CN101727344A - Method and device for installing software - Google Patents
Method and device for installing software Download PDFInfo
- Publication number
- CN101727344A CN101727344A CN201010000566A CN201010000566A CN101727344A CN 101727344 A CN101727344 A CN 101727344A CN 201010000566 A CN201010000566 A CN 201010000566A CN 201010000566 A CN201010000566 A CN 201010000566A CN 101727344 A CN101727344 A CN 101727344A
- Authority
- CN
- China
- Prior art keywords
- installation
- task
- installation task
- formation
- progress
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Stored Programmes (AREA)
Abstract
The invention discloses a method and a device for installing software, belonging to the field of computing. The method comprises the following steps of: taking out an installing task from an installing queue; if the type of the installing task is known, transmitting a silent installing parameter corresponding to the type for the installing task and creating an installing process; installing the installing task according to the installing process; and when the installing task is finished, taking out next installing task from the installing queue. The invention also discloses a device for installing software. The device comprises a taking module, a creating module and an installing module. The invention can simply and rapidly mount the software by adding the silent installing parameter in the installing task, reduces the user interaction, improves the installing efficiency and effectively saves the user time.
Description
Technical field
The present invention relates to computer realm, particularly a kind of method and apparatus of install software.
Background technology
Along with the development of computing machine and Internet technology, computer is carrying more and more important effect in people's work, life, and the software of variety of functions is also more and more, needs to install dozens or even hundreds of money software in general personal user's the computer usually.When numerous softwares need be installed, the process of installation was loaded down with trivial details and consuming time.
At this problem, following method is arranged generally in the prior art:
Take out an installation task from formation is installed, carries out installation kit in normal way, create erection schedule, user interactions when this installation kit is installed after erection schedule withdraws from, takes out next installation task, repeats above installation steps.
After prior art was analyzed, the inventor found that prior art has following shortcoming at least:
When carrying out installation kit, be to call installation kit in normal way, eject Setup Wizard, wait for user interactions.And the user interactions is here just constantly clicked the Next button usually simply, and is more loaded down with trivial details.Particularly when the needs installed software was a lot, installation effectiveness was low, poor user experience.
Summary of the invention
The embodiment of the invention provides a kind of method and apparatus of install software.Described technical scheme is as follows:
On the one hand, a kind of method of install software when two or more installation tasks to be installed, comprising:
From being installed, formation takes out the installation task;
If the type of described installation task is known, import into and the described type installation parameter of mourning in silence accordingly for described installation task, create erection schedule;
According to described erection schedule, described installation task is installed, when described installation task is finished, from described installation formation, take out next installation task.
Comprise before from formation is installed, taking out the installation task:
According to default sortord, for formation is installed in installation task creation to be installed.
Import into the described type installation parameter of mourning in silence accordingly for described installation task and specifically to comprise:
By command line parameter is that described installation task is imported into and the described type installation parameter of mourning in silence accordingly.
According to described erection schedule, described installation task is installed specifically comprises:
Judge described whether support progress of installation task notice,
If, then, parse installation progress value and result code according to described progress notice, according to described installation progress value and result code, described installation task is installed;
If not, then detect described erection schedule,, described installation task is installed according to the state of described erection schedule.
When described installation task is finished, from described installation formation, take out next installation task and specifically comprise:
If the installation progress value reaches 100%, and result code represents to install normal, and then described installation task is finished, and takes out next installation task from described installation formation;
If described result code is represented failure is installed, then described installation task is finished, and takes out next installation task from described installation formation;
If detect and withdraw from described erection schedule, then described installation task is finished, and takes out next installation task from described installation formation.
Detecting described erection schedule specifically comprises:
Mode with the detection procedure handle detects described erection schedule.
Described method also comprises:
If described installation task is then installed in type the unknown of described installation task in normal way.
On the other hand, a kind of device of install software when two or more installation tasks to be installed, is characterized in that, comprising:
Take out module, be used for taking out the installation task from formation is installed;
Creation module if it is known to be used for the type of described installation task, is imported into and the described type installation parameter of mourning in silence accordingly for described installation task, creates erection schedule;
Installed module is used for according to described erection schedule, and described installation task is installed, and when described installation task is finished, takes out next installation task from described installation formation.
Described device also comprises:
The formation module is used for according to default sortord, for formation is installed in installation task creation to be installed.
Described creation module comprises:
Parameter is imported the unit into, and being used for by command line parameter is that described installation task is imported into and the described type installation parameter of mourning in silence accordingly.
Described installed module specifically comprises:
Judging unit is used to judge described whether support progress of installation task notice,
First installation unit is used for when described installation task support progress is notified, and then according to described progress notice, parses installation progress value and result code, according to described installation progress value and result code, described installation task is installed;
Second installation unit is used for then detecting described erection schedule when described not support of installation task progress is notified, and according to the state of described erection schedule, described installation task is installed.
Described installed module comprises:
First retrieval unit reaches 100% if be used for the installation progress value, and result code is represented to install normal, and then described installation task is finished, and takes out next installation task from described installation formation;
Second retrieval unit is represented failure is installed if be used for described result code, and then described installation task is finished, and takes out next installation task from described installation formation;
The 3rd retrieval unit is represented failure is installed if be used for described result code, and then described installation task is finished, and takes out next installation task from described installation formation.
Described second installation unit specifically comprises:
Detection sub-unit is used for detecting described erection schedule with the mode of detection procedure handle.
Described device also comprises:
Common installed module if be used for type the unknown of described installation task, is then installed described installation task in normal way.
The beneficial effect of the technical scheme that the embodiment of the invention provides is:
The present invention is by when two or more installation tasks to be installed, for the installation task adds the installation parameter of mourning in silence, the execution installation of mourning in silence, and whether withdraw from according to the progress notice or the process of the task of installation, judge whether the installation task is finished, after the installation task is finished, next installation task continue to be installed, and this method can be simply, install software efficiently, reduced user interactions, improve the efficient of installing, effectively saved user time.
Description of drawings
Fig. 1 is the process flow diagram of the method for a kind of install software of providing of the embodiment of the invention;
Fig. 2 is the process flow diagram of the method for the another kind of install software that provides of the embodiment of the invention;
Fig. 3 is the structural representation of the device of a kind of install software of providing of the embodiment of the invention.
Embodiment
For making the purpose, technical solutions and advantages of the present invention clearer, embodiment of the present invention is described further in detail below in conjunction with accompanying drawing.
Embodiment 1
Operation when in order to simplify a plurality of software being installed improves user experience, and the embodiment of the invention provides a kind of method of install software, and when two or more installation tasks to be installed, as shown in Figure 1, this method comprises:
101: from formation is installed, take out the installation task;
102: if type that should the installation task is known, import into and the type installation parameter of mourning in silence accordingly, create erection schedule for this installation task;
103: according to this erection schedule, this installation task is installed, when this installation task is finished, the next installation task of taking-up the formation is installed from this.
Wherein, in the above-mentioned steps 101, from formation is installed, take out the installation task and comprise before:
According to default sortord, for formation is installed in installation task creation to be installed.
Wherein, in the above-mentioned steps 102, import into the type installation parameter of mourning in silence accordingly for this installation task and specifically to comprise:
Import into and the type installation parameter of mourning in silence accordingly for this installation task by command line parameter.
Wherein, in the above-mentioned steps 103,, this installation task is installed specifically comprises according to this erection schedule:
Judge this whether support progress of installation task notice,
If, then, parse installation progress value and result code according to this progress notice, according to this installation progress value and result code, this installation task is installed;
If not, then detect this erection schedule,, this installation task is installed according to the state of this erection schedule.
Wherein, in the above-mentioned steps 103, when this installation task is finished, from this installation formation, take out next installation task and specifically comprise:
If the installation progress value reaches 100%, and result code represents to install normal, then should the installation task finish, and installs from this and takes out next installation task formation;
If this result code is represented failure is installed, then should the installation task finish, install from this and take out next installation task formation;
If detect and withdraw from this erection schedule, then should the installation task finish, install from this and take out next installation task formation.
Wherein, this erection schedule of above-mentioned detection specifically comprises:
Mode with the detection procedure handle detects this erection schedule.
Said method also comprises:
If this installation task is then installed in type the unknown that should the installation task in normal way.
The present invention is by when two or more installation tasks to be installed, for the installation task adds the installation parameter of mourning in silence, the execution installation of mourning in silence, and whether withdraw from according to the progress notice or the process of the task of installation, judge whether the installation task is finished, after the installation task is finished, next installation task continue to be installed, and this method can be simply, install software efficiently, reduced user interactions, improve the efficient of installing, effectively saved user time.
Embodiment 2
Operation when in order to simplify a plurality of software being installed improves user experience, and the embodiment of the invention provides a kind of method of install software, and when two or more installation tasks to be installed, as shown in Figure 2, this method comprises:
201: according to default sortord, for formation is installed in installation task creation to be installed;
Wherein, default sortord can be that the priority according to user's setting sorts, and also can download the rank order of finishing according to installation kit, can also be according to the importance ranking of plug-in unit, and the embodiment of the invention is not done concrete qualification to this.
Wherein, setting up formation is installed is to be installation task ranking to be installed, so that install in order.
Need to prove that the installation task to be installed of embodiment of the invention indication can be a plurality of software installation kits, also can be a plurality of software upgrade package, the embodiment of the invention is not done concrete qualification to this.
When installation task to be installed is software upgrade package, included but not limited to following process before step 201: start software upgrading, this locality has been adorned software matrix detected, this detection comprises the detection to version number etc.; Need upgrading software tabulation and concrete configuration information to server lookup, this concrete configuration information comprises version number, downloads and installs the URL of bag, downloads speed limit parameter etc.; Upgrading software tabulation and concrete configuration information download and install bag from file server one by one as required; After finishing this batch process of downloading, carry out step 201 and follow-up step again.
Need to prove that those skilled in the art can know, above-mentionedly this locality has been adorned method that software matrix detects can have multiplely that the embodiment of the invention is not done concrete qualification.
202: from formation is installed, take out an installation task;
Wherein, the taking-up mode generally is to begin to get from the highest installation task of queue priority is installed, and this priority refers to this installation task residing position in formation is installed, if forward relatively, then priority is higher, first of formation is installed then claims that its priority is the highest if should the installation task be in.
Need to prove, those skilled in the art can be known, after taking out an installation task, need judge the type that task is installed, if client can be discerned the installation kit parameter of installation task, type that then should the installation task is known, if client can't be discerned the installation kit parameter of installation task, type that then should the installation task is unknown.
Need to prove, each installation kit parameter that task is installed all is that the parameter of configuration includes but not limited to download link, version number by the background system configuration, the format parameter of the installation order row format parameter of mourning in silence, whether support progress notice, progress notice etc.These parameter configuration are issued to client by server, are carried out by the client specific explanations.
203: if it is known that the type of task is installed, import into and the type installation parameter of mourning in silence accordingly, create erection schedule for the installation task of taking out;
Wherein, those skilled in the art can know that the installation parameter of mourning in silence is used for the order installation kit and carries out the installation of mourning in silence, mourn in silence to install to refer to and need not the Any user intervention when installing, directly press default setting and install, when installing when mourning in silence, the user need not to carry out alternately with computing machine.
In addition, the installation order line parameter of mourning in silence of different software installation kits may be inequality, so client needs the compatible multiple installation form of mourning in silence.For the known installation task of type, can be according to its type, for it imports mourn in silence installation parameter corresponding with it into.
Need to prove that the installation parameter of specifically mourning in silence of each software passes through backstage configuration-system human configuration, and is handed down to client by server.
Particularly, importing the installation parameter of mourning in silence into for the installation task of taking out specifically comprises: import the installation parameter of mourning in silence by command line parameter into for the installation task, command line parameter is:
Concrete form can be as follows:
setup.exe##silence=1&handle=“value”
Wherein, the value of silence is fixed as 1, represents to mourn in silence installation, does not promptly have the interface and installs;
Handle has identified the main window handle of interface program, and its value is generally the decimal system, is used to notify installation progress and result.
For example, for the QQ installation procedure, the following parameter of mourning in silence can be arranged:
QQ.exe##silence=1&handle=3721。
Further, if this installation task is then installed in type the unknown of the task of installation in normal way.Here said common mode is meant the mode of general install software.
204: judge whether support progress of installation task notice, if, execution in step 205, if not, execution in step 206;
Wherein, the method for judging whether support progress of installation task notice is the configuration parameter of the installation kit of inquiry installation task, judges whether support progress of installation task notice according to parameter.
205: according to the progress notice, parse installation progress value and result code, finish interface display and this installation task is installed according to described installation progress value and result code, when the installation progress value reaches 100%, and result code is represented to install normal, then should the installation task finish execution in step 207;
Wherein, the progress notice sends to the message that is used to notify installment state of client when being the software installation, and result code is whether the expression installation normally reaches the parameter of describing the installation failure cause.
Need to prove that the progress notice can be carried out in several ways, such as message, pipeline, shared drive etc., the embodiment of the invention does not limit this, and the embodiment of the invention is only to be that example describes by message informing mode interface, and example is as follows:
Notify by WM_COPYDATA message, interface program upgrades the interface installation progress in the response of this message.
Message definition can be as follows:
Message:WM_COPYDATA
WParam: sender's window handle
LParam: point to the COPYDATASTRUCT structure
The meaning of parameters of COPYDATASTRUCT specifically sees the following form:
The member | Type | Describe |
??dwData | ??ULONG_PTR | Be fixed as 10001 (SETUP_NOTIFY) |
The member | Type | Describe |
??cbData | ??DWORD | The length of lpData, 8 |
??lpData[0] | ??DWORD | Current installation progress is between the 0-100 |
??lpData[1] | ??DWORD | Installation results, 0 success, non-0 error code |
According to above-mentioned definition, the concrete outcome code value of various installment states can have to give a definition:
// predefined macro
Notice is installed in #define SETUP_NOTIFY 10001 // expression
#define IRE_SUCCESS 0 // successful installation
#define IRE_DISKFULL 1 // installation failure, disk space is full
#define IRE_OSNOTSUPPORT 2 // installation failure, operating system is not supported
The result code Notification Format of installment state can have multiple, the embodiment of the invention is only being that example describes with the minor function: for example when the result code Notification Format be SendInstallProgress (HWND hWnd, DWORDdwProgress, DWORD dwResult), then:
Have message SendInstallProgress (hWnd, 30, IRE_SUCCESS); The particular content of this message is that current installation progress is 30%, installs normal;
Message SendInstallProgress (hWnd, 100, IRE_SUCCESS); The particular content of this message is that current installation progress is 100%, installs normal;
Message SendInstallProgress (hWnd, 20, IRE_DISKFULL); The particular content of this message is that current installation progress is 20%, and failure is installed, because disk space is full.
Further, if result code represents to install failure, then should the installation task finish, can judge this moment and install in the formation whether the installation task is arranged, if execution in step 208 also can be according to the content of message, revise, right a wrong or the retry installation process, after success, carry out follow-up step again.
Need to prove that the progress Notification Format of different software installation kits may be inequality, some may not support progress be notified, so client needs the compatible multiple installation form of mourning in silence.The concrete progress Notification Format parameter of each software is passed through backstage configuration-system human configuration, and is handed down to client by server.
The configuration information that the backstage configuration-system specifically issues can represent that the embodiment of the invention is not done concrete qualification to this by the xml structure.
206: detect erection schedule, according to the state of erection schedule, this installation task is installed, withdraw from erection schedule if detect, then installation task is finished.
Particularly, detecting erection schedule generally is to be undertaken by the mode of detection procedure handle, withdraws from this erection schedule when detecting, and then installation task is finished.
Need to prove, be to judge earlier whether support progress of installation task notice among the above-mentioned steps 204-206, install according to the result who judges then, also can when beginning to install, carry out the judgement of whether support progress notice, and then continue to install according to the result who judges, can also after beginning to install, carry out the judgement of whether support progress notice, and then continue to install, begin to install and the order judged can be exchanged according to the result who judges.
207: when installing, judge and install whether also have the installation task in the formation, if, execution in step 208, if not, execution in step 209;
208: from formation is installed, take out next installation task, execution in step 203;
Need to prove that if when installing, also have new software download to finish, this new software can be resequenced with remaining installation task in the installation formation, or directly comes the last of installation formation, decides on user's setting.
209: finish.
The present invention is by when two or more installation tasks to be installed, for the installation task adds the installation parameter of mourning in silence, the execution installation of mourning in silence, and whether withdraw from according to the progress notice or the process of the task of installation, judge whether the installation task is finished, after the installation task is finished, next installation task continue to be installed, and this method can be simply, install software efficiently, reduced user interactions, improve the efficient of installing, effectively saved user time.
Embodiment 3
Operation when in order to simplify a plurality of software being installed improves user experience, and the embodiment of the invention provides a kind of device of install software, is used for when two or more installation tasks to be installed, and as shown in Figure 3, this device comprises:
Take out module 301, be used for taking out the installation task from formation is installed;
This creation module 302 comprises:
Parameter is imported unit 3021 into, is used for importing into and the type installation parameter of mourning in silence accordingly for this installation task by command line parameter.
This installed module 303 specifically comprises:
Judging unit 3031 is used to judge this whether support progress of installation task notice,
This second installation unit 3033 specifically comprises:
The 3rd retrieval unit 3036 is represented failure is installed if be used for this result code, then should the installation task finish, and installs from this and takes out next installation task formation.
This device also comprises:
This device also comprises:
Common installed module 304, if be used for should the installation task type the unknown, this installation task then is installed in normal way.
The device that present embodiment provides belongs to same design with method embodiment, and its specific implementation process sees method embodiment for details, does not repeat them here.
The present invention is by when two or more installation tasks to be installed, for the installation task adds the installation parameter of mourning in silence, the execution installation of mourning in silence, and whether withdraw from according to the progress notice or the process of the task of installation, judge whether the installation task is finished, after the installation task is finished, next installation task continue to be installed, and this method can be simply, install software efficiently, reduced user interactions, improve the efficient of installing, effectively saved user time.
The all or part of of the technique scheme that the embodiment of the invention provides can be finished by the relevant hardware of programmed instruction, described program can be stored in the storage medium that can read, and this storage medium comprises: various media that can be program code stored such as ROM, RAM, magnetic disc or CD.
The above only is preferred embodiment of the present invention, and is in order to restriction the present invention, within the spirit and principles in the present invention not all, any modification of being done, is equal to replacement, improvement etc., all should be included within protection scope of the present invention.
Claims (14)
1. the method for an install software when two or more installation tasks to be installed, is characterized in that, comprising:
From being installed, formation takes out the installation task;
If the type of described installation task is known, import into and the described type installation parameter of mourning in silence accordingly for described installation task, create erection schedule;
According to described erection schedule, described installation task is installed, when described installation task is finished, from described installation formation, take out next installation task.
2. method according to claim 1 is characterized in that, takes out the installation task and comprise before from formation is installed:
According to default sortord, for formation is installed in installation task creation to be installed.
3. according to claim 1 or 2 each described methods, it is characterized in that, import into the described type installation parameter of mourning in silence accordingly for described installation task and specifically comprise:
By command line parameter is that described installation task is imported into and the described type installation parameter of mourning in silence accordingly.
4. according to claim 1 or 2 each described methods, it is characterized in that,, described installation task be installed specifically comprise according to described erection schedule:
Judge described whether support progress of installation task notice,
If, then, parse installation progress value and result code according to described progress notice, according to described installation progress value and result code, described installation task is installed;
If not, then detect described erection schedule,, described installation task is installed according to the state of described erection schedule.
5. method according to claim 4 is characterized in that, when described installation task is finished, takes out next installation task and specifically comprise from described installation formation:
If the installation progress value reaches 100%, and result code represents to install normal, and then described installation task is finished, and takes out next installation task from described installation formation;
If described result code is represented failure is installed, then described installation task is finished, and takes out next installation task from described installation formation;
If detect and withdraw from described erection schedule, then described installation task is finished, and takes out next installation task from described installation formation.
6. method according to claim 4 is characterized in that, detects described erection schedule and specifically comprises:
Mode with the detection procedure handle detects described erection schedule.
7. according to claim 1,2,5,6 each described methods, it is characterized in that described method also comprises:
If described installation task is then installed in type the unknown of described installation task in normal way.
8. the device of an install software when two or more installation tasks to be installed, is characterized in that, comprising:
Take out module, be used for taking out the installation task from formation is installed;
Creation module if it is known to be used for the type of described installation task, is imported into and the described type installation parameter of mourning in silence accordingly for described installation task, creates erection schedule;
Installed module is used for according to described erection schedule, and described installation task is installed, and when described installation task is finished, takes out next installation task from described installation formation.
9. device according to claim 8 is characterized in that, described device also comprises:
The formation module is used for according to default sortord, for formation is installed in installation task creation to be installed.
10. according to Claim 8 or 9 each described devices, it is characterized in that described creation module comprises:
Parameter is imported the unit into, and being used for by command line parameter is that described installation task is imported into and the described type installation parameter of mourning in silence accordingly.
11. according to Claim 8 or 9 each described devices, it is characterized in that described installed module specifically comprises:
Judging unit is used to judge described whether support progress of installation task notice,
First installation unit is used for when described installation task support progress is notified, and then according to described progress notice, parses installation progress value and result code, according to described installation progress value and result code, described installation task is installed;
Second installation unit is used for then detecting described erection schedule when described not support of installation task progress is notified, and according to the state of described erection schedule, described installation task is installed.
12. device according to claim 9 is characterized in that, described installed module comprises:
First retrieval unit reaches 100% if be used for the installation progress value, and result code is represented to install normal, and then described installation task is finished, and takes out next installation task from described installation formation;
Second retrieval unit is represented failure is installed if be used for described result code, and then described installation task is finished, and takes out next installation task from described installation formation;
The 3rd retrieval unit is represented failure is installed if be used for described result code, and then described installation task is finished, and takes out next installation task from described installation formation.
13. device according to claim 11 is characterized in that, described second installation unit specifically comprises:
Detection sub-unit is used for detecting described erection schedule with the mode of detection procedure handle.
14. according to Claim 8,9,12,13 each described devices, it is characterized in that described device also comprises:
Common installed module if be used for type the unknown of described installation task, is then installed described installation task in normal way.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010000566A CN101727344A (en) | 2010-01-12 | 2010-01-12 | Method and device for installing software |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010000566A CN101727344A (en) | 2010-01-12 | 2010-01-12 | Method and device for installing software |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101727344A true CN101727344A (en) | 2010-06-09 |
Family
ID=42448274
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010000566A Pending CN101727344A (en) | 2010-01-12 | 2010-01-12 | Method and device for installing software |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101727344A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102542116A (en) * | 2012-01-06 | 2012-07-04 | 深圳市汉普电子技术开发有限公司 | Method and device of DFM (Design for Manufacturability) analysis automation |
WO2013081680A2 (en) | 2011-11-28 | 2013-06-06 | Wyse Technology Inc. | Deployment of a driver or an application on a client device having a write-filter |
CN103186394A (en) * | 2011-12-30 | 2013-07-03 | 腾讯科技(深圳)有限公司 | Method and device for installing software |
CN103514010A (en) * | 2012-06-19 | 2014-01-15 | 谷歌公司 | Automatic application updates |
CN103593210A (en) * | 2013-10-09 | 2014-02-19 | 北京奇虎科技有限公司 | Progress display method and device |
CN104156252A (en) * | 2014-08-28 | 2014-11-19 | 广州金山网络科技有限公司 | Application software installation method and device |
CN105740021A (en) * | 2016-01-29 | 2016-07-06 | 广东欧珀移动通信有限公司 | Installation method and device of application program |
CN107122205A (en) * | 2017-04-11 | 2017-09-01 | 上海众开信息科技有限公司 | The set-up time of installation procedure determines method and device |
CN108108203A (en) * | 2016-11-25 | 2018-06-01 | 阿里巴巴集团控股有限公司 | The method, apparatus and system of installation process are downloaded for installation kit |
CN113553120A (en) * | 2021-06-30 | 2021-10-26 | 珠海豹趣科技有限公司 | Task execution method and device, storage medium and electronic equipment |
-
2010
- 2010-01-12 CN CN201010000566A patent/CN101727344A/en active Pending
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013081680A2 (en) | 2011-11-28 | 2013-06-06 | Wyse Technology Inc. | Deployment of a driver or an application on a client device having a write-filter |
CN104094256A (en) * | 2011-11-28 | 2014-10-08 | 韦斯技术有限公司 | Deployment of a driver or an application on a client device having a write-filter |
EP2786279A4 (en) * | 2011-11-28 | 2015-05-20 | Wyse Technology Llc | Deployment of a driver or an application on a client device having a write-filter |
CN104094256B (en) * | 2011-11-28 | 2017-09-01 | 韦斯技术有限公司 | Deployment driving or application on the client device with write-in filter |
CN103186394B (en) * | 2011-12-30 | 2016-07-06 | 腾讯科技(深圳)有限公司 | A kind of software installation method and device |
CN103186394A (en) * | 2011-12-30 | 2013-07-03 | 腾讯科技(深圳)有限公司 | Method and device for installing software |
CN102542116A (en) * | 2012-01-06 | 2012-07-04 | 深圳市汉普电子技术开发有限公司 | Method and device of DFM (Design for Manufacturability) analysis automation |
CN102542116B (en) * | 2012-01-06 | 2014-12-17 | 深圳市汉普电子技术开发有限公司 | Method and device of DFM (Design for Manufacturability) analysis automation |
CN103514010A (en) * | 2012-06-19 | 2014-01-15 | 谷歌公司 | Automatic application updates |
CN103514010B (en) * | 2012-06-19 | 2018-06-05 | 谷歌有限责任公司 | Automatic application update |
CN103593210A (en) * | 2013-10-09 | 2014-02-19 | 北京奇虎科技有限公司 | Progress display method and device |
CN104156252A (en) * | 2014-08-28 | 2014-11-19 | 广州金山网络科技有限公司 | Application software installation method and device |
CN105740021A (en) * | 2016-01-29 | 2016-07-06 | 广东欧珀移动通信有限公司 | Installation method and device of application program |
CN108108203A (en) * | 2016-11-25 | 2018-06-01 | 阿里巴巴集团控股有限公司 | The method, apparatus and system of installation process are downloaded for installation kit |
CN108108203B (en) * | 2016-11-25 | 2021-02-26 | 斑马智行网络(香港)有限公司 | Method, device and system for downloading and installing process of installation package |
CN107122205A (en) * | 2017-04-11 | 2017-09-01 | 上海众开信息科技有限公司 | The set-up time of installation procedure determines method and device |
CN107122205B (en) * | 2017-04-11 | 2021-01-29 | 深圳市客一客信息科技有限公司 | Installation time determining method and device for installation program |
CN113553120A (en) * | 2021-06-30 | 2021-10-26 | 珠海豹趣科技有限公司 | Task execution method and device, storage medium and electronic equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101727344A (en) | Method and device for installing software | |
CN102436387B (en) | Method and device for fast computer startup | |
CN103797436B (en) | For the dynamic power optimization of calculation element | |
CN100456234C (en) | Method and system for synchronizing visual and speech events in a multimodal application | |
CN106598835B (en) | Application testing method, device and system | |
CN102446111B (en) | Real time machine starts | |
CN101446965B (en) | Data query method and system thereof | |
CN100511156C (en) | Apparatus for compulsively terminating thread blocked on input/output operation and method for the same | |
CN102567047B (en) | Fast computer startup | |
CN105512029A (en) | Method, server and system for testing intelligent terminal | |
CN102520975B (en) | Intelligent updating method of external equipment driver, device and system | |
CN107465539A (en) | The upgrade-system of the upgrade method of firmware, terminal and firmware | |
US20150106153A1 (en) | Workflow compilation | |
CN104731706A (en) | Method and device for test management using distributed computing | |
CN105786839A (en) | Application data acquisition method and apparatus | |
WO2013182051A1 (en) | Software installation method, terminal, system and computer storage medium | |
CN102736927A (en) | Method and apparatus for downloading software updates to place user terminal into desired configuration state | |
CN102833272A (en) | Downloading method and device based on user subscription | |
CN102023857B (en) | ServiceOS-based multi-platform application program service management method and system | |
CN102768628A (en) | Method and device for preinstallation of third party application | |
CN112860251A (en) | Method and system for constructing website front end | |
US11861214B2 (en) | Memory device forensics and preparation | |
CN114879977A (en) | Application deployment method, device and storage medium | |
CN110673930B (en) | Virtual machine migration method, virtualization device, storage medium and device | |
US8090997B2 (en) | Run-time fault resolution from development-time fault and fault resolution path identification |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20100609 |
|
RJ01 | Rejection of invention patent application after publication |