CN101654793B - Electrolytic cell gathering overhaul workshop middle digging structure - Google Patents

Electrolytic cell gathering overhaul workshop middle digging structure Download PDF

Info

Publication number
CN101654793B
CN101654793B CN2008100128495A CN200810012849A CN101654793B CN 101654793 B CN101654793 B CN 101654793B CN 2008100128495 A CN2008100128495 A CN 2008100128495A CN 200810012849 A CN200810012849 A CN 200810012849A CN 101654793 B CN101654793 B CN 101654793B
Authority
CN
China
Prior art keywords
dig
digging
electrolyzer
furnaceman
repair department
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008100128495A
Other languages
Chinese (zh)
Other versions
CN101654793A (en
Inventor
马骀
周渤
欧宝成
Original Assignee
Shenyang Aluminum and Magnesium Engineering and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Aluminum and Magnesium Engineering and Research Institute Co Ltd filed Critical Shenyang Aluminum and Magnesium Engineering and Research Institute Co Ltd
Priority to CN2008100128495A priority Critical patent/CN101654793B/en
Publication of CN101654793A publication Critical patent/CN101654793A/en
Application granted granted Critical
Publication of CN101654793B publication Critical patent/CN101654793B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electrolytic Production Of Metals (AREA)

Abstract

The invention relates to an electrolytic cell gathering overhaul workshop middle digging structure, in particular to the electrolytic cell gathering overhaul workshop middle digging structure in an electrolytic cell gathering overhaul workshop of an electrolytic aluminium factory. The electrolytic cell gathering overhaul workshop middle digging structure comprises electrolytic cells and a digging workshop section which is provided with a digging platform; the digging platform is provided with detaching, transporting, loading and unloading equipment; a dust-collecting hopper in the digging process is arranged above the digging platform, and covers the working range of the detaching, transporting, loading and unloading equipment; and a dust-collecting device in the waste unloading process is arranged under the digging platform. The electrolytic cell gathering overhaul workshop middle digging structure has the advantages that: dust in the digging process and the waste unloading process is collected to prevent polluting the environment; and a material transporting channel and the dust-collecting device arranged under the digging platform in the waste unloading process reduce environmental pollution and facilitate transportation in the waste unloading process.

Description

Electrolyzer concentrates the heavy repair department middle part to dig furnace structure
Technical field
The present invention relates to a kind of heavy repair department middle part and dig furnace structure, relate in particular to a kind of electrolyzer and concentrate the heavy repair department middle part to dig furnace structure at the concentrated heavy repair department of electrolytic aluminium factory electrolyzer.
Background technology
In the production process of electrolytic aluminum, the life-span of its main production equipments---cell lining is certain.But electrolyzer is because of its cost height, and replacing process complexity is for prolonging its work-ing life, so electrolyzer is carried out in good time maintenance and repairing is very necessary.Because of the singularity and the complicacy of electrolytic cell equipment itself, determined the process of its maintenance and repairing, have extremely strong professional and complicacy, in electrolyzer is concentrated heavy repair department, the various stages of repairing technology are carried out rational subregion and layout is necessary.
On a large scale, the electrolytic aluminium factory of large-scale groove concentrates the plane furnaceman section of heavy repair department to adopt the plane furnaceman skill of heat plane, dry method usually.No matter be to dig stove, or the loading and unloading of waste material all inevitably produce a large amount of dust in its technological process.And dig the stove process to environment cause certain pollution be must solution in the design process problem.
Summary of the invention
The invention provides the concentrated heavy repair department of a kind of electrolyzer middle part plane furnace structure for solving the problems of the technologies described above, purpose can improve repair capability, guarantees repairing quality, more can protect and improve the repairing environment simultaneously.
Be achieved in that for reaching above-mentioned purpose the present invention electrolyzer digs furnace structure in the middle part of concentrating heavy repair department, comprise electrolyzer, dig furnaceman's section, be provided with plane stove platform in plane furnaceman section, dig the stove platform and be provided with the transportation loading and unloading equipment of removing, above digging the stove platform, be provided with plane furnaceman preface dust collection cover, dig furnaceman's preface dust collection cover and cover the working range of removing transportation loading and unloading equipment, below digging the stove platform, be provided with waste material unloading operation dust arrester installation.
The top of described plane furnaceman preface dust collection cover is provided with dodge gate.
Described dodge gate is movable type, rolling type or wraparound method.
Described waste material unloading operation dust arrester installation below is connected with discharging hopper.
Described waste material unloading operation dust arrester installation below is located in the haul passage with discharging hopper.
Be provided with the waste material transport trolley in the described haul passage.
The both sides of described haul passage are provided with haul passage retaining wall.
Described plane furnaceman section is arranged on the middle part that electrolyzer is concentrated heavy repair department.
Advantageous effect of the present invention: plane furnaceman section makes electric tank cathode pot shell loaded vehicle shipment distance shorten when being arranged on the middle part of concentrating heavy repair department, on plane furnaceman preface dust collection cover, dodge gate is set and has solved the problem that the electric tank cathode pot shell is transported and transported flexibly, easily, and collect digging the dust that furnaceman's preface and waste material load operation, play the effect that prevents contaminate environment.Below digging the stove platform, be provided with haul passage and waste material unloading operation dust arrester installation and make the effect that when waste material unloading operation, reduces environmental pollution and convenient transportation.
Description of drawings
Fig. 1 is that electrolysis plow furnaceman section is provided with structural representation in the concentrated heavy repair department of electrolytic aluminium factory of the present invention.
Fig. 2 is the A-A cut-away view among Fig. 1.
Fig. 3 is the B-B cut-away view among Fig. 1.
Among the figure, 1, dig furnaceman's preface dust collection cover; 2, dodge gate; 3, remove transportation loading and unloading equipment; 4, waste material unloading operation dust arrester installation; 5, discharging hopper; 6, waste material transport trolley; 7, dig the stove platform; 8, haul passage; 9, haul passage retaining wall; 10, electrolyzer; 11, dig furnaceman's section; 12, ventilator room.
Embodiment
Below in conjunction with accompanying drawing the present invention is described in further details.
As Fig. 1, Fig. 2 and electrolyzer of the present invention shown in Figure 3 concentrate the heavy repair department middle part to dig furnace structure, comprise electrolyzer 10, dig furnaceman's section 11, dig furnaceman's section 11 and be arranged on the middle part that electrolyzer is concentrated heavy repair department, electrolyzer concentrates heavy repair department to be provided with ventilator room 12 outward, be provided with plane stove platform 7 in plane furnaceman section 11, dig stove platform 7 and be provided with the transportation loading and unloading equipment 3 of removing, remove transportation loading and unloading equipment 3 and dig stove, the versatility function of loading and unloading, above digging stove platform 7, be provided with plane furnaceman preface dust collection cover 1, dig furnaceman's preface dust collection cover 1 and cover the working range of removing transportation loading and unloading equipment 3, the top of digging furnaceman's preface dust collection cover 1 is provided with dodge gate 2, dodge gate is portable, rolling type or wraparound method, below digging stove platform 7, be provided with waste material unloading operation dust arrester installation 4, waste material unloading operation dust arrester installation 4 belows are connected with discharging hopper 5, waste material unloading operation dust arrester installation 4 belows and discharging hopper 5 are located in the haul passage 8, be provided with waste material transport trolley 6 in the haul passage 8, the both sides of haul passage 8 are provided with haul passage retaining wall 9; Haul passage 8 is a slope haul passage as shown in Figure 3.
Principle of work of the present invention is as follows: when dismounting transportation loading and unloading equipment 3 digs the stove operation, cause negative pressure by the air that digs in furnaceman's preface dust collection cover 1, realize digging the purpose of gathering dust of stove operation and waste material loading operation.The waste material of removing in the electric tank cathode pot shell is by the discharging hopper 5 waste material transport trolley 6 of packing into, and the dusts that 4 pairs of unloadings of waste material unloading operation dust arrester installation waste material produces are collected.

Claims (8)

1. electrolyzer concentrates the heavy repair department middle part to dig furnace structure, comprise electrolyzer, dig furnaceman's section, it is characterized in that being provided with plane stove platform in plane furnaceman section, dig the stove platform and be provided with the transportation loading and unloading equipment of removing, above digging the stove platform, be provided with plane furnaceman preface dust collection cover, dig furnaceman's preface dust collection cover and cover the working range of removing transportation loading and unloading equipment, below digging the stove platform, be provided with waste material unloading operation dust arrester installation.
2. electrolyzer according to claim 1 concentrates the heavy repair department middle part to dig furnace structure, it is characterized in that the top of described plane furnaceman preface dust collection cover is provided with dodge gate.
3. electrolyzer according to claim 2 concentrates the heavy repair department middle part to dig furnace structure, it is characterized in that described dodge gate is movable type, rolling type or wraparound method.
4. electrolyzer according to claim 1 concentrates the heavy repair department middle part to dig furnace structure, it is characterized in that described waste material unloading operation dust arrester installation below is connected with discharging hopper.
5. electrolyzer according to claim 4 concentrates the heavy repair department middle part to dig furnace structure, it is characterized in that described waste material unloading operation dust arrester installation below is located in the haul passage with discharging hopper.
6. electrolyzer according to claim 5 concentrates the heavy repair department middle part to dig furnace structure, it is characterized in that being provided with the waste material transport trolley in the described haul passage.
7. concentrate the heavy repair department middle part to dig furnace structure according to claim 5 or 6 described electrolyzers, it is characterized in that the both sides of described haul passage are provided with haul passage retaining wall.
8. electrolyzer according to claim 1 concentrates the heavy repair department middle part to dig furnace structure, it is characterized in that described plane furnaceman section is arranged on the middle part that electrolyzer is concentrated heavy repair department.
CN2008100128495A 2008-08-19 2008-08-19 Electrolytic cell gathering overhaul workshop middle digging structure Expired - Fee Related CN101654793B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100128495A CN101654793B (en) 2008-08-19 2008-08-19 Electrolytic cell gathering overhaul workshop middle digging structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100128495A CN101654793B (en) 2008-08-19 2008-08-19 Electrolytic cell gathering overhaul workshop middle digging structure

Publications (2)

Publication Number Publication Date
CN101654793A CN101654793A (en) 2010-02-24
CN101654793B true CN101654793B (en) 2011-02-02

Family

ID=41709239

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100128495A Expired - Fee Related CN101654793B (en) 2008-08-19 2008-08-19 Electrolytic cell gathering overhaul workshop middle digging structure

Country Status (1)

Country Link
CN (1) CN101654793B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528027B (en) * 2019-09-27 2021-08-31 沈阳铝镁设计研究院有限公司 Method for large repairing gas of electrolytic cell

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2656435Y (en) * 2003-11-08 2004-11-17 贵阳铝镁设计研究院 Overhead crane blanking device
CN201313940Y (en) * 2008-12-03 2009-09-23 沈阳铝镁设计研究院 Middle digging structure of overhaul workshop

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2656435Y (en) * 2003-11-08 2004-11-17 贵阳铝镁设计研究院 Overhead crane blanking device
CN201313940Y (en) * 2008-12-03 2009-09-23 沈阳铝镁设计研究院 Middle digging structure of overhaul workshop

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王会全等.电解槽干法刨炉的应用与推广.《轻金属》.2004,(第4期),第26-28页. *

Also Published As

Publication number Publication date
CN101654793A (en) 2010-02-24

Similar Documents

Publication Publication Date Title
CN102177280B (en) Service machine used for intervention on electrolysis cells for producing aluminium by igneous electrolysis
CN106180153A (en) A kind of lead-acid accumulator storage compartment
CN101654793B (en) Electrolytic cell gathering overhaul workshop middle digging structure
CN111617881A (en) Broken production line of incomplete utmost point electrolyte clearance for aluminium
CN201313940Y (en) Middle digging structure of overhaul workshop
CN101575716B (en) Electrolyzer liner dismounting structure of electrolyzer centralized overhaul workshop
CN201313941Y (en) Structure for removing lining of electrolytic cell
CN203652820U (en) Unpowered ash discharge system of clinker silo top bag dust filter
CN2741993Y (en) Adding device for anode covering material
CN213051056U (en) Broken production line of incomplete utmost point electrolyte clearance for aluminium
CN203714870U (en) Pebble coal seal cover
CN207664446U (en) A kind of power equipment online management system
CN201485510U (en) Structure for removing cathode lining of electrolytic cell
CN206122311U (en) Lead acid battery storage compartment
CN213468656U (en) Debris collecting box for air separator
SE503598C2 (en) Gas collecting device in aluminum furnaces
CN214523872U (en) Waste material transfer device for housing construction
CN218538302U (en) Scraper conveyor for fly ash transportation
CN101824629B (en) Structure for removing cathode lining of electrolytic bath
CN219429150U (en) Conveying device for broken electrolyte dust removal system of aluminum electrolysis anode assembly workshop
CN211336096U (en) Mechanical automation transport vechicle
CN203737032U (en) Novel efficient electric bag type composite dust collector
CN211920226U (en) Fresh alumina conveying system for electrolytic aluminum plant
CN211191346U (en) High-efficient factory building dust device of collecting
CN101591789A (en) Tear the distributing style between stove in a kind of electrolytic cell overhaul workshop open

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHENYANG ALUMINUM + MAGNESIUM ENGINEERING + RESEAR

Free format text: FORMER NAME: SHENYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

CP01 Change in the name or title of a patent holder

Address after: 110001 Heping Street, Heping District, Liaoning, Shenyang, No. 184

Patentee after: Shenyang Aluminum & Magnesium Engineering & Research Institute Co., Ltd.

Address before: 110001 Heping Street, Heping District, Liaoning, Shenyang, No. 184

Patentee before: Shenyang Aluminium and Magnesium Design Institute

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110202

Termination date: 20200819

CF01 Termination of patent right due to non-payment of annual fee