CN101667722B - Method for melting ice and snow on power transmission and distribution lines by low voltage and high current - Google Patents

Method for melting ice and snow on power transmission and distribution lines by low voltage and high current Download PDF

Info

Publication number
CN101667722B
CN101667722B CN2008102143790A CN200810214379A CN101667722B CN 101667722 B CN101667722 B CN 101667722B CN 2008102143790 A CN2008102143790 A CN 2008102143790A CN 200810214379 A CN200810214379 A CN 200810214379A CN 101667722 B CN101667722 B CN 101667722B
Authority
CN
China
Prior art keywords
snow
ice
transmission
line
overhead ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008102143790A
Other languages
Chinese (zh)
Other versions
CN101667722A (en
Inventor
唐翊程
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2008102143790A priority Critical patent/CN101667722B/en
Publication of CN101667722A publication Critical patent/CN101667722A/en
Application granted granted Critical
Publication of CN101667722B publication Critical patent/CN101667722B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

本发明公开了一种用低电压高电流熔去输配电线路上之冰雪的方法,它包括采用需熔化冰雪之输配电线路及输电线路两端的变电站,在输电线路的两端,即变电站的进出线上,其一端连接12伏至80伏的低电压,另一端连接短路操作台。在需熔化冰雪时,在连接低电压的一端进行低压电输出操作,在连接短路操作台的一端进行短路操作,使需熔化冰雪之输配电线路上实现低电压高电流而产生热量,从而使配电线路上需熔化之冰雪被获得热量而熔化。按本发明的方法来除掉输电线路上的冰雪,省人省力,无须登杆塔,冰雪天气想熔哪条线路是非常方便、快捷、安全的。特别是在冬季可以做到有计划地对每一条线路进行除冰雪工作,不会影响工农业生产和人们的日常生活用电。

Figure 200810214379

The invention discloses a method for melting ice and snow on transmission and distribution lines with low voltage and high current. On the incoming and outgoing line, one end is connected to a low voltage of 12 volts to 80 volts, and the other end is connected to a short-circuit operating table. When it is necessary to melt ice and snow, low-voltage electrical output operation is performed on the end connected to the low voltage, and short-circuit operation is performed on the end connected to the short-circuit operation table, so that the power transmission and distribution line that needs to melt ice and snow realizes low voltage and high current to generate heat, so that the distribution The snow and ice that needs to be melted on the electric line is obtained by heat and melted. According to the method of the present invention, the ice and snow on the transmission line are removed, which saves manpower and labor, and does not need to climb a pole tower. It is very convenient, fast and safe to melt which line in ice and snow weather. Especially in winter, it is possible to carry out deicing and snow removal work for each line in a planned manner, without affecting industrial and agricultural production and people's daily power consumption.

Figure 200810214379

Description

Method with the low voltage and high current melting ice and snow on power transmission and distribution lines
Technical field
The present invention relates to the guard method on the defeated modified line road of electric power, particularly a kind of method with the low voltage and high current melting ice and snow on power transmission and distribution lines.
Background technology
14 provinces of in February, 2008 China suffer that the harm of ice and snow makes the electrical network broken string of falling the shaft tower, electrical network has a power failure comprehensively and makes national economy suffer heavy losses never before seen, Guizhou ice and snow not seen once in a hundred years especially congeals, make Duyun City and high-and low-voltage circuit, the whole Bouyei-Miao Autonomous Prefecture of Qiannan broken string of falling the shaft tower even more serious, caused Quanzhou to have a power failure not having a circuit is the intact not broken string of falling the shaft tower.How eliminating the ice and snow that coagulates that overlays on the lead, is China and countries in the world problem anxious to be solved in winter.
The power supply administration of northern China electrical network, the past, the Chinese Central Television (CCTV) reported with the ice and snow on the method removal lead of low-voltage short circuit, reported also that Russia also used low-voltage short circuit deicing, what they adopted is that 220 volts, 380 volts voltages are removed the ice and snow on the lead.220, can produce blast during 380 volts of high voltage short circuit deicing, and their short-circuit voltage electric current increases severely fast, have loosening point will emit arc light on short circuit place switch and lead contact point and the lead, stronger than the arc light of common electric welding.The loosening point of switch is lived in the weldering of high temperature arc light will blow lead, so the short circuit deicing of China does not continue development.
Summary of the invention
The objective of the invention is provides both safety for the deficiency that solves above-mentioned technology, can not damage electric line, again need not rod-rising tower, economize people's a kind of method in labour-saving again with the low voltage and high current melting ice and snow on power transmission and distribution lines.
In order to achieve the above object, a kind of method provided by the invention with the low voltage and high current melting ice and snow on power transmission and distribution lines, it comprises that employing need melt the electric line of ice and snow and the transformer station at transmission line two ends, two ends at transmission line, be on the turnover line of transformer station, the one end connects 12 volts to 80 volts low-voltage, and the other end connects the short circuit operating desk.When need fusing ice and snow, carry out the low tension output function at an end that connects low-voltage, carry out the short circuit operation at an end that connects the short circuit operating desk, make and realize low voltage and high current on the electric line that needs fusing ice and snow and produce heat, need the obtained heat of ice and snow of fusing on the electric line and melt thereby make.
On the turnover line of described transformer station at an end between the electric line, the low-voltage of input is to realize by the out-put supply of special transformer.Described special transformer is a three-phase low voltage and high current transformer, its input is that 10 kilovolts of high pressure are made power supply, and output voltage is two pole tensions, 80 volts of one-levels, another is 12 volts low-voltage output very, and the employing output current is 200 amperes to 300 amperes a transformer.This special transformer is used in industrial, is used for the transformer of metal smelting.It is three-phase low voltage and high current transformer.Molten ice and snow mainly is the heat that sends with high electric current, through short circuit, except that the heat of the point of impingement than much higher on the lead, the heat on the lead is consistent.The blast when operating in order to reduce short circuit and the arc light of generation, 110 kilovolts, 12 volts of voltages inputs of the used for transmission line of two-conductor line more than 220 kilovolts and 500 kilovolts reach 80 volts of voltages of short used for transmission line for 10 kilovolts and import.Select the size of transformer for use with circuit length, 220 kilovolts of two-conductor lines and 500 kilovolt adopt 300 amperes transformer.
Described short circuit operating desk comprises the carbon-point and the short circuit operating handle of contact short circuit, makes carbon-point realize the short circuit operation between the lead of required short circuit by the short circuit operating handle; The short circuit operation is to be duration of short circuit with the second, collides back and forth between each utmost point of the lead of need short circuit operation with 5 seconds to 10 seconds that are interrupted and realizes the short circuit operation.
Because during short circuit, can produce the high temperature arc light, if do contact point with metal, the high temperature of contact point can and be stained with metal molten and stick together, and can not in time separate.If the overlong time of contact also can be blown lead.For fear of the generation of this phenomenon, and make things convenient for the short circuit operation, on the short circuit operating desk, be provided with the carbon-point and the short circuit operating handle of contact short circuit, make carbon-point between the lead of required short circuit, realize short circuit by the short circuit operating handle.Adopt carbon-point as contact point (short dot), can not melt because of high temperature and be stained with and stick together.For fear of lonely light, high temperature burn operating personnel, available iron plate self-control 100 *100 *The 140cm operating desk back and forth collides short circuit with the carbon-point the operating desk to the centre from three directions by operating personnel.As long as have the people of electric power knowledge all can realize this short circuit operation, be not described in detail in this.12V voltage is safe voltage, as long as and 80V voltage is worn insulation boots, catch to touch the lead people and can not shocked by electricity.It is in order to protect operating personnel not burnt by high temperature that operating personnel wear gloves, dark glasses, and eyes are not by welding flash.
When described electric line is transmission line, overhead ground wire, the on-insulated overhead ground wire of the on-insulated overhead ground wire of transmission line and transformer station's turnover line is transformed into insulated static wire; To be transformed into on-insulated overhead ground wire and use a slice porcelain insulator, and long with 1.5m, and with the joining seam line of the same specification of overhead ground wire, its two ends connect on shaft tower ironware and the overhead ground wire and ground connection by porcelain insulator; On the terminal pole of two ends transformer station, draw to descend to the earth connection of ground with two insulated conductors with the same specification of overhead ground wire, untie before the molten ice and snow; Want line to untie joining seam line on the overhead ground wire and colligation on the shaft tower metallic support before the molten ice and snow, again the downlead in the transformer station of circuit two ends is untied; The molten ice and snow of short circuit just can be carried out the work; This moment, overhead ground wire was earth-free state, so be called insulated static wire.After removing the ice and snow on lead and the overhead ground wire, the downlead at two is recovered ground connection; The circuit ice and snow that congeals repeatedly can repeat the work of molten ice and snow.
A kind of method with the low voltage and high current melting ice and snow on power transmission and distribution lines that the present invention obtains is removed the ice and snow on the electric line, and people from province is laborsaving, need not rod-rising tower.Unify call command by on-the-spot person in overall.Send electricity by on-the-spot director commander, the order of accepting the person in overall, commander send.The short circuit operating desk of the other end is by the telephone order of another on-the-spot director according to the person in overall, and commander's short circuit is operated.Establish the special messenger in the circuit and supervise molten ice condition condition, Advise By Wire person in overall.As long as establish point of observation in the line.
In 10 KV distribution circuits, have one section be cable and the lead of insulation arranged, cable and have between the lead of insulation can not direct short-circuit, in order to avoid burn out the insulating barrier of cable and insulated conductor, the work of the molten ice and snow of short circuit will be avoided cable and insulated conductor is arranged, and at uninsulated conductor and cable, have the junction of insulated conductor to carry out; Before the molten ice and snow, distribution transforming disconnecting link switches all in the 10kV distribution line is disconnected, the high-voltage fuse in the circuit will be with the copper cash that is not less than φ 16mm; When melting ice and snow; carrying out low voltage and high current at transformer station's outlet bar send; short circuit is at distribution line terminal pole and the enterprising line operate of branch line terminal pole; time is controlled in 5 seconds to 10 seconds; also can sight path length and the ice-melt situation suitably increase and decrease the time, molten ice and snow speed is fast, the frozen water of fusing plays a part guardwire safety; in short time, can not cause the accident of blowing lead.
The used special transformer of the present invention can have been bought in China transformer producer, and the tool materials of making are simple.As long as overhead ground wire is made into insulated static wire, the overhead ground wire transformation can be carried out under charged situation, and the staff is before transforming insulated static wire, and overhead ground wire should have good earth, carries out construction safety.Ice and snow weather thinks that molten which bar circuit is very convenient, fast, safe.
Before going into the winter overhead ground wire joining seam line is untied, before the thunderstorm season joining seam line is recovered ground connection, step on the intact situation that bar is checked parts such as porcelain vase in passing.Untie and recover and under the charged situation of circuit, to untie and recover ground connection, carry out the safety requirements of live line working.Unties when the earth connection of transformer station's two terminal shaft tower has only molten ice, recover after melting ice, recover ground connection and need not rod-rising tower.
With 12 volts, 80 volts low-voltage deicing safety, quick, reliable.Just can accomplish in the winter time in a planned way each bar circuit to be carried out deicing work, can not influence industrial and agricultural production and daily life electricity consumption.The loss that ice and snow has a power failure has been educated us, and China's power supply department and the world are subjected to the country of ice and snow harm, all are badly in need of carrying out this work.
Description of drawings
Fig. 1 is the circuit connection diagram between two transformer stations;
Fig. 2 is that the power transmission line overhead ground wire adopts a slice insulator every playing structural representation.Wherein: transformer station 1; The transmission line 2 of molten ice and snow; Turnover line 3 on two substation architecture; The fastening hook 4 of lead; Special transformer 5; Power line connects 6; Output LOW voltage 7; Transformer grounding line 8; Send electric operating desk 9; Power-cutting switch 10; Prop up the tripod 11 of support sending electric lead; Short circuit operating desk 12; The fastening short circuit anchor post 13 of solid conductor; Short circuit operating handle 14; Lead 15; Overhead ground wire 16, a slice insulator 17, joining seam 18, metallic support 19; Joining seam line 20; Iron tower 21; Downlead 22.
Embodiment
The invention will be further described in conjunction with the accompanying drawings below by embodiment.
Embodiment 1
As shown in Figure 1, a kind of method that present embodiment is described with the low voltage and high current melting ice and snow on power transmission and distribution lines, it comprises that employing need melt the transmission line 2 of ice and snow and the transformer station 1 at transmission line two ends, on the turnover line of an end transformer station of the transformer station 1 at transmission line 2 two ends, connect and send electric operating desk 9, by power-cutting switch 10 output 12V to 80V low-voltages, on the turnover line of the transformer station 1 of transmission line 2 other ends, connect short circuit operating desk 12; On the turnover line 3 of the transformer station 1 of transmission line 2 one ends of need fusings ice and snow, carry out the low tension input operation, on the short circuit operating desk 12 that other end transformer station 1 connects, carry out the short circuit operation, make the snow cover acquisition heat that needs fusing on the transmission line 2 and melt.The turnover line 3 of transformer station 1 is connected with sending electric operating desk 9 and short circuit operating desk 12 by the fastening hook 4 of lead.
Input 12V to 80V low-voltage on the turnover line 3 of described transformer station 1 at an end between the transmission line 2, be that power supply by special transformer 5 send electricity to realize, described special transformer 5, its input is 1 to be that 10 kilovolts of high pressure are made power supply, special transformer 5 output voltages are two pole tensions, 80 volts of one-levels, another is 12 volts low-voltage output very, and special transformer adopts 200 amperes to 300 amperes transformer.Special transformer 5 connects 6 input power supplys by power line, and output LOW voltage 7; Output LOW voltage 7 is 12 volts and 80 volts of two ends, and special transformer 5 passes through transformer grounding line 8 ground connection when using.
Industrial, special transformer 5 is used for metal smelting.Special transformer 5 usefulness among the present invention be that the 10kV high pressure is done power supply, output voltage is the two poles of the earth, a 80V very, another is 12V very.This is that a kind of three-phase low voltage and high current transformer 5 can be tailor-made in transformer production producer.Three support porcelain vase sheets are installed on the crossbeam of the tripod 11 of support sending electric lead, are used for fixing and send electric lead to avoid sending electric lead ground connection.The tripod 11 that props up the support sending electric lead can decide the quantity of tripod according to the length of sending electric lead.When melting ice and snow, with power-cutting switch 10 closures, at this moment the voltage of the 12V of special transformer or 80V is delivered on the transmission line 2 by sending electric lead.
The blast when operating and the arc light of generation in order to reduce short circuit, 110 kilovolts, 12 volts of voltages inputs of the used for transmission line of two-conductor line more than 220 kilovolts and 500 kilovolts, 10 kilovolts of lines and short 80 volts of voltages of used for transmission line are imported.
The operation of short circuit for convenience is provided with short circuit operating handle 14 on short circuit operating desk 12.
During operation, the blast that produces when 12 volts and 80 volts of voltage short circuits is minimum, short circuit operating desk 12 is provided with anchor post 13, there are 3 carbon-points to link to each other in the operating desk with anchor post 13, the collision of these three carbon-points of operating handle 14 control with separate, the arc light that produces in collision place is big, but the strength ratio electric welding is much smaller.Operating personnel must be with degree of depth tinted glasses.Everywhere heat is consistent on lead.When separating carbon-point, the distance between the carbon-point should not be drawn back excessive, generally between 5cm to 10cm.Because in certain distance, when carbon-point separated, the distance between them was directly proportional with the intensity that produces arc light.10 kilovolt will disconnect the order of the distribution transforming in circuit gram switch with 80 volts, and the fusing fuse of the disconnecting link switch in branch line and the circuit is replaced with copper cash.The staff of the main line end and the branch line end will accept commander in chief's phone, and sight path length and ice-melt situation are controlled at the time in 5~10 seconds, and short circuit simultaneously disconnects simultaneously.Send electricity from transformer station's outlet bar, do the short circuit operation at circuit end bar and branch line end bar farthest.The short circuit tool making is simple.Because big high-voltage fuse all is unable to bear the temperature of big electric current again, the disconnect disconnecting link is arranged in the circuit, will linking up with copper cash of high-voltage fuse particularly arranged.
As shown in Figure 2, be a basic iron tower, the 16th, overhead ground wire, the 17th, a slice insulator, the 18th, joining seam is to use and overhead ground wire 16 the same specifications, long steel strand wire of 1.5m or steel reinforced aluminium conductor are the joining seam 18 that joining seam line 20 is done, metallic support 19.What accompanying drawing 2 was painted is the annexation of iron tower 21, overhead ground wire 16, joining seam line 20 under normal condition, and at this moment, overhead ground wire 16 is by joining seam line 20 and metallic support 19 ground connection.The present invention will make accompanying drawing 2 overhead ground wires 16 of transmission line with a slice insulator 17 into every rising, every have a slice insulator 17 of all will using of overhead ground wire 16 to isolate, with making joining seam line 20, connect overhead ground wire 16 and tower grounding with the steel strand wire or the steel reinforced aluminium conductor of 1.5 meters length of accompanying drawing 2 overhead ground wires 16 the same specifications.Do not have each end of the year and before thunderstorm season snows the joining seam 18 of 1.5 meters joining seam lines on the circuit is untied, and colligation is on metallic support 19.This moment, overhead ground wire 16 was earth-free state, so be called insulated static wire.Terminal shaft tower at accompanying drawing 1 transformer station two draws down to the earth connection of ground with the insulated copper lead of the same specification of overhead ground wire with two.Untie when circuit congeals, the molten ice and snow of short circuit just can be carried out the work.After removing the ice and snow on the overhead ground wire, the downlead 22 at accompanying drawing one two is recovered ground connection.The circuit ice and snow that congeals repeatedly can repeat the work of molten ice and snow.In a planned way carry out deicing work, do not influence the electricity consumption of industrial and agricultural production and people's normal life.Unify call command by on-the-spot person in overall before the molten ice, operation is commanded by the work on the spot director by two transformer stations, establishes the special messenger with lower aloft on the circuit and observes molten ice condition condition and notify the commander in chief and send electric person in overall.Serve electricity back notice short circuit director, commander's short circuit operating personnel carry out the short circuit operation, and duration of short circuit should not be grown, and is controlled at (sight path length and ice-melt situation suitably increase and decrease the time and select transformer for use) in 5 seconds to 10 seconds.The heat melts ice and snow that produces during the short circuit operation, the water that fusing ice and snow produces plays a part cooling, guardwire and overhead ground wire, is can not burn out lead and overhead ground wire in the short time.Fast with 12 volts and the molten speed of icing of 80 volts of low-voltages, it is laborsaving to economize the people, and it is safe need not rod-rising tower just can melting away the ice and snow that covers lead, can avoid coagulating the power outage of the ice and snow weather broken string of falling the shaft tower.The order of molten ice and snow is a pilot line, back overhead ground wire.

Claims (7)

1.一种用低电压高电流熔去输配电线路上之冰雪的方法,它包括采用需熔化冰雪之输配电线路及输电线路两端的变电站,在输电线路的两端,即变电站的进出线上,其一端连接12伏至80伏的低电压,另一端连接短路操作台;在需熔化冰雪时,在连接低电压的一端进行低压电输出操作,在连接短路操作台的一端进行短路操作,使需熔化冰雪之输配电线路上实现低电压高电流而产生热量,从而使输配电线路上需熔化之冰雪获得热量而熔化。1. A method for melting ice and snow on transmission and distribution lines with low voltage and high current, which includes the use of transmission and distribution lines and substations at both ends of the transmission line that need to melt ice and snow, at the two ends of the transmission line, the incoming and outgoing lines of the substation One end of it is connected to a low voltage of 12 volts to 80 volts, and the other end is connected to a short-circuit operation table; when it is necessary to melt ice and snow, the end connected to the low voltage is used for low-voltage electrical output operation, and the end connected to the short-circuit operation table is used for short-circuit operation. The transmission and distribution lines that need to melt ice and snow can realize low voltage and high current to generate heat, so that the ice and snow that need to be melted on the transmission and distribution lines can obtain heat and melt. 2.根据权利要求1所述的一种用低电压高电流熔去输配电线路上之冰雪的方法,其特征是所述的在输配电线路一端的变电站的进出线上,输入的低电压是通过特种变压器的输出电源来实现;所述的特种变压器是三相低电压高电流变压器,其输入端为10千伏高压作电源,输出电压为两极电压,一极80伏,另一极为12伏的低电压输出,所述变压器的输出电流为200安培至300安培。2. A method of melting ice and snow on transmission and distribution lines with low voltage and high current according to claim 1, characterized in that the input low-voltage It is realized by the output power supply of a special transformer; the special transformer is a three-phase low-voltage high-current transformer, its input terminal is a 10 kV high-voltage power supply, and the output voltage is a two-pole voltage, one pole is 80 volts, and the other pole is 12 Volts of low voltage output, the output current of the transformer is 200 amps to 300 amps. 3.根据权利要求1或2所述的一种用低电压高电流熔去输配电线路上之冰雪的方法,其特征是所述的短路操作台,包括接触短路的碳棒和短路操作把手,通过短路操作把手使碳棒在所需短路的导线间实现短路操作;短路操作是以秒钟为短路时间,在需短路操作的导线之各极之间来回碰撞来实现,短路操作的时间控制在5秒到10秒。3. A method for melting ice and snow on transmission and distribution lines with low voltage and high current according to claim 1 or 2, characterized in that the short-circuit operation platform includes a short-circuit contact carbon rod and a short-circuit operation handle, Short-circuit the carbon rod between the required short-circuited wires through the short-circuit operation handle; the short-circuit operation takes seconds as the short-circuit time, and is realized by colliding back and forth between the poles of the wires to be short-circuited, and the short-circuit operation time is controlled within 5 seconds to 10 seconds. 4.根据权利要求1或2所述的一种用低电压高电流熔去输配电线路上之冰雪的方法,其特征是所述输配电线路是输电线路、架空地线时,把输电线路不绝缘架空地线和变电站进出线的不绝缘架空地线改造成绝缘架空地线;要把不绝缘架空地线改造成用一片绝缘瓷瓶,并用1.5m长,与架空地线同样规格的搭头线,其两端通过绝缘瓷瓶连接杆塔铁件和架空地线上并接地;在两端变电站的终端杆上,用两根与架空地线同样规格的绝缘导线引下到地面接地线上;熔冰雪前要先解开架空地线上的搭头线并绑扎在杆塔金属支架上,再将线路两端变电站内的引下线解开;此时架空地线呈不接地状态,短路熔冰雪就可以开展工作;除去导线和架空地线上的冰雪后,把两头的引下线恢复接地;线路反复凝冻冰雪,可以重复熔冰雪的工作。4. A method for melting ice and snow on transmission and distribution lines with low voltage and high current according to claim 1 or 2, characterized in that when the transmission and distribution lines are transmission lines or overhead ground wires, the transmission lines The uninsulated overhead ground wire and the uninsulated overhead ground wire of the substation incoming and outgoing lines shall be transformed into insulated overhead ground wires; the uninsulated overhead ground wire shall be transformed into a piece of insulating porcelain bottle, and a 1.5m long lap head with the same specification as the overhead ground wire shall be used The two ends of the wire are connected to the iron parts of the tower and the overhead ground wire through insulating porcelain bottles and grounded; on the terminal poles of the substation at both ends, two insulated wires of the same specification as the overhead ground wire are used to lead down to the ground ground wire; Before ice and snow, untie the head wire of the overhead ground wire and tie it to the metal support of the tower, and then untie the down conductors in the substation at both ends of the line; The work can be carried out; after removing the ice and snow on the conductor and the overhead ground wire, restore the grounding of the down conductors at both ends; the line repeatedly freezes the ice and snow, and the work of melting ice and snow can be repeated. 5.根据权利要求3所述的一种用低电压高电流熔去输配电线路上之冰雪的方法,其特征是所述输配电线路是输电线路、架空地线时,把输电线路不绝缘架空地线和变电站进出线的不绝缘架空地线改造成绝缘架空地线;要把不绝缘架空地线改造成用一片绝缘瓷瓶,并用1.5m长,与架空地线同样规格的搭头线,其两端通过绝缘瓷瓶连接杆塔铁件和架空地线上并接地;在两端变电站的终端杆上,用两根与架空地线同样规格的绝缘导线引下到地面接地线上;熔冰雪前要先解开架空地线上的搭头线并绑扎在杆塔金属支架上,再将线路两端变电站内的引下线解开;此时架空地线呈不接地状态,短路熔冰雪就可以开展工作;除去导线和架空地线上的冰雪后,把两头的引下线恢复接地;线路反复凝冻冰雪,可以重复熔冰雪的工作。5. A method for melting ice and snow on transmission and distribution lines with low voltage and high current according to claim 3, characterized in that when the transmission and distribution lines are transmission lines or overhead ground wires, the transmission lines are not insulated The overhead ground wire and the non-insulated overhead ground wire of the substation incoming and outgoing lines are transformed into insulated overhead ground wires; the non-insulated overhead ground wire is transformed into a piece of insulating porcelain bottle, and a 1.5m long lap wire with the same specification as the overhead ground wire is used. Both ends of the tower are connected to the iron parts of the tower and the overhead ground wire through insulating porcelain bottles and grounded; on the terminal poles of the substation at both ends, use two insulated wires of the same specification as the overhead ground wire to lead down to the ground ground wire; before melting ice and snow It is necessary to untie the head wire of the overhead ground wire and tie it to the metal support of the tower, and then untie the down conductors in the substation at both ends of the line; Work; after removing the ice and snow on the wire and the overhead ground wire, restore the grounding of the down conductors at both ends; the line repeatedly freezes the ice and snow, and the work of melting ice and snow can be repeated. 6.根据权利要求1或2所述的一种用低电压高电流熔去输配电线路上之冰雪的方法,其特征是所述的输配电线路是10千伏配电线路时,10千伏配电线路上设有一段电缆和有绝缘的导线,短路熔冰雪的工作要避开电缆和有绝缘导线,而在无绝缘导线与电缆、有绝缘导线的连接处进行;熔冰雪前,将10kV配电线路中所有的配变刀闸开关断开,线路中的高压保险丝要用不小于φ16mm的铜线;熔冰雪时,在变电站出线杆进行低电压高电流送电,短路在配电线路终端杆和分支线终端杆上进行操作。6. A method of melting ice and snow on transmission and distribution lines with low voltage and high current according to claim 1 or 2, characterized in that when the transmission and distribution lines are 10 kV distribution lines, 10 kV There is a section of cable and insulated wire on the volt distribution line. The work of melting ice and snow should avoid the cable and insulated wire, and should be carried out at the connection between the non-insulated wire and the cable and the insulated wire; before melting the ice and snow, the All distribution transformer knife switches in the 10kV distribution line are disconnected, and the high-voltage fuse in the line must use copper wires not less than φ16mm; when melting ice and snow, low-voltage and high-current power transmission is carried out at the outlet pole of the substation, and the short circuit occurs in the distribution line Operate on terminal poles and branch line terminal poles. 7.根据权利要求3所述的一种用低电压高电流熔去输配电线路上之冰雪的方法,其特征是所述的输配电线路是10千伏配电线路时,10千伏配电线路上设有一段电缆和有绝缘的导线,短路熔冰雪的工作要避开电缆和有绝缘导线,而在无绝缘导线与电缆、有绝缘导线的连接处进行;熔冰雪前,将10kV配电线路中所有的配变刀闸开关断开,线路中的高压保险丝要用不小于φ16mm的铜线;熔冰雪时,在变电站出线杆进行低电压高电流送电,短路在配电线路终端杆和分支线终端杆上进行操作。7. A method of melting ice and snow on transmission and distribution lines with low voltage and high current according to claim 3, wherein when the transmission and distribution lines are 10 kV distribution lines, the 10 kV distribution lines There is a section of cable and insulated wires on the power line. The work of melting ice and snow should avoid cables and insulated wires, and do it at the connection between non-insulated wires, cables, and insulated wires; before melting ice and snow, put 10kV All distribution transformer knife switches in the power line are disconnected, and the high-voltage fuse in the line must use copper wires not less than φ16mm; when melting ice and snow, low-voltage and high-current power transmission is carried out at the outlet pole of the substation, and short-circuited at the terminal pole of the distribution line and branch line terminal pole to operate.
CN2008102143790A 2008-09-05 2008-09-05 Method for melting ice and snow on power transmission and distribution lines by low voltage and high current Expired - Fee Related CN101667722B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008102143790A CN101667722B (en) 2008-09-05 2008-09-05 Method for melting ice and snow on power transmission and distribution lines by low voltage and high current

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008102143790A CN101667722B (en) 2008-09-05 2008-09-05 Method for melting ice and snow on power transmission and distribution lines by low voltage and high current

Publications (2)

Publication Number Publication Date
CN101667722A CN101667722A (en) 2010-03-10
CN101667722B true CN101667722B (en) 2011-07-20

Family

ID=41804210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008102143790A Expired - Fee Related CN101667722B (en) 2008-09-05 2008-09-05 Method for melting ice and snow on power transmission and distribution lines by low voltage and high current

Country Status (1)

Country Link
CN (1) CN101667722B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102136711A (en) * 2011-01-20 2011-07-27 何正华 Method for forming resistance heat to melt ice on high-tension line with low tension
CN102231506A (en) * 2011-07-13 2011-11-02 潘明清 Device and method for rapidly melting ice and snow of transmission line
CN102611061B (en) * 2012-03-13 2015-06-24 云南电力试验研究院(集团)有限公司电力研究院 Single-pole ground loop type direct-current deicing method for overhead ground wire and OPGW (optical fiber composite overhead ground wire)
CN102780193B (en) * 2012-07-06 2015-08-19 广东电网公司电力科学研究院 A kind of power transmission line overhead ground wire electric current de-icing method
CN104049158A (en) * 2014-05-13 2014-09-17 国家电网公司 A single-phase instantaneous artificial ground short-circuit test system for transmission lines
CN104953529B (en) * 2015-03-05 2017-07-11 国家电网公司 A kind of online de-icing method of distribution line based on single-phase earth fault current

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01202110A (en) 1988-02-05 1989-08-15 Hitachi Ltd Ice and snow removing method for transmission line and its device
CN2130295Y (en) * 1992-05-09 1993-04-21 能源部武汉高压研究所 Automatic ice-melting device for transmission line without power-cut
US6018152A (en) * 1999-04-13 2000-01-25 Allaire; Marc-Andre Method and device for de-icing conductors of a bundle of conductors
CN200944519Y (en) * 2006-08-29 2007-09-05 薛辉 Automatic ice-melting device for transmission line
CN101162831A (en) * 2007-10-12 2008-04-16 龚良贵 Divided conductor powerline with loading ice melting scheme

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01202110A (en) 1988-02-05 1989-08-15 Hitachi Ltd Ice and snow removing method for transmission line and its device
CN2130295Y (en) * 1992-05-09 1993-04-21 能源部武汉高压研究所 Automatic ice-melting device for transmission line without power-cut
US6018152A (en) * 1999-04-13 2000-01-25 Allaire; Marc-Andre Method and device for de-icing conductors of a bundle of conductors
CN200944519Y (en) * 2006-08-29 2007-09-05 薛辉 Automatic ice-melting device for transmission line
CN101162831A (en) * 2007-10-12 2008-04-16 龚良贵 Divided conductor powerline with loading ice melting scheme

Also Published As

Publication number Publication date
CN101667722A (en) 2010-03-10

Similar Documents

Publication Publication Date Title
CN101667722B (en) Method for melting ice and snow on power transmission and distribution lines by low voltage and high current
CN101689757B (en) Ice-melting device and method suitable for split conductor transmission lines
CN101442198B (en) Ice-melting mode and apparatus for mobile DC power supply
CN101242087A (en) Ice fusion method for power transmission line
CN202749782U (en) Transmission line ice melting system implemented by switching operation in whole process
CN103296629A (en) Ground wire DC (direct current) deicing method based on discharge gap insulator
CN108923365B (en) Transmission line wire suitable for live online ice melting and use method thereof
CN108092182B (en) Segmented ice melting method and system for high-voltage transmission line
CN106384989A (en) Device and method for performing DC ice melting on overhead ground wire of power transmission line
CN103701080A (en) Method for melting ice by utilizing power transmission circuit load current
CN103368122A (en) Ground wire direct current-based deicing automatic wiring system
CN101612894A (en) Electric locomotive pantograph arc blowout device
CN201663021U (en) Bidirectional lightning protection pillar insulator
CN116073311B (en) A method for detecting and discharging the neutral section of a contact network during ice melting process to prevent melting
CN105262001A (en) Ice melting method for overhead ground wire of power transmission line
CN201408615Y (en) Snow-blowing ice-melting device of electric high tension shackle insulator
CN101340070A (en) Overhead power line capable of automatically protecting and preventing icing and automatically melting ice
CN108418166A (en) A kind of fixed short-circuit AC ice melting device of allocated radio change
CN115882412A (en) Ice melting method for ground wire of wire without power failure
CN209515539U (en) Multifunction combined ice-melt disconnecting switch
CN204205517U (en) A kind of automatic defrosting snow device of transmission system
CN206712417U (en) Ice-melt gold utensil
CN203481768U (en) Spherical fixed outer-gap lightning arrester for 10kV system insulating overhead line tension rod
CN113964772A (en) Ice-melting system and ice-melting method of ice-covered section at the end of 10kV distribution network
CN104332929A (en) Single-ground wire ice melting method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110720

Termination date: 20120905