CN101713194B CN2009102109741A CN200910210974A CN101713194B CN 101713194 B CN101713194 B CN 101713194B CN 2009102109741 A CN2009102109741 A CN 2009102109741A CN 200910210974 A CN200910210974 A CN 200910210974A CN 101713194 B CN101713194 B CN 101713194B
Authority
CN
China
Prior art keywords
frame
capsule
water
glue
top flat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009102109741A
Other languages
Chinese (zh)
Other versions
CN101713194A (en
Inventor
张宝昌
刘德进
曲俐俐
陆连洲
张祚森
刘庆凯
赵建明
付大伟
范新堂
马淑文
史修章
于洪明
王天增
韩先良
稽焕晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority to CN2009102109741A priority Critical patent/CN101713194B/en
Publication of CN101713194A publication Critical patent/CN101713194A/en
Application granted granted Critical
Publication of CN101713194B publication Critical patent/CN101713194B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to a water-filled capsule for caisson transportation and a production method thereof. The capsule for caisson lifting transportation trolleys comprises a top plate, a frame, a bottom plate and a water inlet from top to bottom, wherein the water inlet is arranged on the frame; and the frame is a cube, but the four end corners are cambered transitions for reducing stress, the top end and the bottom end are respectively provided with a chamfer adhesion reinforcing part extending inwards. The production method of the water-filled capsule comprises the following steps of: mixing rubber, making the top plate, making the bottom plate, making the frame, assembling the plates, and installing the water inlet. The four cambered corner angles of the capsule can reduce the stressof the capsule, and can prevent the splitting of the capsule body and water leakage in the water filling lifting process. The adhesion joints between the frame, and the top plate and the bottom plateare respectively provided with the chamfer adhesion reinforcing part, thereby further ensuring the adhesion firmness between the rubber plates and ensuring the smooth operation of the water filling lifting process. The test proves that the water-filled capsule can be reused hundreds of times.

Description

Water-filled capsule for caisson transportation and production method thereof
Technical field
The present invention relates to rubber and production method thereof, specifically, relate to a kind of inner water-filling, be used for weight is carried out the rubber capsule and the production method thereof of jacking operation.
Background technology
Caisson be marine structure indispensable important component part, for example marine vertical-type breakwater, port and piers etc. when carrying out construction operation, all need at first be placed caisson at construction location, and then carry out the construction of topside on caisson.At present, the production of caisson is normally finished on land, so caisson need be transported to marine job position.Existing caisson goes out transportation method and mainly contains three kinds, is respectively jack group jacking caisson, traction or pushing tow chassis migration technology; The jacking of jack chassis, migration caisson technology; Air bag jacking, migration caisson technology.Though these three kinds of technologies also can both be finished the operation of caisson, mostly exist complicated operation, operation loaded down with trivial details, the preliminary preparation amount is big wait not enough.For this reason, a kind of method of utilizing the capsule trolley caisson transportation is proposed newly, in this method, default water-filled capsule on chassis, capsule carries out jacking as the jacking parts to caisson, then by the chassis load-bearing, utilizes the rail clamping device promotion chassis on the track to move.In the middle of this transportation resources, the effect of capsule is most important, because so the weight of caisson is greatly to the requirement of capsule also unusual height just, for example to all having very high requirement in the expandability of capsule, tear-resistant ability, service life or the like, existing conventional capsule and common capsule manufacture technology all can't satisfy the use needs.
Summary of the invention
Purpose of the present invention is at existing capsule and the existing deficiency of production method thereof, provides a kind of later-model caisson to go out to use capsule and production method thereof.
The technical solution adopted in the present invention is: a kind of water-filled capsule for caisson transportation, described capsule comprises top flat from top to bottom successively, frame, egative film, and the water inlet tap that is provided with on the frame, described frame is cuboid, but at its four end angles is the arc transition that reduces stress, and top and low side are provided with the sticking and enhancing portion of the chamfering that extends inward, described capsule top flat, frame, and egative film consisting of: natural rubber 90-110 part according to weight ratio, sulphur 1.5-2 part, activating agent 7-10 part, carbon black 30-50 part, accelerator 1-2 part, soften flux 25-30 part, aging inhibitor 1-3 part.
Preferably, the thickness of described top flat is 3cm, and the thickness of egative film is 1.5cm, and the height of frame is 70cm, and the width of top flat and egative film is 100cm, and length is 240cm.
The production method of above-mentioned water-filled capsule for caisson transportation may further comprise the steps, and refining glue, top flat making, negative film making, frame are made, closed sheet and water nozzle installation steps, and each operation idiographic flow is:
1) mixing process: natural rubber drying glue 24-36 hour, cutting glue, to remove crust pollution-free in the middle of getting, and do not have the position of going mouldy; By the formula rate weighing, check errorlessly, natural gum is plasticated for three sections, each section test plasticity is carried out mixing after plasticity is qualified; Mixing stone roller glue machine adds rubber earlier, adds elastomeric compound in proper order by the large and small material of rubber, and the refining glue time was not less than 20-40 minute; Parked behind the sampling and testing 24-48 hour; Park the back sizing material and carry out the secondary preheating, after the preheating, carry out both sides filter glue with rubber strainer, glue is ground in the agent of filter glue after vulcanization, parks then 24-48 hour, finishes refining glue;
2) top flat, egative film and frame are made: the sizing material that refining is good squeezes sheet machine slice by wide pair through grinding after the glue machine gives heat, egative film is compound by 2 layers of 8mm film after the slice, top flat is compound by 4 layers of 8.0mm, all carries out pressing and arrangement with plate mangle after compound, guarantees inner no bubble; Utilize extruder to cooperate mould to extrude required frame shape sizing material;
3) bonding: the frame end face places the top flat periphery down, adopt the heater unit heating bonding piecemeal, blow soft upper and lower surface glue face with heater unit, heater unit hair dryer temperature 120+20 degree before bonding, after promptly with the pressure roller roll extrusion to evenly fitting, egative film is identical with the adhering method and the said method of frame;
4) water inlet tap is installed: mould is inserted in capsule frame installation in position, the bonding water inlet tap that punches in capsule frame minor face middle part then, the processing of sandblasting before water inlet tap closes, the coating adhesive airing, add thin film on the mouthpiece both sides, tighten, then in the packing of capsule middle part;
5) sulfidization molding: earlier 2500 * 1500 vulcanizing presses are warming up to 120 ℃~130 ℃, product and sulphur mould are advanced vulcanizing press, fill wind and must not be higher than mould; Frame is clogged with wooden unit around the mould after entering; Fill wind after boosting to more than the 10Mpa; Vapour pressure 120 ℃~130 ℃ * 4 hours; The 25kg pump must not be shut down in preceding 2 hours of the sulphur; The special messenger keeps an eye on vapour pressure and blast must not be above and below specified value in the sulfuration; Stop vapour cooling blowing-out after the sulfuration; Not handy hard thing during depanning is stopped the surface in order to avoid damage capsule; The relevant inspection and the pressure testing detection carried out by the flow process requirement in the sulfuration back.
Preferably, in the described frame manufacturing process, the frame joint should be in the capsule middle part, and it is bonding that joint is cut into miter angle, adds soft thin adhesive tape and seals compacting.
Beneficial effect of the present invention is: at first, four drift angles of capsule are circular-arc transition, can reduce capsule stress, can prevent from the situation of tearing, leak of capsule body is occurred in water-filling jacking process; Secondly, be provided with the bonding enhancing of chamfering portion in the abutting edge of frame and top flat and egative film, further guarantee the adhesion firmness between the film, guaranteed carrying out smoothly of water-filling jacking operation; In addition, the valve of special water inlet tap structure and conventional capsule or water-filling mouth are compared and can be guaranteed in the water filling process that the situation that the joint portion of capsule and water inlet tap can not occur tearing guarantees out normally carrying out of fortune work.Multi-layer bonded and the water-filling mouth place that is adopted in production method, the special processing technology of frame joint can guarantee that also the tear-resistant ability of capsule promotes greatly, and through evidence, the repeated usage number of times of this water-filled capsule reaches up to a hundred times.
The specific embodiment
Specific embodiments of the invention, a kind of water-filled capsule for caisson transportation, described capsule comprises top flat from top to bottom successively, frame, egative film, and the water inlet tap that is provided with on the frame, described frame is cuboid, but at its four end angles is the arc transition that reduces stress, and top and low side are provided with the sticking and enhancing portion of the chamfering that extends inward, described capsule top flat, frame, and egative film consisting of: natural rubber 90-110 part according to weight ratio, sulphur 1.5-2 part, activating agent 7-10 part, carbon black 30-50 part, accelerator 1-2 part, soften flux 25-30 part, aging inhibitor 1-3 part.
The thickness of described top flat is 3cm, and the thickness of egative film is 1.5cm, and the height of frame is 70cm, and the width of top flat and egative film is 100cm, and length is 240cm.
The production method of above-mentioned water-filled capsule for caisson transportation may further comprise the steps, and refining glue, top flat making, negative film making, frame are made, closed sheet and water nozzle installation steps, and each operation idiographic flow is:
1) mixing process: natural rubber drying glue 24-36 hour, cutting glue, to remove crust pollution-free in the middle of getting, and do not have the position of going mouldy; By the formula rate weighing, check errorlessly, natural gum is plasticated for three sections, each section test plasticity is carried out mixing after plasticity is qualified; Mixing stone roller glue machine adds rubber earlier, adds elastomeric compound in proper order by the large and small material of rubber, and the refining glue time was not less than 20-40 minute; Parked behind the sampling and testing 24-48 hour; Park the back sizing material and carry out the secondary preheating, after the preheating, carry out both sides filter glue with rubber strainer, glue is ground in the agent of filter glue after vulcanization, parks then 24-48 hour, finishes refining glue;
2) top flat, egative film and frame are made: the sizing material that refining is good squeezes sheet machine slice by wide pair through grinding after the glue machine gives heat, egative film is compound by 2 layers of 8mm film after the slice, top flat is compound by 4 layers of 8.0mm, all carries out pressing and arrangement with plate mangle after compound, guarantees inner no bubble; Utilize extruder to cooperate mould to extrude required frame shape sizing material, in the frame manufacturing process, the frame joint should be in the capsule middle part, and it is bonding that joint is cut into miter angle, adds soft thin adhesive tape and seal compacting;
3) bonding: the frame end face places the top flat periphery down, adopt the heater unit heating bonding piecemeal, blow soft upper and lower surface glue face (face of joint) with heater unit before bonding, heater unit hair dryer temperature 120 ± 20 degree, after promptly with the pressure roller roll extrusion to evenly fitting, egative film is identical with the adhering method and the said method of frame;
4) water inlet tap is installed: mould is inserted in capsule frame installation in position, the bonding water inlet tap that punches in capsule frame minor face middle part then, the processing of sandblasting before water inlet tap closes, the coating adhesive airing, add thin film on the mouthpiece both sides, tighten, then in the packing of capsule middle part;
5) sulfidization molding: earlier 2500 * 1500 vulcanizing presses are warming up to 120 ℃~130 ℃, product and sulphur mould are advanced vulcanizing press, fill wind and must not be higher than mould; Frame is clogged with wooden unit around the mould after entering; Fill wind after boosting to more than the 10Mpa; Vapour pressure 120 ℃~130 ℃ * 4 hours; The 25kg pump must not be shut down in preceding 2 hours of the sulphur; The special messenger keeps an eye on vapour pressure and blast must not be above and below specified value in the sulfuration; Stop vapour cooling blowing-out after the sulfuration; Not handy hard thing during depanning is stopped the surface in order to avoid damage capsule; The relevant inspection and the pressure testing detection carried out by the flow process requirement in the sulfuration back.

Claims (4)

1. water-filled capsule for caisson transportation, it is characterized in that: described capsule comprises top flat from top to bottom successively, frame, egative film, and the water inlet tap that is provided with on the frame, described frame is cuboid, but at its four end angles is the arc transition that reduces stress, and top and low side are provided with the sticking and enhancing portion of the chamfering that extends inward, described capsule top flat, frame, and egative film consisting of: natural rubber 90-110 part according to weight ratio, sulphur 1.5-2 part, activating agent 7-10 part, carbon black 30-50 part, accelerator 1-2 part, soften flux 25-30 part, aging inhibitor 1-3 part.
2. water-filled capsule for caisson transportation as claimed in claim 1 is characterized in that: the thickness of described top flat is 3cm, and the thickness of egative film is 1.5cm, and the height of frame is 70cm, and the width of top flat and egative film is 100cm, and length is 240cm.
3. the production method of a water-filled capsule for caisson transportation as claimed in claim 1 is characterized in that may further comprise the steps, and refining glue, top flat making, negative film making, frame are made, closed sheet and water nozzle installation steps, and each operation idiographic flow is:
1) mixing process: natural rubber drying glue 24-36 hour, cutting glue, to remove crust pollution-free in the middle of getting, and do not have the position of going mouldy; By the formula rate weighing, check errorlessly, natural gum is plasticated for three sections, each section test plasticity is carried out mixing after plasticity is qualified; Mixing stone roller glue machine adds rubber earlier, adds elastomeric compound in proper order by the large and small material of rubber, and the refining glue time was not less than 20-40 minute; Parked behind the sampling and testing 24-48 hour; Park the back sizing material and carry out the secondary preheating, after the preheating, carry out both sides filter glue with rubber strainer, glue is ground in the agent of filter glue after vulcanization, parks then 24-48 hour, finishes refining glue;
2) top flat, egative film and frame are made: the sizing material that refining is good squeezes sheet machine slice by wide pair through grinding after the glue machine gives heat, egative film is compound by 2 layers of 8mm film after the slice, top flat is compound by 4 layers of 8.0mm, all carries out pressing and arrangement with plate mangle after compound, guarantees inner no bubble; Utilize extruder to cooperate mould to extrude required frame shape sizing material;
3) bonding: the frame end face places the top flat periphery down, adopt the heater unit heating bonding piecemeal, blow soft upper and lower surface glue face with heater unit, heater unit hair dryer temperature 120 ± 20 degree before bonding, after promptly with the pressure roller roll extrusion to evenly fitting, egative film is identical with the adhering method and the said method of frame;
4) water inlet tap is installed: mould is inserted in capsule frame installation in position, the bonding water inlet tap that punches in capsule frame minor face middle part then, the processing of sandblasting before water inlet tap closes, the coating adhesive airing, add thin film on the mouthpiece both sides, tighten, then in the packing of capsule middle part;
5) sulfidization molding: earlier 2500 * 1500 vulcanizing presses are warming up to 120 ℃~130 ℃, product and sulphur mould are advanced vulcanizing press, fill wind and must not be higher than mould; Frame is clogged with wooden unit around the mould after entering; Fill wind after boosting to more than the 10Mpa; Vapour pressure 120 ℃~130 ℃ * 4 hours; The 25kg pump must not be shut down in preceding 2 hours of the sulphur; The special messenger keeps an eye on vapour pressure and blast must not be above and below specified value in the sulfuration; Stop vapour cooling blowing-out after the sulfuration; Not handy hard thing during depanning is in order to avoid damage the utricule surface.
4. the production method of water-filled capsule for caisson transportation as claimed in claim 3, it is characterized in that: in the described frame manufacturing process, the frame joint should be in the capsule middle part, and it is bonding that joint is cut into miter angle, adds soft thin adhesive tape and seals compacting.
CN2009102109741A 2009-11-13 2009-11-13 Water-filled capsule for caisson transportation and production method thereof Expired - Fee Related CN101713194B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009102109741A CN101713194B (en) 2009-11-13 2009-11-13 Water-filled capsule for caisson transportation and production method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009102109741A CN101713194B (en) 2009-11-13 2009-11-13 Water-filled capsule for caisson transportation and production method thereof

Publications (2)

Publication Number Publication Date
CN101713194A CN101713194A (en) 2010-05-26
CN101713194B true CN101713194B (en) 2011-12-28

Family

ID=42417156

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009102109741A Expired - Fee Related CN101713194B (en) 2009-11-13 2009-11-13 Water-filled capsule for caisson transportation and production method thereof

Country Status (1)

Country Link
CN (1) CN101713194B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109834947A (en) * 2019-02-01 2019-06-04 丹阳市云孚科技有限公司 A kind of production method of accumulator capsule

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2192232A (en) * 1986-07-01 1988-01-06 Holywell Eng Ltd Improvements relating to hydraulically or pneumatically operated lifting bags
CN101456523A (en) * 2008-12-10 2009-06-17 钟爱民 Folding jacking air-bag
CN101508410A (en) * 2009-03-09 2009-08-19 钟爱民 Large-scale component jacking method
CN100542769C (en) * 2006-05-15 2009-09-23 天津市腾祥科技发展有限公司 Scrap rubber-rubber powder modified and prepare the method for compounded rubber waterproof roll with it

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2192232A (en) * 1986-07-01 1988-01-06 Holywell Eng Ltd Improvements relating to hydraulically or pneumatically operated lifting bags
CN100542769C (en) * 2006-05-15 2009-09-23 天津市腾祥科技发展有限公司 Scrap rubber-rubber powder modified and prepare the method for compounded rubber waterproof roll with it
CN101456523A (en) * 2008-12-10 2009-06-17 钟爱民 Folding jacking air-bag
CN101508410A (en) * 2009-03-09 2009-08-19 钟爱民 Large-scale component jacking method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王万永等.水垫试验.《起重运输机械》.1981,32-37. *

Also Published As

Publication number Publication date
CN101713194A (en) 2010-05-26

Similar Documents

Publication Publication Date Title
CN104015375B (en) A kind of big thickness area composite product pouring and molding method
CN101797802B (en) One-step forming process of multi-layered shear web of MW wind turbine blade
CN103510965A (en) Highway tunnel lining surface sticky steel strip strengthening method and device
CN202559719U (en) Concrete formwork with maintenance device
CN111531919A (en) Resin vacuum forming device and component preparation method
CN101713194B (en) Water-filled capsule for caisson transportation and production method thereof
CN202676576U (en) Test-specimen covering mould set of fast packaging device of concrete impermeability instrument
CN206233092U (en) A kind of inflatable bridge expanssion joint end liner
CN109319320B (en) Steel oil tank lining structure and lining transformation process
CN206617707U (en) A kind of steel band leak stopping sealing suit
CN207808652U (en) Prespreading TPE Macromolecular self-adhesive membrane waterproof rolls
CN115782276A (en) Construction method of blade leading edge protection system
CN206360585U (en) Double glazing
CN115195155A (en) High-temperature-resistant high-pressure-resistant vacuum bag film sealing structure and method
CN102280230B (en) Glass reinforced plastic insulating sleeve for wind driven generator and molding method of glass reinforced plastic insulating sleeve
CN105584744A (en) Method for vacuum film negative-pressure glue reverse permeation repair of integral fuel tank of airplane
CN212446424U (en) Resin vacuum forming device
CN205291633U (en) Novel priming by vacuum guiding gutter
CN201969446U (en) Improved structure for sealing filter
CN206781059U (en) A kind of frock of vacuum flexible bag moulding
CN215242213U (en) Forming die for composite material RTM (resin transfer molding) laminated plate
CN211286759U (en) Pressure injecting glue jar device is glued to structure
CN217681780U (en) Damaged patching device of section of jurisdiction corner
CN204019709U (en) A kind of concrete segment maintenance mould
CN211215585U (en) Composite rubber filter cloth of filter press

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhang Baochang

Inventor after: Ma Shuwen

Inventor after: Shi Xiuzhang

Inventor after: Yu Hongming

Inventor after: Wang Tianzeng

Inventor after: Han Xianliang

Inventor after: Ji Huanxiao

Inventor after: Liu Dejin

Inventor after: Qu Lili

Inventor after: Lu Lianzhou

Inventor after: Zhang Zuosen

Inventor after: Liu Qingkai

Inventor after: Zhao Jianming

Inventor after: Fu Dawei

Inventor after: Fan Xintang

Inventor before: Liu Dejin

Inventor before: Ma Shuwen

Inventor before: Shi Xiuzhang

Inventor before: Yu Hongming

Inventor before: Wang Tianzeng

Inventor before: Han Xianliang

Inventor before: Ji Huanxiao

Inventor before: Zhang Baochang

Inventor before: Qu Lili

Inventor before: Lu Lianzhou

Inventor before: Zhang Zuosen

Inventor before: Liu Qingkai

Inventor before: Zhao Jianming

Inventor before: Fu Dawei

Inventor before: Fan Xintang

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LIU DEJIN ZHANG BAOCHANG QU LILI LU LIANZHOU ZHANG ZUOSEN LIU QINGKAI ZHAOJIANMING FU DAWEI FAN XINTANG MA SHUWEN SHI XIUZHANG YU HONGMING WANG TIANZENG HAN XIANLIANG JI HUANXIAO TO: ZHANG BAOCHANG LIU DEJIN QU LILI LU LIANZHOU ZHANG ZUOSEN LIU QINGKAI ZHAO JIANMING FU DAWEI FAN XINTANG MA SHUWEN SHI XIUZHANG YU HONGMING WANG TIANZENG HAN XIANLIANG JI HUANXIAO

C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111228

Termination date: 20121113