CN101653781B - Perforation production new technique of hot rolling large-diameter steel pipe - Google Patents

Perforation production new technique of hot rolling large-diameter steel pipe Download PDF

Info

Publication number
CN101653781B
CN101653781B CN2009100754455A CN200910075445A CN101653781B CN 101653781 B CN101653781 B CN 101653781B CN 2009100754455 A CN2009100754455 A CN 2009100754455A CN 200910075445 A CN200910075445 A CN 200910075445A CN 101653781 B CN101653781 B CN 101653781B
Authority
CN
China
Prior art keywords
time
hole
push rod
rod top
boring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2009100754455A
Other languages
Chinese (zh)
Other versions
CN101653781A (en
Inventor
冀文生
赵亚东
武建兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan Tongze Heavy Industry Co Ltd
Original Assignee
Taiyuan Tongze Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan Tongze Heavy Industry Co Ltd filed Critical Taiyuan Tongze Heavy Industry Co Ltd
Priority to CN2009100754455A priority Critical patent/CN101653781B/en
Publication of CN101653781A publication Critical patent/CN101653781A/en
Application granted granted Critical
Publication of CN101653781B publication Critical patent/CN101653781B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forging (AREA)

Abstract

The invention discloses a perforation production new technique of a hot rolling large-diameter steel pipe, aiming at solving the problems that when in once perforation and secondary perforation of the existing technique for producing the large-diameter steel pipe, the energy is consumed, and the degree of burning loss and the degree of oxidation of the steel pipe are increased. The new technique comprises the technical steps: a recycling briar dress replacing device of a penetrating ejector rob top I and a recycling briar dress replacing device of a penetrating ejector rob top II are respectively arranged at the two sides of a background rolling line of a perforating machine; a shifting device of the steel pipe is arranged between foreground and background of the perforating machine; after a heating tube blank is perforated for a first time, a separated tubular billet is transferred back to the foreground of the perforating machine by the shifting device of the steel pipe; the rolling line is moved onto a support frame of the penetrating ejector rob top I by the recycling briar dress replacing device of the penetrating ejector rob top I; and the penetrating ejector rob top II arranged on a support frame of the penetrating ejector rob top II is moved onto the rolling line of the background of the perforating machine by the recycling briar dress replacing device of the penetrating ejector rob top II, and then the steel tube is perforated for a second time. Therefore, the new technique reduces the equipment investment and the running cost.

Description

A kind of perforation production technology of hot rolling large-diameter steel pipe
Technical field
The present invention relates to a kind of production technology of smelter seamless steel pipe.
Background technology
When large-diameter steel pipe was produced, first method was after boring a hole with a punch, treated to carry out reconditioning or processing after the steel pipe cooling, and this method workman's labour intensity is big, and work situation is poor, and production efficiency is low, and the rate of becoming a useful person of product is low.Second method is after boring a hole with a punch, to carry out the drilling/rolling second time at another punch, and this method has been brought and invested the high shortcoming of big operating cost.The third method is after a punch is bored a hole in batch, by changing the rolling tool of this punch, carry out again the drilling/rolling second time after steel pipe heated again, the shortcoming of this method is that steel pipe need heat twice, increase energy consumption, strengthened again scaling loss and the oxidation of steel pipe.
Summary of the invention
The invention solves existing large-diameter steel pipe and on a punch, change push rod during secondary punch and come directly towards length consuming time, and need to pipe carry out increase that post bake brings energy consumption strengthened again the scaling loss of steel pipe and the technical problem of oxidation.
The present invention is by the above problem of following solution:
A kind of perforation production technology of hot rolling large-diameter steel pipe comprises following processing step:
The first step, the circulation material toggling circulation material toggling changing device more of changing device and the push rod top of boring a hole for the second time more that the push rod top of boring a hole for the first time is set respectively in perforator background roll line both sides;
Second goes on foot, is provided with the transporting apparatus of steel pipe between punch foreground and backstage;
The 3rd step, heating pipe arrange the push rod top of boring a hole for the first time at the backstage of punch roll line, the second time of the backstage of punch roll line one side bore a hole the push rod top the circulation material toggling more changing device the push rod top of boring a hole for the second time is set;
The 4th step, pipe cooperated with the push rod top of boring a hole for the first time on the drilling/rolling line be rolled;
Hollow billet after the 5th step, the push rod of will boring a hole for the first time top and the perforation first time separates;
The 6th step, the hollow billet after separating are transferred go back to the foreground of punch by the transporting apparatus of steel pipe, bore a hole for the first time the push rod top by the circulation material toggling of the push rod top of boring a hole for the first time more changing device dial and leave on roll line bores a hole the bracing frame that push rod comes directly towards to the first time;
The 7th step, for the second time bore a hole the push rod top the circulation material toggling more changing device will be arranged on the push rod top of boring a hole for the second time on the bracing frame of the push rod top of boring a hole for the second time and push on the backstage roll line of punch;
The 8th step, will transfer back the hollow billet after the first time perforation on punch foreground and push the push rod of boring a hole for the second time on the perforator background roll line and come directly towards to join and close rollingly, finish secondary punch;
Collect after the steel pipe discharging after the 9th step, for the second time perforation, the circulation material toggling of push rod top of boring a hole for the second time is after more changing device pushes the push rod top of boring a hole the second time on the roll line on the bracing frame of the push rod top of boring a hole for the second time, and the circulation material toggling of the push rod top of boring a hole for the first time more changing device is bored a hole push rod top clawback to the roll line of punch at the first time that will bore a hole for the first time on the bracing frame of push rod top;
The tenth the step, to next pipe carry out the above-mentioned the 4th go on foot the 9th the step cycling, finish the piercing process second time to a collection of steel pipe.
The present invention compares with existing various production methods, namely reduces equipment investment and operating cost, has improved widely again workman's work situation and labour intensity, has improved simultaneously product quality.
Description of drawings
Fig. 1 is a structural representation of realizing equipment horizontal layout of the present invention
The specific embodiment
Below in conjunction with accompanying drawing production technology of the present invention is described:
Carry out boring a hole for the first time interval circulation of push rod top and the push rod top of boring a hole for the second time of roll line on the backstage 4 of a punch 2 arranges.After the pipe that heats enters punch foreground 1, after main frame 2 pierces into hollow steel pipe 8, the push rod 6 of boring a hole for the first time separates with hollow steel pipe 8, hollow steel pipe 8 returns on the punch foreground 1 by steel pipe conveying equipment 7, bore a hole for the first time the push rod top the circulation material toggling more changing device will bore a hole for the first time after the push rod top is transplanted on the bracing frame of the push rod top of boring a hole for the first time, the circulation material toggling of the push rod top of boring a hole for the second time more pushes on the backstage roll line of punch steel pipe is carried out the drilling/rolling second time in the changing device push rod top of will boring a hole for the second time.

Claims (1)

1. the perforation production technology of a hot rolling large-diameter steel pipe comprises following processing step:
The first step, the circulation material toggling circulation material toggling changing device more of changing device and the push rod top of boring a hole for the second time more that the push rod top of boring a hole for the first time is set respectively in perforator background roll line both sides;
Second goes on foot, is provided with the transporting apparatus of steel pipe between punch foreground and backstage;
The 3rd step, heating pipe arrange the push rod top of boring a hole for the first time at the backstage of punch roll line, the second time of the backstage of punch roll line one side bore a hole the push rod top the circulation material toggling more changing device the push rod top of boring a hole for the second time is set;
The 4th step, pipe cooperated with the push rod top of boring a hole for the first time on the drilling/rolling line be rolled;
Hollow billet after the 5th step, the push rod of will boring a hole for the first time top and the perforation first time separates;
The 6th step, the hollow billet after separating are transferred go back to the foreground of punch by the transporting apparatus of steel pipe, bore a hole for the first time the push rod top by the circulation material toggling of the push rod top of boring a hole for the first time more changing device dial and leave on roll line bores a hole the bracing frame that push rod comes directly towards to the first time;
The 7th step, for the second time bore a hole the push rod top the circulation material toggling more changing device will be arranged on the push rod top of boring a hole for the second time on the bracing frame of the push rod top of boring a hole for the second time and push on the backstage roll line of punch;
Hollow billet after bore a hole the 8th first time that goes on foot, will transfer go back to the punch foreground cooperates rolling with the push rod top of boring a hole the second time on pushing the perforator background roll line, finish for the second time perforation;
Collect after the steel pipe discharging after the 9th step, for the second time perforation, the circulation material toggling of push rod top of boring a hole for the second time is after more changing device pushes the push rod top of boring a hole the second time on the roll line on the bracing frame of the push rod top of boring a hole for the second time, and the circulation material toggling of the push rod top of boring a hole for the first time more changing device is bored a hole push rod top clawback to the roll line of punch at the first time that will bore a hole for the first time on the bracing frame of push rod top;
The tenth the step, to next pipe carry out the above-mentioned the 4th go on foot the 9th the step cycling, finish the piercing process second time to a collection of steel pipe.
CN2009100754455A 2009-09-15 2009-09-15 Perforation production new technique of hot rolling large-diameter steel pipe Active CN101653781B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100754455A CN101653781B (en) 2009-09-15 2009-09-15 Perforation production new technique of hot rolling large-diameter steel pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100754455A CN101653781B (en) 2009-09-15 2009-09-15 Perforation production new technique of hot rolling large-diameter steel pipe

Publications (2)

Publication Number Publication Date
CN101653781A CN101653781A (en) 2010-02-24
CN101653781B true CN101653781B (en) 2010-12-08

Family

ID=41708356

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100754455A Active CN101653781B (en) 2009-09-15 2009-09-15 Perforation production new technique of hot rolling large-diameter steel pipe

Country Status (1)

Country Link
CN (1) CN101653781B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102343362A (en) * 2010-08-03 2012-02-08 扬州龙川钢管有限公司 Perforating and extending integrated machine
CN102343360A (en) * 2010-08-03 2012-02-08 扬州龙川钢管有限公司 Composite roll piercing mill for producing large-bore seamless steel tube
CN102303048A (en) * 2011-09-19 2012-01-04 太原重工股份有限公司 Continuous piercing method for seamless steel tube
CN103331325A (en) * 2013-06-18 2013-10-02 中兴能源装备股份有限公司 Method for manufacturing ultra-large-diameter pipeline
CN104438333A (en) * 2014-12-10 2015-03-25 西北工业大学 Tri-roller reciprocating type skew rolling technique of seamless pipes
CN105834217A (en) * 2016-03-25 2016-08-10 江苏武进不锈股份有限公司 Preparation process of large-diameter duplex stainless steel seamless steel tube and application to oceanographic engineering

Also Published As

Publication number Publication date
CN101653781A (en) 2010-02-24

Similar Documents

Publication Publication Date Title
CN101653781B (en) Perforation production new technique of hot rolling large-diameter steel pipe
CN102179450B (en) Hot expanding process for seamless steel tube, and hot tube expanding machine
CN103272845B (en) Hot rolling process of small-bore ultra-thin-wall seamless steel tube
CN100562587C (en) A kind of heating process of titanium oblique perforating rod ingot
CN101337236A (en) Rolling mill technique of three-roller full-floating core rod tandem rolling tube
CN102284486A (en) Process for manufacturing seamless steel tubes by hot rolling
CN102303065A (en) Method for manufacturing seamless steel tube for vehicle-mounted large-diameter high pressure gas cylinder
CN201024190Y (en) Cross piercing billet heating device
CN105234200A (en) On-line tube-expanding production process of large-diameter seamless steel tubes
CN111531104A (en) Novel oil drill pipe joint production line
CN106914554A (en) The step of heavy caliber seamless steel pipe two push type thermal expansion machine and its thermal expansion process
CN101972776A (en) Hot rolling production process of automatic tube rolling mill
CN102303048A (en) Continuous piercing method for seamless steel tube
CN101954377A (en) Full-floating mandrel tandem-rolling seamless steel pipe production process
CN102228905A (en) Production process of hot continuous rolling seamless steel tube with small caliber
CN107583954B (en) Hot drawing continuous rolled pipe production line and pipe manufacturing method
CN104438333A (en) Tri-roller reciprocating type skew rolling technique of seamless pipes
CN101020192A (en) Hot rolling process of seamless steel pipe
CN102009069A (en) Manufacturing process of small-caliber hot rolling seamless steel tubes
CN102059272A (en) Method for horizontal continuous casting, Pilger rolling and continuous drawing of copper alloy condenser tube
CN101716598B (en) Process for producing large-caliber steel pipe through mandril circulation
CN101428298B (en) Process for manufacturing pipeline tube
CN103978037B (en) Roller mill
CN102581014A (en) Process for producing thin-wall seamless steel tubes
CN107971706A (en) A kind of production method of super large caliber titanium alloy seamless pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant