Electrolyzer concentrates the heavy repair department middle part to dig furnace structure
Technical field
The present invention relates to a kind of heavy repair department middle part and dig furnace structure, relate in particular to a kind of electrolyzer and concentrate the heavy repair department middle part to dig furnace structure at the concentrated heavy repair department of electrolytic aluminium factory electrolyzer.
Background technology
In the production process of electrolytic aluminum, the life-span of its main production equipments---cell lining is certain.But electrolyzer is because of its cost height, and replacing process complexity is for prolonging its work-ing life, so electrolyzer is carried out in good time maintenance and repairing is very necessary.Because of the singularity and the complicacy of electrolytic cell equipment itself, determined the process of its maintenance and repairing, have extremely strong professional and complicacy, in electrolyzer is concentrated heavy repair department, the various stages of repairing technology are carried out rational subregion and layout is necessary.
On a large scale, the electrolytic aluminium factory of large-scale groove concentrates the plane furnaceman section of heavy repair department to adopt the plane furnaceman skill of heat plane, dry method usually.No matter be to dig stove, or the loading and unloading of waste material all inevitably produce a large amount of dust in its technological process.And dig the stove process to environment cause certain pollution be must solution in the design process problem.
Summary of the invention
The invention provides the concentrated heavy repair department of a kind of electrolyzer middle part plane furnace structure for solving the problems of the technologies described above, purpose can improve repair capability, guarantees repairing quality, more can protect and improve the repairing environment simultaneously.
Be achieved in that for reaching above-mentioned purpose the present invention electrolyzer digs furnace structure in the middle part of concentrating heavy repair department, comprise electrolyzer, dig furnaceman's section, be provided with plane stove platform in plane furnaceman section, dig the stove platform and be provided with the transportation loading and unloading equipment of removing, above digging the stove platform, be provided with plane furnaceman preface dust collection cover, dig furnaceman's preface dust collection cover and cover the working range of removing transportation loading and unloading equipment, below digging the stove platform, be provided with waste material unloading operation dust arrester installation.
The top of described plane furnaceman preface dust collection cover is provided with dodge gate.
Described dodge gate is movable type, rolling type or wraparound method.
Described waste material unloading operation dust arrester installation below is connected with discharging hopper.
Described waste material unloading operation dust arrester installation below is located in the haul passage with discharging hopper.
Be provided with the waste material transport trolley in the described haul passage.
The both sides of described haul passage are provided with haul passage retaining wall.
Described plane furnaceman section is arranged on the middle part that electrolyzer is concentrated heavy repair department.
Advantageous effect of the present invention: plane furnaceman section makes electric tank cathode pot shell loaded vehicle shipment distance shorten when being arranged on the middle part of concentrating heavy repair department, on plane furnaceman preface dust collection cover, dodge gate is set and has solved the problem that the electric tank cathode pot shell is transported and transported flexibly, easily, and collect digging the dust that furnaceman's preface and waste material load operation, play the effect that prevents contaminate environment.Below digging the stove platform, be provided with haul passage and waste material unloading operation dust arrester installation and make the effect that when waste material unloading operation, reduces environmental pollution and convenient transportation.
Description of drawings
Fig. 1 is that electrolysis plow furnaceman section is provided with structural representation in the concentrated heavy repair department of electrolytic aluminium factory of the present invention.
Fig. 2 is the A-A cut-away view among Fig. 1.
Fig. 3 is the B-B cut-away view among Fig. 1.
Among the figure, 1, dig furnaceman's preface dust collection cover; 2, dodge gate; 3, remove transportation loading and unloading equipment; 4, waste material unloading operation dust arrester installation; 5, discharging hopper; 6, waste material transport trolley; 7, dig the stove platform; 8, haul passage; 9, haul passage retaining wall; 10, electrolyzer; 11, dig furnaceman's section; 12, ventilator room.
Embodiment
Below in conjunction with accompanying drawing the present invention is described in further details.
As Fig. 1, Fig. 2 and electrolyzer of the present invention shown in Figure 3 concentrate the heavy repair department middle part to dig furnace structure, comprise electrolyzer 10, dig furnaceman's section 11, dig furnaceman's section 11 and be arranged on the middle part that electrolyzer is concentrated heavy repair department, electrolyzer concentrates heavy repair department to be provided with ventilator room 12 outward, be provided with plane stove platform 7 in plane furnaceman section 11, dig stove platform 7 and be provided with the transportation loading and unloading equipment 3 of removing, remove transportation loading and unloading equipment 3 and dig stove, the versatility function of loading and unloading, above digging stove platform 7, be provided with plane furnaceman preface dust collection cover 1, dig furnaceman's preface dust collection cover 1 and cover the working range of removing transportation loading and unloading equipment 3, the top of digging furnaceman's preface dust collection cover 1 is provided with dodge gate 2, dodge gate is portable, rolling type or wraparound method, below digging stove platform 7, be provided with waste material unloading operation dust arrester installation 4, waste material unloading operation dust arrester installation 4 belows are connected with discharging hopper 5, waste material unloading operation dust arrester installation 4 belows and discharging hopper 5 are located in the haul passage 8, be provided with waste material transport trolley 6 in the haul passage 8, the both sides of haul passage 8 are provided with haul passage retaining wall 9; Haul passage 8 is a slope haul passage as shown in Figure 3.
Principle of work of the present invention is as follows: when dismounting transportation loading and unloading equipment 3 digs the stove operation, cause negative pressure by the air that digs in furnaceman's preface dust collection cover 1, realize digging the purpose of gathering dust of stove operation and waste material loading operation.The waste material of removing in the electric tank cathode pot shell is by the discharging hopper 5 waste material transport trolley 6 of packing into, and the dusts that 4 pairs of unloadings of waste material unloading operation dust arrester installation waste material produces are collected.