CN101672893A - 模拟电网频率变化的发电机组一次调频性能测试方法 - Google Patents

模拟电网频率变化的发电机组一次调频性能测试方法 Download PDF

Info

Publication number
CN101672893A
CN101672893A CN200810042742A CN200810042742A CN101672893A CN 101672893 A CN101672893 A CN 101672893A CN 200810042742 A CN200810042742 A CN 200810042742A CN 200810042742 A CN200810042742 A CN 200810042742A CN 101672893 A CN101672893 A CN 101672893A
Authority
CN
China
Prior art keywords
frequency
primary frequency
frequency modulation
generator set
primary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200810042742A
Other languages
English (en)
Other versions
CN101672893B (zh
Inventor
沈丛奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
East China Power Test and Research Institute Co Ltd
Shanghai Minghua Electric Power Technology and Engineering Co Ltd
Original Assignee
East China Power Test and Research Institute Co Ltd
Shanghai Minghua Electric Power Technology and Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East China Power Test and Research Institute Co Ltd, Shanghai Minghua Electric Power Technology and Engineering Co Ltd filed Critical East China Power Test and Research Institute Co Ltd
Priority to CN2008100427425A priority Critical patent/CN101672893B/zh
Publication of CN101672893A publication Critical patent/CN101672893A/zh
Application granted granted Critical
Publication of CN101672893B publication Critical patent/CN101672893B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

本发明提出一种模拟电网频率变化的发电机组一次调频性能测试方法,其步骤包括设置一个频差模拟模块和一个选择模块于发电机组频率控制回路;选取电网扰动时的频率变化数据;依据上述数据设定上述频差模拟模块,以使该频差模拟模块模拟电网出现扰动时的频率变化发出频差信号;上述选择模块断开实际机组频率信号,接入上述模拟模块发出的模拟频差信号,进行发电机组的一次调频性能测试,记录测试过程数据。本发明使发电机组的一次调频满足电网的实际需要,提高电网的电能质量,同时避免不必要的调节作用,节约发电机组的资源。

Description

模拟电网频率变化的发电机组一次调频性能测试方法
技术领域
本发明是有关于一种发电机组一次调频性能测试方法,且特别是有关于一种模拟电网频率变化的发电机组一次调频性能测试方法。
背景技术
电网频率是发电功率与用电负荷平衡的依据,当发电功率与用电负荷大小相等时,电网频率稳定;发电功率大于用电负荷时,电网频率升高;发电功率小于用电负荷时,电网频率降低。
一次调频,是指电网的频率一旦偏离额定值时,电网中发电机组的控制系统自动控制机组有功功率的增减,限制电网频率变化,使电网频率维持稳定的自动控制过程。如图1所示,图1为目前电网一次调频控制的原理图,其中ΔP=f(Δf),控制器使其入口偏差趋于0,当有频差时,控制器使发电功率变化,测试时通过模拟频差变化,观察发电功率变化来评价一次调频的性能,ΔP应随f(Δf)快速变化。
如图2所示,图2为目前电网一次调频性能测试方法的模拟频差示意图。目前通过在发电机组控制系统中人为模拟频率偏差的方法来测试发电机组的一次调频性能。人为模拟频差一般采用简单的频差阶跃扰动,与电网出现扰动时电网频率变化的情况不同,不能正确反映发电机组的一次调频性能,而通过实际动作试验代价太大,而且不可能为测试和调整某台发电机组一次调频性能进行。
发明内容
本发明提出一种模拟电网频率变化的发电机组一次调频性能测试方法,以解决上述问题。
为达到上述目的,本发明采取的技术方案包括以下步骤:
设置一个频差模拟模块和一个选择模块于发电机组频率控制回路;选取电网扰动时的频率变化数据;依据上述数据设定上述频差模拟模块,以使该频差模拟模块模拟电网出现扰动时的频率变化发出频差信号;上述选择模块断开实际机组频率信号,接入上述模拟模块发出的模拟频差信号,进行发电机组的一次调频性能测试,记录测试过程数据。
本发明的发电机组一次调频性能测试方法还包括:根据测试结果调整机组频率控制系统的参数,重复进行调频测试至少一次。
本发明的发电机组一次调频性能测试方法还包括:根据发电机组一次调频的积分电量计算方法,计算模拟电网频率扰动过程机组的一次调频积分电量,根据计算结果进行一次调频调节性能的量化和机组调节参数的优化。
综上所述,本发明方法模拟电网在用电和发电出现偏差时电网频率的变化,可测试出发电机组真实的一次调频性能,同时可用于调试发电机组的一次调频功能和性能,使发电机组的一次调频满足电网的实际需要,提高电网的电能质量,同时避免不必要的调节作用,节约发电机组的资源。
为让本发明的上述特征和优点能更明显易懂,下文特举较佳实施例,并配合附图,作详细说明如下。
附图说明
图1所示为目前电网一次调频控制原理图。
图2所示为目前电网一次调频性能测试方法的模拟频差示意图。
图3所示为本发明一实施例的一次调频性能测试方法示意图。
图4所示为本发明一实施例的一次调频性能测试方法的模拟频差示意图。
具体实施方式
为了更了解本发明的技术内容,特举具体实施例并配合所附图式说明如下。
如图3所示,图3为本发明一实施例的一次调频性能测试方法示意图。其中,一个选择模块设置于发电机组控制系统的实际频差输入端,其与一个频差模拟模块相连,且控制切换实际频差和模拟频差;选取电网扰动时的频率变化数据;依据上述数据设定上述频差模拟模块以模拟电网出现扰动时的频率变化发出频差信号,其模拟频差如图4所示;上述选择模块断开实际机组频率信号,接入上述模拟模块发出的模拟频差信号,观察发电机组的功率变化来测试和调整一次调频性能。
根据测试结果调整机组频率控制系统的参数,重复进行调频测试。
根据发电机组一次调频的积分电量计算方法,计算模拟电网频率扰动过程机组的一次调频积分电量,根据计算结果进行一次调频调节性能的量化和机组调节参数的优化。
通过上述方法,测试和调整一次调频性能完全适合电网的要求。
此外,在本发明另一实施例中,设置一个操作和显示界面以供操作员进行测试控制,其中该界面可设置频差变化的幅度、进行测试选择、增加一次调频性能的计算功能、并自动计算出性能指标,从而方便操作员地进行一次调频性能试验。
虽然本发明已以较佳实施例揭露如上,然其并非用以限定本发明,任何所属技术领域中具有通常知识者,在不脱离本发明的精神和范围内,当可作些许的更动与润饰,因此本发明的保护范围当视权利要求书所界定者为准。

Claims (3)

1.一种发电机组一次调频性能测试方法,其特征在于,包括:
设置一个频差模拟模块和一个选择模块于发电机组频率控制回路;
选取电网扰动时的频率变化数据;
依据上述数据设定上述频差模拟模块,以使该频差模拟模块模拟电网出现扰动时的频率变化发出频差信号;
上述选择模块断开实际机组频率信号,接入上述模拟模块发出的模拟频差信号,进行发电机组的一次调频性能测试,记录测试过程数据。
2.根据权利要求1所述的发电机组一次调频性能测试方法,其特征在于,上述进行发电机组的一次调频性能测试,记录测试过程数据还包括:根据测试结果调整机组频率控制系统的参数,重复进行调频测试至少一次。
3.根据权利要求1所述的发电机组一次调频性能测试方法,其特征在于,根据发电机组一次调频的积分电量计算方法,计算模拟电网频率扰动过程机组的一次调频积分电量,根据计算结果进行一次调频调节性能的量化和机组调节参数的优化。
CN2008100427425A 2008-09-10 2008-09-10 模拟电网频率变化的发电机组一次调频性能测试方法 Active CN101672893B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100427425A CN101672893B (zh) 2008-09-10 2008-09-10 模拟电网频率变化的发电机组一次调频性能测试方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100427425A CN101672893B (zh) 2008-09-10 2008-09-10 模拟电网频率变化的发电机组一次调频性能测试方法

Publications (2)

Publication Number Publication Date
CN101672893A true CN101672893A (zh) 2010-03-17
CN101672893B CN101672893B (zh) 2012-08-08

Family

ID=42020204

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100427425A Active CN101672893B (zh) 2008-09-10 2008-09-10 模拟电网频率变化的发电机组一次调频性能测试方法

Country Status (1)

Country Link
CN (1) CN101672893B (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102323550A (zh) * 2011-09-09 2012-01-18 西北电网有限公司 发电机组一次调频调节性能测定方法
CN102508159A (zh) * 2011-11-17 2012-06-20 河海大学 大型发电机组自动调节装置通用辅助测试系统及方法
CN102545215A (zh) * 2012-01-16 2012-07-04 河北省电力研究院 基于全球定位系统的区域电网一次调频性能定量分析评价方法
CN102707231A (zh) * 2012-05-16 2012-10-03 广东电网公司电力科学研究院 基于matlab/simulink的发电机组一次调频分析系统
CN102787870A (zh) * 2012-08-25 2012-11-21 华北电力大学(保定) 一种提高供热机组一次调频能力的方法
CN104166093A (zh) * 2014-07-23 2014-11-26 国网上海市电力公司 兼顾电网调频需求的超临界机组调速系统建模参数测量方法
CN106707162A (zh) * 2016-12-21 2017-05-24 国电南瑞科技股份有限公司 一种发电机组调节性能测试方法和平台
CN106899027A (zh) * 2017-03-29 2017-06-27 哈尔滨工业大学 汽轮机高调阀门流量动态非线性的一次调频能力补偿方法
CN111650513A (zh) * 2020-05-22 2020-09-11 国网天津市电力公司电力科学研究院 一种火力发电机组一次调频静态试验方法
CN116316703A (zh) * 2023-04-04 2023-06-23 华能沾化光伏发电有限公司 实现网源协调功能的独立一次调频系统

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI485322B (zh) * 2012-09-18 2015-05-21 Univ Nat Cheng Kung 風力發電模擬裝置及其控制方法

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4741023A (en) * 1986-12-23 1988-04-26 General Electric Company On-line test and diagnostic system for power system stabilizer
CN1295859C (zh) * 2004-05-08 2007-01-17 上海慧能科技有限公司 发电机组一次调频调节效能测定方法
CN2862055Y (zh) * 2005-09-26 2007-01-24 中国人民解放军96531部队 智能型可移动式发电机组负载试验装置

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102323550A (zh) * 2011-09-09 2012-01-18 西北电网有限公司 发电机组一次调频调节性能测定方法
CN102508159A (zh) * 2011-11-17 2012-06-20 河海大学 大型发电机组自动调节装置通用辅助测试系统及方法
CN102508159B (zh) * 2011-11-17 2013-09-25 河海大学 大型发电机组自动调节装置通用辅助测试系统及方法
CN102545215A (zh) * 2012-01-16 2012-07-04 河北省电力研究院 基于全球定位系统的区域电网一次调频性能定量分析评价方法
CN102545215B (zh) * 2012-01-16 2014-05-28 河北省电力公司电力科学研究院 基于全球定位系统的区域电网一次调频性能定量分析评价方法
CN102707231B (zh) * 2012-05-16 2015-06-10 广东电网公司电力科学研究院 基于matlab/simulink的发电机组一次调频分析系统
CN102707231A (zh) * 2012-05-16 2012-10-03 广东电网公司电力科学研究院 基于matlab/simulink的发电机组一次调频分析系统
CN102787870A (zh) * 2012-08-25 2012-11-21 华北电力大学(保定) 一种提高供热机组一次调频能力的方法
CN102787870B (zh) * 2012-08-25 2014-11-26 华北电力大学(保定) 一种提高供热机组一次调频能力的方法
CN104166093A (zh) * 2014-07-23 2014-11-26 国网上海市电力公司 兼顾电网调频需求的超临界机组调速系统建模参数测量方法
CN104166093B (zh) * 2014-07-23 2017-05-10 国网上海市电力公司 兼顾电网调频需求的超临界机组调速系统建模参数测量方法
CN106707162A (zh) * 2016-12-21 2017-05-24 国电南瑞科技股份有限公司 一种发电机组调节性能测试方法和平台
CN106707162B (zh) * 2016-12-21 2019-03-19 国电南瑞科技股份有限公司 一种发电机组调节性能测试方法和平台
CN106899027A (zh) * 2017-03-29 2017-06-27 哈尔滨工业大学 汽轮机高调阀门流量动态非线性的一次调频能力补偿方法
CN106899027B (zh) * 2017-03-29 2019-06-11 哈尔滨工业大学 汽轮机高调阀门流量动态非线性的一次调频能力补偿方法
CN111650513A (zh) * 2020-05-22 2020-09-11 国网天津市电力公司电力科学研究院 一种火力发电机组一次调频静态试验方法
CN111650513B (zh) * 2020-05-22 2024-01-26 国网天津市电力公司电力科学研究院 一种火力发电机组一次调频静态试验方法
CN116316703A (zh) * 2023-04-04 2023-06-23 华能沾化光伏发电有限公司 实现网源协调功能的独立一次调频系统
CN116316703B (zh) * 2023-04-04 2023-10-24 华能沾化光伏发电有限公司 实现网源协调功能的独立一次调频系统

Also Published As

Publication number Publication date
CN101672893B (zh) 2012-08-08

Similar Documents

Publication Publication Date Title
CN101672893B (zh) 模拟电网频率变化的发电机组一次调频性能测试方法
Hu et al. Grid-forming inverter enabled virtual power plants with inertia support capability
Rakhshani et al. Inertia emulation in AC/DC interconnected power systems using derivative technique considering frequency measurement effects
Pourmousavi et al. Real-time central demand response for primary frequency regulation in microgrids
Astero et al. Decentralized cooperative control strategy of microsources for stabilizing autonomous VSC-based microgrids
Zhang et al. Fully distributed coordination of multiple DFIGs in a microgrid for load sharing
CN104980043B (zh) 功率变换器与该功率变换器的频率特性测试及调节方法
MX2011000033A (es) Metodo y sistema para operar una planta de energia de viento que comprende un numero de generadores de turbina de viento.
KR101023703B1 (ko) 실 기상조건을 이용한 mms 성능평가용 hils 시스템.
CN108923460A (zh) 微网虚拟同步机多机并联动态一致响应的参数配置方法
CN104821764B (zh) 一种依据系统动态特性的脉冲负载的功率等效方法
Rakhshani et al. Modeling and sensitivity analyses of VSP based virtual inertia controller in HVDC links of interconnected power systems
CN102904266B (zh) 一种确立风电场无功补偿容量适网性的方法
JP2016208826A (ja) 電力システムの改善された安定性のためのシステム及び方法
Oshnoei et al. Intelligent power control of inverter air conditioners in power systems: A brain emotional learning-based approach
CN105281625A (zh) 风力涡轮控制器和用于控制风力涡轮机的电力产生的方法
CN102075012B (zh) 自动装置逻辑验证系统及测试方法
CN108183492A (zh) 无功补偿控制装置的测试系统及测试方法
Hong et al. Realization of high fidelity power-hardware-in-the-loop capability using a MW-scale motor-generator set
Ashourian et al. Controlling and modeling power-electronic interface DERs in islanding mode operation micro grid
Pratt et al. Using an advanced distribution management system test bed to evaluate the impact of model quality on volt/var optimization
CN109103943B (zh) 一种发电机组控制系统及控制方法
CN109782629A (zh) 变速恒频抽水蓄能机组控制器硬件在环仿真测试平台
Farzinfar et al. Stability evaluation of microgrid using real-time simulation
Chen et al. Practical Strategy for Adjusting Parameters of Hydro-Governors in Hydro-Dominant Power Systems Accommodating Asynchronous Interconnection

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANGHAI MINGHUA ELECTRIC POWER TECHNOLOGY ENGINEE

Free format text: FORMER OWNER: EAST CHINA ELECTRIC POWER TEST + RESEARCH INSTITUTE CO., LTD.

Effective date: 20130206

Owner name: EAST CHINA ELECTRIC POWER TEST + RESEARCH INSTITUT

Free format text: FORMER OWNER: SHANGHAI MINGHUA ELECTRIC POWER TECHNOLOGY ENGINEERING CO., LTD.

Effective date: 20130206

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130206

Address after: 200437 Shanghai Road, Handan, building 801, room 9, building 171, room

Patentee after: Shanghai Minghua Electric Power Technology Engineering Co., Ltd.

Patentee after: East China Electric Power Test & Research Institute Co., Ltd.

Patentee after: Shanghai Electric Power Corporation

Patentee after: State Grid Corporation of China

Address before: 200437 Handan Road, Shanghai, No. 171, No.

Patentee before: East China Electric Power Test & Research Institute Co., Ltd.

Patentee before: Shanghai Minghua Electric Power Technology Engineering Co., Ltd.