CN101674194A - 基于日志特征分析的机群负载模型及其建模方法 - Google Patents
基于日志特征分析的机群负载模型及其建模方法 Download PDFInfo
- Publication number
- CN101674194A CN101674194A CN200910093782A CN200910093782A CN101674194A CN 101674194 A CN101674194 A CN 101674194A CN 200910093782 A CN200910093782 A CN 200910093782A CN 200910093782 A CN200910093782 A CN 200910093782A CN 101674194 A CN101674194 A CN 101674194A
- Authority
- CN
- China
- Prior art keywords
- submodel
- time
- parallelism
- degree
- implementation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100937827A CN101674194B (zh) | 2009-09-28 | 2009-09-28 | 基于日志特征分析的机群负载模型及其建模方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100937827A CN101674194B (zh) | 2009-09-28 | 2009-09-28 | 基于日志特征分析的机群负载模型及其建模方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101674194A true CN101674194A (zh) | 2010-03-17 |
CN101674194B CN101674194B (zh) | 2011-11-09 |
Family
ID=42021198
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009100937827A Expired - Fee Related CN101674194B (zh) | 2009-09-28 | 2009-09-28 | 基于日志特征分析的机群负载模型及其建模方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101674194B (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104156505A (zh) * | 2014-07-22 | 2014-11-19 | 中国科学院信息工程研究所 | 一种基于用户行为分析的Hadoop集群作业调度方法及装置 |
CN106376013A (zh) * | 2016-10-21 | 2017-02-01 | 黄林果 | 一种自组织网络的高可靠性链路设计方法 |
CN107277151A (zh) * | 2017-06-27 | 2017-10-20 | 曙光信息产业(北京)有限公司 | 一种作业调度系统的计时方法 |
CN108829500A (zh) * | 2018-05-04 | 2018-11-16 | 南京信息工程大学 | 一种云环境下模块化并行作业的动态节能调度方法 |
CN109885384A (zh) * | 2018-12-13 | 2019-06-14 | 平安壹钱包电子商务有限公司 | 任务并行度优化方法、装置、计算机设备及存储介质 |
CN114385877A (zh) * | 2022-03-23 | 2022-04-22 | 北京得瑞领新科技有限公司 | 测试过程的可视化处理方法及系统、计算机可读介质 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101266633B (zh) * | 2006-11-29 | 2011-06-08 | 优万科技(北京)有限公司 | 无缝超大规模虚拟游戏世界平台 |
CN101311917B (zh) * | 2007-05-24 | 2011-04-06 | 中国科学院过程工程研究所 | 一种面向粒子模型的多层直连集群并行计算系统 |
-
2009
- 2009-09-28 CN CN2009100937827A patent/CN101674194B/zh not_active Expired - Fee Related
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104156505A (zh) * | 2014-07-22 | 2014-11-19 | 中国科学院信息工程研究所 | 一种基于用户行为分析的Hadoop集群作业调度方法及装置 |
CN104156505B (zh) * | 2014-07-22 | 2017-12-15 | 中国科学院信息工程研究所 | 一种基于用户行为分析的Hadoop集群作业调度方法及装置 |
CN106376013A (zh) * | 2016-10-21 | 2017-02-01 | 黄林果 | 一种自组织网络的高可靠性链路设计方法 |
CN107277151A (zh) * | 2017-06-27 | 2017-10-20 | 曙光信息产业(北京)有限公司 | 一种作业调度系统的计时方法 |
CN108829500A (zh) * | 2018-05-04 | 2018-11-16 | 南京信息工程大学 | 一种云环境下模块化并行作业的动态节能调度方法 |
CN108829500B (zh) * | 2018-05-04 | 2022-05-27 | 南京信息工程大学 | 一种云环境下模块化并行作业的动态节能调度方法 |
CN109885384A (zh) * | 2018-12-13 | 2019-06-14 | 平安壹钱包电子商务有限公司 | 任务并行度优化方法、装置、计算机设备及存储介质 |
CN109885384B (zh) * | 2018-12-13 | 2023-02-07 | 平安壹钱包电子商务有限公司 | 任务并行度优化方法、装置、计算机设备及存储介质 |
CN114385877A (zh) * | 2022-03-23 | 2022-04-22 | 北京得瑞领新科技有限公司 | 测试过程的可视化处理方法及系统、计算机可读介质 |
CN114385877B (zh) * | 2022-03-23 | 2022-06-03 | 北京得瑞领新科技有限公司 | 测试过程的可视化处理方法及系统、计算机可读介质 |
Also Published As
Publication number | Publication date |
---|---|
CN101674194B (zh) | 2011-11-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101674194B (zh) | 基于日志特征分析的机群负载模型及其建模方法 | |
Pakes et al. | Computing markov perfect nash equilibria: Numerical implications of a dynamic differentiated product model | |
van den Berg et al. | Modeling and control of a manufacturing flow line using partial differential equations | |
Suri et al. | Comparative analysis of software effort estimation techniques | |
Todd | Periodic linear-quadratic methods for modeling seasonality | |
Pozin et al. | Models in performance testing | |
Oyarbide et al. | Manufacturing systems modelling using system dynamics: forming a dedicated modelling tool | |
CN103903070A (zh) | 应用系统资源需求测算系统 | |
White | A control model of the software requirements process | |
Bertot et al. | An overview of cloud simulation enhancement using the Monte-Carlo method | |
CN109426975A (zh) | 一种可变周期的电量结算方法及其系统 | |
Ballin et al. | Optimization of sampling strata with the SamplingStrata package | |
Clarke et al. | Manufacturing Cell Machine/Manning Performance Simulation by Using CAPS/ECSL | |
Sallo et al. | Enriching computing simulators by generating realistic serverless traces | |
Kerbyson et al. | Is predictive tracing too late for HPC users? | |
CN114138095B (zh) | 互联网数据中心idc的功耗处理方法、设备和可读介质 | |
Casey et al. | A multi-factor Uzawa growth theorem and endogenous capital-augmenting technological change | |
CN117952564B (zh) | 一种基于进度预测的排程模拟优化方法及系统 | |
Brady | When Load Testing Large User Population Web Applications The Devil Is In the (Virtual) User Details. | |
Psaroudakis et al. | A discrete event simulation model to evaluate changes to a software project delivery process | |
RU83151U1 (ru) | Устройство для моделирования системы оценки экономических показателей | |
Chlumský et al. | Improving Accuracy of Walltime Estimates in PBS Professional Using Soft Walltimes | |
Biazen et al. | Comparative analysis of analytical and discrete-event simulation models of assembly line systems | |
Mohammed et al. | SimAS: A Simulation-assisted Approach for the Scheduling Algorithm Selection under Perturbations | |
Rechtschaffen | Queuing simulation using a random number generator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Ruan Li Inventor after: Xiao Limin Inventor after: Liu Zhuo Inventor after: Liang Aihua Inventor before: Xiao Limin Inventor before: Liu Zhuo Inventor before: Liang Aihua Inventor before: Ruan Li |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: XIAO LIMIN LIU ZHUO LIANG AIHUA RUAN LI TO: RUAN LI XIAO LIMIN LIU ZHUO LIANG AIHUA |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111109 Termination date: 20170928 |