CN101736936A - Novel modularized emergency first-aid repair tower - Google Patents
Novel modularized emergency first-aid repair tower Download PDFInfo
- Publication number
- CN101736936A CN101736936A CN 201010117226 CN201010117226A CN101736936A CN 101736936 A CN101736936 A CN 101736936A CN 201010117226 CN201010117226 CN 201010117226 CN 201010117226 A CN201010117226 A CN 201010117226A CN 101736936 A CN101736936 A CN 101736936A
- Authority
- CN
- China
- Prior art keywords
- tower
- aid repair
- cross
- emergency
- novel modularized
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
The invention provides a novel modularized emergency first-aid repair tower which comprises a truss type rod column, a truss type cross arm, a truss type support and a base, wherein the rod column, the cross arm and the support adopt universal module assembly sections and are assembled in a flange connecting way; and all the module assembly sections can be mutually connected to form different tower types. The invention adopts a section universal modularizing assembly way, improves the flexibility of reserving the first-aid repair tower and the first-aid repair capability of an emergency first-aid repair tower demanding unit when dealing a power accident disaster and saves the storage space and investment, the assembly way is portable, simple and easy, and the corrosion resistant capability of materials of the first-aid repair tower is high, thereby improving the first-aid repair efficiency of a power transmission line.
Description
Technical field
The present invention relates to a kind of novel modularized emergency first-aid repair tower, being specifically related to that the assembling of a kind of module is intersegmental can be general mutually and form the modularized emergency first-aid repair tower of multiple different towers, belongs to electric power accident rush-repairing tower manufacturing field.
Background technology
The accident of falling the bar of overhead transmission line is the disaster of electric power accident.In case the accident of falling the bar of generation must be rushed to repair with the fastest speed, restores electricity.If rush to repair by former design standard, consuming time longer, therefore more run unit adopts emergency first-aid repair tower to repair recovery fast and send electricity at present, and then forever repairs.Because transmission tower is of a great variety, for corresponding demand unit, if the whole corresponding emergent repairing towers of deposit then may bring no small financial burden.And, also can bring bigger pressure and constraints to the storage of demand unit because the emergent repairing tower volume is bigger.
In the prior art, also relate to electric power accident rush-repairing tower is carried out improved open source literature, for example the patent No. is the utility model patent " a kind of electric power accident rush-repairing tower " of ZL200720032038.2, involved a kind of electric power accident rush-repairing tower, this emergent repairing tower comprises tower body and tower body device for fastening, tower body comprises roofbolt and insulator crossarm, insulator crossarm is horizontally set on roofbolt top, the tower body device for fastening comprises the backguy of the roofbolt that can be strained and fixed, backguy one end is connected with roofbolt top, and the other end is connected with fixed end.Yet the shortcoming that this utility model exists is: the housing structure of this emergent repairing tower is fixed, and can't repack the emergent repairing tower of various turriforms flexibly into.
And for example the patent No. is the patent of invention " lead elevating mechanism for gate emergent repairing tower " of ZL200710066608.4, relate to a kind of lead elevating mechanism for gate emergent repairing tower, as the lifting lead in the circuit on power system repairing, comprise the gate emergent repairing tower of forming by left and right pillar and cross-arm, between left and right pillar and between each column and cross-arm the drag-line reinforcement is arranged, said cross-arm comprises limit cross-arm and middle cross-arm, fix with left and right pillar respectively, also comprise an interim crossbeam, this interim crossbeam can place under the cross-arm, one end and column are fixed, and have screw mandrel to connect between the other end and column, can change two column spacings by regulating screw mandrel; Cross-arm is made up of three sections frame girders at least in said, in composition between the adjacent frame beam of cross-arm, by the detachable connection at two sections frame girders of frame girder termination grafting bearing pin formation.Yet the shortcoming that this invention exists is: the complex structure of this emergent repairing tower, and still exist structure to fix, can't repack the shortcoming of the emergent repairing tower of various turriforms flexibly into.
Therefore, be necessary to design a kind of novel modularized emergency first-aid repair tower that can overcome above-mentioned shortcoming, to satisfy the electric power accident rush-repairing needs.
Summary of the invention
The objective of the invention is at existing emergent repairing tower complex structure, and structure is all comparatively fixing and be not easy to repack into flexibly various tower bodies, the shortcoming of dealing with various requirements, and provide a kind of novel modularized emergency first-aid repair tower, module assembling is intersegmental can be general mutually and form the modularized emergency first-aid repair tower of multiple different towers, thereby lowered the financial burden of demand unit, alleviated the storage pressure and constraints.
The technical solution adopted in the present invention is: a kind of novel modularized emergency first-aid repair tower, it is characterized in that, comprise that truss-like roofbolt and truss-like cross-arm, truss-like support and base, versatility module assembling section is all adopted in roofbolt, cross-arm and support, assemble by the flange ways of connecting, and each module is assembled intersegmental interconnecting and is formed different towers.The technique effect that brings thus is at least: the assembling mode of this segmentation Universal, modular, increased the flexibility ratio of deposit emergency first-aid repair tower, improved the repairing ability when emergency first-aid repair tower demand unit tackles the electric power accident disaster, memory space and investment have been saved, and this assembling mode is light simple and easy, emergent repairing tower material corrosion resistance is strong, has therefore improved the repairing efficient of transmission line of electricity.
Aforesaid novel modularized emergency first-aid repair tower, it is characterized in that: described roofbolt, cross-arm, supporting module are assembled intersegmental, can be general mutually and connect to form multiple different tower by flange, be applicable to the AC linear tower, exchange double, exchange strained angled tower, exchange compact type tower and DC line tower.The technique effect that brings thus is at least: the scope of application of this modular construction is extensive, and highly versatile can be applicable to the electric power accident rush-repairing tower of multiple structure.
Aforesaid novel modularized emergency first-aid repair tower is characterized in that: described base is assembled by cross universal type pin-connected panel chassis, described cross universal type pin-connected panel chassis, and assembly unit arbitrarily is applicable to mountain area, field, the multiple landform in Plain.The technique effect that brings thus is at least: the structure scope of application on this chassis is extensive, and highly versatile is applicable to the use of the electric power accident rush-repairing tower of multiple landform.
Aforesaid novel modularized emergency first-aid repair tower is characterized in that: described module assembling section material adopts steel, high-strength aluminum alloy or all insulation composite material processing and fabricating to form.The technique effect that brings thus is at least: multiple material all can be produced the emergent repairing tower of this kind structure, can select different materials to make according to actual needs.
The invention has the beneficial effects as follows: the assembling mode of this segmentation Universal, modular, increased the flexibility ratio of deposit emergency first-aid repair tower, improved the repairing ability when emergency first-aid repair tower demand unit tackles the electric power accident disaster, memory space and investment have been saved, and this assembling mode is light simple and easy, emergent repairing tower material corrosion resistance is strong, has therefore improved the repairing efficient of transmission line of electricity.
Novel modularized emergency first-aid repair tower of the present invention has very high use value, and in carrying out electric power accident rush-repairing tower equipment transportation, each module assembling section of this emergent repairing tower can be broken and be deposited, and makes memory space less, convenient transportation; According to actual conditions each module assembling section being assembled into required tower at the scene can come into operation.Greatly improve the speed of setting up of emergent repairing tower, improved electric power accident rush-repairing speed and repairing efficient.
Description of drawings
Fig. 1 is the structural representation of the novel modularized emergency first-aid repair tower of the embodiment of the invention.
Fig. 2 is roofbolt, the cross-arm of the embodiment of the invention, the versatility module assembling segment structure schematic diagram of support.
Fig. 3 is the structural representation of other several typical emergent repairing tower towers of the embodiment of the invention.
The specific embodiment
The present invention is described in further detail below in conjunction with drawings and Examples.
The explanation of mark among Fig. 1: the 1-roofbolt, the 2-cross-arm, 3-supports, the 4-base, each module assembling section of 101-111-roofbolt, each module assembling section of 201-208-cross-arm, 301-304-supports each module assembling section
The explanation of mark among Fig. 2: the versatility module assembling section of a-roofbolt, the versatility module assembling section of b-cross-arm, the versatility module assembling section that c-supports
The explanation of mark among Fig. 3: A-AC linear single loop compact, B-exchanges double loop I type, and C-exchanges double loop II type
Embodiment 1:
As shown in Figure 1, the novel modularized emergency first-aid repair tower that the embodiment of the invention provides is by roofbolt 1, and cross-arm 2 supports 3, and base 4 is formed interchange single loop type structure.Roofbolt 1 is made up of each module assembling section of 101-111, and cross-arm 2 is made up of each module assembling section of 201-208, and support 3 is made up of each module assembling section of 301-304.Roofbolt 1, cross-arm 2 and support 3 and all adopt versatility module assembling section assemble by the flange ways of connecting, and each module intersegmental interconnecting of assembling and form different towers.
Described roofbolt 1, cross-arm 2, to support the assembling of 3 modules intersegmental, can be general mutually and connect to form multiple different tower by flange, and be applicable to the AC linear tower, exchange double, exchange strained angled tower, interchange compact type tower and DC line tower.The technique effect that brings thus is at least: the scope of application of this modular construction is extensive, and highly versatile can be applicable to the electric power accident rush-repairing tower of multiple structure.
Described base 4 is assembled by cross universal type pin-connected panel chassis, described cross universal type pin-connected panel chassis, and assembly unit arbitrarily is applicable to mountain area, field, the multiple landform in Plain.The technique effect that brings thus is at least: the structure scope of application on this chassis is extensive, and highly versatile is applicable to the use of the electric power accident rush-repairing tower of multiple landform.
Described module assembling section material adopts steel, high-strength aluminum alloy or all insulation composite material processing and fabricating to form.The technique effect that brings thus is at least: multiple material all can be produced the emergent repairing tower of this kind structure, can select different materials to make according to actual needs.
Embodiment 2:
Shown in Fig. 2-3, each module assembling section has versatility and can form the tower of different structure.
The invention has the beneficial effects as follows: the assembling mode of this segmentation Universal, modular, increased the flexibility ratio of deposit emergency first-aid repair tower, improved the repairing ability when emergency first-aid repair tower demand unit tackles the electric power accident disaster, memory space and investment have been saved, and this assembling mode is light simple and easy, emergent repairing tower material corrosion resistance is strong, has therefore improved the repairing efficient of transmission line of electricity.
Novel modularized emergency first-aid repair tower of the present invention has very high use value, and in carrying out electric power accident rush-repairing tower equipment transportation, each module assembling section of this emergent repairing tower can be broken and be deposited, and makes memory space less, convenient transportation; According to actual conditions each module assembling section being assembled into required tower at the scene can come into operation.Greatly improve the speed of setting up of emergent repairing tower, improved electric power accident rush-repairing speed and repairing efficient.
Claims (4)
1. novel modularized emergency first-aid repair tower, it is characterized in that, comprise that truss-like roofbolt and truss-like cross-arm, truss-like support and base, versatility module assembling section is all adopted in roofbolt, cross-arm and support, assemble by the flange ways of connecting, and each module is assembled intersegmental interconnecting and is formed different towers.
2. novel modularized emergency first-aid repair tower according to claim 1, it is characterized in that: described roofbolt, cross-arm, supporting module are assembled intersegmental, can be general mutually and connect to form multiple different tower by flange, be applicable to the AC linear tower, exchange double, exchange strained angled tower, exchange compact type tower and DC line tower.
3. novel modularized emergency first-aid repair tower according to claim 1, it is characterized in that: described base is assembled by cross universal type pin-connected panel chassis, described cross universal type pin-connected panel chassis, assembly unit arbitrarily is applicable to mountain area, field, the multiple landform in Plain.
4. novel modularized emergency first-aid repair tower according to claim 1 is characterized in that: described module assembling section material adopts steel, high-strength aluminum alloy or all insulation composite material processing and fabricating to form.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010117226 CN101736936A (en) | 2010-03-04 | 2010-03-04 | Novel modularized emergency first-aid repair tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010117226 CN101736936A (en) | 2010-03-04 | 2010-03-04 | Novel modularized emergency first-aid repair tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101736936A true CN101736936A (en) | 2010-06-16 |
Family
ID=42460915
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010117226 Pending CN101736936A (en) | 2010-03-04 | 2010-03-04 | Novel modularized emergency first-aid repair tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101736936A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103276647A (en) * | 2013-05-27 | 2013-09-04 | 北京交通大学 | Track beam emergency repairing and replacing system |
CN104074389A (en) * | 2013-03-28 | 2014-10-01 | 国家电网公司 | Combined high-voltage line iron power upright post type rush repair tower |
CN104074388A (en) * | 2013-03-28 | 2014-10-01 | 国家电网公司 | Element for combined type high-voltage line rush repair tower |
CN105178680A (en) * | 2015-06-25 | 2015-12-23 | 重庆瑜煌电力设备制造有限公司 | Emergency repair tower and mounting method thereof |
CN106121341A (en) * | 2016-08-09 | 2016-11-16 | 国网上海市电力公司 | A kind of extra high voltage network emergency first-aid repair strain rod tower |
CN106437275A (en) * | 2015-08-13 | 2017-02-22 | 中国电力科学研究院 | Electric transmission line iron tower cross arm additional prestress strengthening method |
CN114033240A (en) * | 2021-12-07 | 2022-02-11 | 中国南方电网有限责任公司超高压输电公司广州局 | Cross arm for +/-800 kV direct-current emergency repair tower |
CN115263069A (en) * | 2022-07-26 | 2022-11-01 | 广东电网有限责任公司 | Rush-repair tower combination device and rush-repair tower installation method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2038524U (en) * | 1988-01-23 | 1989-05-31 | 大同铁路分局大同西供电段 | Combined contact-net support |
CN2571933Y (en) * | 2002-10-07 | 2003-09-10 | 周阳 | Combined wire pole |
CN2620018Y (en) * | 2002-10-16 | 2004-06-09 | 周印 | Combined column self-vertical iron tower |
CN2651366Y (en) * | 2003-11-26 | 2004-10-27 | 张思忠 | Wire poles |
CN100342105C (en) * | 2003-04-04 | 2007-10-10 | 塔解决方案公司 | Modular tower structure |
CN201056879Y (en) * | 2007-06-14 | 2008-05-07 | 冯海潮 | First-aid tower for electrical accident |
KR20090024976A (en) * | 2007-09-05 | 2009-03-10 | 김샛별 | Sectional electric pole |
-
2010
- 2010-03-04 CN CN 201010117226 patent/CN101736936A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2038524U (en) * | 1988-01-23 | 1989-05-31 | 大同铁路分局大同西供电段 | Combined contact-net support |
CN2571933Y (en) * | 2002-10-07 | 2003-09-10 | 周阳 | Combined wire pole |
CN2620018Y (en) * | 2002-10-16 | 2004-06-09 | 周印 | Combined column self-vertical iron tower |
CN100342105C (en) * | 2003-04-04 | 2007-10-10 | 塔解决方案公司 | Modular tower structure |
CN2651366Y (en) * | 2003-11-26 | 2004-10-27 | 张思忠 | Wire poles |
CN201056879Y (en) * | 2007-06-14 | 2008-05-07 | 冯海潮 | First-aid tower for electrical accident |
KR20090024976A (en) * | 2007-09-05 | 2009-03-10 | 김샛별 | Sectional electric pole |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104074389A (en) * | 2013-03-28 | 2014-10-01 | 国家电网公司 | Combined high-voltage line iron power upright post type rush repair tower |
CN104074388A (en) * | 2013-03-28 | 2014-10-01 | 国家电网公司 | Element for combined type high-voltage line rush repair tower |
WO2014153962A1 (en) * | 2013-03-28 | 2014-10-02 | 国家电网公司 | Upright-column type rush-repair tower for combined type high-voltage line iron tower |
CN103276647A (en) * | 2013-05-27 | 2013-09-04 | 北京交通大学 | Track beam emergency repairing and replacing system |
CN103276647B (en) * | 2013-05-27 | 2015-08-19 | 北京交通大学 | A kind of rail beam emergency first-aid repair replacement system |
CN105178680A (en) * | 2015-06-25 | 2015-12-23 | 重庆瑜煌电力设备制造有限公司 | Emergency repair tower and mounting method thereof |
CN106437275A (en) * | 2015-08-13 | 2017-02-22 | 中国电力科学研究院 | Electric transmission line iron tower cross arm additional prestress strengthening method |
CN106437275B (en) * | 2015-08-13 | 2019-03-05 | 中国电力科学研究院 | A kind of additional prestress strengthening method of iron tower of power transmission line cross-arm |
CN106121341A (en) * | 2016-08-09 | 2016-11-16 | 国网上海市电力公司 | A kind of extra high voltage network emergency first-aid repair strain rod tower |
CN114033240A (en) * | 2021-12-07 | 2022-02-11 | 中国南方电网有限责任公司超高压输电公司广州局 | Cross arm for +/-800 kV direct-current emergency repair tower |
CN115263069A (en) * | 2022-07-26 | 2022-11-01 | 广东电网有限责任公司 | Rush-repair tower combination device and rush-repair tower installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101736936A (en) | Novel modularized emergency first-aid repair tower | |
CN202611306U (en) | Multifunctional combined aluminum alloy rush-repair tower for power transmission line | |
CN204424739U (en) | A kind of multi-section combined box-type substation | |
CN202402793U (en) | Plastic-steel cable bridge with insertion side plates | |
CN203200985U (en) | Light steel structure plant wind-resisting column and roof beam connection structure | |
CN201771239U (en) | Novel modularized emergency repair tower | |
CN101736935A (en) | Easy-to-transport electric power accident rush-repairing tower | |
CN209874051U (en) | Novel semi-rigid beam column connected node of assembled steel construction | |
CN203319564U (en) | Portal crane for shipbuilding | |
CN201593328U (en) | Electric power fault rush-repair tower convenient for transportation | |
CN202405642U (en) | Electric cabinet frame | |
CN208209857U (en) | A kind of telescopic photovoltaic module support | |
CN202094568U (en) | Alternating current extra-high voltage co-tower double-loop long-spanning aluminium tube type rigid jumper | |
CN203161451U (en) | Modular wind driven generator tower barrel | |
CN105317263A (en) | All-insulation universal accident emergency repair tower | |
CN208455880U (en) | A kind of novel fabricated clod wash heavy wall structural steel frame-shear wall structure system | |
CN105625576A (en) | Series-tied-arch-type prestressed steel structure cantilever system | |
CN202881841U (en) | Novel long-span pipe bridge structure | |
CN218732523U (en) | Low-voltage cabinet frame construction | |
CN105064760A (en) | Four tube-single tube switching joint for narrow-foundation steel tube poles | |
CN105226944A (en) | A kind of balance of voltage device based on staggered step-up/step-down circuit | |
CN203531135U (en) | Corrugated glass fiber reinforced plastic house | |
CN211342030U (en) | Four-column double-oblique-beam layered framework of terminal station | |
CN203452182U (en) | Continuous beam framed structure | |
CN202017263U (en) | Novel light rigid frame structure node |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20100616 |