quality, be in corresponding core-network side carrying and S1 interface bearing and the wireless side carrying of described reserved GBR load of the terminal of Idle state or connected state to utilize described bearing modification flow process to recover.
The another kind of grouped data network gateway that the embodiment of the present invention provides comprises:
The 4th receiver module is used for receiving the first Indication message that carries recovery reserved GBR load information that MME sends;
The 4th recovers module, be used for after the 4th receiver module receives described the first Indication message, determine the quality of service information of described reserved GBR load, and recover the maximum rate of core-network side carrying corresponding to described reserved GBR load according to described definite quality of service information.
The terminal equipment that the embodiment of the present invention provides comprises:
The message constructing module is used for carrying the information relevant with recovering reserved GBR load in message;
Sending module is used for sending the described message that carries the information relevant with recovering reserved GBR load.
Description by technique scheme as can be known, the embodiment of the present invention provides the technical scheme of multiple recovery reserved GBR load, has successfully recovered to be in the GBR carrying that keeps attitude.
Description of drawings
Fig. 1 is the method flow diagram of the recovery reserved GBR load of the embodiment of the present invention one;
Fig. 2 is the method flow diagram of the recovery reserved GBR load of the embodiment of the present invention two;
Fig. 3 a is the method flow diagram one of the recovery reserved GBR load of the embodiment of the present invention three;
Fig. 3 b is the method flow diagram two of the recovery reserved GBR load of the embodiment of the present invention three;
Fig. 4 is the method flow diagram of the recovery reserved GBR load of the embodiment of the present invention four;
Fig. 5 is the method flow diagram of the recovery reserved GBR load of the embodiment of the present invention five;
Fig. 6 is the method flow diagram of the recovery reserved GBR load of the embodiment of the present invention six;
Fig. 7 is the method flow diagram of the recovery reserved GBR load of the embodiment of the present invention seven;
Fig. 8 is the method flow diagram of the recovery reserved GBR load of the embodiment of the present invention eight;
Fig. 9 a is the method flow diagram one of the recovery reserved GBR load of the embodiment of the present invention nine;
Fig. 9 b is the method flow diagram two of the recovery reserved GBR load of the embodiment of the present invention nine;
Figure 10 is the method flow diagram of the recovery reserved GBR load of the embodiment of the present invention ten;
Figure 11 is the method flow diagram of the recovery reserved GBR load of the embodiment of the present invention 11;
Figure 12 is the method flow diagram of the recovery reserved GBR load of the embodiment of the present invention 12;
Figure 13 is the method flow diagram of the recovery reserved GBR load of the embodiment of the present invention 13;
Figure 14 a is the mobile management network element structural representation one of the embodiment of the present invention 14;
Figure 14 b is the mobile management network element structural representation two of the embodiment of the present invention 14;
Figure 15 is the grouped data network gateway structural representation of the embodiment of the present invention 15;
Figure 16 is the grouped data network gateway structural representation of the embodiment of the present invention 16;
Figure 17 a is the grouped data network gateway structural representation one of the embodiment of the present invention 17;
Figure 17 b is the grouped data network gateway structural representation two of the embodiment of the present invention 18;
Figure 18 is the terminal equipment structural representation of the embodiment of the present invention 19.
Embodiment
Below in conjunction with accompanying drawing, the technical scheme that the embodiment of the present invention provides is described.
Embodiment one, recovers the method for reserved GBR load as shown in Figure 1.
Step 1, MME receive the message relevant to terminal.
The message relevant to terminal that MME receives can be the message that terminal sends, and for example, is in the service request information of the terminal transmission of connected state; Again for example, be in the service request information of the terminal transmission of Idle state; Also have the tracing section updating request message that terminal sends etc.The message that terminal sends can be sent to MME by intermediate equipment such as base station.
The message relevant to terminal that MME receives can be also the message that other network entity sends, for example, in the handoff procedure of terminal, acknowledge message is completed in the switching that the switching request acknowledgement message that the target BS that target MME receives sends and source-end networks equipment send.
When the message relevant to terminal is the message of terminal transmission, can carry the information relevant with recovering reserved GBR load in this message.The reserved GBR load list that the information relevant with recovering reserved GBR load such as needs recover recovers the information of whole reserved GBR loads etc. for another example.
Step 2, MME determine and need to the reserved GBR load of above-mentioned terminal be recovered.
The information that MME carries in can the message relevant to terminal according to its reception is determined needs the reserved GBR load of terminal is recovered; For example, the reserved GBR load list that recovers according to the needs that carry in message is determined needs the reserved GBR load of terminal is recovered; Again for example, determining needs according to the information of the whole reserved GBR loads of recovery that carry in message recovers etc. the reserved GBR load of terminal.
MME also can when find that there is the GBR carrying that keeps attitude in this terminal, determine and need to the reserved GBR load of terminal be recovered; For example, in the situation that do not carry the information relevant with recovering reserved GBR load in the message relevant with terminal that MME receives, MME finds this terminal and whether has the GBR carrying that keeps attitude, have if find this terminal the carrying that keeps attitude GBR, determine and need to the reserved GBR load of this terminal be recovered.
Step 3, MME send to PDN GW and carry the first Indication message that recovers reserved GBR load information, recover core-network side carrying corresponding to this reserved GBR load with indication PDN GW; MME sends the second Indication message that carries quality of service information to the base station, with S1 interface bearing and the wireless side carrying corresponding according to the quality of service information recovery reserved GBR load that carries in the second Indication message of indication base station.The wireless side carrying is empty port load-supporting.
The recovery reserved GBR load information of carrying in above-mentioned the first Indication message can be the reserved GBR load sign and the quality of service information that need to recover.When the reserved GBR load of needs recovery was many, sign and the quality of service information of the reserved GBR load that MME can recover all needs only sent by first Indication message, also can be by many first Indication messages transmissions.That is to say, article one, can carry identification information and a quality of service information that needs the reserved GBR load of recovery in the first Indication message, at least two reserved GBR loads that need to recover that also can carry in all reserved GBR loads that need to recover identify and quality of service information, can also carry reserved GBR loads sign and quality of service information that all need to recover.Need to prove, also can not carry quality of service information in above-mentioned the first Indication message.
In the situation that the first Indication message carries quality of service information, MME need to first obtain the quality of service information of the reserved GBR load that needs recovery, and the mode that MME obtains quality of service information can comprise following two kinds:
Mode one, for E-UTRAN, reduce to quality of service information before zero owing to storing reserved GBR load speed in MME, therefore, MME can obtain from its canned data needs quality of service information corresponding to reserved GBR load that recover.
Mode two, for UTRAN, can receive due to MME the PDP Context information that carries quality of service information, therefore, MME can obtain quality of service information corresponding to reserved GBR load that need to recover from the PDP Context information that it receives.
The first Indication message that MME sends can transfer to by the gateway of intermediate equipment such as terminal PDN GW.Under there was more news in the gateway of terminal, MME can be sent to PDN GW with the first Indication message by the gateway after upgrading; For example, the terminal initiating updating of tracking area, the tracing section updating request message that the MME receiving terminal sends by the base station, MME is in the situation that be that terminal selects new gateway, and MME sends to PDN GW by the current gateway of terminal and carries the first Indication message that recovers reserved GBR load information; MME is in the situation that selected new gateway for terminal, and MME is by carrying for the new gateway of selecting of terminal sends to PDN GW the first Indication message that recovers reserved GBR load information.
PDN GW determines the quality of service information of this reserved GBR load after receiving the first Indication message, and the maximum rate of reserved GBR load is set according to the quality of service information of determining.It is multiple that PDN GW determines that the mode of the quality of service information of reserved GBR load has, as PDN GW by carrying out with PCRF the quality of service requirement that information interaction obtains this reserved GBR load, and the quality of service information of determining this reserved GBR load according to the quality of service requirement that obtains and current network resources situation; PDN GW obtains the quality of service information requirement of this reserved GBR load according to local collocation strategy for another example, and requires and the current network resources situation is determined the quality of service information of this reserved GBR load according to the quality of service information that obtains; Also have, PDN GW obtains the quality of service information that carries in the first Indication message, and determines the quality of service information of this reserved GBR load according to the quality of service information that carries in the first Indication message and current network resources situation.Need to prove, PDN GW also can adopt alternate manner to determine the quality of service information of reserved GBR load, and the embodiment of the present invention does not limit the specific implementation process that PDN GW determines the quality of service information of reserved GBR load.
PDN GW determines the process of quality of service information of reserved GBR load as in the situation that the real network resource allows according to the quality of service information that carries in the first Indication message and current network resources situation, distribute the quality of service information that is not less than the quality of service information that carries in the first Indication message for reserved GBR load; In the situation that the real network resource allows, distribute the service quality of carrying in the first Indication message for reserved GBR load for another example; Also have in the unallowed situation of real network resource, distribute quality of service information lower than the quality of service information that carries in the first Indication message etc. for reserved GBR load.The embodiment of the present invention does not limit PDN GW and determines the specific implementation process of the quality of service information of reserved GBR load according to the quality of service information that carries in the first Indication message and current network resources situation.
The quality of service information of the reserved GBR load that above-mentioned PDN GW determines can only be maximum rate, certainly, also can comprise maximum rate and other parameter.
PDN GW is after determining the quality of service information of reserved GBR load, recovering core-network side carrying corresponding to above-mentioned reserved GBR load according to this quality of service information of determining, is namely core-network side carrying Resources allocation corresponding to reserved GBR load according to this quality of service information of determining.For example, according to the maximum rate of determining, core-network side carrying corresponding to reserved GBR load is set.
PDN GW returns to response message for the first Indication message to MME after having recovered core-network side carrying corresponding to reserved GBR load.Can carry the quality of service information that PDN GW determines in this response message, the reserved GBR load sign that also can carry the quality of service information that PDNGW determines and successfully recover the core-network side carrying.Need to prove, it can be the quality of service information that MME obtains from this response message that above-mentioned MME is sent to the quality of service information that carries in the second Indication message of base station.Certainly, the quality of service information that carries in the second Indication message can be also the quality of service information that MME adopts alternate manner to obtain, for example, and the quality of service information that target MME obtains from switching former end.
In addition, PDN GW is after receiving the first Indication message and determining the quality of service information of reserved GBR load, can trigger the dedicated bearing modification process of existing modification service quality according to this quality of service information of determining, thereby utilize this bearing modification flow process to recover core-network side carrying corresponding to above-mentioned reserved GBR load.No matter terminal is in Idle state, still is in connected state, utilizes the above-mentioned bearing modification flow process that is triggered all can realize the recovery of the core-network side carrying that reserved GBR load is corresponding.Utilize the above-mentioned bearing modification flow process that is triggered to recover reserved GBR load corresponding S1 interface bearing and wireless side carrying.The specific implementation process of utilizing the bearing modification flow process to recover core-network side carrying corresponding to reserved GBR load and S1 interface bearing and wireless side carrying can for existing implementation procedure, be not described in detail at this.Need to prove, if PDN GW triggers the bearing modification flow process, the second Indication message of MME transmission can send to the message base station, that carry quality of service information for MME in the bearing modification flow process, is bearing modification request or the session management request that in the bearing modification flow process, MME sends as the second Indication message.The quality of service information that carries in the second Indication message can only comprise maximum rate, certainly, also can comprise maximum rate and out of Memory.
The base station is after the second Indication message that receives the MME transmission, in the situation that the reserved GBR load that exist to need recovers corresponding, maximum rate is zero S1 interface bearing and wireless side carrying, the base station does not need to carry out the process of setting up of S1 interface bearing and wireless side carrying again, but the direct maximum rate that S1 interface bearing and wireless side carrying are set according to the quality of service information in the second Indication message, namely direct maximum rate with S1 interface bearing and wireless side carrying is nonzero value by zero adjustment; In the situation that do not exist reserved GBR load corresponding, maximum rate is zero S1 interface bearing and wireless side carrying, S1 interface bearing corresponding to the reserved GBR load that need to recover and the process of setting up of wireless side carrying need to be carried out in the base station, then the maximum rate of S1 interface bearing and wireless side carrying is set according to the quality of service information in the second Indication message then.
If above-mentioned two situations all might exist at the place, base station, but only may there be a kind of situation for a concrete reserved GBR load, the base station is after receiving the second Indication message, need to first judge whether to exist need the reserved GBR load that recovers corresponding, success set up, maximum rate is zero S1 interface bearing and wireless side carrying, then, then according to judged result carry out corresponding operation.If a kind of in only there are above-mentioned two situations in base station place, the base station does not need to carry out above-mentioned deterministic process, but after receiving the second Indication message, directly carries out above-mentioned corresponding operation.For example, the S1 interface bearing that the reserved GBR load that need to recover is corresponding and wireless side carrying one fix on the base station and receive not carry out before the second Indication message and set up operation, the base station is after receiving the second Indication message, directly set up the carrying of S1 interface bearing corresponding to this reserved GBR load and wireless side, and the maximum rate of S1 interface bearing and wireless side carrying is set according to the quality of service information that carries in the second Indication message.
Successfully set up when the base station receives the second Indication message, maximum rate is that zero S1 interface bearing and wireless side carrying can be: under terminal is in Idle state, MME is after the service request that receives the terminal transmission, and the maximum rate corresponding to reserved GBR load of indication base station foundation is zero S1 interface bearing and wireless side carrying.Under terminal was in Idle state, it was zero S1 interface bearing and the specific implementation process of wireless side carrying such as the description in following embodiment that MME indicates the base station to set up maximum rate.
Need to prove, in the description of above-described embodiment one, MME can first send the first Indication message, then sends the second Indication message; MME also can first send the second Indication message, then sends the first Indication message.The different sending orders of the first Indication message, the second Indication message exemplify description in the following embodiments.
From the description of above-described embodiment one as can be known, embodiment one triggers PDN GW by MME to recover core-network side carrying corresponding to reserved GBR load, and trigger the base station by MME and recover S1 interface bearing corresponding to reserved GBR load and wireless side carrying, thereby successfully recovered reserved GBR load.
Embodiment one has multiple different specific implementation process, is elaborated below in conjunction with several specific implementation processes of accompanying drawing to embodiment one.
Embodiment two, terminal such as UE (subscriber equipment) are in Idle state, UE first initiates a service request procedure under Idle state makes the state of UE become connected state, then, UE initiates the service request procedure of connected state, recovers the reserved GBR load of UE in the service request procedure of the UE under being in connected state.
The specific implementation process of embodiment two as shown in Figure 2.
In Fig. 2, step 1, the UE that is in connected state send service request information to MME.Carry the cells such as S-TMSI in this service request information.Can also increase the cell that carries for the carrying information relevant with recovering reserved GBR load in the service request information that UE sends.The sign of the reserved GBR load that the information of the cell of this increase carrying can be recovered for needs also can be for recovering the indication information of whole reserved GBR loads.During for the sign of the reserved GBR load that needs to recover, this sign can exist with the form of GBR bearing identification list when the information of the cell carrying that increases.The indication information that recovers whole reserved GBR loads can be 1 bit indicating bit etc.
Certainly, also can not carry the cell of above-mentioned increase in the service request information that UE sends, in the present embodiment, the cell that service request information is not carried above-mentioned increase can be expressed as the whole reserved GBR loads of requirement recovery in this service request procedure, also can be expressed as in this service request procedure and not require the whole reserved GBR loads of recovery.The implication of the concrete expression of service request information need to be in each network equipment clear.If do not require the recovery reserved GBR load in the service request procedure of the terminal that is in connected state, can recover reserved GBR load in other process, for example, when UE need to utilize the GBR carrying that keeps attitude to carry out business, UE can initiate the bearing resource modification process, to recover reserved GBR load in the bearing resource modification process.UE initiates the bearing resource modification process, and the specific implementation process of recovery reserved GBR load is on the books in other embodiments in this flow process.
Step 2, eNodeB receive the service request information that UE sends, and this service request information is transmitted to MME.
After step 2a, MME received service request information, determining needed to recover reserved GBR load, and MME sends and upgrades bearing request message (i.e. the first Indication message).
MME determines mode that need to recover reserved GBR load to be had multiplely, and when carrying the reserved GBR load list in the service request information that receives at MME, MME determines needs to recover reserved GBR load; When carrying for another example the indication information that recovers whole reserved GBR loads and this indication information representing that needs recover reserved GBR load in the service request information that MME receives, MME determines needs the recovery reserved GBR load; Also have, do not represent to recover whole reserved GBR loads in the situation that carry the information relevant with recovering reserved GBR load in MME in default service requests message, after MME receives the service request information of not carrying above-mentioned increase cell, search the reserved GBR load that whether has this UE, after finding the reserved GBR load that has this UE, determining needs to recover reserved GBR load.
Can carry the GBR carrying list of the reservation attitude that needs recovery and QoS corresponding to each GBR carrying in list in the renewal bearing request message that MME sends, namely MME utilizes one to upgrade the information that bearing request message sends all reserved GBR loads that need to recover.When the reserved GBR load of needs recovery has many, MME also can upgrade the information that bearing request message sends the reserved GBR load that needs recovery by many, for example, one is upgraded bearing request message and only carries a sign that needs the reserved GBR load that recovers and QoS etc.
The QoS that upgrades the reserved GBR load that the needs that carry in bearing request message recover can be the QoS of reserved GBR load when normally moving.In the E-UTRAN environment, for discharge the reserved GBR load that forms due to the S1 interface, due to the QoS that preserves maximum rate in MME and reduce to the carrying before zero, therefore, the QoS when MME can obtain reserved GBR load and normally moves from its canned data.Be that zero carrying (is that UE is under the UTRAN environment for the maximum rate that passes over from UTRAN, having maximum rate is zero carrying, afterwards, UE moves to the E-UTRAN environment from the UTRAN environment, the QoS that consults when including reserved GBR load in the PDP Context of UE under former UTRAN environment that receives due to MME and normally moving, QoS when therefore, MME can get reserved GBR load and normally moves from the PDP Context information that received in the past.
Need to prove, the renewal bearing request message here is only a kind of explanation that exemplifies, and the step 2a of the present embodiment also can adopt other message, and the present embodiment does not limit the message name of concrete employing.
Step 2b, Serving GW should upgrade bearing request message and be transmitted to PDN GW after receiving the renewal bearing request message of MME transmission.Still carry in the renewal bearing request message that Serving GW forwards and recover reserved GBR load information, as carry reserved GBR load list and QoS, carry for another example reserved GBR load sign and QoS.
After step 2c, PDN GW receive the renewal bearing request message that Serving GW sends, obtain the recovery reserved GBR load information of carrying in bearing request message of upgrading, and need to determine the QoS of the reserved GBR load that recovers.PDN GW arranges core-network side carrying corresponding to reserved GBR load according to the QoS of the reserved GBR load of determining.
The QoS of the reserved GBR load that determine to need recovers can be for: PDN GW by carrying out information interaction or obtain qos requirement for reserved GBR load according to local collocation strategy with PCRF, then determine the QoS of reserved GBR load according to the qos requirement of the concrete condition of current network resources and above-mentioned acquisition then.The object lesson of the QoS of another definite reserved GBR load that need to recover is: reduce to zero reserved GBR load for the maximum rate of coming from the UTRAN band, PDN GW provides a new QoS who is not less than the QoS of former requirement according to the current network resources situation for reserved GBR load.The QoS of the former requirement here refers to the QoS of reserved GBR load when normal operation.Certainly, here be not less than also can be for being equal to or less than.For example, PDN GW can in the situation that the QoS that the current network resources situation will be carried in allowing to upgrade bearing request message as the QoS of reserved GBR load, namely in the situation that the current network resources situation allows PDN GW according to the QoS that carries in upgrading bearing request message, core-network side corresponding to reserved GBR load to be set carries.
Step 2d, PDN GW are after being provided with core-network side carrying corresponding to reserved GBR load, send and upgrade bearing response message, can carry the QoS of the reserved GBR load that successfully recovers and the list that successfully recovers reserved GBR load in this renewal bearing response message.The successful recovery here refers to the successful recovery of core-network side carrying.No matter PDN GW has successfully recovered all reserved GBR loads, has still recovered the part reserved GBR load, all can carry the list of the reserved GBR load that successfully recovers in this renewal bearing response message.A kind of simple variation is: when successfully recovering all reserved GBR loads, can not carry the list of the reserved GBR load that successfully recovers, and when successful recovered part reserved GBR load, can carry the list of the reserved GBR load that successfully recovers.Another kind of simple variation is: the reserved GBR load that recovers at needs only has one and when successfully having been recovered, the list that can not carry the reserved GBR load that successfully recovers.Above-mentioned description for carrying the list that successfully recovers reserved GBR load in the renewal bearing response message also is applicable in following corresponding embodiment, no longer repeat specification in the following embodiments.
The renewal bearing response message that step 2e, Serving GW will receive is transmitted to MME, still can carry the QoS of the reserved GBR load that successfully recovers and the carrying list that success recovers in this renewal bearing response message.To step 4.
Fig. 2 acceptance of the bid is marked with step 3, and the subscription authentication of step 3 is applied to be in the service request procedure of UE of Idle state, and in the present embodiment, because UE is in connected state, therefore, this step does not need to carry out.
Step 4, MME send S1 bearer context request message (i.e. the second Indication message) to eNodeB after receiving and upgrading bearing response message, recover the S1 carrying take indication eNodeB as the reserved GBR load that successfully recovers the core-network side carrying.Carry QoS in S1 bearer context request message, this QoS is for upgrading the QoS that carries in bearing response message.Can also carry the reserved GBR load identification information that successfully recovers the core-network side carrying in S1 bearer context request message, this identification information is for upgrading the identification information that carries in bearing response message.An object lesson that recovers the S1 interface bearing is: set up the S1 interface bearing according to the QoS in S1 bearer context request message.
Step 5, eNodeB are that the reserved GBR load that successfully recovers the core-network side carrying recovers corresponding wireless side carrying.
An object lesson that recovers the wireless side carrying is: after successfully setting up the S1 carrying, eNodeB calculates the QoS of wireless side carrying corresponding to reserved GBR load according to the QoS in S1 bearer context request message, then, set up the wireless side carrying according to the QoS that calculates.Successfully recover S1 interface bearing corresponding to reserved GBR load and wireless side carrying by step 4 and 5.
Step 6, UE can send upstream data according to the reserved GBR load that above-mentioned success recovers.
Step 7, eNodeB send the S1 bearer context to MME and complete message, with the restoration result of notice MME reserved GBR load.
Step 8, MME send to Serving GW and upgrade bearing request message.If there is the corresponding empty port load-supporting of core-network side carrying successfully not set up, MME will trigger the carrying dispose procedure so.
MME in above-described embodiment two is after the service request that receives the UE transmission that is in connected state, by send the renewal bearing request message that carries reserved GBR load list and QoS to PDN GW, make PDN GW upgrade bearing request message according to this and recover core-network side carrying corresponding to reserved GBR load; PDN GW is by sending the QoS carry the reserved GBR load that successfully recovers the core-network side carrying and successfully recovering the renewal bearing response message of the reserved GBR load sign of core-network side carrying to MME, make MME upgrade bearing response message according to this and send to eNodeB and carry that the reserved GBR load that successfully recovers the core-network side carrying identifies and the S1 bearer context request message of QoS; ENodeB can recover S1 interface bearing corresponding to reserved GBR load and wireless side carrying according to the S1 bearer context request message that receives.Thereby in being in the process of connected state, UE successfully recovers reserved GBR load.
Embodiment three, UE are in Idle state, and UE first initiates the service request procedure under Idle state, set up in this service request procedure reserved GBR load corresponding, maximum rate is zero S1 interface bearing and wireless side carrying.After this service request procedure was completed, UE was in connected state.The UE that is in connected state initiates the connected state service request procedure again, carries and be modified in the maximum rate of Idle state foundation as the QoS of zero S1 interface bearing and wireless side carrying to recover core-network side corresponding to reserved GBR load, improves maximum rate.The specific implementation process of embodiment three is as shown in Fig. 3 a and Fig. 3 b.
Fig. 3 a shows the service request procedure under the UE initiation Idle state that is in Idle state.Set up in the service request procedure shown in Fig. 3 a reserved GBR load corresponding, maximum rate is zero S1 interface bearing and wireless side carrying.
In Fig. 3 a, step 1, the UE that is in Idle state send service request information to MME, carry the cells such as S-TMSI in this service request information.
Step 2, eNodeB receive service request information, and this service request information is transmitted to MME.
The authentication process that step 3, MME initiate NAS message.
Step 4, after authentication success, MME sends S1 bearer context request message to eNodeB, to set up the S1 interface bearing.At MME after to find this network element internal memory be zero reserved GBR load at maximum rate, it is zero S1 interface bearing that MME can utilize S1 bearer context request message indication eNodeB to set up maximum rate for reserved GBR load, for example, MME is carried at reserved GBR load list and QoS in S1 bearer context request message, and sends to eNodeB.An object lesson that recovers the S1 interface bearing is: set up the S1 interface bearing according to the QoS in S1 bearer context request message.
Step 5, eNodeB are that the UE that is in Idle state sets up the wireless side carrying that maximum rate is non-zero.It is zero wireless side carrying that eNodeB also need to set up maximum rate for reserved GBR load.
The maximum rate that step 6, UE can set up according to above-mentioned success is that the wireless side carrying of non-zero sends upstream data.
Step 7, eNodeB send the S1 bearer context request to MME and set up message (also claiming the S1 bearer context request to complete message).
After step 8, MME receive the S1 bearer context request and set up message, send to Serving GW and upgrade bearing request message, if there is the corresponding empty port load-supporting of core-network side carrying successfully not set up, MME will trigger the carrying dispose procedure so.
If the access technology of step 9 UE changes, Serving GW sends to PDN GW and upgrades bearing request message.
After step 10, PDN GW receive and upgrade bearing request message, otherwise according to configured dynamic PCC, by determining the PCC rule of the access technology after variation with the information interaction of PCRF, then determine Qos according to the PCC rule of the access technology after changing; PDN GW determines Qos according to local Qos strategy.
Step 11, PDN GW send and upgrade bearing response message.
The renewal bearing response message that step 12, Serving GWS-GW will receive is transmitted to MME.
Fig. 3 b shows the service request procedure under the UE initiation connected state that is in connected state.Recover core-network side carrying corresponding to reserved GBR load in the service request procedure shown in Fig. 3 b, and for that set up, that reserved GBR load is corresponding, maximum rate be that zero S1 interface bearing and wireless side carrying arrange maximum rate.
In Fig. 3 b, step 1, UE send service request information to MME.Carry the cells such as S-TMSI in this service request information.Can also increase the cell that carries for the carrying information relevant with recovering reserved GBR load in the service request information that UE sends.The sign of the reserved GBR load that the information of the cell of this increase carrying can be recovered for needs also can be for recovering the indication information of whole reserved GBR loads.During for the sign of the reserved GBR load that needs to recover, this sign can exist with the form of GBR bearing identification list when the information of the cell carrying that increases.The indication information that recovers whole reserved GBR loads can be 1 bit indicating bit etc.
Certainly, also can not carry the cell of above-mentioned increase in the service request information that UE sends, in the present embodiment, the cell that service request information is not carried above-mentioned increase can be expressed as the whole reserved GBR loads of requirement recovery in this service request procedure, also can be expressed as in this service request procedure and not require the whole reserved GBR loads of recovery.The implication of the concrete expression of service request information need to be in each network equipment clear.If do not require the recovery reserved GBR load in the service request procedure of the terminal that is in connected state, can recover reserved GBR load in other process, for example, when UE need to utilize the GBR carrying that keeps attitude to carry out business, UE can initiate the bearing resource modification process, to recover reserved GBR load in the bearing resource modification process.UE initiates the bearing resource modification process, and the specific implementation process of recovery reserved GBR load is on the books in other embodiments in this flow process.
Step 2, eNodeB receive the service request information that UE sends, and this service request information is transmitted to MME.
After step 2a, MME received service request information, determining needed to recover reserved GBR load, and MME sends and upgrades bearing request message (i.e. the first Indication message).
MME determines mode that need to recover reserved GBR load to be had multiplely, and when carrying the reserved GBR load list in the service request information that receives at MME, MME determines needs to recover reserved GBR load; When carrying for another example the indication information that recovers whole reserved GBR loads and this indication information representing that needs recover reserved GBR load in the service request information that MME receives, MME determines needs the recovery reserved GBR load; Also have, do not represent to recover whole reserved GBR loads in the situation that carry the information relevant with recovering reserved GBR load in MME in default service requests message, after MME receives the service request information of not carrying above-mentioned increase cell, search the reserved GBR load that whether has this UE, after finding the reserved GBR load that has this UE, determining needs to recover reserved GBR load.PDN GW determines the specific implementation process of Qos such as the description in above-mentioned embodiment.
Can carry the GBR carrying list of the reservation attitude that needs recovery and QoS corresponding to each GBR carrying in list in the renewal bearing request message that MME sends, namely MME utilizes one to upgrade the information that bearing request message sends all reserved GBR loads that need to recover.When the reserved GBR load of needs recovery has many, MME also can upgrade the information that bearing request message sends the reserved GBR load that needs recovery by many, for example, one is upgraded bearing request message and only carries a sign that needs the reserved GBR load that recovers and QoS etc.
The QoS that upgrades the reserved GBR load that the needs that carry in bearing request message recover can be the QoS of reserved GBR load when normally moving.In the E-UTRAN environment, for discharge the reserved GBR load that forms due to the S1 interface, due to the QoS that preserves maximum rate in MME and reduce to the carrying before zero, therefore, the QoS when MME can obtain reserved GBR load and normally moves from its canned data.Be zero carrying for the maximum rate that passes over from UTRAN, the QoS that consults when including reserved GBR load in the PDP Context that receives due to MME and normally moving, QoS when therefore, MME can get reserved GBR load and normally moves from the PDP Context information that receives.
Need to prove, the renewal bearing request message here is only a kind of explanation that exemplifies, and the step 2a of the present embodiment also can adopt other message, and the present embodiment does not limit the message name of concrete employing.
Step 2b, Serving GW should upgrade bearing request message and be transmitted to PDN GW after receiving the renewal bearing request message of MME transmission.Still carry in the renewal bearing request message that Serving GW forwards and recover reserved GBR load information, as carry reserved GBR load list and QoS, carry for another example reserved GBR load sign and QoS.
After step 2c, PDN GW receive the renewal bearing request message that Serving GW sends, obtain and upgrade the recovery reserved GBR load information of carrying in bearing request message, and the QoS of definite reserved GBR load.PDN GW arranges core-network side carrying corresponding to reserved GBR load according to the QoS of the reserved GBR load of determining.
The QoS that determines reserved GBR load can be for: PDN GW by carrying out information interaction or obtain qos requirement for reserved GBR load according to local collocation strategy with PCRF, then determine the QoS of reserved GBR load according to the qos requirement of the concrete condition of current network resources and above-mentioned acquisition then.The object lesson of the QoS of a definite reserved GBR load is: reduce to zero reserved GBR load for the maximum rate of coming from the UTRAN band, PDN GW provides a new QoS who is not less than the QoS of former requirement according to the current network resources situation for reserved GBR load.Certainly, here be not less than also can be for being equal to or less than.A concrete example is: PDN GW can will upgrade the QoS that carries in the bearing request message QoS as reserved GBR load, and namely PDN GW arranges core-network side carrying corresponding to reserved GBR load according to upgrading the QoS that carries in bearing request message.Concrete as the description in above-mentioned embodiment.
Step 2d, PDN GW send and upgrade bearing response message after being provided with core-network side carrying corresponding to reserved GBR load, can carry the QoS of the reserved GBR load that successfully recovers in this renewal bearing response message.Upgrade the identification information that also can carry the reserved GBR load that successfully recovers in bearing response message, as the reserved GBR load list.Concrete as the description in above-mentioned embodiment.The successful recovery here refers to the successful recovery of core-network side carrying.
The renewal bearing response message that step 2e, Serving GW will receive is transmitted to MME, still can carry the QoS of the reserved GBR load that successfully recovers in this renewal bearing response message.To step 4.
Fig. 3 b acceptance of the bid is marked with step 3, and the subscription authentication of step 3 is applied to be in the service request procedure of UE of Idle state, and in the present embodiment, because UE is in connected state, therefore, this step does not need to carry out.
After step 4, MME receive and upgrade bearing response message, obtain reserved GBR load list and the QoS information of successfully recovering from upgrade bearing response message, and send S1 bearer context request message (i.e. the second Indication message) to eNodeB, revise maximum rate corresponding to reserved GBR load as the QoS of zero S1 carrying take indication eNodeB.Carry QoS in above-mentioned S1 bearer context request message, this QoS can be for upgrading the QoS that carries in bearing response message, in addition, can also carry the reserved GBR load list that successfully recovers in this S1 bearer context request message, concrete as the description in above-mentioned embodiment.
Step 5, eNodeB are corresponding wireless side carrying Resources allocation, the modification QoS of reserved GBR load that successfully recovers the core-network side carrying, to improve the speed of wireless side carrying.Successfully recover S1 interface bearing corresponding to reserved GBR load and wireless side carrying by step 4 and step 5.
Step 6, UE can send upstream data according to the reserved GBR load that above-mentioned success recovers.
Step 7, eNodeB send the S1 bearer context to MME and complete message, with the restoration result of notice MME reserved GBR load.The S1 bearer context is completed message bearing bearing identification.This bearing identification such as S1 interface bearing sign etc.
Step 8, MME send to Serving GW and upgrade bearing request message after receiving the S1 bearer context and completing message, if there is the corresponding empty port load-supporting of core-network side carrying successfully not set up, MME will trigger the carrying dispose procedure so.
MME in above-described embodiment three is after the service request that receives the UE transmission that is in Idle state, by send S1 bearer context request message to eNodeB, make the eNodeB can be in the situation that the Idle state of UE is that to set up maximum rate be zero S1 interface bearing and wireless side carrying to reserved GBR load according to this message; MME is after the service request that receives the UE transmission that is in connected state, by send the renewal bearing request message that carries reserved GBR load list and QoS to PDN GW, make PDN GW upgrade bearing request message according to this and recover core-network side carrying corresponding to reserved GBR load; PDN GW is by sending the QoS carry the reserved GBR load that successfully recovers the core-network side carrying and successfully recovering the renewal bearing response message of the reserved GBR load sign of core-network side carrying to MME, make MME upgrade bearing response message according to this and send to eNodeB and carry that the reserved GBR load that successfully recovers the core-network side carrying identifies and the S1 bearer context request message of QoS; ENodeB can will revise the S1 interface bearing of above-mentioned foundation and the maximum rate of wireless side carrying according to the S1 bearer context request message that receives.Thereby in being in the process of Idle state and connected state, UE successfully recovers reserved GBR load.
Embodiment four, UE are in Idle state, and UE initiates the service request procedure under an Idle state, recover the reserved GBR load of UE in the service request procedure of the UE under being in Idle state.The specific implementation process of embodiment four as shown in Figure 4.
In Fig. 4, step 1, UE send service request information to MME.Carry the cells such as S-TMSI in this service request information.
Step 2, eNodeB receive the service request information that UE sends, and this service request information is transmitted to MME.
After step 2a, MME receive service request information, whether have the reserved GBR load of this UE in the MME seeking system, have the reserved GBR load of this UE in finding system after, MME sends and upgrades bearing request message (i.e. the first Indication message).
Can carry the GBR carrying list of the reservation attitude that needs recovery and QoS corresponding to each GBR carrying in list in the renewal bearing request message that MME sends, namely MME utilizes one to upgrade the information that bearing request message sends all reserved GBR loads that need to recover.When the reserved GBR load of needs recovery has many, MME also can upgrade the information that bearing request message sends the reserved GBR load that needs recovery by many, for example, one is upgraded bearing request message and only carries a sign that needs the reserved GBR load that recovers and QoS etc.
The QoS of the reserved GBR load that the needs that carry in this renewal bearing request message recover can be the QoS of reserved GBR load when normally moving.In the E-UTRAN environment, for discharge the reserved GBR load that forms due to the S1 interface, due to the QoS that preserves maximum rate in MME and reduce to the carrying before zero, therefore, the QoS when MME can obtain reserved GBR load and normally moves from its canned data.Be zero carrying for the maximum rate that passes over from UTRAN, the QoS that consults when including reserved GBR load in the PDP Context that receives due to MME and normally moving, QoS when therefore, MME can get reserved GBR load and normally moves from the PDP Context information that receives.
Need to prove, the renewal bearing request message here is only a kind of explanation that exemplifies, and the step 2a of the present embodiment also can adopt other message, and the present embodiment does not limit the message name of concrete employing.
Step 2b, Serving GW should upgrade bearing request message and be transmitted to PDN GW after receiving the renewal bearing request message of MME transmission.Still carry in the renewal bearing request message that Serving GW forwards and recover reserved GBR load information, as carry reserved GBR load list and QoS, carry for another example reserved GBR load sign and QoS.
After step 2c, PDN GW receive the renewal bearing request message that Serving GW sends, obtain and upgrade the recovery reserved GBR load information of carrying in bearing request message, and the QoS of definite reserved GBR load.PDN GW arranges core-network side carrying corresponding to reserved GBR load according to the QoS of the reserved GBR load of determining.
The QoS that determines reserved GBR load can be for: PDN GW by carrying out information interaction or obtain qos requirement for reserved GBR load according to local collocation strategy with PCRF, then determine the QoS of reserved GBR load according to the qos requirement of the concrete condition of current network resources and above-mentioned acquisition then.The object lesson of the QoS of a definite reserved GBR load is: reduce to zero reserved GBR load for the maximum rate of coming from the UTRAN band, PDN GW provides a new QoS who is not less than the QoS of former requirement according to the current network resources situation for reserved GBR load.Certainly, here be not less than also can be for being equal to or less than.A concrete example is: PDN GW also can will upgrade the QoS that carries in the bearing request message QoS as reserved GBR load, and namely PDN GW arranges core-network side carrying corresponding to reserved GBR load according to upgrading the QoS that carries in bearing request message.
Step 2d, PDN GW send and upgrade bearing response message after having recovered core-network side carrying corresponding to reserved GBR load, can carry the successfully QoS of the reserved GBR load of recovery in this renewals bearing response message.The successful recovery here refers to the successful recovery of core-network side carrying.Also can carry the identification information of the reserved GBR load that successfully recovers in above-mentioned renewal bearing response message, as the reserved GBR load list.Concrete as the description in above-mentioned embodiment.
The renewal bearing response message that step 2e, Serving GW will receive is transmitted to MME, still can carry the QoS of the reserved GBR load that successfully recovers in this renewal bearing response message.
Step 3 is carried out the subscription authentication process.
After step 4, MME receive and upgrade bearing response message, obtain reserved GBR load list and the QoS information of successfully recovering from upgrade bearing response message, and sending S1 bearer context request message (i.e. the second Indication message) to eNodeB, eNodeB recovers S1 interface bearing corresponding to reserved GBR load with indication.Carry QoS in above-mentioned S1 bearer context request message, this QoS can be for upgrading the QoS that carries in bearing response message, in addition, can also carry the reserved GBR load list that successfully recovers in this S1 bearer context request message, concrete as the description in above-mentioned embodiment.
Step 5, eNodeB are that the reserved GBR load that successfully recovers the core-network side carrying recovers corresponding wireless side carrying.An example that recovers the wireless side carrying is: after successfully setting up the S1 carrying, eNodeB calculates the QoS of wireless side carrying corresponding to reserved GBR load according to the QoS in S1 bearer context request message, then, set up the wireless side carrying according to the QoS that calculates.
Step 6, UE can send upstream data according to the reserved GBR load that above-mentioned success recovers.
Step 7, eNodeB send the S1 bearer context to MME and complete message, with the restoration result of notice MME reserved GBR load.The S1 bearer context is completed message bearing bearing identification.This bearing identification such as S1 interface bearing sign etc.
Step 8, MME send to Serving GW and upgrade bearing request message after receiving the S1 bearer context and completing message, if there is the corresponding empty port load-supporting of core-network side carrying successfully not set up, MME will trigger the carrying dispose procedure so.
MME in above-described embodiment four is after the service request that receives the UE transmission that is in Idle state, by send the renewal bearing request message that carries reserved GBR load list and QoS to PDN GW, make PDN GW upgrade bearing request message according to this and recover core-network side carrying corresponding to reserved GBR load; PDN GW is by sending the QoS carry the reserved GBR load that successfully recovers the core-network side carrying and successfully recovering the renewal bearing response message of the reserved GBR load sign of core-network side carrying to MME, make MME upgrade bearing response message according to this and send to eNodeB and carry that the reserved GBR load that successfully recovers the core-network side carrying identifies and the S1 bearer context request message of QoS; ENodeB can recover S1 interface bearing corresponding to reserved GBR load and wireless side carrying according to the S1 bearer context request message that receives.Thereby in being in the process of Idle state, UE successfully recovers reserved GBR load.
Embodiment five, UE are in Idle state, UE initiates the service request under Idle state, in the service request procedure of UE under being in Idle state, MME notice PDN GW recovers reserved GBR load, PDN GW according to the notice of MME, revise the reserved GBR load of the dedicated bearer modification process recovery UE of QoS by utilization.The specific implementation process of embodiment five as shown in Figure 5.
In Fig. 5, step 1, UE send service request information to MME.Carry the cells such as S-TMSI in this service request information.
Step 2, eNodeB receive the service request information that UE sends, and this service request information is transmitted to MME.
After step 2a, MME receive service request information, whether have the reserved GBR load of this UE in the MME seeking system, have the reserved GBR load of this UE in finding system after, MME sends and upgrades bearing request message (i.e. the first Indication message).
Can carry the GBR carrying list of the reservation attitude that needs recovery and QoS corresponding to each GBR carrying in list in the renewal bearing request message that MME sends, namely MME utilizes one to upgrade the information that bearing request message sends all reserved GBR loads that need to recover.When the reserved GBR load of needs recovery has many, MME also can upgrade the information that bearing request message sends the reserved GBR load that needs recovery by many, for example, one is upgraded bearing request message and only carries a sign that needs the reserved GBR load that recovers and QoS etc.
The QoS of the reserved GBR load that the needs that carry in this renewal bearing request message recover can be the QoS of reserved GBR load when normally moving.In the E-UTRAN environment, for discharge the reserved GBR load that forms due to the S1 interface, due to the QoS that preserves maximum rate in MME and reduce to the carrying before zero, therefore, the QoS when MME can obtain reserved GBR load and normally moves from its canned data.Be zero carrying for the maximum rate that passes over from UTRAN, the QoS that consults when including reserved GBR load in the PDP Context that receives due to MME and normally moving, QoS when therefore, MME can get reserved GBR load and normally moves from the PDP Context information that receives.
Need to prove, the renewal bearing request message here is only a kind of explanation that exemplifies, and the step 2a of the present embodiment also can adopt other message, and the present embodiment does not limit the message name of concrete employing.
Step 2b, Serving GW should upgrade bearing request message and be transmitted to PDN GW after receiving the renewal bearing request message of MME transmission.Still carry in the renewal bearing request message that Serving GW forwards and recover reserved GBR load information, as carry reserved GBR load list and QoS, carry for another example reserved GBR load sign and QoS.
After PDN GW receives the renewal bearing request message that Serving GW sends, determine the quality of service information of the reserved GBR load that needs recover according to the current network resources situation, then, trigger the dedicated bearer modification process of existing modification QoS according to this quality of service information of determining, utilize this bearing modification flow process to recover reserved GBR load.Need to prove, in this bearing modification flow process, if the S1 interface bearing that reserved GBR load is corresponding and wireless side carrying are successfully set up, but maximum rate is zero, need to revise the QoS of S1 interface bearing corresponding to reserved GBR load and wireless side carrying; If the S1 interface bearing that reserved GBR load is corresponding and wireless side carrying are not set up, need to set up S1 interface bearing corresponding to reserved GBR load and wireless side carrying according to QoS.In addition, the detailed process of the quality of service information of the definite reserved GBR load that need to recover of PDN GW such as the description in other embodiment no longer describe in detail at this.
In the bearing modification flow process, the S1 interface bearing that the reserved GBR load that success is set up is corresponding and wireless side carrying can be S1 interface bearing and the wireless side carryings that utilizes flow process shown in Figure 3 to set up.
Step 2d, PDN GW are sending the renewal bearing response message.
The renewal bearing response message that step 2e, Serving GW will receive is transmitted to MME.
Step 3 is carried out the subscription authentication process.
After step 4, MME receive the renewal bearing response message that Serving GW sends, send S1 bearer context request message to eNodeB, eNodeB recovers the S1 interface bearing with indication.The S1 interface bearing here is for the carrying except reserved GBR load.
Step 5, eNodeB are that the wireless side carrying is set up in the carrying in network.
Need to prove, in carrying out this step 5 processes, if the S1 interface bearing that reserved GBR load is corresponding is not successfully set up, eNodeB can set up S1 interface bearing and wireless side carrying for reserved GBR load in this step, like this, after second Indication message of eNodeB in receiving the bearing modification flow process, eNodeB modification reserved GBR load is corresponding, successful foundation, maximum rate is zero S1 interface bearing and the maximum rate of wireless side carrying.
An example that recovers the wireless side carrying is: eNodeB is after successfully setting up the S1 interface bearing, calculate the QoS of wireless side carrying corresponding to reserved GBR load according to the QoS in S1 bearer context request message, then, set up the wireless side carrying according to the QoS that calculates.
Need to prove in addition, the present embodiment can be carried out according to step the different implementation procedure of difference generation of sequential.For example, can make and recover to carry out after S1 interface bearing corresponding to reserved GBR load and wireless side carrying, like this, eNodeB is when receiving S1 bearer context request message, can first set up maximum rate is zero S1 interface bearing and wireless side carrying, then, in recovering reserved GBR load corresponding S1 interface bearing and wireless side load bearing process, the maximum rate of revising above-mentioned foundation is zero S1 interface bearing and the QoS of wireless side carrying.Again for example, eNodeB directly sets up the carrying of the non-vanishing S1 interface bearing of maximum rate and wireless side after receiving S1 bearer context request message.
Step 6, UE can send upstream data according to the reserved GBR load that above-mentioned success recovers.
Step 7, eNodeB send the S1 bearer context to MME and complete message.This S1 bearer context is completed message bearing and has the EPS carrying list of the EPS carrying list of eNodeB address, acceptance, refusal and S1 TEID (s) (DL) etc.
Step 8, MME send to Serving GW and upgrade bearing request message after receiving the S1 bearer context and completing message, if there is the corresponding empty port load-supporting of EPS carrying successfully not set up, MME will trigger the carrying dispose procedure so.
MME in above-described embodiment five is after the service request that receives the UE transmission that is in Idle state, by send the renewal bearing request message that carries reserved GBR load list and QoS to PDN GW, make PDN GW upgrade bearing request message according to this and trigger the bearing modification flow process, thereby recover core-network side carrying corresponding to reserved GBR load, S1 interface bearing and wireless side carrying; In the bearing modification flow process of embodiment five, can directly set up S1 interface bearing and wireless side carrying according to QoS, can be also that zero S1 interface bearing and wireless side carrying improves the maximum rate processing to the maximum rate that has existed; Thereby in being in the process of Idle state, UE successfully recovers reserved GBR load.
Embodiment six, UE are in connected state, UE initiates the service request under connected state, in the service request procedure of UE under being in connected state, MME notice PDN GW recovers reserved GBR load, PDN GW according to the notice of MME, revise the reserved GBR load of the dedicated bearer modification process recovery UE of QoS by utilization.The specific implementation process of embodiment six as shown in Figure 6.
In Fig. 6, step 1, UE send service request information to MME.Carry the cells such as S-TMSI in this service request information.Can also increase the cell that carries for the carrying information relevant with recovering reserved GBR load in the service request information that UE sends.The sign of the reserved GBR load that the information of the cell of this increase carrying can be recovered for needs also can be for recovering the indication information of whole reserved GBR loads.During for the sign of the reserved GBR load that needs to recover, this sign can exist with the form of GBR bearing identification list when the information of the cell carrying that increases.The indication information that recovers whole reserved GBR loads can be 1 bit indicating bit etc.
Certainly, also can not carry the cell of above-mentioned increase in the service request information that UE sends, in the present embodiment, the cell that service request information is not carried above-mentioned increase can be expressed as the whole reserved GBR loads of requirement recovery in this service request procedure, also can be expressed as in this service request procedure and not require the whole reserved GBR loads of recovery.The implication of the concrete expression of service request information need to be in each network equipment clear.If do not require the recovery reserved GBR load in the service request procedure of the terminal that is in connected state, can recover reserved GBR load in other process, for example, when UE need to utilize the GBR carrying that keeps attitude to carry out business, UE can initiate the bearing resource modification process, to recover reserved GBR load in the bearing resource modification process.UE initiates the bearing resource modification process, and the specific implementation process of recovery reserved GBR load is on the books in other embodiments in this flow process.
Step 2, eNodeB receive the service request information that UE sends, and this service request information is transmitted to MME.
After step 2a, MME receive service request information, whether have the reserved GBR load of this UE in the MME seeking system, have the reserved GBR load of this UE in finding system after, MME sends and upgrades bearing request message (i.e. the first Indication message).
Can carry the GBR carrying list of the reservation attitude that needs recovery and QoS corresponding to each GBR carrying in list in the renewal bearing request message that MME sends, namely MME utilizes one to upgrade the information that bearing request message sends all reserved GBR loads that need to recover.When the reserved GBR load of needs recovery has many, MME also can upgrade the information that bearing request message sends the reserved GBR load that needs recovery by many, for example, one is upgraded bearing request message and only carries a sign that needs the reserved GBR load that recovers and QoS etc.
The QoS of the reserved GBR load that the needs that carry in this renewal bearing request message recover can be the QoS of reserved GBR load when normally moving.In the E-UTRAN environment, for discharge the reserved GBR load that forms due to the S1 interface, due to the QoS that preserves maximum rate in MME and reduce to the carrying before zero, therefore, the QoS when MME can obtain reserved GBR load and normally moves from its canned data.Be zero carrying for the maximum rate that passes over from UTRAN, the QoS that consults when including reserved GBR load in the PDP Context that receives due to MME and normally moving, QoS when therefore, MME can get reserved GBR load and normally moves from the PDP Context information that receives.
Need to prove, the renewal bearing request message here is only a kind of explanation that exemplifies, and the step 2a of the present embodiment also can adopt other message, and the present embodiment does not limit the message name of concrete employing.
Step 2b, Serving GW should upgrade bearing request message and be transmitted to PDN GW after receiving the renewal bearing request message of MME transmission.Still carry in the renewal bearing request message that Serving GW forwards and recover reserved GBR load information, as carry reserved GBR load list and QoS, carry for another example reserved GBR load sign and QoS.
After PDN GW receives the renewal bearing request message that Serving GW sends, determine the quality of service information of the reserved GBR load that needs recover according to the current network resources situation, then, trigger the dedicated bearer modification process of existing modification QoS according to this quality of service information of determining, utilize this bearing modification flow process to recover reserved GBR load.Need to prove, in this bearing modification flow process, if the S1 interface bearing that reserved GBR load is corresponding and wireless side carrying are successfully set up, but maximum rate is zero, need to revise the QoS of S1 interface bearing corresponding to reserved GBR load and wireless side carrying; If the S1 interface bearing that reserved GBR load is corresponding and wireless side carrying are not set up, need to set up S1 interface bearing corresponding to reserved GBR load and wireless side carrying according to QoS.In addition, the detailed process of the quality of service information of the definite reserved GBR load that need to recover of PDN GW such as the description in other embodiment no longer describe in detail at this.
In the bearing modification flow process, the S1 interface bearing that the reserved GBR load that success is set up is corresponding and wireless side carrying can be S1 interface bearing and the wireless side carryings that utilizes flow process shown in Figure 3 to set up.
Step 2d, PDN GW are sending the renewal bearing response message to Serving GW.
The renewal bearing response message that step 2e, Serving GW will receive is transmitted to MME, to step 4.
Fig. 6 acceptance of the bid is marked with step 3, and the subscription authentication of step 3 is applied to be in the service request procedure of UE of Idle state, and in the present embodiment, because UE is in connected state, therefore, this step does not need to carry out.
Step 4, after subscription authentication success, MME sends service request to UE and accepts message.
MME in above-described embodiment six is after the service request that receives the UE transmission that is in connected state, by send the renewal bearing request message that carries reserved GBR load list and QoS to PDN GW, make PDN GW upgrade bearing request message according to this and trigger the bearing modification flow process, thereby recover core-network side carrying corresponding to reserved GBR load, S1 interface bearing and wireless side carrying; In the bearing modification flow process of embodiment six, can directly set up S1 interface bearing and wireless side carrying according to QoS, can be also that zero S1 interface bearing and wireless side carrying improve maximum rate and process to the maximum rate that has existed, the maximum rate here be that zero S1 interface bearing and wireless side carrying can be to set up in UE is in the process of Idle state; Thereby be in the process of connected state or successfully recover reserved GBR load in UE is in the process of connected state and Idle state at UE.
Embodiment seven, UE initiating updating of tracking area, in the tracing section updating process that UE initiates, MME notice PDN GW recovers reserved GBR load, and PDN GW recovers the reserved GBR load of UE according to the notice of MME.The specific implementation process of embodiment seven as shown in Figure 7.
In Fig. 7, step 1, in the situation that satisfy the tracing section updating condition, UE initiating updating of tracking area request message.UE is in the situation that be provided with " Active Flag " sign in the tracing section updating request message, can also increase cell in the tracing section updating request message, the cell of this increase is used for the carrying information relevant with recovering reserved GBR load, needs the reserved GBR load that recovers with indication.
Step 2, UE send the tracing section updating request message to eNodeB, can comprise in this tracing section updating request message: oldGUTI, last visited TAI, active flag, the cells such as EPS bearer status, P-TMSI Signature.
After step 3, eNodeB receive the tracing section updating request message, this tracing section updating request message is transmitted to MME.
Step 4, caused the MME change in the situation that UE is attached to MME and routing update originally, target MME sends context request message to former MME.
After step 5, former MME received context request message, MME returned to context response information to target, to step 8.
If UE was attached to SGSN originally and routing update causes moving in the situation of MME, above-mentioned steps 4 and step 5 can replace with following step 6 and step 7.
Step 6, target MME network element send context request message to former SGSN.
After step 7, former SGSN received context request message, MME returned to context response information to target, to step 8.
Step 8, UE initiate authentication process.This step is optional step, and namely UE can not initiate authentication process.
Step 9, target MME send context acknowledgement message to former MME.
In the situation that carry out above-mentioned steps 6 and step 7, above-mentioned steps 9 can replace with following step 10.
Step 10, target MME send context acknowledgement message to former SGSN.
Step 11, in the situation that MME does not reselect new Serving GW, MME send to upgrade bearing request message to Serving GW network element.In the situation that MME has selected new Serving GW, MME can send to new Serving GW and create bearing request message.
In the situation that be provided with " active flag " mark in the tracing section updating request message that MME receives and there is reserved GBR load in MME in finding system, perhaps MME determines in the situation of the reservation attitude GBR that has the needs recovery according to the cell that increases in above-mentioned steps 1, MME is to carry the first Indication message that recovers reserved GBR load information by Serving GW to renewal bearing request message or the establishment bearing request message that PDN GW sends, and the first Indication message is used to indicate PDN GW and recovers reserved GBR load.
The renewal bearing request message that MME sends or create can carry the GBR carrying list that needs the reservation attitude recovered and QoS corresponding to each GBR carrying in list in bearing request message, namely MME utilizes one to upgrade bearing request message or one and create the information that bearing request message sends all reserved GBR loads that need to recover.When the reserved GBR load of needs recovery has many, MME also can upgrade bearing request message or many by many and create the information that bearing request message sends needs the reserved GBR load that recovers, for example, one is upgraded bearing request message or one and creates bearing request message and only carry a sign that needs the reserved GBR load that recovers and QoS etc.
The QoS that upgrades bearing request message or create the reserved GBR load that the needs that carry in bearing request message recover can be the QoS of reserved GBR load when normally moving.In the E-UTRAN environment, for discharge the reserved GBR load that forms due to the S1 interface, due to the QoS that preserves maximum rate in MME and reduce to the carrying before zero, therefore, the QoS when MME can obtain reserved GBR load and normally moves from its canned data.Be zero carrying for the maximum rate that passes over from UTRAN, the QoS that consults when including reserved GBR load in the PDP Context that receives due to MME and normally moving, QoS when therefore, MME can get reserved GBR load and normally moves from the PDP Context information that receives.
Need to prove, the renewal bearing request message here and establishment bearing request message are only a kind of explanations that exemplifies, and the step 11 of the present embodiment also can adopt other message, and the present embodiment does not limit the message name of concrete employing.
Step 12, Serving GW should upgrade bearing request message and be transmitted to PDN GW after receiving and upgrading bearing request message.
Step 13, PDN GW receive the renewal bearing request message, carry recovery reserved GBR load information in parsing the renewal bearing request message after, carry out recovery reservation attitude GBR and operate.
The recovery reserved GBR load operation here can have two kinds of different modes:
Mode 1, the definite QoS that needs the reserved GBR load of recovery of PDN GW, for example, PDN GW is by mutual with PCRF or according to the quality of service information that carries in local collocation strategy or transmission comes according to MME message and consider that the mode such as present Internet resources situation determines QoS, recover core-network side carrying corresponding to reserved GBR load according to this QoS, and QoS is sent to MME, make MME indication eNodeB recover S1 interface bearing corresponding to reserved GBR load and wireless side carrying.For example, utilize the process that step 2c in embodiment two describes to step 5 or utilize the process that step 2c in embodiment three describes to step 5 or utilize the process that in embodiment four, step 2b describes to step 5 to recover reserved GBR load.
Mode 2, PDN GW determine the QoS of the reserved GBR load that needs recover according to present Internet resources situation, and trigger the dedicated bearer modification process of revising QoS, recover reserved GBR load to utilize this bearing modification process.For example, utilize the process that in embodiment five, step 2b describes to recover reserved GBR load.
Step 14, PDN GW send to Serving GW and upgrade bearing response message.If PDN GW adopts mode 1, PDN GW can increase cell in upgrading bearing response message, this cell is used for the reserved GBR load sign of carrying recovery and the QoS of respective carrier, and the reserved GBR load sign can adopt the form of reserved GBR load list.If PDN GW adopts mode 2, the renewal bearing response message of PDN GW transmission is the message in existing tracing section updating flow process.
Step 15, Serving GW will upgrade bearing response message and be transmitted to MME after receiving and upgrading bearing response message.If PDN GW adopts mode 1, still carry the cell that newly increases for the QoS of the reserved GBR load sign of carrying recovery and respective carrier in the renewal bearing response message that Serving GW sends, above-mentioned reserved GBR load sign can adopt the form of reserved GBR load list.If PDN GW adopts mode 2, the renewal bearing response message of Serving GW transmission is the message in existing tracing section updating flow process.
After step 16, target MME receive and upgrade bearing response message, send to HSS and upgrade location request message.
Step 17, HSS send cancel location message to former MME after receiving and upgrading location request message.
Step 18, in the situation that UE was attached to SGSN originally and routing update causes moving to MME, former SGSN network element sends the order of Iu Connection Release to RNC.
After step 19, RNC receive the order of Iu Connection Release, discharge Iu and connect, and complete message to former SGSN transmission Iu Connection Release.
After step 20, former MME receive cancel location message, return to the canceling position acknowledge message to HSS.
Step 21, HSS send to target MME and upgrade the position acknowledge message after receiving the canceling position acknowledge message.
After step 22, target MME receive and upgrade the position acknowledge message, send tracing section updating to UE and accept message.If be provided with " Active Flag " sign in the tracing section updating request message, this moment S1 interface bearing and wireless side bearing activation.The wireless side carrying is the user plane bearer of wireless side.
After step 23, UE receive tracing section updating and accept message, send tracing section updating to target MME and complete message.
Embodiment seven is on MME notice PDN GW recovers basis that reserved GBR load and MME change, the corresponding steps of above-mentioned corresponding embodiment is merged in the tracing section updating process, successfully recover reserved GBR load in the tracing section updating process thereby be at UE.
Embodiment eight, UE initiating updating of tracking area, in the tracing section updating process that UE initiates, MME and Serving GW network element all do not change, and MME notice PDN GW recovers reserved GBR load, and PDN GW recovers the reserved GBR load of UE according to the notice of MME.The specific implementation process of embodiment eight as shown in Figure 8.
In Fig. 8, step 1, in the situation that satisfy the tracing section updating trigger condition, UE triggers the tracing section updating process, UE is in the situation that be provided with " Active Flag " sign in the tracing section updating request message, can also increase cell in the tracing section updating request message, the cell of this increase is used for the carrying information relevant with recovering reserved GBR load, needs the reserved GBR load that recovers with indication.
Step 2, UE send the tracing section updating request message to eNodeB, can comprise in this tracing section updating request message: oldGUTI, last visited TAI, active flag, the cells such as EPS bearer status, P-TMSI Signature.
After step 3, eNodeB receive the tracing section updating request message, this tracing section updating request message is transmitted to MME.
If step 4 UE is in Idle state, can carry out authentication/security process.
Step 5, in the situation that be provided with " Active Flag " sign in the tracing section updating request message and there is reserved GBR load in MME in finding system, MME sends and upgrades bearing request message (i.e. the first Indication message).
Can carry the GBR carrying list of the reservation attitude that needs recovery and QoS corresponding to each GBR carrying in list in the renewal bearing request message that MME sends, namely MME utilizes one to upgrade the information that bearing request message sends all reserved GBR loads that need to recover.When the reserved GBR load of needs recovery has many, MME also can upgrade the information that bearing request message sends the reserved GBR load that needs recovery by many, for example, one is upgraded bearing request message and only carries a sign that needs the reserved GBR load that recovers and QoS etc.
The QoS that upgrades the reserved GBR load that the needs that carry in bearing request message recover can be the QoS of reserved GBR load when normally moving.In the E-UTRAN environment, for discharge the reserved GBR load that forms due to the S1 interface, due to the QoS that preserves maximum rate in MME and reduce to the carrying before zero, therefore, the QoS when MME can obtain reserved GBR load and normally moves from its canned data.Be zero carrying for the maximum rate that passes over from UTRAN, the QoS that consults when including reserved GBR load in the PDP Context that receives due to MME and normally moving, QoS when therefore, MME can get reserved GBR load and normally moves from the PDP Context information that receives.
Need to prove, the renewal bearing request message here is only a kind of explanation that exemplifies, and the step 5 of the present embodiment also can adopt other message, and the present embodiment does not limit the message name of concrete employing.
Step 6, Serving GW should upgrade bearing request message and be transmitted to PDN GW after receiving and upgrading bearing request message.
Step 7 or step 7b, PDN GW network element receive and upgrade bearing request message, carry if upgrade the reserved GBR load information of recovering in bearing request message, carry out and recover to keep attitude GBR operation.
The recovery reserved GBR load operation here can have two kinds of different modes, and is concrete as the description in above-mentioned embodiment seven, is not repeated.
Step 8, PDN GW send to Serving GW and upgrade bearing response message.If PDN GW adopts mode 1, PDN GW can increase cell in upgrading bearing response message, this cell is used for the reserved GBR load sign of carrying recovery and the QoS of respective carrier, and the reserved GBR load sign can adopt the form of reserved GBR load list.If PDN GW adopts mode 2, PDN GW sends and upgrades bearing response message, can not increase above-mentioned cell in this renewal bearing response message.
Step 9, Serving GW will upgrade bearing response message and be transmitted to MME after receiving and upgrading bearing response message.If PDN GW adopts mode 1, still carry the cell that newly increases for the QoS of the reserved GBR load sign of carrying recovery and respective carrier in the renewal bearing response message that Serving GW sends, above-mentioned reserved GBR load sign can adopt the form of reserved GBR load list.If PDN GW adopts mode 2, can not carry the cell of above-mentioned increase in the renewal bearing response message that Serving GW sends.
After step 10, MME receive and upgrade bearing response message, send tracing section updating to UE and accept message.If be provided with " Active Flag " sign in the tracing section updating request message, this moment, the carrying of S1 interface bearing and wireless side was activated.
After step 11, UE receive tracing section updating and accept message, send tracing section updating to target MME and complete message.
Embodiment eight is on MME notice PDN GW recovers basis that reserved GBR load and MME do not change, the corresponding steps of above-mentioned corresponding embodiment is merged in the tracing section updating process, successfully recover reserved GBR load in the tracing section updating process thereby be at UE.
Embodiment nine, UE switch to E-UTRAN from UTRAN, are that reserved GBR load is set up S1 interface bearing and wireless side carrying in handoff preparation phase, recover core-network side carrying corresponding to reserved GBR load in handover execution stage.The specific implementation process of embodiment nine is as shown in Fig. 9 a and 9b.
The flow chart of the handoff preparation phase when Fig. 9 a shows UE and switches to EUTRAN from UTRAN.In handoff preparation phase, the up-downgoing data are normal transmission still.In addition, when not adopting direct pass-through mode to transmit the up-downgoing data, can adopt the mode of SGSN forwarding data.
In Fig. 9 a, step 1, UE initiate handoff procedure.
Step 2, former RNC send RELOCATION REQUEST message to former SGSN.
Step 3, former SGSN forward RELOCATION REQUEST message to target MME, and former SGSN forwards S1 bearer context information to target MME.
Step 4, target MME send to target Serving GW and create bearing request message.
Step 4a, target Serving GW send to target MME and create bearing response message after receiving the establishment bearing request message.
Step 5, target MME send handover request message to target eNode B after receiving and creating bearing response message.If target MME is after receiving S1 bearer context information, finding and having maximum rate in system is zero reserved GBR load, target MME can carry announcement information in the handover request message of target eNode B transmission, sets up the carrying of S1 interface bearing and wireless side take notification target eNodeB as reserved GBR load.At this moment, the maximum rate of the S1 interface bearing of foundation and wireless side carrying is non-zero.
Step 5a, target eNode B are after receiving handover request message, and MME returns to switching request acknowledgement message to target.
Step 6, target MME send to target Serving GW and create bearing request message after receiving switching request acknowledgement message.
Step 6a, target Serving GW return to the establishment bearing response message to target MME after receiving the establishment bearing request message.
Step 7, target MME send relocation response message to former SGSN after receiving the establishment bearing response message.
Step 8, former SGSN send to former Serving GW network element and create bearing request message.
Step 9, former Serving GW return to the establishment bearing response message to former SGSN after receiving the establishment bearing request message.
After handoff preparation phase is completed, continue follow-up handover execution stage.The flow chart of the handover execution stage when Fig. 9 b shows UE and switches to EUTRAN from UTRAN.In the handover execution stage shown in Fig. 9 b, recover core-network side carrying corresponding to reserved GBR load.
In Fig. 9 b, after step 1, handoff preparation phase were completed, former SGSN sent the reorientation order to former RNC.
After step 2, former RNC receive the reorientation order, send from the UTRAN switching command to UE, UE switches to target eNode B with order.
Step 3, former RNC can send the SRNC contextual information to former SGSN.
Step 3a, former SGSN is transmitted to target MME with the SRNC contextual information that receives.
After step 3b, target MME receive the SRNC contextual information, return to SRNC context confirmation to former SGSN.
After step 3c, former SGSN receive SRNC context confirmation, send the SRNS contextual information to target eNode B.
Step 4, UE move in the E-UTRAN environment, and carry out the operation of access eNodeB.
Step 5, after UE has entered the E-UTRAN environment, send from the UTRAN handoff completion message to target eNode B.
Step 6, target eNode B receive after the UTRAN handoff completion message, send handoff notification message to target MME.
After step 7, target MME receive handoff notification message, send reorientation to former SGSN and complete message, complete to notify former SGSN to switch.
Step 7a, former SGSN receive reorientation complete message after, return to reorientation to target MME and complete acknowledge message.
Step 8, target MME send and upgrade bearing request message.In the situation that there is reserved GBR load in target MME in finding system, can carry the GBR carrying list of the reservation attitude that needs recovery and QoS corresponding to each GBR carrying in list in the renewal bearing request message (i.e. the first Indication message) that target MME sends, namely target MME utilizes one to upgrade the information that bearing request message sends all reserved GBR loads that need to recover.When the reserved GBR load of needs recovery has many, target MME also can upgrade the information that bearing request message sends the reserved GBR load that needs recovery by many, for example, one is upgraded bearing request message and only carries a sign that needs the reserved GBR load that recovers and QoS etc.
The QoS that upgrades the reserved GBR load that the needs that carry in bearing request message recover can be the QoS of reserved GBR load when normally moving.QoS when target MME can normally move from the bearer context acquisition of information reserved GBR load of former MME or former SGSN transmission.
Need to prove, the renewal bearing request message here is only a kind of explanation that exemplifies, and the step 5 of the present embodiment also can adopt other message, and the present embodiment does not limit the message name of concrete employing.
Renewal bearing request message that step 9, target Serving GW will receive, that target MME sends is transmitted to PDN GW.After PDN GW finds to recover reserved GBR load information in upgrading bearing request message, carry out and recover the reserved GBR load operation.
The recovery reserved GBR load operation here can have two kinds of different modes, and is concrete as the description in above-mentioned embodiment seven, is not repeated.
PDN GW sends and upgrades bearing response message after having carried out recovery reservation attitude GBR operation.
The renewal bearing response message that step 10, target Serving GW will receive is transmitted to target MME.If PDN GW adopts mode 1, still carry the cell that newly increases for the QoS of the reserved GBR load sign of carrying recovery and respective carrier in the renewal bearing response message that Serving GW sends, above-mentioned reserved GBR load sign can adopt the form of reserved GBR load list.If PDN GW adopts mode 2, the renewal bearing response message of Serving GW transmission is the message in existing tracing section updating flow process.
Step 11, in the situation that satisfy the tracing section updating trigger condition, can trigger the tracing section updating process.Do not recover the reserved GBR load operation if carry out in the step 9 of the present embodiment, can recover reserved GBR load in this tracing section updating process.Recover the process of reserved GBR load such as the description of above-mentioned embodiment eight in the tracing section updating process.
Step 12, former SGSN network element send the deleting bearing request message to former Serving GW.
After step 12a, former Serving GW receive the deleting bearing request message, reply the deleting bearing response message to former SGSN.Former SGSN network element discharges original Iu and connects.
If reserved GBR load is not recovered, after switching is completed, still have reserved GBR load in system in above-mentioned handoff preparation phase and handover execution stage.In this case, can utilize other embodiment to recover the GBR carrying, for example, after above-mentioned switching was completed, UE initiated the connected state service request procedure, and recovers reserved GBR load in this service request procedure.Recover the specific implementation process of reserved GBR load such as the description in above-mentioned embodiment in service request procedure.
In above-described embodiment nine, the target MME in handoff preparation phase by sending handover request message to target BS, makes target BS can recover S1 interface bearing corresponding to reserved GBR load and wireless side carrying after receiving the S1 loading context information; Target MME in handover execution stage receive switch complete acknowledge message after, upgrade bearing request message by sending to PDN GW, make the core-network side carrying that PDN GW can be corresponding according to this message recovery reserved GBR load; The corresponding steps of above-mentioned corresponding embodiment can be merged come in when recovering the core-network side carrying.Thereby be at UE and successfully recover reserved GBR load in handoff procedure.
The method of embodiment ten, UE triggering PDN GW initiation recovery reserved GBR load as shown in Figure 10.
In Figure 10, step 1, terminal trigger the bearing resource modification process, and terminal sends the request bearing resource to PDN GW and revises message, to step 2.
The request bearing resource that terminal sends is revised can carry reserved GBR load sign and the quality of service information that needs recovery in message.Revise in order to make the request bearing resource reserved GBR load sign and quality of service information that message can be carried needs recovery, need to revise message to existing request bearing resource expands, as increase new cell, carry reserved GBR load sign and quality of service information to utilize new cell.
The request bearing resource is revised message can transfer to PDN GW by intermediate equipment; For example, the request bearing resource is revised message and is transferred to PDN GW through MME and gateway.
Step 2, PDN GW can revise the information of carrying in message according to the request bearing resource and judge whether that needs recover the reserved GBR load of terminal after receiving request bearing resource modification message; After determining the reserved GBR load that needs the recovery terminal, PDN GW determines the quality of service information of the reserved GBR load that needs recover according to the current network resources situation, and trigger the dedicated bearing modification process of revising service quality according to this quality of service information, recover core-network side carrying corresponding to reserved GBR load and S1 interface bearing and wireless side carrying to utilize the bearing modification flow process.Utilize the bearing modification flow process to recover the specific implementation process of core-network side carrying corresponding to reserved GBR load and S1 interface bearing and wireless side carrying, describe in following embodiment 13.
The PDN GW of above-described embodiment ten can successfully recover core-network side carrying corresponding to reserved GBR load, S1 interface bearing and wireless side carrying by triggering the bearing modification flow process after the request bearing resource that receives the terminal transmission is revised message; Thereby successfully recover reserved GBR load in the bearing resource modification process process that terminal triggers.
A specific implementation process of the method for embodiment 11, UE triggering PDN GW initiation recovery reserved GBR load as shown in Figure 11.
In Figure 11, step 1, UE trigger the bearing resource modification process, and UE sends the request bearing resource and revises message, and this bearing resource is revised in message and included the cells such as LBI, PTI, QoS and TAD.
The request bearing resource that UE sends is revised the cell that can also increase in message for the carrying information relevant with recovering reserved GBR load.As increase Bearer Id cell and bearer QoS cell, and can carry the reserved GBR load that needs to recover in Bearer Id cell and identify, bearer QoS cell can carry quality of service information corresponding to reserved GBR load that needs recovery.
Step 2, MME revise message with its request bearing resource that receives and are transmitted to Serving GW, and the request bearing resource of this forwarding is revised in message and included the cells such as IMSI, LBI, PTI, QOS and TAD.In the situation that the request bearing resource that MME receives carries Bearer Id and Bearer QoS cell in revising message, the request bearing resource that MME sends is revised in message also needs to carry Bearer Id and Bearer QoS cell.
The request bearing resource that step 3, Serving GW will receive is revised message and is transmitted to PDN GW, and the request bearing resource of this forwarding is revised in message and included the cells such as IMSI, LBI, PTI, QOS and TAD.In the situation that the request bearing resource that Serving GW receives carries Bearer Id and Bearer QoS cell in revising message, the request bearing resource that Serving GW sends is revised in message also needs to carry Bearer Id and Bearer QoS cell.
Step 4, PDN GW receive the request bearing resource and revise message.PDN GW finds Bearer Id and Bearer QoS cell in the request bearing resource is revised message after, determine the quality of service information of the GBR carrying that needs recover according to the current network resources situation.Definite quality of service information of the GBR carrying of recovery that needs here can as the description in above-mentioned embodiment, not be repeated.
Step 5, PDN GW trigger according to the quality of service information of the GBR carrying that the needs of determining recover the dedicated bearer modification process of revising QoS.
Step 6, provide the result of strategy completing IP-CAN session modification process indicating that PCEF initiates.
The PDN GW of above-described embodiment 11 can successfully recover core-network side carrying corresponding to reserved GBR load, S1 interface bearing and wireless side carrying by triggering the bearing modification flow process after the request bearing resource that receives the UE transmission is revised message; Thereby successfully recover reserved GBR load in the bearing resource modification process process that UE triggers.
The method of embodiment 12, downlink data packet triggering PDN GW initiation recovery reserved GBR load as shown in Figure 12.
In Figure 12, the downlink data packet of step 1, PDN GW receiving terminal.
After step 2, PDN GW determine the reserved GBR load that is carried as this terminal corresponding to this downlink data packet, trigger the dedicated bearing modification process of revising service quality, recover core-network side carrying corresponding to this reserved GBR load and S1 interface bearing and wireless side carrying to utilize this bearing modification flow process.The terminal here can be the terminal that is in Idle state, can be also the terminal that is in connected state.
PDN GW can when the maximum rate of judging this downlink data packet and exist bearer context and carrying corresponding to this downlink data packet is zero, determine the reserved GBR load that is carried as described terminal corresponding to this downlink data packet.
The PDN GW of above-described embodiment 12 can successfully recover core-network side carrying corresponding to reserved GBR load, S1 interface bearing and wireless side carrying by triggering the bearing modification flow process after receiving the downlink data packet of terminal; Thereby successfully recover reserved GBR load in the downlink data packet transmitting procedure.
A specific implementation process of the method for embodiment 13, downlink data packet triggering PDN GW initiation recovery reserved GBR load as shown in Figure 13.
In Figure 13, step 1, PDN GW receive the downlink data packet of UE.
Step 1a, PDN GW find that having the maximum rate of bearer context information corresponding to this downlink data packet and the corresponding carrying of downlink data packet is zero, PDN GW determines the quality of service information of the reserved GBR load that needs recover according to current network resources, and trigger the bearing modification flow process, to recover reserved GBR load.The specific implementation process of definite quality of service information here such as the description in above-mentioned embodiment.
Need to prove, store the QOS of reserved GBR load when normal operation in PDN GW.The QOS of the reserved GBR load of storing in PDN GW when normal operation can obtain by following dual mode:
Mode one, for UE from the UTRAN environment moves to the EUTRAN environment maximum rate that time band comes is zero reserved GBR load, because PDN GW and GGSN are that unification arranges, QOS value when therefore, PDN GW can obtain and store reserved GBR load and normally moves.
Mode two, in the EUTRAN environment because the S1 interface discharges the reserved GBR load cause, the QOS when PDN GW can obtain and store reserved GBR load and normally moves.
Step 2, PDN GW send and upgrade bearing request message.
The renewal bearing request message that step 3, Serving GW will receive is transmitted to MME.In the situation that MME receives the renewal bearing request message, UE is in the ECM_IDLE attitude, the service request procedure that MME trigger network side is initiated, be that MME sends service request information, at this moment, following step 4 to step 7 can merge in the service request procedure that network side initiates, namely with service request procedure in corresponding message combine.Certainly, step 4 to step 7 also can be carried out according to following order.
Step 4, MME send bearing modification request message or session management request message to eNodeB.
After step 5, eNodB receive bearing modification request message or session management request message, the QoS of EPS carrying is mapped as the QoS of wireless side carrying, and initiates the RRC reconfiguration course.ENodB sends RRC to UE and connects reconfiguration message.
After step 6, UE receive RRC connection reconfiguration message, connect to reshuffle to eNodeB transmission RRC and complete message, to confirm radio bearer modification.
Step 7, eNodeB receive RRC connect reshuffle complete message after, send the bearing modification response message to MME.
Step 8, UE send to eNodeB and directly transmit the session management response message, comprise EPS BearerIdentity cell in this response message.
Step 9, eNodeB send the session management response message to MME, include EPS BearerIdentity cell in this session management response message.
Step 10, MME send to Serving GW and upgrade bearing response message.
Step 11, Serving GW send to PDN GW and upgrade bearing response message.
Step 12, in the situation that bearing modification is to trigger due to PCC, PDN GW need to be bearing modification is completed after confirms that to PCRF modification complete.
The PDN GW of above-described embodiment 13 can successfully recover core-network side carrying corresponding to reserved GBR load, S1 interface bearing and wireless side carrying by triggering the bearing modification flow process after receiving the downlink data packet of UE; Thereby successfully recover reserved GBR load in the downlink data packet transmitting procedure.
Embodiment 14, mobile management network element MME.The structure of MME is as shown in accompanying drawing 14a and Figure 14 b.
MME shown in Figure 14 a comprises that the first receiver module 1410, first recovers judge module 1420 and first and recovers module 1430; MME can also comprise that memory module 1440, acquisition module 1450 and first set up indicating module 1460 alternatively.
The first receiver module 1410 is used for receiving the message relevant to terminal.The message relevant to terminal that the first receiver module 1410 receives can be the message that terminal sends, and for example, is in the service request information of the terminal transmission of connected state; Again for example, be in the service request information of the terminal transmission of Idle state; Also have the tracing section updating request message that terminal sends etc.The message that terminal sends can send by intermediate equipment such as base station.The message relevant to terminal that the first receiver module 1410 receives can be also the message that other network entity sends, for example, in the handoff procedure of terminal, the switching request acknowledgement message of acknowledge message and target BS transmission is completed in the switching that the source-end networks equipment that target MME receives sends.When the message relevant to terminal is the message of terminal transmission, can carry the information relevant with recovering reserved GBR load in this message.The reserved GBR load list that the information relevant with recovering reserved GBR load such as needs recover recovers the information of whole reserved GBR loads etc. for another example.
First recovers judge module 1420 is used for judging whether and need to the reserved GBR load of terminal being recovered.
The first structure of recovering judge module 1420 can be as shown in Figure 14 b.In Figure 14 b first recovers judge module 1420 and comprises: the first judgement submodule 1421 and/or the second judgement submodule 1422.
The first judgement submodule 1421 is used for determining needs according to the relevant information with recovering reserved GBR load that the first receiver module 1410 message relevant with terminal that receive is carried the reserved GBR load of terminal is recovered.For example, the reserved GBR load list that recovers according to the needs that carry in message of the first judgement submodule 1421 is determined needs the reserved GBR load of terminal is recovered; Again for example, the first judgement submodule 1421 is determined needs according to the information of the whole reserved GBR loads of recovery that carry in message and the reserved GBR load of terminal is recovered etc.Concrete as the description in the various embodiments described above, no longer describe in detail at this.
The second judgement submodule 1422 is used for finding that terminal exists the GBR carrying that keeps attitude to determine and need to the reserved GBR load of terminal be recovered.For example, in the situation that do not carry the information relevant with recovering reserved GBR load in the first receiver module 1410 message relevant with terminal that receive, second judges that submodule 1422 finds this terminal and whether has the GBR carrying that keeps attitude, have if find this terminal the carrying that keeps attitude GBR, the second judgement submodule 1422 is determined and need to the reserved GBR load of this terminal be recovered.Concrete as the description in the various embodiments described above, no longer describe in detail at this.
First recover module 1430 be used for first recover judge module 1420 determine need to recover the reserved GBR load of terminal after, send to PDN GW and carry the first Indication message that recovers reserved GBR load information, recover core-network side carrying corresponding to this reserved GBR load with indication PDN GW, and send the second Indication message that carries quality of service information to the base station, recover S1 interface bearing corresponding to this reserved GBR load and wireless side carrying to indicate the base station according to quality of service information.
The recovery reserved GBR load information of carrying in above-mentioned the first Indication message can be the reserved GBR load sign and the quality of service information that need to recover.When the reserved GBR load of needs recovery is many, sign and the quality of service information of the reserved GBR load that the first recovery module 1430 can be recovered all needs only send by first Indication message, also can be by many first Indication messages transmissions.That is to say, article one, can carry identification information and a quality of service information that needs the reserved GBR load of recovery in the first Indication message, at least two reserved GBR loads that need to recover that also can carry in all reserved GBR loads that need to recover identify and quality of service information, can also carry reserved GBR loads sign and quality of service information that all need to recover.Need to prove, also can not carry quality of service information in the first Indication message that above-mentioned the first recovery module 1430 sends.
In the situation that the first Indication message carries quality of service information, first recovers the quality of service information that module 1430 need to first be obtained the reserved GBR load that needs recovery, memory module 1440 can provide quality of service information for the first recovery module 1430, and acquisition module 1450 also can provide quality of service information for the first recovery module 1430.
For E-UTRAN, memory module 1440 stores reserved GBR load speed and reduces to zero quality of service information before.
For UTRAN, acquisition module 1450 obtains quality of service information from the PDP Context information that the MME at its place receives.
The first the first Indication message that recovers module 1430 transmissions can transfer to by the gateway of intermediate equipment such as terminal PDN GW.Under there was more news in the gateway of terminal, first recovers module 1430 can be sent to PDN GW with the first Indication message by the gateway after upgrading; For example, the terminal initiating updating of tracking area, the tracing section updating request message that the first receiver module 1410 receiving terminals send by the base station, MME is in the situation that be that terminal selects new gateway, and first recovers module 1430 sends to PDN GW by the current gateway of terminal and carries the first Indication message that recovers reserved GBR load information; MME is in the situation that selected new gateway for terminal, and first recovers module 1430 by carrying for the new gateway of selecting of terminal sends to PDN GW the first Indication message that recovers reserved GBR load information.First recovers module 1430 can first send the first Indication message, then sends the second Indication message; First recovers module 1430 also can first send the second Indication message, then sends the first Indication message.The different sending orders of the first Indication message, the second Indication message exemplify description in the various embodiments described above, be not repeated.
First sets up indicating module 1460 is used under terminal is in Idle state, the first receiver module 1410 receive service request information and first recover judge module judge need to recover the reserved GBR load of terminal after, it is zero S1 interface bearing and wireless side carrying that maximum rate corresponding to reserved GBR load set up in the indication base station, so that the base station is that zero S1 interface bearing and wireless side carrying arranges maximum rate to maximum rate after receiving the second Indication message.
Each module in Figure 14 a and Figure 14 b can be accomplished in several ways the recovery of reserved GBR load, and for example, the operation that each module in Figure 14 a and Figure 14 b is carried out can be as the record in above-mentioned embodiment two to embodiment nine.No longer describe in detail at this.
From the description of above-described embodiment 14 as can be known, MME in embodiment 14 recovers core-network side carrying corresponding to reserved GBR load by triggering PDN GW, and trigger the base station and recover S1 interface bearing corresponding to reserved GBR load and wireless side carrying, thereby can realize the recovery of reserved GBR load.
Embodiment 15, grouped data network gateway PDN GW.The structure of PDN GW as shown in Figure 15.
PDN GW shown in Figure 15 comprises: the second receiver module 1510, second recovers judge module 1520 and second and recovers module 1530.
The second receiver module 1510 is used for receiving bearing resource and revises message, and this bearing resource is revised message and revised message for the bearing resource that transmits due to terminal triggering bearing resource modification process.That is to say, terminal triggers the bearing resource modification process, and terminal sends the request bearing resource to PDN GW and revises message, and the second receiver module 1510 receives this request bearing resource and revises message.This request bearing resource that the second receiver module 1510 receives is revised can carry reserved GBR load sign and the quality of service information that needs recovery in message.This request bearing resource is revised message can transfer to by intermediate equipment the second receiver module 1510 of PDN GW; For example, the request bearing resource is revised message and is transferred to the second receiver module 1510 of PDN GW through MME and gateway.
Second recovers judge module 1520 is used for judging whether that according to the information that the bearing resource modification message that the second receiver module 1510 receives is carried needs recover the reserved GBR load of terminal.
Second recover module 1530 second recover judge module 1520 judge need to recover the reserved GBR load of terminal after, determine the quality of service information of the reserved GBR load that needs recover according to current network resources, and trigger the dedicated bearing modification process of revising service quality, recover core-network side carrying corresponding to reserved GBR load and S1 interface bearing and wireless side carrying to utilize the bearing modification flow process.Utilize the bearing modification flow process to recover the specific implementation process of core-network side carrying corresponding to reserved GBR load and S1 interface bearing and wireless side carrying, describe in the above-described embodiments, be not repeated.
The second receiver module 1510, second recovers judge module 1520 and the second concrete operation of carrying out of recovery module 1530 can be as the description in above-mentioned embodiment 11.
From the description of above-described embodiment 15 as can be known, PDN GW in embodiment 15 is after terminal triggers the bearing resource modification process, the dedicated bearing modification process of revising service quality by triggering can recover core-network side carrying corresponding to reserved GBR load, S1 interface bearing and wireless side carrying, thereby can realize the recovery of reserved GBR load in the bearing resource modification process.
Embodiment 16, grouped data network gateway PDN GW.The structure of PDN GW as shown in Figure 16.
PDN GW shown in Figure 16 comprises: the 3rd receiver module 1610, the 3rd recovers judge module 1620 and the 3rd and recovers module 1630.
The downlink data packet of the 3rd receiver module 1610 receiving terminals.
The 3rd recovers judge module 1620 judges whether carrying corresponding to high downlink data packet is the reserved GBR load of terminal.The 3rd recovers judge module 1620 can when the maximum rate of judging this downlink data packet and exist bearer context and carrying corresponding to this downlink data packet is zero, determine the reserved GBR load that is carried as terminal corresponding to this downlink data packet.
The 3rd recovers module 1630 after the 3rd recovery judge module 1620 is determined the reserved GBR load that is carried as terminal corresponding to this downlink data packet, determine the quality of service information of the reserved GBR load that needs recover according to current network resources, and trigger the dedicated bearing modification process of revising service quality, recover core-network side carrying corresponding to this reserved GBR load and S1 interface bearing and wireless side carrying to utilize this bearing modification flow process.The terminal here can be the terminal that is in Idle state, can be also the terminal that is in connected state.
The 3rd receiver module 1610, the 3rd recovers judge module 1620 and the 3rd concrete operation of carrying out of recovery module 1630 can be as the description in above-mentioned embodiment 13.
From the description of above-described embodiment 16 as can be known, PDN GW in embodiment 16 is after receiving the downlink data packet of terminal, the dedicated bearing modification process of revising service quality by triggering can recover core-network side carrying corresponding to reserved GBR load, S1 interface bearing and wireless side carrying, thereby can realize the recovery of reserved GBR load in the downlink data packet transmitting procedure.
Embodiment 17, grouped data network gateway PDN GW.The structure of PDN GW is as shown in accompanying drawing 17a and Figure 17 b.
PDN GW shown in Figure 17 a comprises: the 4th receiver module 1710 and the 4th recovers module 1720.
The 4th receiver module 1710 receives the first Indication message that carries recovery reserved GBR load information that MME sends.
The 4th recovers module 1720 after the 4th receiver module 1710 to first Indication messages, determine according to the recovery reserved GBR load information of carrying in this first Indication message the reserved GBR load that needs recover, and determine the quality of service information of this reserved GBR load according to the current network resources situation, then, recover the maximum rate of core-network side carrying corresponding to reserved GBR load according to this quality of service information of determining.The 4th mode of recovering the quality of service information of the definite reserved GBR load that need to recover of module 1720 has multiple, below in conjunction with accompanying drawing 17b, the 4th structure of recovering module 1720 is exemplified explanation.
In Figure 17 b the 4th recovers module 1720 can comprise that determination module 1721 and the 5th recovers module 1722.
Determination module 1721 is according to the mutual of PCRF or obtain the quality of service information requirement that recovers reserved GBR load according to local collocation strategy, requires and the current network resources state is determined the quality of service information of reserved GBR load according to the quality of service information that obtains.Determination module 1722 also can be determined according to the quality of service information that carries in the first Indication message and current network resources state the quality of service information of reserved GBR load.The 5th recovers module 1722 quality of service information definite according to determination module 1721 recovers the maximum rate of core-network side carrying corresponding to reserved GBR load.The 5th recovers module 1722 can after successfully recovering the core-network side carrying, return to response message to MME.The quality of service information of core-network side carrying be can carry in this response message, the quality of service information of core-network side carrying and the GBR bearing identification that success recovers also can be carried.
The 5th recovers module 1722 also can be the 6th recovery module 1723, after the 6th recovery module 1723 is determined the quality of service information of the reserved GBR load that needs recovery at determination module 1721, trigger the dedicated bearing modification process of revising service quality, be in the core-network side carrying corresponding to reserved GBR load of the terminal of Idle state or connected state to utilize the bearing modification flow process to recover.
The 4th receiver module 1710, the 4th recovers module 1720, determination module 1721, the 5th recovers judge module 1722 and the 6th recovery module 1723 can coordinate with the MME in above-mentioned Figure 14 the relevant art content of completing record in embodiment two to embodiment nine, is not described in detail at this.
From the description of above-described embodiment 17 as can be known, PDN GW in embodiment 17 is after receiving the first Indication message, can determine by adopting with modes such as PCRF are mutual the quality of service information that needs the reserved GBR load that recovers, thereby can recover core-network side carrying corresponding to reserved GBR load.
Embodiment 18, terminal equipment are UE.The structure of terminal equipment as shown in Figure 18.
Terminal equipment shown in Figure 180 comprises: message constructing module 1810 and sending module 1820.
Message constructing module 1810 is carried the information relevant with recovering reserved GBR load in message.This message can be revised message etc. in the service request information of connected state, service request information, tracing section updating request message or the request bearing resource that terminal is in Idle state for end.
Sending module 1820 sends the message that carries the information relevant with recovering reserved GBR load.
Message constructing module 1810 in Figure 18 and the concrete operation of carrying out of sending module 1820 such as the record in above-mentioned embodiment one to three, six to seven and embodiment ten and 11 no longer describe in detail at this.
From the description of above-described embodiment 18 as can be known, terminal equipment in embodiment 18 is by carrying the information relevant with recovering reserved GBR load in the message of structure, make the reserved GBR load that MME or PDN GW can be known needs recovery, thereby can make MME or PDN GW continue the process of follow-up recovery reserved GBR load.
Through the above description of the embodiments, those skilled in the art can be well understood to the present invention and can realize by the mode that software adds essential hardware platform, can certainly all implement by hardware, but in a lot of situation, the former is better execution mode.Based on such understanding, technical scheme of the present invention is to can embodying with the form of software product in whole or in part that background technology contributes, this computer software product can be stored in storage medium, as ROM/RAM, magnetic disc, CD etc., comprise that some instructions are with so that a computer equipment (can be personal computer, server, the perhaps network equipment etc.) carry out the described method of some part of each embodiment of the present invention or embodiment.
Although described the present invention by embodiment, those of ordinary skills know, the present invention has many distortion and variation and do not break away from spirit of the present invention, and the claim of application documents of the present invention comprises these distortion and variation.

Claims (25)

1. a method of recovering reserved GBR load, is characterized in that, comprising:
Mobile management network element MME receives the message relevant to terminal;
After described MME determines and need to recover the reserved GBR load of described terminal, send to grouped data network gateway PDN GW and carry the first Indication message that recovers reserved GBR load information, recover core-network side carrying corresponding to this reserved GBR load with indication PDN GW, described MME sends the second Indication message that carries quality of service information to the base station, recover S1 interface bearing corresponding to this reserved GBR load and wireless side carrying to indicate the base station according to described quality of service information.
2. the method for claim 1, is characterized in that, the described message relevant to terminal comprises:
Be in the service request information of the terminal transmission of connected state; Perhaps
Be in the service request information of the terminal transmission of Idle state; Perhaps
The tracing section updating request message that terminal sends; Perhaps
Complete acknowledge message for the network equipment before switching in the S1 loading context information that sends to target MME in the switching set-up procedure of described terminal and hand-off execution process to the switching that target MME sends.
3. the method for claim 1, is characterized in that, described MME determines the step that need to recover the reserved GBR load of described terminal and comprises following at least one step:
Described MME according to receive with the relevant message of terminal in the relevant information with recovering reserved GBR load of carrying determine needs the reserved GBR load of terminal recovered; Perhaps
Described MME finds that described terminal exists the GBR carrying that keeps attitude to determine and need to the reserved GBR load of terminal be recovered.
4. method as claimed in claim 3, is characterized in that, the described information relevant with recovering reserved GBR load comprises: the reserved GBR load list of needs recovery or recover the information of whole reserved GBR loads.
5. the method for claim 1, is characterized in that, described recovery reserved GBR load information comprises: reserved GBR load sign and quality of service information that needs recover; And described MME sends described recovery reserved GBR load information by at least one the first Indication messages to PDN GW.
6. method as claimed in claim 5, is characterized in that, the quality of service information that carries in described the first Indication message is:
For E-UTRAN, the reserved GBR load speed of described MME storage is reduced to the quality of service information before zero; Perhaps
For UTRAN, the quality of service information that described MME obtains from the PDP Context information that receives.
7. the method for claim 1, is characterized in that, described method also comprises:
After described PDN GW receives described the first Indication message, determine the quality of service information of described reserved GBR load according to the current network resources state, and recover the maximum rate of core-network side carrying corresponding to described reserved GBR load according to described definite quality of service information, and return to response message to described MME.
8. method as claimed in claim 7, is characterized in that, describedly determines that according to the current network resources state quality of service information of described reserved GBR load comprises:
Obtain quality of service information from the first Indication message, and determine the quality of service information of described reserved GBR load according to the described quality of service information that obtains and current network resources state; Perhaps
According to PCRF obtain alternately quality of service requirement, and determine the quality of service information of described reserved GBR load according to described quality of service requirement and current network resources situation; Perhaps
Obtain quality of service requirement according to local collocation strategy, and determine the quality of service information of described reserved GBR load according to described quality of service requirement and current network resources situation.
9. method as claimed in claim 7 is characterized in that:
Carry described definite quality of service information in described response message, and the second Indication message that carries quality of service information that MME sends to the base station comprises:
Described MME receives described response message, the quality of service information that carries in described response message is carried in the second Indication message, and sends described the second Indication message to the base station;
Perhaps carries described definite quality of service information in described response message and successfully recover the reserved GBR load sign of core-network side carrying, and MME comprises to the second Indication message that the base station transmission carries quality of service information:
Described MME receives described response message, the quality of service information that carries in described response message and the reserved GBR load sign of successfully recovering the core-network side carrying is carried in the second Indication message, and sends described the second Indication message to the base station.
10. the method for claim 1, is characterized in that, described method also comprises:
Described base station receives described the second Indication message, sets up the carrying of S1 interface bearing and wireless side, and the maximum rate of described S1 interface bearing and wireless side carrying is set according to the quality of service information that carries in described the second Indication message; Perhaps
Described base station receives described the second Indication message, search described reserved GBR load corresponding, success S1 interface bearing and the wireless side carrying of setting up, and the maximum rate of described S1 interface bearing and wireless side carrying is set according to the quality of service information that carries in described the second Indication message.
11. method as claimed in claim 10 is characterized in that, described reserved GBR load corresponding, success S1 interface bearing and the wireless side carrying of setting up comprises:
Under terminal was in Idle state, MME was after the service request that receives described terminal transmission, and the maximum rate corresponding to described reserved GBR load of indication base station foundation is zero S1 interface bearing and wireless side carrying.
12. the method for claim 1 is characterized in that, described method also comprises:
Described PDN GW is after receiving described the first Indication message, determine the quality of service information of described reserved GBR load according to the current network resources state, and trigger the dedicated bearing modification process of revising service quality, be in the core-network side carrying corresponding to described reserved GBR load of the terminal of Idle state or connected state to utilize described bearing modification flow process to recover;
And described the second Indication message is: the message in described bearing modification flow process.
13. a method of recovering reserved GBR load is characterized in that, described method comprises:
PDN GW receives the request bearing resource and revises message, and the described request bearing resource is revised message and revised message for the request bearing resource that transmits due to terminal triggering bearing resource modification process;
After described PDN GW revises message and determines needs the reserved GBR load of described terminal is recovered according to the described request bearing resource, determine the quality of service information of described reserved GBR load, and trigger the dedicated bearing modification process of revising service quality, be in corresponding core-network side carrying and S1 interface bearing and the wireless side carrying of described reserved GBR load of the terminal of Idle state or connected state to utilize described bearing modification flow process to recover.
14. method as claimed in claim 13 is characterized in that, the described request bearing resource is revised message and is comprised: the quality of service information of the reserved GBR load that the bearing identification of the reserved GBR load that needs recover and described needs recover.
15. a method of recovering reserved GBR load is characterized in that, described method comprises:
The downlink data packet of PDN GW receiving terminal;
After described PDN GW determines the reserved GBR load that is carried as described terminal corresponding to this downlink data packet, determine the quality of service information of described reserved GBR load, and trigger the dedicated bearing modification process of revising service quality, be in corresponding core-network side carrying and S1 interface bearing and the wireless side carrying of described reserved GBR load of the terminal of Idle state or connected state to utilize described bearing modification flow process to recover.
16. method as claimed in claim 15 is characterized in that, described PDN GW determines that the reserved GBR load that is carried as described terminal corresponding to this downlink data packet comprises:
When described PDN GW is zero at the maximum rate of judging described downlink data packet and exist bearer context and this carrying, determine the reserved GBR load that is carried as described terminal corresponding to this downlink data packet.
17. a mobile management network element is characterized in that, comprising:
The first receiver module is used for receiving the message relevant to terminal;
First recovers judge module, is used for judging whether and need to the reserved GBR load of described terminal being recovered;
First recovers module, be used for first recover judge module determine need to recover the reserved GBR load of described terminal after, send to PDN GW and carry the first Indication message that recovers reserved GBR load information, recover core-network side carrying corresponding to this reserved GBR load with indication PDN GW, and send the second Indication message that carries quality of service information to the base station, recover S1 interface bearing corresponding to this reserved GBR load and wireless side carrying to indicate the base station according to described quality of service information.
18. mobile management network element as claimed in claim 17 is characterized in that, first recovers judge module comprises:
The relevant information with recovering reserved GBR load that the first judgement submodule, the message relevant with terminal that is used for receiving according to described the first receiver module carry is determined needs the reserved GBR load of terminal is recovered; Perhaps
The second judgement submodule is used for finding that described terminal exists the GBR carrying that keeps attitude to determine and need to the reserved GBR load of terminal be recovered.
19. mobile management network element as claimed in claim 17 is characterized in that, described mobile management network element also comprises:
Memory module is used for for E-UTRAN, and storage reserved GBR load speed is reduced to the quality of service information before zero; And the quality of service information that described the first recovery module will be obtained from memory module is carried in the first Indication message; And/or
Acquisition module is used for for UTRAN, obtains quality of service information from the PDP Context information that MME receives; And the quality of service information that described the first recovery module gets described acquisition module is carried in the first Indication message.
20. mobile management network element as claimed in claim 17 is characterized in that, described mobile management network element also comprises:
First sets up indicating module, be used under terminal is in Idle state, the first receiver module receive service request and first that described terminal sends recover judge module determine need to recover the reserved GBR load of described terminal after, it is zero S1 interface bearing and wireless side carrying that maximum rate corresponding to described reserved GBR load set up in the indication base station.
21. a grouped data network gateway is characterized in that, described grouped data network gateway comprises:
The second receiver module is used for receiving bearing resource and revises message, and described bearing resource is revised message and revised message for the bearing resource that transmits due to terminal triggering bearing resource modification process;
Second recovers judge module, is used for revising message according to described bearing resource and judges whether that needs recover the reserved GBR load of described terminal;
Second recovers module, be used for second recover judge module determine need to recover the reserved GBR load of described terminal after, trigger the dedicated bearing modification process of revising service quality, be in corresponding core-network side carrying and S1 interface bearing and the wireless side carrying of described reserved GBR load of the terminal of Idle state or connected state to utilize described bearing modification flow process to recover.
22. a grouped data network gateway is characterized in that, described grouped data network gateway comprises:
The 3rd receiver module is for the downlink data packet of receiving terminal;
The 3rd recovers judge module, is used for judging whether carrying corresponding to described downlink data packet is the reserved GBR load of described terminal;
The 3rd recovers module, be used for after described the 3rd recovery judge module is determined the reserved GBR load that is carried as described terminal corresponding to this downlink data packet, trigger the dedicated bearing modification process of revising service quality, be in corresponding core-network side carrying and S1 interface bearing and the wireless side carrying of described reserved GBR load of the terminal of Idle state or connected state to utilize described bearing modification flow process to recover.
23. a grouped data network gateway is characterized in that, described grouped data network gateway comprises:
The 4th receiver module is used for receiving the first Indication message that carries recovery reserved GBR load information that MME sends;
The 4th recovers module, be used for after the 4th receiver module receives described the first Indication message, determine the quality of service information of described reserved GBR load, and recover the maximum rate of core-network side carrying corresponding to described reserved GBR load according to described definite quality of service information.
24. a kind of grouped data network gateway as claimed in claim 23 is characterized in that, the described the 4th recovers module comprises:
Determination module, be used for after the 4th receiver module receives described the first Indication message, according to the mutual of PCRF or obtain the quality of service requirement of described recovery reserved GBR load according to local collocation strategy, determine the quality of service information of described reserved GBR load according to the described quality of service requirement that obtains and current network resources state; Perhaps determine the quality of service information of described reserved GBR load according to the quality of service information that carries in described the first Indication message and current network resources state;
The 5th recovers module, and the quality of service information that is used for determining according to described determination module recovers the maximum rate of core-network side carrying corresponding to described reserved GBR load.
25. a kind of grouped data network gateway as claimed in claim 24 is characterized in that, the described the 5th recovers module comprises:
The 6th recovers module, the quality of service information that is used for determining according to described determination module triggers the dedicated bearing modification process of revising service quality, is in the core-network side carrying corresponding to described reserved GBR load of the terminal of Idle state or connected state to utilize described bearing modification flow process to recover.
CN 200810225719 2008-11-07 2008-11-07 Method and device for recovering reserved GBR load Active CN101742576B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200810225719 CN101742576B (en) 2008-11-07 2008-11-07 Method and device for recovering reserved GBR load

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200810225719 CN101742576B (en) 2008-11-07 2008-11-07 Method and device for recovering reserved GBR load

Publications (2)

Publication Number Publication Date
CN101742576A CN101742576A (en) 2010-06-16
CN101742576B true CN101742576B (en) 2013-06-05

Family

ID=42465282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200810225719 Active CN101742576B (en) 2008-11-07 2008-11-07 Method and device for recovering reserved GBR load

Country Status (1)

Country Link
CN (1) CN101742576B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102388654B (en) 2009-04-27 2015-11-25 华为技术有限公司 A kind of service restoration method of cordless communication network, Apparatus and system
CN101883430B (en) * 2010-06-28 2012-07-04 新邮通信设备有限公司 Radio resource control (RRC) connection reestablishment method
EP3512240B1 (en) 2010-08-20 2020-10-21 Huawei Technologies Co., Ltd. Method and apparatus for reporting radio bearer loss information
CN102378160B (en) * 2010-08-23 2015-11-25 中兴通讯股份有限公司 Based on carrying establishing method and the system of this locality access
CN102378295B (en) * 2010-08-23 2016-01-20 中兴通讯股份有限公司 Resource release method and system
CN106162761A (en) * 2015-03-25 2016-11-23 中兴通讯股份有限公司 A kind of reduce cutting off rate method, Apparatus and system
CN106714133B (en) 2015-08-14 2020-09-15 中兴通讯股份有限公司 Recovery processing method and device for gateway
BR112018012269A2 (en) * 2015-12-18 2018-11-27 Huawei Technologies Co., Ltd. A method and apparatus for redirection
CN108476546B (en) * 2015-12-29 2021-11-09 Lg 电子株式会社 Method and apparatus for establishing bearer for transmission of user data
CN107295452B (en) * 2016-03-30 2021-06-08 中兴通讯股份有限公司 Information notification method and device
CN109392014B (en) * 2017-08-14 2020-11-24 电信科学技术研究院 QoS flow admission control method and communication device

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1917706A (en) * 2006-08-18 2007-02-21 华为技术有限公司 Method for configuring resources of up-link channel, and corresponging terminal, base staion and system

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1917706A (en) * 2006-08-18 2007-02-21 华为技术有限公司 Method for configuring resources of up-link channel, and corresponging terminal, base staion and system

Also Published As

Publication number Publication date
CN101742576A (en) 2010-06-16

Similar Documents

Publication Publication Date Title
CN101742576B (en) Method and device for recovering reserved GBR load
EP3979707B1 (en) Method for initiating user plane path modification in a communications system
CN101370001B (en) Information transfer method
CN101605353B (en) Data communication method, communication system and relevant device
JP5478737B2 (en) Method and device for group-based mobility optimization in machine type communication
CN102076038B (en) Method and device for implementing oop initialization prearranged assignment (LIPA) connection switching preparation process
EP2424301B1 (en) Method and network element device for processing access point name restriction information
CN101552977B (en) Load creating method and mobility management entity
CN105723797B (en) The method of the maximum carrying number of maintenance
CN101588325A (en) Disaster recovery method, device and system based on wireless packet gateways
CN101686563A (en) Method for releasing resources in mobile communication system
EP3490280B1 (en) Session management entity relocation
CN102714831A (en) Handover method and mobility management network element
CN103249096B (en) A kind of switching handling method, equipment and system
CN103796262A (en) Direct switching method and apparatus
CN103338487A (en) Method and equipment for intersystem reselection or switching processing
EP3986082B1 (en) User plane gateway updating methods, mobility management entity, computer-readable storage medium and communications system
EP3737199B1 (en) Communication network component and method for handling a service request
CN101742696A (en) Method and device for transferring information
CN101877841B (en) Method, system and network equipment for realizing urgent services
CN102413562B (en) Management method and equipment of PDN (Packet Data Network) connection
CN102413584B (en) Method and equipment for managing PDN (public data network) connection
CN101594607A (en) The maintaining method of gateway information of packet data network, system and equipment
CN102065503A (en) Service gateway selection system and method
CN101772096A (en) Information acquisition method, device and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant