CN101691743A CN200910017930A CN200910017930A CN101691743A CN 101691743 A CN101691743 A CN 101691743A CN 200910017930 A CN200910017930 A CN 200910017930A CN 200910017930 A CN200910017930 A CN 200910017930A CN 101691743 A CN101691743 A CN 101691743A
Authority
CN
China
Prior art keywords
dam
bag
rubber
folding
dam bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910017930A
Other languages
Chinese (zh)
Other versions
CN101691743B (en
Inventor
洪志强
王士智
杨孝栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUNNY RUBBER YANTAI CO Ltd
Original Assignee
SUNNY RUBBER YANTAI CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUNNY RUBBER YANTAI CO Ltd filed Critical SUNNY RUBBER YANTAI CO Ltd
Priority to CN2009100179307A priority Critical patent/CN101691743B/en
Publication of CN101691743A publication Critical patent/CN101691743A/en
Application granted granted Critical
Publication of CN101691743B publication Critical patent/CN101691743B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining Or Joining Of Plastics Or The Like (AREA)
  • Casting Or Compression Moulding Of Plastics Or The Like (AREA)

Abstract

The invention relates to a dam bag of a rubber dam and a processing technology thereof, belonging to the technical fields of dam bags of the rubber dam and a production method thereof. The dam bag of the rubber dam comprises successively-connected dam bodies, a unvulcanized rheid section is used for connecting adjacent dam bodies, the dam bodies and the rheid sections are in an integral structure, the number of the dam bodies 1 is more than or equal to 2, ranging from 2 to 10, and the rheid section 4 is a rubber rheid. The processing technology comprises the following steps: 1) folding; 2) separating; 3) vulcanizing and shaping at one time; and 4) flattening. As for the dam bag of the rubber dam and the production method thereof provided by the invention, the dam is long in service life, convenient in processing and high in safety coefficient, and the breadth of the dam bag is as much as 10m.

Description

A kind of dam bag of rubber dam and processing technology thereof
Technical field
The present invention relates to a kind of dam bag of rubber dam and processing technology thereof, belong to dam bag of rubber dam and production method technical field thereof.
Background technology
At present, when producing rubber dam dam bag, generally adopt the sulfuration of vulcanizing press single width, the dam bag fabric width of producing thus is only below 1.1 meters, because fabric width length is short, when using, reality the mutual tower of several dam bags need be connect, to strengthen fabric width, therefore the assembly width of cloth less than along the dam length direction just has a tower joint for one meter.Because dam bag surface finish is relatively poor, therefore need add at the position that two mutual towers of dam bag connect and level up sheet, owing to level up sheet and make by elastomeric material, therefore mobile big when high temperature hot pressing, the skew dislocation takes place easily, make the employed sheet of leveling up just in time to be bonded in the staggered floor place that dam bag tower connects, thereby reduce the overall performance of dam bag of rubber dam, level up sheet in addition and also have easily aging defective, it is easy to crack to cause tower to meet layer place, cause potential safety hazard, reduced the safety factor when the dam bag uses.
Summary of the invention
The objective of the invention is to solve the weak point that above-mentioned prior art exists, provide a kind of long service life, safety factor height, dam bag fabric width to be multiplied, can to reach 10 meters dam bag of rubber dam and processing technology thereof.
The objective of the invention is to reach by following technical measures:
A kind of dam bag of rubber dam, special character are to comprise the dam body 1 that is connected successively, and the software section 4 by one section uncured between adjacent two dam bodys 1 connects, and dam body 1 is integrative-structures with software section 4.
The quantity of described dam body 1 is 2-10 more than or equal to 2.
Described software section 4 is the rubber software.
The processing technology of above-mentioned dam bag of rubber dam, special character are may further comprise the steps:
1, folding
Dam bag initiating terminal is measured a segment length and is placed outside the single width vulcanizer fabric width, dam body 1 with the dam bag is layed on the single width vulcanizer table top with single width vulcanizer fabric width then, upwards be folded to form folding interlayer successively, folding number of times is decided by the single width fabric width of the actual dam bag of rubber dam that will produce.Folding S-shaped or 2 shapes of route.
2, isolate
Laying size and fold plane area are complementary, contain the nonwoven layer 2 of interleaving agent in folding interlayer, make adjacent fold plane adhesion when sulfuration.
3, disposable sulfidization molding
Bilayer or multilayer aspect folding, that isolate after finishing are carried out while moulding, sulfuration simultaneously by vulcanizing press, and adjacent aspect intersects the corner's software section 4 that connects and does not cure, and all the other sulfureted aspects form dam body 1.
4, flatten
Moulding, the dam bag of sulfuration after finishing are taken out in vulcanizing press, because the software section 4 of every layer of corner does not all cure, are axle with each turning therefore, and every layer is trailed successively, form dam bag of rubber dam.
Described interleaving agent is an emulsification silicon rubber.
The present invention has following good effect:
1), adopt bilayer or the moulding simultaneously of multilayer dam body, sulfuration, realized the increase of the single width width of dam bag.The piece of dam bag integral body has reduced 70%-75%, and has improved the presentation quality of dam bag, has also improved the safety factor of dam bag.
2), since dam bag single width fabric width can reach 10 meters, the part for rubber dam of height of dam below 2 meters can be made into no overlapping the slot dam bag.
3), owing to adopt bilayer or the moulding simultaneously of multilayer dam body, sulfuration process, the production efficiency of moulding, sulfuration improves more than 1.6 times.
Description of drawings
Fig. 1: the structural representation that the mutual tower of prior art dam bag of rubber dam connects;
Fig. 2: the structural representation that dam bag of rubber dam of the present invention vulcanizes in vulcanizing press.
Among the figure: 1, dam body, 2, nonwoven layer, 3, vulcanizing press, 4, the software section.
The specific embodiment
Followingly provide the specific embodiment of the present invention, be used for formation of the present invention is described further with reference to accompanying drawing.
Embodiment 1
A kind of dam bag of rubber dam and processing technology thereof with reference to the accompanying drawings 2, a kind of dam bag of rubber dam comprises the dam body 1 that is connected successively, software section 4 by one section uncured between adjacent two dam bodys 1 connects, dam body 1 is integrative-structures with software section 4, the quantity of described dam body 1 equals 2, and described software section 4 is the rubber software.
The processing technology of a kind of dam bag of rubber dam of present embodiment comprises following procedure of processing:
1, folding
Dam bag initiating terminal is measured a segment length and is placed outside the single width vulcanizer fabric width, and the dam body 1 with the dam bag is layed on the single width vulcanizer table top with single width vulcanizer fabric width then, and upwards folding 1 time, form folding interlayer, folding route is S-shaped.
2, isolate
Laying size and fold plane area are complementary, contain the nonwoven layer 2 of interleaving agent in folding interlayer, make adjacent fold plane adhesion when sulfuration.
3, disposable sulfidization molding
Double-deck aspect folding, that isolate after finishing is carried out while moulding, sulfuration simultaneously by vulcanizing press, and adjacent aspect intersects the corner's software section 4 that connects and does not cure, and all the other sulfureted two aspects form two dam bodys 1.
4, flatten
Moulding, the dam bag of sulfuration after finishing are taken out in vulcanizing press, because the software section 4 of corner does not cure, are axle with each turning therefore, and every layer is trailed successively, form dam bag of rubber dam.
Described interleaving agent is an emulsification silicon rubber.
Embodiment 2
A kind of dam bag of rubber dam of present embodiment and production method thereof with reference to the accompanying drawings 2 is that with the difference of embodiment 1 quantity of described dam body 1 is 5.
The production method of a kind of dam bag of rubber dam of present embodiment comprises following procedure of processing:
1, folding
Dam bag initiating terminal is measured a segment length and is placed outside the single width vulcanizer fabric width, and the dam body 1 with the dam bag is layed on the single width vulcanizer table top with single width vulcanizer fabric width then, upwards is folded to form folding interlayer successively, and upwards folding 4 times, folding route is 2 shapes.
2, isolate
Laying size and fold plane area are complementary, contain the nonwoven layer 2 of interleaving agent in folding interlayer, make adjacent fold plane adhesion when sulfuration.
3, disposable sulfidization molding
With folding, isolate 5 after finishing layer by layer face carry out while moulding, sulfuration simultaneously by vulcanizing press, adjacent aspect intersects the corner's software section 4 that connects and does not cure, and 5 dam bodys 1 of all the other sulfureted 5 aspects formation.
4, flatten
Moulding, the dam bag of sulfuration after finishing are taken out in vulcanizing press, because the software section 4 of every layer of corner does not all cure, are axle with each turning therefore, and every layer is trailed successively, form dam bag of rubber dam.
Described interleaving agent is an emulsification silicon rubber.
Embodiment 3
A kind of dam bag of rubber dam of present embodiment and production method thereof with reference to the accompanying drawings 2 is that with the difference of embodiment 1 quantity of dam body 1 is 10.
The production method of a kind of dam bag of rubber dam of present embodiment comprises following procedure of processing:
1, folding
Dam bag initiating terminal is measured a segment length and is placed outside the single width vulcanizer fabric width, and the dam body 1 with the dam bag is layed on the single width vulcanizer table top with single width vulcanizer fabric width then, upwards is folded to form folding interlayer successively, and upwards folding 9 times, folding route is S-shaped.
2, isolate
Laying size and fold plane area are complementary, contain the nonwoven layer 2 of interleaving agent in folding interlayer, make adjacent fold plane adhesion when sulfuration.
3, disposable sulfidization molding
With folding, isolate 10 after finishing layer by layer face carry out while moulding, sulfuration simultaneously by vulcanizing press, adjacent aspect intersects the corner's software section 4 that connects and does not cure, and 10 dam bodys 1 of all the other sulfureted 10 aspects formation.
4, flatten
Moulding, the dam bag of sulfuration after finishing are taken out in vulcanizing press, because the software section 4 of every layer of corner does not all cure, are axle with each turning therefore, and every layer is trailed successively, form dam bag of rubber dam.
Described interleaving agent is an emulsification silicon mark glue.
The foregoing description has following good effect:
1), adopt bilayer or the moulding simultaneously of multilayer dam body, sulfuration, realized the increase of the single width width of dam bag.The piece of dam bag integral body has reduced 70%-75%, and has improved the presentation quality of dam bag, has also improved the safety factor of dam bag.
2), since dam bag single width fabric width can reach 10 meters, the part for rubber dam of height of dam below 2 meters can be made into no overlapping the slot dam bag.
3), owing to adopting the moulding simultaneously of bilayer or multilayer dam bag, sulfuration process, 1.6 times of the production efficiency raisings of moulding, sulfuration.

Claims (5)

1. a dam bag of rubber dam is characterized in that comprising the dam body (1) that is connected successively, and the software section (4) by one section uncured between adjacent two dam bodys (1) connects, and dam body (1) is an integrative-structure with software section (4).
2. according to the described a kind of dam bag of rubber dam of claim 1, the quantity that it is characterized in that described dam body (1) is 2-10 more than or equal to 2.
3. according to the described a kind of dam bag of rubber dam of claim 1, it is characterized in that described software section (4) is the rubber software.
4. according to the processing technology of the described a kind of dam bag of rubber dam of the arbitrary claim of claim 1-3, it is characterized in that comprising following procedure of processing:
1), folding
Dam bag initiating terminal is measured a segment length and is placed outside the single width vulcanizer fabric width, dam body (1) with the dam bag is layed on the single width vulcanizer table top with single width vulcanizer fabric width then, upwards be folded to form folding interlayer successively, folding number of times is decided by the single width fabric width of the actual dam bag of rubber dam that will produce.Folding S-shaped or 2 shapes of route.
2), isolate
Laying size and fold plane area are complementary, contain the nonwoven layer (2) of interleaving agent in folding interlayer, make adjacent fold plane adhesion when sulfuration.
3), disposable sulfidization molding
Bilayer or multilayer aspect folding, that isolate after finishing are carried out while moulding, sulfuration simultaneously by vulcanizing press, and adjacent aspect intersects the corner's software section (4) that connects and does not cure, and all the other sulfureted aspects form dam body (1).
4), flatten
Moulding, the dam bag of sulfuration after finishing are taken out in vulcanizing press, because the software section (4) of every layer of corner does not all cure, are axle with each turning therefore, and every layer is trailed successively, form dam bag of rubber dam.
5. according to the production method of the described a kind of dam bag of rubber dam of claim 4, it is characterized in that described interleaving agent is an emulsification silicon rubber.
CN2009100179307A 2009-08-15 2009-08-15 Dam bag of rubber dam and processing technology thereof Active CN101691743B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100179307A CN101691743B (en) 2009-08-15 2009-08-15 Dam bag of rubber dam and processing technology thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100179307A CN101691743B (en) 2009-08-15 2009-08-15 Dam bag of rubber dam and processing technology thereof

Publications (2)

Publication Number Publication Date
CN101691743A true CN101691743A (en) 2010-04-07
CN101691743B CN101691743B (en) 2011-03-16

Family

ID=42080452

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100179307A Active CN101691743B (en) 2009-08-15 2009-08-15 Dam bag of rubber dam and processing technology thereof

Country Status (1)

Country Link
CN (1) CN101691743B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102086636A (en) * 2010-12-20 2011-06-08 江苏扬州合力橡胶制品有限公司 Method for installing rubber dam bag as well as bag body of rubber dam bag
CN102561270A (en) * 2012-01-18 2012-07-11 江苏扬州合力橡胶制品有限公司 Production process of seamless rubber dam bag
CN102619193A (en) * 2012-04-16 2012-08-01 烟台桑尼橡胶有限公司 Dam blocking air bag and vulcanizing boiler vulcanization processing method thereof
CN102628260A (en) * 2012-04-16 2012-08-08 烟台桑尼橡胶有限公司 Air bag for retaining dam and method for machining air bag by vulcanization of plate vulcanizing machine
CN102660935A (en) * 2012-05-21 2012-09-12 烟台桑尼橡胶有限公司 Dam bag for spiral steel mesh rubber dam and preparation process thereof
CN109024636A (en) * 2018-07-13 2018-12-18 烟台桑尼橡胶有限公司 A kind of PLASTIC MOVABLE COFFER DAMS and its processing technology

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100515737C (en) * 2007-06-29 2009-07-22 青岛华海环保工业有限公司 Technique for forming rubber dam
CN201077977Y (en) * 2007-12-12 2008-06-25 衡水佳兴工程橡胶有限公司 Rubber dam bag body

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102086636A (en) * 2010-12-20 2011-06-08 江苏扬州合力橡胶制品有限公司 Method for installing rubber dam bag as well as bag body of rubber dam bag
CN102086636B (en) * 2010-12-20 2012-07-25 江苏扬州合力橡胶制品有限公司 Method for installing rubber dam bag as well as bag body of rubber dam bag
CN102561270A (en) * 2012-01-18 2012-07-11 江苏扬州合力橡胶制品有限公司 Production process of seamless rubber dam bag
CN102561270B (en) * 2012-01-18 2014-02-05 江苏扬州合力橡胶制品有限公司 Production process of seamless rubber dam bag
CN102619193A (en) * 2012-04-16 2012-08-01 烟台桑尼橡胶有限公司 Dam blocking air bag and vulcanizing boiler vulcanization processing method thereof
CN102628260A (en) * 2012-04-16 2012-08-08 烟台桑尼橡胶有限公司 Air bag for retaining dam and method for machining air bag by vulcanization of plate vulcanizing machine
CN102628260B (en) * 2012-04-16 2015-07-29 烟台桑尼橡胶有限公司 A kind of vulcanizing press sulfuration processing method of checkdam air bag
CN102660935A (en) * 2012-05-21 2012-09-12 烟台桑尼橡胶有限公司 Dam bag for spiral steel mesh rubber dam and preparation process thereof
CN102660935B (en) * 2012-05-21 2015-01-14 烟台桑尼橡胶有限公司 Dam bag for spiral steel mesh rubber dam and preparation process thereof
CN109024636A (en) * 2018-07-13 2018-12-18 烟台桑尼橡胶有限公司 A kind of PLASTIC MOVABLE COFFER DAMS and its processing technology

Also Published As

Publication number Publication date
CN101691743B (en) 2011-03-16

Similar Documents

Publication Publication Date Title
CN101691743B (en) Dam bag of rubber dam and processing technology thereof
CN103935050B (en) A kind of sandwich structure moulding technique preventing thick honeycomb sliding from subsiding
CN103600498B (en) The manufacture of segmented wind electricity blade and assembly method
CN105398582A (en) Skin, bulkhead integrated unmanned aerial vehicle body and manufacturing method of bulkhead integrated unmanned aerial vehicle body
CN103233443A (en) Rubber dam bag body and production method thereof
CN103507123A (en) Wood interlayer thermoplastic composite material and preparing method thereof
CN105837870A (en) Multi-layer rubber compound insulation shoe sole for hot-line work and preparation method thereof
CN103410326B (en) Transition joint arm and manufacture method, foldable arm rack, apparatus for distributing
CN107521206A (en) A kind of light weight water proof type car trunk cover plate and preparation method thereof
CN111572107A (en) Automobile roof material and preparation method thereof
CN201670058U (en) Procured tread and retreaded tire using same
CN101913275B (en) Non-butyl rubber composite material for air-tight layer and preparation method thereof
CN205310849U (en) Integral type composite honeycomb board former
CN214089187U (en) Tear-resistant anti-layering waterproof coiled material
CN101837713A (en) Precured tread and retreaded tire using precured tread
CN104452974B (en) Wood plastic composite board/rubber sheet laminated isolation bearing for village and town low-rise buildings and production method of isolation bearing
CN103071274A (en) Inflation adhesive ball fabric-liner middle tread and manufacturing method thereof
CN102672983A (en) Preparation technology for spiral steel mesh rubber belt
JP6092494B1 (en) Rubber undulation weir body and manufacturing method thereof
CN106427174A (en) Production process of composite mat
CN102628260B (en) A kind of vulcanizing press sulfuration processing method of checkdam air bag
CN107160776B (en) High-strength sandwich base material for automobile roof and production method thereof
CN101454147A (en) Manufacturing method of pneumatic tire
CN204311570U (en) Villages and small towns low-rise building wood-plastic clad plate/sheet rubber laminated shock isolation support
CN203221692U (en) Rubber dam bag body

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant