CN101664960A CN200910307643A CN200910307643A CN101664960A CN 101664960 A CN101664960 A CN 101664960A CN 200910307643 A CN200910307643 A CN 200910307643A CN 200910307643 A CN200910307643 A CN 200910307643A CN 101664960 A CN101664960 A CN 101664960A
Authority
CN
China
Prior art keywords
threaded sleeve
nut
steel bar
prestressed steel
mounting nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910307643A
Other languages
Chinese (zh)
Other versions
CN101664960B (en
Inventor
许宏雷
刘春杰
陈晓东
孙玉霞
甄志伟
王龙
孙涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cscec International Construction Co ltd
China State Construction Engineering Corp Ltd CSCEC
Original Assignee
China Construction Baili Engineering Technology Development Co Ltd
CSCEC International Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Baili Engineering Technology Development Co Ltd, CSCEC International Co Ltd filed Critical China Construction Baili Engineering Technology Development Co Ltd
Priority to CN 200910307643 priority Critical patent/CN101664960B/en
Publication of CN101664960A publication Critical patent/CN101664960A/en
Application granted granted Critical
Publication of CN101664960B publication Critical patent/CN101664960B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention discloses a mounting nut of a prestressed steel bar, which comprises a fixed-end mounting nut and a stretch-end mounting nut that are respectively provided with a threaded sleeve; the inside diameter of the threaded sleeve is slightly larger than the diameter of the prestressed steel bar; the middle part of the inner wall of the threaded sleeve is provided with a section of threads;the end surface of the tail part of the threaded sleeve is embedded with a magnet ring in a concentric way; the sleeve end of the threaded sleeve expands and forms a locating surface towards one sideof the tail part of a locating column; and the sleeve end of the fixed-end mounting nut is fixed with the locating column with a locating column end inwards to the thread section. The nut has simple and reliable structure, convenient manufacture and low cost, ensures the reliable installation of an anchor backing plate, simplifies the installation process of the anchor backing plate, reduces the tool kind and amount in the construction site and the labor intensity of the workers, quickens the construction progress, saves a great deal of working hours, and realizes the fast installation of theprestressed steel bar.

Description

Mounting nut of prestressed steel bar
Technical field
The present invention relates to a kind of nut that is connected on the railway plate die, is used for the prestressed rod iron.
Background technology
In the past in the track plate prefabrication process, connect the installation nut employing plain nut that prestressed steel bar is used, prefabricated anchor plate is to adopt bolt that anchor plate is connected with the anchor recess mould, because the quantity of prestressed steel bar and anchor plate is various, aforesaid operations will cause sizable workload, makes installation effectiveness low; Simultaneously, the axial location of prestressed steel bar all is by range estimation or by survey tool, and the position that range estimation is installed is accurate inadequately, can make installation effectiveness become low again by survey tool.
Summary of the invention
In order to overcome the deficiencies in the prior art, the invention provides a kind of mounting nut of prestressed steel bar, solve prestressed steel bar and the low technical problem of anchor plate installation effectiveness; And the accurate inadequately problem in the axial installation site that solves prestressed steel bar and anchor plate.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of mounting nut of prestressed steel bar, comprise that stiff end is installed nut and the stretch-draw end is installed nut, it is characterized in that: described stiff end is installed by nut and stretch-draw end installation nut all has a threaded sleeve, the internal diameter of threaded sleeve is slightly larger than the diameter of prestressed steel bar, there is one section screw thread at the middle part of threaded sleeve inwall, be embedded with a magnet ring on the tail end face of threaded sleeve with one heart, expand the sleeve pipe termination of threaded sleeve, forming locating surface towards reference column afterbody one side, the sleeve pipe termination of stiff end installation nut inwardly is fixed with the reference column of a band reference column termination to thread segment.
Be welded to connect between the reference column termination of described reference column and the sleeve pipe termination of threaded sleeve.
Described termination can be square toes, turret head or interior hexagonal socket cap.
Beneficial effect of the present invention is as follows:
The present invention is for the prefabricated speed of accelerating the track plate, improves track plate production efficiency and a kind of novel pre-stressed rod iron developed is installed nut, is divided into that stiff end is installed nut and the stretch-draw end is installed two kinds on nut.Stiff end is installed the double action that nut plays locking and location prestressed steel bar, and the stretch-draw end is installed nut can effective fastening prestressed steel bar, realize the Fast Installation of prestressed steel bar.
The present invention installs the degree of depth of the reference column in the nut by limiting stiff end, the axial installation site of control prestressed steel bar.By installing at stiff end on nut end face, the stretch-draw end installation nut end face magnet ring is installed, is replaced bolt to connect, reach the purpose of Fast Installation anchor plate with magnet ring.
The present invention is simple and reliable for structure, and is easily manufactured, with low cost, can realize the quick positioning and locking of prestressed steel bar.The present invention relies on the suction of magnet ring, has guaranteed the reliable installation of anchor plate, has simplified the mounting process of anchor plate, has reduced kind, quantity and the working strength of workers of job site instrument, has accelerated construction speed, has saved a large amount of man-hours.The present invention has easy construction, quick, and characteristics simple to operate can guarantee that the quality of track plate has very high stability and reliability when producing in enormous quantities.
Description of drawings
The present invention is further described below in conjunction with drawings and Examples.
Fig. 1 is the structural representation that stiff end is installed nut.
Fig. 2 is the schematic perspective view that stiff end is installed nut.
Fig. 3 is the structural representation that the stretch-draw end is installed nut.
Fig. 4 is a user mode schematic diagram of the present invention.
Reference numeral: 1-magnet ring, 2-threaded sleeve, 3-reference column, 3.1-reference column termination, 4-sleeve pipe termination, 5-screw thread, 6-railway plate die, 7-anchor plate, 8-stiff end anchor recess mould, 9-stretch-draw end anchor recess mould, 10-prestressed steel bar, 11-stiff end are installed nut, 12-stretch-draw end is installed nut.
The specific embodiment
Embodiment is referring to shown in Figure 4, this mounting nut of prestressed steel bar, comprise that stiff end is installed nut 11 and the stretch-draw end is installed nut 12, stiff end is installed by nut and stretch-draw end installation nut all has a threaded sleeve, the internal diameter of threaded sleeve is slightly larger than the diameter of prestressed steel bar 10, there is one section screw thread 5 at the middle part of threaded sleeve inwall, be embedded with a magnet ring 1 on the tail end face of threaded sleeve with one heart, expand the sleeve pipe termination 4 of threaded sleeve, forming locating surface towards reference column afterbody one side, the sleeve pipe termination of stiff end installation nut inwardly is fixed with the reference column 3 of a band reference column termination 3.1 to thread segment, be welded to connect between the reference column termination 3.1 of reference column and the sleeve pipe termination 4 of threaded sleeve.
Described termination 4 is square toes, turret head or interior hexagonal socket cap.
The present invention includes two kinds: stiff end is installed by nut and the stretch-draw end is installed nut, and above-mentioned two kinds of nuts use in pairs.Anchor plate and mounting nut of prestressed steel bar directly paste tight by magnetic force.Prestressed steel bar 10 is installed nut screwing clamping with stiff end earlier, because the position-limiting action of reference column, tighten the other end location of promptly having finished prestressed steel bar when tightening again.
As shown in Figure 1 and Figure 2, stiff end installation nut is made up of threaded sleeve, magnet ring, reference column.Reference column and threaded sleeve welding, magnet ring is embedded in the end face of threaded sleeve, and the other end of threaded sleeve can be made the turret head of being convenient to wrench operated or the termination form that is fit to other tool operation, and the end face of termination 4 is as locating surface is installed.By the length of control reference column, just can control the screw-in depth of prestressed steel bar, can realize the axial location of prestressed steel bar.
As shown in Figure 3, stretch-draw end installation nut is made up of threaded sleeve and magnet ring, and magnet ring is embedded on the end face of threaded sleeve.Threaded sleeve is provided with one section screw thread, and the rear and front end is logical open form formula.
As shown in Figure 4, be connected with stretch-draw end anchor recess mould 9 on the railway plate die 6, threaded sleeve 2 is through 9 li of stretch-draw end anchor recess moulds, and the magnet ring 1 on the threaded sleeve end face holds anchor plate 7, makes the anchor plate 7 and the medial end of stretch-draw end anchor recess mould 9 paste tight.
As shown in Figure 4, be connected with stiff end anchor recess mould 8 on the railway plate die 6, threaded sleeve 2 is through 8 li of stiff end anchor recess moulds, and the magnet ring 1 on the threaded sleeve end face holds anchor plate 7, makes the anchor plate 7 and the medial end of stiff end anchor recess mould 8 paste tight.

Claims (3)

1. mounting nut of prestressed steel bar, comprise that stiff end is installed nut (11) and the stretch-draw end is installed nut (12), it is characterized in that: described stiff end is installed by nut and stretch-draw end installation nut all has a threaded sleeve, the internal diameter of threaded sleeve is slightly larger than the diameter of prestressed steel bar (10), there is one section screw thread (5) at the middle part of threaded sleeve inwall, be embedded with a magnet ring (1) on the tail end face of threaded sleeve with one heart, expand the sleeve pipe termination (4) of threaded sleeve, forming locating surface towards reference column afterbody one side, the sleeve pipe termination of stiff end installation nut inwardly is fixed with the reference column (3) of a band reference column termination (3.1) to thread segment.
2. mounting nut of prestressed steel bar according to claim 1 is characterized in that: be welded to connect between the reference column termination (3.1) of described reference column and the sleeve pipe termination (4) of threaded sleeve.
3. mounting nut of prestressed steel bar according to claim 1 is characterized in that: described termination (4) are square toes, turret head or interior hexagonal socket cap.
CN 200910307643 2009-09-24 2009-09-24 Mounting nut of prestressed steel bar Expired - Fee Related CN101664960B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200910307643 CN101664960B (en) 2009-09-24 2009-09-24 Mounting nut of prestressed steel bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200910307643 CN101664960B (en) 2009-09-24 2009-09-24 Mounting nut of prestressed steel bar

Publications (2)

Publication Number Publication Date
CN101664960A true CN101664960A (en) 2010-03-10
CN101664960B CN101664960B (en) 2011-06-01

Family

ID=41801816

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200910307643 Expired - Fee Related CN101664960B (en) 2009-09-24 2009-09-24 Mounting nut of prestressed steel bar

Country Status (1)

Country Link
CN (1) CN101664960B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105415491A (en) * 2015-12-15 2016-03-23 天津银龙预应力材料股份有限公司 Fixed-end tensioning piece and fixed-end tensioning machine

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4405974C1 (en) * 1994-02-24 1995-05-18 Noell Serv & Maschtechn Gmbh Screw tensioning piece for externally threaded tension bolt and part
CN2318264Y (en) * 1997-11-07 1999-05-12 中国人民解放军工程兵工程学院企业管理局 Quickly adjustable prestressing ground tackle
CN100348803C (en) * 2004-11-16 2007-11-14 周兆弟 Pile connecting buckle and its prefabricated unit
CN100491097C (en) * 2006-01-26 2009-05-27 许宏元 Prestressing system device of concrete structure and uses of the device
CN201043328Y (en) * 2007-02-06 2008-04-02 重庆长江预应力有限公司 Self-anchored pre-stress steel tube component
JP4736060B2 (en) * 2007-05-21 2011-07-27 住友電工スチールワイヤー株式会社 Inner nut assembly, anti-corrosion PC steel rod assembly and PC structure
JP2008285976A (en) * 2007-05-21 2008-11-27 Sumitomo Denko Steel Wire Kk Inner side nut, anticorrosive pc steel bar assembly body, and pc structural body
CN201501031U (en) * 2009-09-24 2010-06-09 北京中建柏利工程技术发展有限公司 Mounting nut for pre-stress steel bar

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105415491A (en) * 2015-12-15 2016-03-23 天津银龙预应力材料股份有限公司 Fixed-end tensioning piece and fixed-end tensioning machine
CN105415491B (en) * 2015-12-15 2024-04-16 天津银龙预应力材料股份有限公司 Fixed end tensioning piece and tensioning end tensioning piece

Also Published As

Publication number Publication date
CN101664960B (en) 2011-06-01

Similar Documents

Publication Publication Date Title
CN102513839A (en) Drilling device of flange face bolt
CN201880872U (en) Cold-core box sand-ejecting nozzle component with adjustable length
CN201695520U (en) Expansion anchor bolt sleeve for wallboard installation
CN101664960B (en) Mounting nut of prestressed steel bar
CN202411863U (en) Drilling device for flange face bolt
CN201501031U (en) Mounting nut for pre-stress steel bar
CN203863807U (en) Grouting sleeve locating device for housing industrialization pre-cast concrete component
CN203843982U (en) Threaded blind hole forming bar
CN203429621U (en) Stress application self-drilling pile
CN201433513Y (en) Positioning device for post-tensioned pre-stressing system of track slab
CN204492012U (en) A kind of bar connecting device
CN209999109U (en) Three-section type water-stopping screw rubber head dismantling tool
CN219451323U (en) Connection structure of precast concrete exterior wall cladding
CN205260534U (en) Bolt assembly
CN204878231U (en) Car bolt assembly
CN102061902B (en) Special tool for installing rubber stopper on well cementing cement head of oil field
CN202194907U (en) Internally-fastening demounting type expansion bolt
CN202702163U (en) Screw type fixture for installation of expansion joint control spring
CN218843765U (en) Assembled slip casting shutoff instrument
CN219060844U (en) Cutting-free outer frame wall connecting piece for full concrete outer wall
CN220168320U (en) Strong reinforced fixing screw
CN203297252U (en) Fastening bolt
CN211890637U (en) Soft decorative pressing sheet installation auxiliary tool
CN216951200U (en) Prevent vertical bolt of portable that skids
CN203636757U (en) Fastening device for polymer injection pump packing box gland

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHINA STATE CONSTRUCTION ENG. CORP. LTD.

Free format text: FORMER OWNER: CHINA CONSTRUCTION BAILI ENGINEERING TECHNOLOGY DEVELOPMENT CO., LTD.

Effective date: 20100903

Owner name: CHINA CONSTRUCTION INTERNATIONAL BUILDING CO., LTD

Free format text: FORMER OWNER: CHINA CONSTRUCTION INTERNATIONAL BUILDING CO., LTD.

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 101300 NO.15, LINHE AVENUE, LINHE INDUSTRY DEVELOPMENT AREA, SHUNYI DISTRICT, BEIJING TO: 100037 NO.15, SANLIHE ROAD, HAIDIAN DISTRICT, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20100903

Address after: 100037 Beijing, Haidian District, Li River Road, No. three, No. 15

Applicant after: CHINA STATE CONSTRUCTION ENGINEERING Corp.,Ltd.

Co-applicant after: CSCEC International Construction Co.,Ltd.

Co-applicant after: CHINA CONSTRUCTION-BAILI ENGINEERING TECHNOLOGY DEVELOPMENT Co.,Ltd.

Address before: 101300, Lin River Street, 15 Industrial Development Zone, Shunyi District, Beijing

Applicant before: CHINA CONSTRUCTION-BAILI ENGINEERING TECHNOLOGY DEVELOPMENT Co.,Ltd.

Co-applicant before: CSCEC International Construction Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110601

Termination date: 20210924