CN101713983B - Semiconductor process monitoring method based on independent component analysis and Bayesian inference - Google Patents
Semiconductor process monitoring method based on independent component analysis and Bayesian inference Download PDFInfo
- Publication number
- CN101713983B CN101713983B CN2009101546318A CN200910154631A CN101713983B CN 101713983 B CN101713983 B CN 101713983B CN 2009101546318 A CN2009101546318 A CN 2009101546318A CN 200910154631 A CN200910154631 A CN 200910154631A CN 101713983 B CN101713983 B CN 101713983B
- Authority
- CN
- China
- Prior art keywords
- overbar
- new
- data
- spe
- monitoring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Complex Calculations (AREA)
- Testing Or Measuring Of Semiconductors Or The Like (AREA)
Abstract
The invention discloses a semiconductor process monitoring method based on independent component analysis and Bayesian inference, comprising the following step of: firstly, dividing working conditions according to the mixed data of the semiconductor process, conducting the independent component analysis for each working condition data, and establishing a corresponding independent component analysis model; and then integrating and combining the monitoring information under the different working conditions by a Bayesian inference method to obtain a final monitoring result. In addition, the invention can also acquire the working condition information of current monitoring data by a posterior probability analysis method, that is to say, the invention can judge that the current monitoring data is in what process operation working condition; compared with the present other methods, the invention can not only greatly enhance the monitoring effect of the semiconductor process, but also largely improve the dependence of the monitoring method on process knowledge and enhance the comprehensive ability and the operating confidence of process operators on the process, thereby being more beneficial to the implementation of the automation of the semiconductor process.
Description
Technical field
The invention belongs to semi-conductor industry process control field, particularly a kind of process monitoring method based on independent component analysis and Bayesian inference.
Background technology
In recent years, the monitoring problem of semi-conductor industry production run more and more obtains the extensive attention of industry member and academia.On the one hand and since semi-conductor industry process itself to product quality require highly, the process that how to prevent effectively produces poor quality or underproof product is the problem that presses for solution.On the other hand, if process is not well monitored, work accident might take place, the lighter influences the quality of product, and weight person will cause the loss of life and property.In addition, the result that semiconductor processes is monitored acquisition can also instruct the improvement of production run and production technology conversely.Therefore, process monitoring has become the research focus of semi-conductor industry production run and has pressed for one of problem of solution.
As a kind of typical batch production process, traditional semiconductor processes monitoring method is except the method based on mechanism model, adopt the multivariate statistical analysis method of multidirectional form mostly, such as multidirectional pca method (MPCA) and multidirectional offset minimum binary method (MPLS) etc.Under the situation that mechanism model is difficult to obtain, become the main stream approach of semiconductor processes monitoring based on the multivariate statistical analysis method of data-driven.But the second-order statistic information that traditional multivariate statistical analysis method can only the leaching process data can not be handled high-order statistic information effectively.By contrast, independent component analysis method (ICA) has himself advantage, the present invention to adopt this method to substitute original multivariate statistical analysis method at the high-order statistic message context of leaching process data process data is carried out information extraction.In addition, because the variation of semiconductor processes product, this process also will operate under the different operation operating modes.Traditional monitoring method hypothesis process operation can't satisfy the monitoring requirement of semiconductor processes under single operating mode.Even the different operating operating mode to process is carried out modeling respectively, also can't reach satisfied monitoring effect.Because when new process data is monitored, need cohesive process knowledge that the operation operating mode of these data is judged, and choose corresponding monitoring model, this has just strengthened the dependence of monitoring method to procedural knowledge greatly, is unfavorable for that the robotization of semiconductor processes is implemented.
Summary of the invention
The objective of the invention is at the deficiencies in the prior art, a kind of semiconductor processes monitoring method based on independent component analysis and Bayesian inference is provided.
The objective of the invention is to be achieved through the following technical solutions:
A kind of semiconductor processes monitoring method based on independent component analysis and Bayesian inference may further comprise the steps:
(1) utilize the data of each nominal situation of Distributed Control System (DCS) collection semiconductor process to form the three-dimensional training sample set that modeling is used: X=[X
1X
2, X
C].Wherein,
C=1,2 ..., C is the data matrix corresponding to process operating mode c, I
cBe batch number under this operating mode, J is the variable number, and K counts for the sampled data of each batch.Deposit these data in historical data base respectively.
(2) respectively the data under the different operating modes are expanded into I along separately a batch direction
c* JK two-dimensional data matrix is carried out pre-service and normalization to it, makes that promptly the average of each process variable is zero, and variance is 1, obtains new data matrix collection to be
(3) along the time point direction each data matrix is arranged again, obtained new data matrix and concentrate and to be
(4) adopt the independent component analysis method that each new data matrix is handled, set up the independent component analysis model, obtain residual matrix
And structure I
2The monitoring and statistics limit of statistic.
(5) at residual matrix
The monitoring and statistics limit of structure SPE statistic.
(6) deposit in historical data base and the real-time data base modeling data and each model parameter standby.
(7) collect new process data, and it is carried out pre-service and normalization.
(8) adopt different operating mode models that it is monitored respectively, promptly set up statistic I
2And SPE.
(9) calculate the posterior probability values of current Monitoring Data under each operation operating mode by the Bayesian inference method, and the probability of malfunction value of computational data.Then, the new statistic FI of structure
2With the monitoring result under the integrated different operating modes of FSPE, and provide corresponding performance analysis and positioning result.
The invention has the beneficial effects as follows: the present invention is by carrying out independent component analysis and modeling respectively to each floor data.Then, introducing Bayesian inference method is carried out integrated and comprehensive to the monitoring information under the different operating modes, obtain last monitoring result.In addition, by the posterior probability analytical technology, the present invention can also obtain the work information of current Monitoring Data.Compare other present semiconductor processes monitoring method, the present invention not only can improve the monitoring effect of semiconductor processes greatly, and improved the dependence of monitoring method to a great extent to procedural knowledge, strengthened understandability and the operation confidence of process operator to process, the robotization that helps semiconductor processes is more implemented.
Description of drawings
Fig. 1 is the data scatter diagram of semiconductor processes;
Fig. 2 is the monitoring result of the inventive method to the normal lot data of semiconductor processes;
Fig. 3 is the monitoring result of MPCA to the normal lot data of semiconductor processes;
Fig. 4 is the monitoring result of the inventive method to semiconductor procedure fault lot data;
Fig. 5 is the monitoring result of MPCA method to semiconductor procedure fault lot data;
Fig. 6 is that the inventive method is to normal batch of performance analysis of semiconductor processes and positioning result.
Embodiment
The present invention is directed to the monitoring problem of semiconductor processes, at first utilize the lot data under the Distributed Control System (DCS) collection different operating operating mode, and it is carried out operating mode divide.Respectively at different operation operating modes, set up corresponding independent component analysis model then, and set up two monitoring and statistics amount I
2With SPE and corresponding statistics limit I thereof
Lim 2And SPE
LimDeposit in all process model parameters in the database standby.When new lot data is monitored, at first utilize the monitoring model under the different operating operating mode that it is monitored, obtain corresponding monitoring result.Obtain the operating mode posterior probability of these data then by the Bayesian inference method,, be integrated into last monitoring result in conjunction with its fault probability of happening under each operating mode.In addition, by current data being carried out the analysis of operating mode posterior probability, the present invention can also obtain the work information of these data and it is located accordingly, has strengthened the understanding of operation slip-stick artist to process greatly, has improved their operation confidence.
The key step of the technical solution used in the present invention is as follows respectively:
The first step utilizes the data of each nominal situation of Distributed Control System (DCS) collection semiconductor process to form the three-dimensional training sample set that modeling is used: X=[X
1X
2, X
C].Wherein,
C=1,2 ..., C is the data matrix corresponding to process operating mode c, I
cBe batch number under this operating mode, J is the variable number, and K counts for the sampled data of each batch.Deposit these data in historical data base respectively;
Second step expanded into I with the data under the different operating modes along separately a batch direction respectively
c* JK two-dimensional data matrix is carried out pre-service and normalization to it, makes that promptly the average of each process variable is zero, and variance is 1, obtains new data matrix collection to be
In historical data base, the process data that collects is carried out pre-service, reject outlier and tangible coarse error information, in order to make the yardstick of process data can not have influence on the result of monitoring, data to different variablees are carried out normalized respectively, the average that is each variable is zero, and variance is 1.Like this, the data of various process variable just are under the identical yardstick, can not have influence on follow-up monitoring effect afterwards.
The 3rd step arranged each data matrix along the time point direction again, obtained new data matrix and concentrated and to be
Traditional semiconductor processes monitoring method need be predicted unknown-value when monitoring new lot data.For fear of this problem, we rearrange the data matrix.Like this, monitor sample just becomes single sampled data points by original whole lot data, has avoided the forecasting problem to batch unknown-value preferably.
The 4th step adopted the independent component analysis method that each new data matrix is handled, and set up the independent component analysis model, obtained residual matrix
And structure I
2The monitoring and statistics limit of statistic;
Adopt independent component analysis (ICA) method to each new data matrix
Handle, extract high-order statistic information, set up the independent component analysis model.Analyze by ICA, can obtain the independent component matrix of this data matrix
Hybrid matrix A
c∈ R
J * r, separation matrix W
c∈ R
R * JAnd residual matrix
As follows:
Wherein, c=1,2 ..., C, r are the independent component number of choosing.Then, structure I
2Statistic also utilizes the Density Estimator method to provide its corresponding monitoring and statistics limit I
Lim, c 2, that is:
Wherein, K () is a kernel function, is chosen for the gaussian kernel form usually, and H is the bandwidth parameter matrix of kernel function, can easy choice be the form at diagonal angle, I
C, i 2I for corresponding data under the operating mode c
2The statistics value.Like this, we just can obtain I
2The probability density distribution information of statistic, thus can ask for its statistics limit I under certain degree of confidence easily
Lim, c 2Value.
The 5th step is at residual matrix
The monitoring and statistics limit of structure SPE statistic;
On the basis of previous step to residual matrix
Set up the SPE statistic and calculate its corresponding monitoring and statistics limit SPE
Lim, c, that is:
Wherein, SPE
C, tr, iObeying parameter is the χ of g and h
2Distribute,
g·h=mean(SPE
c,tr)
(1.18)
2g
2h=var(SPE
c,tr)
Therefore, the monitoring and statistics of SPE statistic statistic limit also can be obtained easily, i.e. SPE
Lim~g χ
h 2
The 6th step deposited in historical data base and the real-time data base modeling data and each model parameter standby;
The 7th step was collected new process data, and it is carried out pre-service and normalization;
For the data sample of newly collecting in the process, except it is carried out the pre-service, the model parameter when adopting modeling is in addition carried out normalization to this data point, promptly deducts the modeling average and divided by the modeling standard deviation.
The 8th step adopted different operating mode models that it is monitored respectively, promptly set up statistic I
2And SPE;
Adopt the model under the different operating modes that new data are monitored, promptly calculate its corresponding I
2As follows with the value of SPE statistic:
Wherein, c=1,2 ..., C, s
cBe the independent component vector that corresponding data extracted,
Be residual vector.
The 9th step was calculated the posterior probability values of current Monitoring Data under each operation operating mode by the Bayesian inference method, and the probability of malfunction value of computational data.Then, the new statistic FI of structure
2With the monitoring result under the integrated different operating modes of FSPE, and provide corresponding performance analysis and positioning result.
At first calculate the posterior probability values of current Monitoring Data under each process operation operating mode, that is: by the Bayesian inference method
P (c) is a prior probability, but simple computation is
Then, the probability of malfunction of calculating current data under each operating mode is as follows:
Wherein,
Be the modeling data under the corresponding operating mode, Pr{} represents probable value.
Calculate last monitoring result, the monitoring result under the promptly integrated different operating operating mode is as follows:
By analyzing the posterior probability values of current Monitoring Data and each operation operating mode, it is carried out performance analysis and is positioned such that:
Wherein, the value of posterior probability is big more, illustrates that the degree of association of current Monitoring Data and corresponding operating mode is big more.Otherwise the possibility that these data of the more little explanation of value are in corresponding operating mode is just more little.
Below in conjunction with a concrete semiconductor processes example validity of the present invention is described.The data of this process are altogether 129 batch datas from three groups of experiments of TIX, comprising the data under 108 batches of nominal situations and 21 batches of fault datas.By the initial analysis to data, finding has the data deletion condition of two batches of processes more serious, removes after these two batches of deficiencies of data, and one has 107 batches of normal data and 20 batches of fault datas.The source of fault mainly is that the variation of each power and pressure causes, for this process is monitored, has chosen 17 process variable altogether, and is as shown in table 1.In addition, the sampling time of each batch point is 85.Fig. 1 has provided through after the pivot analysis, and all preceding two-dimensional data features of normal batch can obviously be found out, the data of this process are produced by three operation operating modes.Next in conjunction with this detailed process implementation step of the present invention is at length set forth:
1. gatherer process nominal situation data, data pre-service, normalization and rearranging
127 batches of effective process data samples collecting are carried out the data pre-service, reject the outlier and the coarse error point of process.96 batches of normal data choosing are then wherein formed the modeling data matrix, and it is divided into three sub-data matrix X
c∈ R
32 * 17 * 85, c=1,2,3.Each subdata matrix is launched into two-dimensional data matrix and it is carried out normalization according to a batch direction, obtain X
c∈ R
32 * 1445, c=1,2,3.Then, along the sampling instant direction two-dimensional data matrix is arranged again, obtain new data matrix and be
c=1,2,3
2. at each process operation operating mode, set up the confidence limit of independent component analysis model and definite corresponding statistic respectively
Respectively to new data matrix
C=1,2,3 carry out the ICA analysis and modeling, choose 3 independent components, obtain detailed ICA model parameter information, i.e. independent component information S
c∈ R
3 * 2720, hybrid matrix A
c∈ R
17 * 3, separation matrix W
c∈ R
3 * 17And residual matrix
Construct I then
2Statistic is also determined its corresponding monitoring and statistics limit by the Density Estimator method.In like manner, can determine the monitoring confidence limit of SPE statistic.Here, our degree of confidence of choosing two statistics is 99%.
3. obtain current Monitoring Data information, and it is carried out pre-service and normalization
In order to test the validity of new method, respectively the data of normal batch and fault batch are tested.The data that picked at random is a certain normal batch, and utilize the normalized parameter under each operating mode that it is handled.Choose a kind of typical fault and test, equally it is carried out normalized.
4. online process monitoring
At first normal batch process data is monitored, the monitoring result that new method and MPCA method obtain respectively as shown in Figures 2 and 3.As can be seen from the figure, new method and MPCA method all can be made preferably monitoring to this batch, promptly do not report phenomenon by mistake and take place, and illustrate that new method do not lose its monitoring effect under nominal situation.Then, fault batch is monitored, the monitoring effect of new method and MPCA method as shown in Figure 4 and Figure 5.Can find out obviously that new method has successfully monitored the fault of process.By contrast, the effect of MPCA method is just far short of what is expected.
5. performance analysis and location
Normal batch data are carried out performance analysis and location, and the result who obtains as shown in Figure 6.As can be seen from the figure, this lot data comes from the possibility maximum of second kind of operation operating mode.
Table 1: monitored variable explanation
Sequence number | Variable | | Variable | |
1 | BCl 3Flow | 10 | RF power | |
2 | Cl 2Flow | 11 | The |
|
3 | The |
12 | TCP is tuning | |
4 | A detects end points | 13 | The |
|
5 | |
14 | The TCP impedance | |
6 | |
15 | The TCP top power | |
7 | RF is tuning | 16 | The |
|
8 | The RF load | 17 | The Vat valve | |
9 | Phase error |
Claims (1)
1. the semiconductor processes monitoring method based on independent component analysis and Bayesian inference is characterized in that, may further comprise the steps:
(1) utilize the data of each nominal situation of Distributed Control System (DCS) collection semiconductor process to form the three-dimensional training sample set that modeling is used: X=[X
1X
2, X
C]; Wherein,
C=1,2 ..., C is the data matrix corresponding to process operating mode c, I
cBe batch number under this operating mode, J is the variable number, and K counts for the sampled data of each batch; Deposit these data in historical data base respectively;
(2) respectively the data under the different operating modes are expanded into I along separately a batch direction
c* JK two-dimensional data matrix is carried out pre-service and normalization to it, makes that promptly the average of each process variable is zero, and variance is 1, obtains new data matrix collection to be
(3) along the time point direction each data matrix is arranged again, obtained new data matrix collection and be
(4) adopt the independent component analysis method that each concentrated new data matrix of new data matrix that step (3) obtains is handled, set up the independent component analysis model, obtain residual matrix
And structure I
2The monitoring and statistics limit of statistic;
(6) deposit in historical data base and the real-time data base modeling data and each model parameter standby;
(7) collect new process data, and new process data is carried out pre-service and normalization;
(8) process data after adopting different operating mode models to step (7) pre-service and normalization is respectively monitored, and promptly sets up statistic I
2And SPE;
(9) calculate the posterior probability values of current Monitoring Data under each operating mode by the Bayesian inference method, and the probability of malfunction value of computational data; Then, the new statistic FI of structure
2With the monitoring result under the integrated different operating modes of FSPE, and provide corresponding performance analysis and positioning result;
Wherein, described step (4) is specially: adopt the independent component analysis method to each new data matrix
Handle, extract high-order statistic information, set up the independent component analysis model; By independent component analysis, can obtain the independent component matrix of this data matrix
Hybrid matrix A
c∈ R
J * r, separation matrix W
c∈ R
RxJAnd residual matrix
As follows:
Wherein, c=1,2 ..., C, r are the independent component number of choosing; Then, structure I
2Statistic also utilizes the Density Estimator method to provide its corresponding monitoring and statistics limit
Described step (5) is specially: on the basis of previous step to residual matrix
Set up the SPE statistic and calculate its corresponding monitoring and statistics limit SPE
Lim, c
Described step (8) is specially: for the new data after the normalization
Adopt the model under the different operating modes that it is monitored respectively, it is as follows promptly to set up corresponding monitoring and statistics amount:
Wherein, c=1,2 ..., C, s
cBe the independent component vector that corresponding data extracted, continue at residual vector
Setting up the SPE statistic is:
Described step (9) is specially:
(a) at first calculate the posterior probability values of current Monitoring Data under each process operating mode, that is: by the Bayesian inference method
(b) probability of malfunction of calculating current data under each operating mode is as follows:
Wherein,
Be the modeling data under the corresponding operating mode, Pr{} represents probable value;
(c) calculate last monitoring result, the monitoring result under the promptly integrated different operating modes is as follows:
(d) calculate the posterior probability values of current Monitoring Data and each operating mode, it carried out performance analysis and is positioned such that:
Wherein, the value of posterior probability is big more, illustrates that the degree of association of current Monitoring Data and corresponding operating mode is big more; Otherwise the possibility that these data of the more little explanation of value are in corresponding operating mode is just more little.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009101546318A CN101713983B (en) | 2009-11-23 | 2009-11-23 | Semiconductor process monitoring method based on independent component analysis and Bayesian inference |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009101546318A CN101713983B (en) | 2009-11-23 | 2009-11-23 | Semiconductor process monitoring method based on independent component analysis and Bayesian inference |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101713983A CN101713983A (en) | 2010-05-26 |
CN101713983B true CN101713983B (en) | 2011-12-21 |
Family
ID=42417688
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009101546318A Expired - Fee Related CN101713983B (en) | 2009-11-23 | 2009-11-23 | Semiconductor process monitoring method based on independent component analysis and Bayesian inference |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101713983B (en) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102830624A (en) * | 2012-09-10 | 2012-12-19 | 浙江大学 | Semi-supervised monitoring method of production process of polypropylene based on self-learning statistic analysis |
CN103309347B (en) * | 2013-06-05 | 2015-11-18 | 浙江大学 | A kind of multiple operating modes process method for supervising based on rarefaction representation |
CN103377316A (en) * | 2013-07-15 | 2013-10-30 | 浙江大学 | Penicillin production process monitoring method based on statistical analysis and Bayesian ensemble |
CN103376795A (en) * | 2013-07-15 | 2013-10-30 | 浙江大学 | Semiconductor process monitoring method based on integrated leaning modeling technology |
CN107092242B (en) * | 2017-06-02 | 2019-05-31 | 宁波大学 | A kind of Industrial Process Monitoring method based on missing variable pca model |
CN108613695B (en) * | 2018-03-28 | 2020-05-12 | 厦门大学 | ICA-SPRT-based redundant sensor fault detection method |
CN111694327B (en) * | 2019-03-12 | 2022-03-18 | 宁波大学 | Industrial process monitoring method based on mixed independent component analysis algorithm |
CN110673577B (en) * | 2019-09-23 | 2021-05-04 | 北京化工大学 | Distributed monitoring and fault diagnosis method for complex chemical production process |
CN112180893B (en) * | 2020-09-15 | 2021-07-13 | 郑州轻工业大学 | Construction method of fault-related distributed orthogonal neighborhood preserving embedded model in CSTR process and fault monitoring method thereof |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1655082A (en) * | 2005-01-27 | 2005-08-17 | 上海交通大学 | Non-linear fault diagnosis method based on core pivot element analysis |
CN101354757A (en) * | 2008-09-08 | 2009-01-28 | 中国科学院地理科学与资源研究所 | Method for predicting dynamic risk and vulnerability under fine dimension |
CN101488491A (en) * | 2008-01-18 | 2009-07-22 | 成均馆大学校产学协力团 | Lamella structured thin films with ultralow dielectric constants and high hardness and method for manufacturing the same |
-
2009
- 2009-11-23 CN CN2009101546318A patent/CN101713983B/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1655082A (en) * | 2005-01-27 | 2005-08-17 | 上海交通大学 | Non-linear fault diagnosis method based on core pivot element analysis |
CN101488491A (en) * | 2008-01-18 | 2009-07-22 | 成均馆大学校产学协力团 | Lamella structured thin films with ultralow dielectric constants and high hardness and method for manufacturing the same |
CN101354757A (en) * | 2008-09-08 | 2009-01-28 | 中国科学院地理科学与资源研究所 | Method for predicting dynamic risk and vulnerability under fine dimension |
Non-Patent Citations (2)
Title |
---|
傅若玮等."基于核独立成分分析的过程故障检测方法".《计算机技术与应用进展》.2008,528-533. |
赵英伟等."基于贝叶斯网络的PECVD故障诊断技术".《半导体技术》.2006,第31卷(第3期),180-182,193. |
Also Published As
Publication number | Publication date |
---|---|
CN101713983A (en) | 2010-05-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101713983B (en) | Semiconductor process monitoring method based on independent component analysis and Bayesian inference | |
CN101458522A (en) | Multi-behavior process monitoring method based on pivot analysis and vectorial data description support | |
CN105425779A (en) | ICA-PCA multi-working condition fault diagnosis method based on local neighborhood standardization and Bayesian inference | |
CN102566554B (en) | Semiconductor process monitoring method on basis of one-class support vector machine | |
CN108830510B (en) | Power data preprocessing method based on mathematical statistics | |
CN103488091A (en) | Data-driving control process monitoring method based on dynamic component analysis | |
CN105404280A (en) | Industrial process fault detection method based on autoregression dynamic hidden variable model | |
CN107038167A (en) | Big data excavating analysis system and its analysis method based on model evaluation | |
CN103377316A (en) | Penicillin production process monitoring method based on statistical analysis and Bayesian ensemble | |
CN104699050A (en) | Leaf-shred preparation segment on-line monitoring and fault diagnosing method for cigarette filament treatment driven by data | |
CN101534305A (en) | Method and system for detecting network flow exception | |
WO2020124779A1 (en) | Working condition state modeling and model correction method | |
CN107728591A (en) | A kind of intelligent quality thickness measurement online decision method and system | |
CN103389701B (en) | Based on the level of factory procedure fault Detection and diagnosis method of distributed data model | |
CN113554055A (en) | Processing condition identification method based on clustering algorithm | |
CN111698267A (en) | Information security testing system and method for industrial control system | |
CN106682835A (en) | Data-driven complex electromechanical system service quality state evaluation method | |
CN105334823A (en) | Supervision-based industrial process fault detection method of linear dynamic system model | |
CN105974223A (en) | Method used for carrying out on-line detection on electric equipment work state and system thereof | |
CN107728602A (en) | A kind of Personalized service method of hydroforming equipment failure | |
CN105744551B (en) | A kind of automatic investigation method of wireless network interference based on pattern-recognition | |
CN103376795A (en) | Semiconductor process monitoring method based on integrated leaning modeling technology | |
CN111188761B (en) | Monitoring method for pump equipment based on Fourier-CVA model | |
CN105975737A (en) | Turning point calculation model and breaker state monitoring method and system for motor current | |
CN103995985B (en) | Fault detection method based on Daubechies wavelet transform and elastic network |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |