CN101714776A - 采用三取二逻辑的换流站10kv站用电控制系统 - Google Patents

采用三取二逻辑的换流站10kv站用电控制系统 Download PDF

Info

Publication number
CN101714776A
CN101714776A CN200810200905A CN200810200905A CN101714776A CN 101714776 A CN101714776 A CN 101714776A CN 200810200905 A CN200810200905 A CN 200810200905A CN 200810200905 A CN200810200905 A CN 200810200905A CN 101714776 A CN101714776 A CN 101714776A
Authority
CN
China
Prior art keywords
plate
program
control system
blocks
plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200810200905A
Other languages
English (en)
Other versions
CN101714776B (zh
Inventor
沈志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Branch Of China National Power Grid Corp Operation Branch
State Grid Corp of China SGCC
Original Assignee
SHANGHAI EHV ADMINISTRATION OF STATE GRID OPERATION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI EHV ADMINISTRATION OF STATE GRID OPERATION CO Ltd filed Critical SHANGHAI EHV ADMINISTRATION OF STATE GRID OPERATION CO Ltd
Priority to CN2008102009058A priority Critical patent/CN101714776B/zh
Publication of CN101714776A publication Critical patent/CN101714776A/zh
Application granted granted Critical
Publication of CN101714776B publication Critical patent/CN101714776B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了采用三取二逻辑的换流站10KV站用电控制系统,增加两块PS830板,由三块PS830板并行处理,共同实现备自投功能和操作联锁逻辑功能,在ASI主机和开关量输出板PS853的程序中增加3取2逻辑,即三块板卡中至少需要两块发出相同的指令方能出口。这样三块PS830板中任一块损坏都不会导致开关误跳或拒跳,可以确保10KV控制系统安全稳定运行,不受单一元件故障影响,该方法具有使用方便、安全等优点。

Description

采用三取二逻辑的换流站10KV站用电控制系统
技术领域
本发明涉及换流站10KV站用电控制系统,尤其设计用于高压直流输电换流站的10KV站用电开关分合闸操作联锁和备自投控制。
背景技术
高压直流换流站的站用电系统为主循环泵,冷却风机和其他负荷提供电源,由于直流输电系统在电网中的重要性,其站用电系统可靠性要求非常高,因此10KV系统一般是三回进线连接至A、B、C三段母线,A母和B母独立向负荷供电,C母通过母联开关与A、B母分别相连,作为备用电源(如图1所示)
A路和B路电源丢失时,备自投系统应能自动合上相应母联开关,通过C母继续向负荷供电,以维持重要负荷的运行。
目前一般的控制系统设计是通过单片机集成了10kv开关的操作联锁逻辑和备自投系统。例如政平换流站的10KV控制系统就是集成在一块PS830微处理器板上,一旦该板卡发生故障,极有可能导致三路站用电全失从而发生全站停电事故。
我们详细研究了多个高压直流输电换流站的10kV控制系统,发现10KV自动切换系统和操作联锁逻辑仅由一块PS830板操控,若是该PS830板故障,仍存在站用电全失的可能性。
10kV站用电的监控功能由一台ASI主机(负责人机接口)、一块PS830板(负责开关操作联锁合备自投逻辑)和一些I/O接口板(负责采集一次设备状态以及传达操作指令)共同完成,均为单系统,无冗余。
上述系统中,ASI主机只负责人机交互,用于提供运行人员监控设备状态和下达指令的界面,如果发生故障不会影响10KV系统运行,I/O板卡对应不同的开关设备,不可能全部同时发生故障,如果有一块板卡故障,只影响对应的开关,不影响整个10KV系统的运行,但是PS830板作为核心部件,一旦发生软硬件故障,极有可能导致全站停电事故。
发明内容
针对已有技术存在的不足,本发明的目的在于提供增加两块PS830板,由三块PS830板并行处理,共同实现备自投功能和操作联锁逻辑功能,在ASI主机和开关量输出板PS853的程序中增加3取2逻辑,即三块板卡中至少需要两块发出相同的指令方能出口。这样三块PS830板中任一块损坏都不会导致开关误跳或拒跳,可以确保10KV控制系统安全稳定运行,不受单一元件故障影响,该方法具有使用方便、安全等优点。
实现本发明目的的技术方案如下:
传统的10kV站用电的监控功能由一台ASI主机、一块PS830板和一些I/O接口板共同完成,均为单系统,无冗余。
1)ASI主机包括主要负责下列工作:
Figure G2008102009058D0000021
提供10KV开关、刀闸、地刀的远方分合闸指令接口
Figure G2008102009058D0000022
提供10KV开关、刀闸、地刀状态监视
2)PS830板负责下列工作:
Figure G2008102009058D0000023
10KV开关的备自投逻辑
10KV开关的操作联锁逻辑
3)PS851板
Figure G2008102009058D0000025
开关量信号采集
4)PS853板
开关量信号输出
上述系统中,ASI主机只负责人机交互,用于提供运行人员监控设备状态和下达指令的界面,如果发生故障不会影响10KV系统运行,I/O板卡对应不同的开关设备,不可能全部同时发生故障,如果有一块板卡故障,只影响对应的开关,不影响整个10KV系统的运行,但是PS830板作为核心部件,一旦发生软硬件故障,极有可能导致全站停电事故
采用三取二逻辑的10KV站用电控制系统设计如下:
所述的硬件改动:在板卡层架的空余位置上增加两块PS830板
所述的软件改动:
1)修改ASI主机人机接口程序:
该页程序接受PS830板送来的“开关联锁条件满足”信号,由于改造后共三块PS830板,因此需要在此做3取2逻辑。
2)修改ASI主机人机接口程序:
该页程序把运行操作人员所发的分合闸指令送入PS830板,由于改造后共三块PS830板,因此需要把相同的指令分别送入三块PS830中(用节点号来区分)
3)修改PS830板程序:
该页程序把最终跳闸指令送入PS853板,因为三块PS830板的分合闸指令送入同一块PS853板,因此需要把相应的“Block no”改成“2”(第二块PS830板)或“3”(第三块PS830板)使之在PS853中能够被区分。
4)修改PS853板程序:
该页程序收到PS830输出的分合闸指令后驱动继电器动作,沟通相应10KV开关分合闸回路使之动作,由于新系统中三块PS830板同时将分合闸指令送入PS853板,因此需要在PS853的程序中做3取2逻辑;所有对应一次设备的PS853板程序全部要做相应的改动。
附图说明
图1为高压直流换流站10KV站用电典型接线图
图2为传统的10KV控制系统结构概览图;
图3为本发明采用三取二逻辑的的10KV控制系统结构概览图;
图4为本发明修改ASI主机人机接口程序图;
图5为本发明另一修改ASI主机人机接口程序图;
图6为本发明修改PS830板程序图;
图7为本发明修改PS853板程序图。
具体实施方式
下面结合附图,进一步说明本发明是如何实现的:
实施例
对于图1、2所示的传统的10KV控制系统结构,10kV站用电的监控功能由一台ASI主机、一块PS830板和一些I/O接口板共同完成,均为单系统,无冗余。
ASI主机包括主要负责下列工作:提供10KV开关、刀闸、地刀的远方分合闸指令接口;提供10KV开关、刀闸、地刀状态监视;
PS830板负责下列工作:10KV开关的备自投逻辑;10KV开关的操作联锁逻辑;
PS851板负责开关量信号采集;
PS853板负责开关量信号输出。
上述系统中,ASI主机只负责人机交互,用于提供运行人员监控设备状态和下达指令的界面,如果发生故障不会影响10KV系统运行,I/O板卡对应不同的开关设备,不可能全部同时发生故障,如果有一块板卡故障,只影响对应的开关,不影响整个10KV系统的运行,但是PS830板作为核心部件,一旦发生软硬件故障,极有可能导致全站停电事故。
对于图3、4、5、6、7所示,采用三取二逻辑的10KV站用电控制系统设计,
增加两块PS830板,由三块PS830板并行处理,共同实现备自投功能和操作联锁逻辑功能,在ASI主机和开关量输出板PS853的程序中增加3取2逻辑,即三块板卡中至少需要两块发出相同的指令方能出口。这样三块PS830板中任一块损坏都不会导致开关误跳或拒跳,可以确保10KV控制系统安全稳定运行,不受单一元件故障影响。

Claims (1)

1.采用三取二逻辑的换流站10KV站用电控制系统,该系统的修改程序如下:
1、硬件改动:在板卡层架的空余位置上增加两块PS830板;
2、软件改动如下:
1)修改ASI主机人机接口程序:
该页程序接受PS830板送来的“开关联锁条件满足”信号,由于改造后共三块PS830板,因此需要在此做3取2逻辑;
2)修改ASI主机人机接口程序:
该页程序把运行操作人员所发的分合闸指令送入PS830板,由于改造后共三块PS830板,因此需要把相同的指令分别送入三块PS830中;
3)修改PS830板程序:
该页程序把最终跳闸指令送入PS853板,因为三块PS830板的分合闸指令送入同一块PS853板,因此需要把相应的“Block no”改成“2”(第二块PS830板)或“3”(第三块PS830板)使之在PS853中能够被区分;
4)修改PS853板程序:
该页程序收到PS830输出的分合闸指令后驱动继电器动作,沟通相应10KV开关分合闸回路使之动作,由于新系统中三块PS830板同时将分合闸指令送入PS853板,因此需要在PS853的程序中做3取2逻辑;所有对应一次设备的PS853板程序全部要做相应的改动。
CN2008102009058A 2008-10-08 2008-10-08 采用三取二逻辑的换流站10kv站用电控制系统 Expired - Fee Related CN101714776B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008102009058A CN101714776B (zh) 2008-10-08 2008-10-08 采用三取二逻辑的换流站10kv站用电控制系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008102009058A CN101714776B (zh) 2008-10-08 2008-10-08 采用三取二逻辑的换流站10kv站用电控制系统

Publications (2)

Publication Number Publication Date
CN101714776A true CN101714776A (zh) 2010-05-26
CN101714776B CN101714776B (zh) 2011-09-14

Family

ID=42418123

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008102009058A Expired - Fee Related CN101714776B (zh) 2008-10-08 2008-10-08 采用三取二逻辑的换流站10kv站用电控制系统

Country Status (1)

Country Link
CN (1) CN101714776B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101951023A (zh) * 2010-08-04 2011-01-19 中国南方电网有限责任公司超高压输电公司检修试验中心 高压直流换流站的开关锁定方法
CN102403695A (zh) * 2011-11-22 2012-04-04 国网运行有限公司秦皇岛超高压管理处 一种变压器非电量保护装置及保护方法
CN105576624A (zh) * 2016-02-02 2016-05-11 国家电网公司 换流站交流场中开关联锁逻辑的实现方法
CN106787204A (zh) * 2016-11-10 2017-05-31 许继集团有限公司 一种应用于换流站的智能终端

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1881744B (zh) * 2005-06-16 2010-05-12 许继集团有限公司 一种高压直流输电换流站实时监控系统的实现方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101951023A (zh) * 2010-08-04 2011-01-19 中国南方电网有限责任公司超高压输电公司检修试验中心 高压直流换流站的开关锁定方法
CN102403695A (zh) * 2011-11-22 2012-04-04 国网运行有限公司秦皇岛超高压管理处 一种变压器非电量保护装置及保护方法
CN105576624A (zh) * 2016-02-02 2016-05-11 国家电网公司 换流站交流场中开关联锁逻辑的实现方法
CN105576624B (zh) * 2016-02-02 2019-07-12 国家电网公司 换流站交流场中开关联锁逻辑的实现方法
CN106787204A (zh) * 2016-11-10 2017-05-31 许继集团有限公司 一种应用于换流站的智能终端

Also Published As

Publication number Publication date
CN101714776B (zh) 2011-09-14

Similar Documents

Publication Publication Date Title
US10568232B2 (en) Modular uninterruptible power supply apparatus and methods of operating same
CN102790426A (zh) 一种改进的变电所单母线分段运行电源备自投切换方法
JP2014193107A (ja) 無停電電源システム用の信頼性の高い静止型切換スイッチング回路
CN104192153A (zh) 轨道列车控制器
CN101714776B (zh) 采用三取二逻辑的换流站10kv站用电控制系统
CN103001254A (zh) 一种交直流混合微网系统
CN101860075A (zh) 三电源自动切换装置
CN111244787A (zh) 一种配电箱
CN103414247B (zh) 多回直流输电系统的回控制权协调切换系统及切换方法
KR102374263B1 (ko) 전원 공급 시스템
CN216312692U (zh) 一种基于总线的飞机混合式配电系统
CN116111715A (zh) 一种大容量海上换流站应急电源接线系统及其控制方法
CN112072776B (zh) 一种自适应10kV母线接线方式变化的备自投系统
CN202957650U (zh) 双路供电模块
CN110556794B (zh) 一种多端混合直流系统的汇流母线保护配置方法
CN201656555U (zh) 三电源自动切换装置
CN112366811A (zh) 一种自动检测发电机运行状态的电源切换装置及方法
CN206389115U (zh) 一种用于岸电系统的集中式双机热备切换高压变频电源
CN108270362B (zh) 一种基于dsp和fpga并机控制的组合式中频电源
CN216086256U (zh) 一种电源自动切换系统
CN104753373A (zh) 一种高原客车双逆变器互备装置
CN103701197A (zh) 一种提高一体化电源系统可靠性的监控冗余备份方法
CN212572180U (zh) 配电辅助控制装置及系统
CN214674511U (zh) 一种交直流供电电源和系统
CN218335420U (zh) 一种dcs控制系统的供配电装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID OPERATION CO., LTD. SHANGHAI SUPERHIGH-

Effective date: 20130802

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: STATE GRID OPERATION CO., LTD. SHANGHAI SUPERHIGH-VOLTAGE MANAGEMENT OFFICE

Effective date: 20130802

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 201600 SONGJIANG, SHANGHAI TO: 100033 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20130802

Address after: 100033 No. 86, Xicheng District, Beijing, Chang'an Avenue

Patentee after: State Grid Corporation of China

Patentee after: State Grid Operation Co., Ltd. Shanghai Superhigh-Voltage Management Office

Address before: 201600, room 339, 1101 Ledu Road, Shanghai, Songjiang District

Patentee before: State Grid Operation Co., Ltd. Shanghai Superhigh-Voltage Management Office

ASS Succession or assignment of patent right

Owner name: SHANGHAI MANAGEMENT OFFICE OF GRID OPERATION BRANC

Free format text: FORMER OWNER: STATE GRID OPERATION CO., LTD. SHANGHAI SUPERHIGH-VOLTAGE MANAGEMENT OFFICE

Effective date: 20150519

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150519

Address after: 100033 No. 86, Xicheng District, Beijing, Chang'an Avenue

Patentee after: State Grid Corporation of China

Patentee after: Shanghai branch of China National Power Grid Corp operation branch

Address before: 100033 No. 86, Xicheng District, Beijing, Chang'an Avenue

Patentee before: State Grid Corporation of China

Patentee before: State Grid Operation Co., Ltd. Shanghai Superhigh-Voltage Management Office

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110914

Termination date: 20191008

CF01 Termination of patent right due to non-payment of annual fee