CN101725475A - Wind power tower drum with precast reinforced concrete pillar - Google Patents
Wind power tower drum with precast reinforced concrete pillar Download PDFInfo
- Publication number
- CN101725475A CN101725475A CN200810152343A CN200810152343A CN101725475A CN 101725475 A CN101725475 A CN 101725475A CN 200810152343 A CN200810152343 A CN 200810152343A CN 200810152343 A CN200810152343 A CN 200810152343A CN 101725475 A CN101725475 A CN 101725475A
- Authority
- CN
- China
- Prior art keywords
- reinforced concrete
- wind power
- tower drum
- tower
- concrete pillar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/727—Offshore wind turbines
Landscapes
- Wind Motors (AREA)
Abstract
The invention relates to a wind power tower drum with a precast reinforced concrete pillar, which consists of fan blades, power equipment and a tower drum, wherein the fan blades and the power equipment are arranged at the upper end of the tower drum; the tower drum is vertically and fixedly arranged on the ground and consists of a pillar formed by arranging a steel tower column and a reinforced concrete cone unit coaxially, mutually, vertically and fixedly; the upper end of the tower column is fixedly provided with the fan blades and the power generation equipment; the tower column and the pillar are arranged coaxially and fixedly; and the cone unit at the bottommost layer of the pillar is fixedly arranged on ground foundation. The wind power tower drum is simple in integral structure and scientific and reasonable in design, effectively solves the problems of high cost and difficult maintenance of the conventional wind power generation and reduces steel consumption greatly; and compared with the conventional all-steel tower drum, the wind power tower drum is long in service life, has the long-term economic benefit, and can replace the conventional wind power tower drum completely.
Description
Technical field
The invention belongs to wind power generation field, especially a kind of wind power tower drum with precast reinforced concrete pillar.
Background technique
Existing wind-driven generator is made of tower tube, rotation flabellum and equal generator set, and rotation flabellum and generator set generally are packed in the upper end of tower tube, and the tower tube needs support force indexs such as stronger rigidity, intensity, so the tower tube adopts steel material to make.In today that iron ore rises steadily, the tower tube cost of wind-driven generator is more and more higher, causes the cost of wind power plant to increase year by year, has had a strong impact on the development of this green energy resource of wind-power electricity generation.As everyone knows, it is the most uneconomic removing to bear pressure with steel, so the tower tube of present wind-driven generator does not reach economic optimumization fully, awaits adopting a kind of the most economical and the most practical new product to replace.
Summary of the invention
The objective of the invention is to overcome the deficiencies in the prior art, simple in structure, design science is provided, can effectively reduces a kind of wind power tower drum of cost of wind power generation with precast reinforced concrete pillar.
The present invention solves its technical problem and is achieved through the following technical solutions:
A kind of wind power tower drum with precast reinforced concrete pillar, constitute by flabellum, power generating equipment, tower tube, flabellum and power generating equipment are installed in the upper end of tower tube, the tower tube vertically installs on the ground, described tower tube is made of steel king-post and reinforced concrete pillar, the king-post upper end installs flabellum, and king-post installs with pilum is coaxial, and the bottom frustum unit and the basis, ground of pilum install.
And described pilum is the multistory reinforced concrete frustum unit coaxial taper type structure that forms that installs mutually, is hollow structure in it.
And, coaxial insert reinforcement cage in the reinforced concrete of described each frustum unit, this reinforcement cage is a circular layer, or the multistory reinforced ring cage that is constituted by the bearing rod mode.
And the coaxial mode that vertically installs mutually in described frustum unit is to adopt the flange mode to carry out coaxial installing between the upper and lower adjacent frustum unit, adopts the joint socket mode to carry out coaxial installing between the perhaps upper and lower adjacent frustum unit.
And described reinforced concrete adopts Steel Fiber Reinforced Concrete to substitute.
And described bottom frustum unit is reserved with a gateway of being convenient to later maintenance.
Advantage of the present invention and beneficial effect are:
1. this wind power tower drum employing hollow taper type reinforced concrete installs the mode of steel king-post as pilum, on this pilum, has reduced the steel using amount of steel king-post effectively, has reduced manufacture cost, has promoted the application popularization scope of wind-power electricity generation.
2. the pilum of this wind power tower drum has adopted reinforced concrete, and steel wherein are in the concrete alkaline environment, and it is well protected, thereby need not brushing rust proof paint often, has saved maintenance cost greatly.
3. overall structure of the present invention is very simple, and design science is reasonable, efficiently solves cost height that existing wind-power electricity generation exists, keeps in repair difficult problem, and steel using amount reduces a lot; With respect to traditional sense all steel system tower tube, longer service life of the present invention has permanent economic benefit more, fully alternative existing wind power tower drum.
Description of drawings
Fig. 1 is a structural representation of the present invention;
Fig. 2 is the structural representation of the embodiment of the invention 2;
Fig. 3 is the longitudinal sectional view of the reinforced concrete frustum unit of Fig. 1 pilum;
Fig. 4 is the longitudinal sectional view of the reinforced concrete frustum unit of Fig. 2 pilum.
Embodiment
The invention will be further described below by specific embodiment, and following examples are descriptive, is not determinate, can not limit protection scope of the present invention with this.
Embodiment 1: referring to Fig. 1, Fig. 3.
A kind of wind power tower drum with precast reinforced concrete pillar, constitute by flabellum 1, power generating equipment 2, tower tube, flabellum and power generating equipment are installed in the upper end of tower tube, the tower tube vertically installs on the ground, and flabellum is connected with power generating equipment by transmission shaft (among the figure not label) and imports transfer motion power; Power generating equipment is the same upper end that is installed in the tower tube with routine in the present embodiment, also can be installed in the tower tube or on the ground by transmission.Innovative point of the present invention is: the tower tube vertically installs the pilum 4 that is constituted mutually and constitutes by steel king-post 3 and reinforced concrete frustum unit are coaxial, the king-post upper end installs flabellum and power generating equipment, king-post carries out coaxial installing with pilum by modes such as flange or lower margins, and the bottom frustum unit and the basis, ground of pilum install.Pilum is the multistory reinforced concrete frustum unit coaxial taper type structure that forms that installs mutually, is hollow structure in it.Coaxial insert reinforcement cage 8 in the reinforced concrete of each frustum unit, this reinforcement cage can be a circular layer, perhaps can be the multistory reinforced ring cage that is constituted by the bearing rod mode, is Compound Steel muscle ring cage in the present embodiment accompanying drawing 3.Adopt the flange mode to carry out coaxial installing between the upper and lower adjacent frustum unit, that is: each frustum unit all thereon, two ends are fixed with flange 5 down, and the flange of next frustum unit carries out coaxial installing with the tight mutually tipping of flange of a last frustum unit and by bolt.
The pilum height of this structural tower tube can be controlled at 1-12m, highly reaches as high as 120 meters, and the external diameter of frustum unit, bottom can reach 4-6 rice, and top frustum external diameter is a 2.6-3 rice, and reinforced concrete tower barrel is thick to be 300-600mm.
Pilum diameter of the present invention dwindles from the base foundation to the top gradually, unit weight is also corresponding to be reduced gradually, adopt the design concept of steel tension, concrete compression, so just can make reinforcing bar, concrete obtain organic assembling, reach the most economical and the most practical purpose.
Maintenance for convenience, this tower tube is a hollow structure, can be shaped on cat ladder in tower tube inside, and the frustum unit of bottommost is reserved with a gateway 6 so that the maintenance in later stage.Can make the working platform of reinforced concrete in the middle of in the pilum as required, but the platform integral manufacturing, link and the bolt that is connected usefulness with a last frustum unit reserved in the platform upper end, and tower tube inside cable can lay along tower tube inwall.
In the present embodiment, the tower body of tower tube lower half portion 10-20 rice adopts reinforced concrete construction, and upper half part still adopts the conventional steel king-post, is suitable for the relatively poor relatively area of foundation bearing capacity and uses.At position that reinforced concrete pillar is connected with the steel king-post and the position that is connected with the top wind power generating set, can increase concrete platform on the top of reinforced concrete tower body, and be connected with steel-made tower or wind power generating set by the mode that flange installs.
The pilum of present embodiment adopts reinforced concrete construction, also can adopt Steel Fiber Reinforced Concrete to come the instead of steel reinforced concrete, and its function and effect are essentially identical.
Embodiment 2: referring to Fig. 2, Fig. 4.
A kind of wind power tower drum with precast reinforced concrete pillar, adopt the joint socket mode to carry out coaxial installing between the upper and lower adjacent frustum unit of formation pilum 7, that is: each frustum unit all thereon, two ends are shaped on bellmouth 10 and socket 9 down, and the socket of next frustum unit (or bellmouth) is pegged graft mutually with the bellmouth (or socket) of a last frustum unit and can be carried out coaxial installing by welding manner.
Other are same as embodiment 1.
Claims (6)
1. wind power tower drum with precast reinforced concrete pillar, constitute by flabellum, power generating equipment, tower tube, flabellum and power generating equipment are installed in the upper end of tower tube, the tower tube vertically installs on the ground, it is characterized in that: described tower tube is made of steel king-post and reinforced concrete pillar, the king-post upper end installs flabellum, and king-post installs with pilum is coaxial, and the bottom frustum unit and the basis, ground of pilum install.
2. the wind power tower drum with precast reinforced concrete pillar according to claim 1 is characterized in that: described pilum is the multistory reinforced concrete frustum unit coaxial taper type structure that forms that installs mutually, is hollow structure in it.
3. the wind power tower drum with precast reinforced concrete pillar according to claim 1 and 2, it is characterized in that: coaxial insert reinforcement cage in the reinforced concrete of described each frustum unit, this reinforcement cage is a circular layer, or the multistory reinforced ring cage that is constituted by the bearing rod mode.
4. the wind power tower drum with precast reinforced concrete pillar according to claim 1, it is characterized in that: the coaxial mode that vertically installs mutually in described frustum unit is to adopt the flange mode to carry out coaxial installing between the upper and lower adjacent frustum unit, adopts the joint socket mode to carry out coaxial installing between the perhaps upper and lower adjacent frustum unit.
5. the wind power tower drum with precast reinforced concrete pillar according to claim 1 and 2 is characterized in that: described reinforced concrete adopts Steel Fiber Reinforced Concrete to substitute.
6. the wind power tower drum with precast reinforced concrete pillar according to claim 1 and 2 is characterized in that: described bottom frustum unit is reserved with a gateway of being convenient to later maintenance.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008101523434A CN101725475B (en) | 2008-10-15 | 2008-10-15 | Wind power tower drum with precast reinforced concrete pillar |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008101523434A CN101725475B (en) | 2008-10-15 | 2008-10-15 | Wind power tower drum with precast reinforced concrete pillar |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101725475A true CN101725475A (en) | 2010-06-09 |
CN101725475B CN101725475B (en) | 2012-01-04 |
Family
ID=42446903
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008101523434A Expired - Fee Related CN101725475B (en) | 2008-10-15 | 2008-10-15 | Wind power tower drum with precast reinforced concrete pillar |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101725475B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102269136A (en) * | 2011-08-15 | 2011-12-07 | 上海交通大学 | Tower frame of large wind driven generator |
CN103423099A (en) * | 2012-05-21 | 2013-12-04 | 上海电气风能有限公司 | Mixed tower supporting structure capable of being used in large-size land wind generating set |
CN103899495A (en) * | 2012-12-27 | 2014-07-02 | 北京万源工业有限公司 | Mixed tower of wind turbine generator set |
CN106438216A (en) * | 2016-10-31 | 2017-02-22 | 江苏金海新能源科技有限公司 | Pre-stressed concrete fan tower provided with segmented straight tower cylinder and installation method of pre-stressed concrete fan tower |
CN110863953A (en) * | 2018-08-28 | 2020-03-06 | 中国电建集团华东勘测设计研究院有限公司 | Annular steel pipe concrete combined wind turbine generator tower structure |
CN111456916A (en) * | 2020-04-21 | 2020-07-28 | 明阳智慧能源集团股份公司 | Concrete tower drum cracking monitoring system for wind generating set |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES1058539Y (en) * | 2004-10-11 | 2005-04-01 | Inneo21 S L | PERFECTED MODULAR TOWER STRUCTURE FOR WIND TURBINES AND OTHER APPLICATIONS. |
ES2246734B1 (en) * | 2005-04-21 | 2007-04-16 | STRUCTURAL CONCRETE & STEEL, S.L. | PREFABRICATED MODULAR TOWER. |
CN201276864Y (en) * | 2008-10-15 | 2009-07-22 | 天津万联管道工程有限公司 | Wind power generation tower barrel with prefabricated steel reinforced concrete pillar |
-
2008
- 2008-10-15 CN CN2008101523434A patent/CN101725475B/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102269136A (en) * | 2011-08-15 | 2011-12-07 | 上海交通大学 | Tower frame of large wind driven generator |
CN103423099A (en) * | 2012-05-21 | 2013-12-04 | 上海电气风能有限公司 | Mixed tower supporting structure capable of being used in large-size land wind generating set |
CN103899495A (en) * | 2012-12-27 | 2014-07-02 | 北京万源工业有限公司 | Mixed tower of wind turbine generator set |
CN106438216A (en) * | 2016-10-31 | 2017-02-22 | 江苏金海新能源科技有限公司 | Pre-stressed concrete fan tower provided with segmented straight tower cylinder and installation method of pre-stressed concrete fan tower |
CN110863953A (en) * | 2018-08-28 | 2020-03-06 | 中国电建集团华东勘测设计研究院有限公司 | Annular steel pipe concrete combined wind turbine generator tower structure |
CN111456916A (en) * | 2020-04-21 | 2020-07-28 | 明阳智慧能源集团股份公司 | Concrete tower drum cracking monitoring system for wind generating set |
Also Published As
Publication number | Publication date |
---|---|
CN101725475B (en) | 2012-01-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101725475B (en) | Wind power tower drum with precast reinforced concrete pillar | |
CN202132187U (en) | Guyed tower structure of wind generating set | |
CN204024928U (en) | One can assemble self-erecting type wind power generating set prestressed concrete steel combination pylon | |
CN203430129U (en) | Steel shell concrete tower barrel | |
CN104121155A (en) | Prestressed concrete and steel combined tower on which self-support wind generator set can be assembled and anchoring method of prestressed concrete and steel combined tower | |
CN202882185U (en) | Ribbed-type rigid grid cable dome | |
CN202323978U (en) | Base components for offshore wind power set installation | |
CN202519698U (en) | Prestressed concrete cylindrical foundation | |
CN102102643A (en) | Lattice hollow-concrete-filled steel tube tower for wind generating set | |
CN111608864A (en) | Guyed steel cylinder tower of wind generating set and steel cylinder replacing method | |
CN201276863Y (en) | Steel reinforced concrete prefabricated wind power generation tower barrel | |
CN202666656U (en) | Tower body with direct discharge chimney of combined type desulfurizing absorption tower | |
CN201276864Y (en) | Wind power generation tower barrel with prefabricated steel reinforced concrete pillar | |
CN102489126A (en) | Composite desulfurizing absorption tower body with direct exhaust chimney | |
CN200999702Y (en) | Novel tower barrel of wind generating set | |
CN201443476U (en) | Tower cylinder for wind power generation | |
CN102734088A (en) | Fan tower | |
CN104963813A (en) | Multilayer tower type vertical-axis multi-wind-condition wind power conversion device | |
CN202402220U (en) | Damping wind power generation tower | |
CN102182343A (en) | Hollow steel tube concrete tower drum for wind generating set | |
CN101725474B (en) | Reinforced concrete prefabricated wind power generation stepped drum | |
CN203297041U (en) | Device for improving rigidity of wind machine tower | |
CN202628408U (en) | Split type sleeve connection concrete-steel combined tower frame for wind turbine generator | |
CN202402219U (en) | Non-corrosive wind power generating tower | |
CN202031370U (en) | Concrete-steel structure composite wind power tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20160816 Address after: 323, room 8, -12, 301700 Fumin Road, Tianjin, Wuqing district (central office area) Patentee after: Tianjin Wanlian Pipeline Technology Development Co. Ltd. Address before: 301700 Tianjin city Wuqing District Fumin Economic Zone Patentee before: Tianjin Waterline Pipeline Engineering Co., Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120104 Termination date: 20161015 |