CN101649746A CN 200910102301 CN200910102301A CN101649746A CN 101649746 A CN101649746 A CN 101649746A CN 200910102301 CN200910102301 CN 200910102301 CN 200910102301 A CN200910102301 A CN 200910102301A CN 101649746 A CN101649746 A CN 101649746A
Authority
CN
China
Prior art keywords
plug
tunnel
water stopping
concrete
lining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200910102301
Other languages
English (en)
Other versions
CN101649746B (zh
Inventor
蔡建国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hydrochina East China Engineering Corp
Original Assignee
Hydrochina East China Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina East China Engineering Corp filed Critical Hydrochina East China Engineering Corp
Priority to CN2009101023014A priority Critical patent/CN101649746B/zh
Publication of CN101649746A publication Critical patent/CN101649746A/zh
Application granted granted Critical
Publication of CN101649746B publication Critical patent/CN101649746B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明涉及一种隧洞封堵堵头周边止水片的设置方法。本发明所要解决的技术问题是提供一种具有设置方便、实用性强、可靠度高、不影响堵头施工直线工期的隧洞封堵堵头周边止水片的设置方法。解决该问题的技术方案是:1)在准备浇筑隧洞混凝土衬砌之前,先将止水铜片加工成L型,固定于靠近隧洞侧的衬砌范围内;2)立模浇筑混凝土衬砌;3)结合混凝土衬砌表面的凿毛处理,凿除平行于衬砌面的止水铜片上的表面混凝土;4)掰直止水铜片;5)浇筑混凝土堵头,将整个隧洞封堵。本发明主要适用于水利水电工程隧洞封堵的挡水堵头。

Description

一种隧洞封堵堵头周边止水片的设置方法
技术领域
本发明涉及一种隧洞封堵堵头周边止水片的设置方法,主要适用于水利水电工程隧洞封堵的挡水堵头。
背景技术
在水利水电工程建设中,一般都会涉及隧洞封堵问题,如导流隧洞完成导流任务后,需采用混凝土堵头进行永久封堵,堵头一般具有挡水水头高,施工工期紧,为防止堵头渗漏,除需对堵头进行灌浆处理外,堵头周边还需设置止水片。当封堵堵头修建在隧洞混凝土衬砌面上,目前止水片的设置一般的做法是在衬砌面上开凿环向槽埋设止水片,或采用环氧砂浆粘贴和螺栓固定止水片的方法。上述止水片的设置方法,不仅施工复杂、工序多、可靠度低,且占用堵头施工的直线工期。
发明内容
为解决现有技术中存在的问题,本发明旨在提供一种具有设置方便、实用性强、可靠度高、不影响堵头施工直线工期的隧洞封堵堵头周边止水片的设置方法。
本发明采用的技术方案:隧洞封堵堵头周边止水片的设置方法包括以下步骤:
1)在准备浇筑隧洞混凝土衬砌之前,先将止水铜片加工成L型,固定于靠近隧洞侧的衬砌范围内;
2)立模浇筑混凝土衬砌;
3)结合混凝土衬砌表面的凿毛处理,凿除平行于衬砌面的止水铜片上的表面混凝土;
4)掰直止水铜片;
5)浇筑混凝土堵头,将整个隧洞封堵。
本发明的有益效果是:本发明止水片的设置方法方便简单、工序少、实用性强、可靠度高,在不影响堵头施工直线工期的前堤下,保证了工程质量,很好地解决了目前堵头周边止水片设置存在的问题。
附图说明
图1是本发明止水片预埋型式图。
图2是本发明堵头浇筑时止水片型式图。
图中,1止水铜片,2混凝土衬砌,3隧洞侧,4表面混凝土,5混凝土堵头。
具体实施方式
1)如图1所示,在准备浇筑隧洞混凝土衬砌2之前,先将止水铜片1加工成L型,固定于靠近隧洞侧3的衬砌范围内(浇筑混凝土之前必须先立模,止水铜片可固定在模板上或钢筋上);
2)立模浇筑混凝土衬砌2,即完成第一阶段止水铜片的预埋;
3)第二阶段如图2所示,结合混凝土衬砌2表面的凿毛处理,凿除平行于衬砌面的止水铜片1上的表面混凝土4;
4)掰直止水铜片1,在混凝土衬砌2的表面形成一圈连续的堵头周边止水片;
5)最后浇筑混凝土堵头5,将整个隧洞封堵。

Claims (1)

1、一种隧洞封堵堵头周边止水片的设置方法,其特征在于包括以下步骤:
1)在准备浇筑隧洞混凝土衬砌(2)之前,先将止水铜片(1)加工成L型,固定于靠近隧洞侧(3)的衬砌范围内;
2)立模浇筑混凝土衬砌(2);
3)结合混凝土衬砌(2)表面的凿毛处理,凿除平行于衬砌面的止水铜片(1)上的表面混凝土(4);
4)掰直止水铜片(1);
5)浇筑混凝土堵头(5),将整个隧洞封堵。
CN2009101023014A 2009-08-25 2009-08-25 一种隧洞封堵堵头周边止水片的设置方法 Active CN101649746B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101023014A CN101649746B (zh) 2009-08-25 2009-08-25 一种隧洞封堵堵头周边止水片的设置方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101023014A CN101649746B (zh) 2009-08-25 2009-08-25 一种隧洞封堵堵头周边止水片的设置方法

Publications (2)

Publication Number Publication Date
CN101649746A true CN101649746A (zh) 2010-02-17
CN101649746B CN101649746B (zh) 2012-01-18

Family

ID=41672055

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101023014A Active CN101649746B (zh) 2009-08-25 2009-08-25 一种隧洞封堵堵头周边止水片的设置方法

Country Status (1)

Country Link
CN (1) CN101649746B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104372862A (zh) * 2014-11-17 2015-02-25 中国葛洲坝集团第三工程有限公司 一种z型止水止浆片及其使用方法
CN107605511A (zh) * 2017-08-31 2018-01-19 中国电建集团北京勘测设计研究院有限公司 洞室堵头周边止水结构及其施工方法
CN110513112A (zh) * 2019-09-04 2019-11-29 中国电建集团中南勘测设计研究院有限公司 一种过流孔形成装置及竖井施工方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104372862A (zh) * 2014-11-17 2015-02-25 中国葛洲坝集团第三工程有限公司 一种z型止水止浆片及其使用方法
CN107605511A (zh) * 2017-08-31 2018-01-19 中国电建集团北京勘测设计研究院有限公司 洞室堵头周边止水结构及其施工方法
CN110513112A (zh) * 2019-09-04 2019-11-29 中国电建集团中南勘测设计研究院有限公司 一种过流孔形成装置及竖井施工方法

Also Published As

Publication number Publication date
CN101649746B (zh) 2012-01-18

Similar Documents

Publication Publication Date Title
CN202000380U (zh) 地下室外墙后浇带回填保护板
CN204552818U (zh) 防隧道侧水沟底部渗漏的排水系统
CN101781991B (zh) 盾构接收或始发端头的双井式加固方法及双井式盾构接收方法
CN103498486B (zh) 一种采用套管对后浇带降水管井实施封堵的方法
CN102041810B (zh) 在集中涌水地带浇筑大坝基础混凝土的施工方法
CN204040078U (zh) 一种后浇带模板支设构造
CN104652815A (zh) 一种厨卫间止水反梁浇筑的施工方法
CN105672486A (zh) 一种在混凝土中预埋锚筋的方法
CN107605511A (zh) 洞室堵头周边止水结构及其施工方法
CN101649746B (zh) 一种隧洞封堵堵头周边止水片的设置方法
CN205636683U (zh) 导流洞快速封堵结构
CN204532364U (zh) 全断面岩石隧道掘进机工法地铁隧道泄压式衬砌结构
CN204225064U (zh) 用于地下式水电站引水的压力管道结构
CN207567738U (zh) 导流隧洞封堵结构
CN104929129A (zh) 无盖重结合异孔引管混凝土盖重固结灌浆方法
CN101769157B (zh) 隧道开挖中掌子面反压处置的施工方法
CN104594389A (zh) 一种带弹性止水条的后浇带外墙封堵结构
CN203307776U (zh) 一种混凝土面板堆石坝趾板结构
CN203716116U (zh) 一种用于导流洞混凝土堵头顶拱回填灌浆的止浆结构
CN204386617U (zh) 一种低水头引水隧洞的固结灌浆结构
CN204023592U (zh) 一种基坑疏干井超前快速封堵结构
CN203514332U (zh) 一种对后浇带降水管井实施封堵的套管
CN202559321U (zh) 导流隧洞堵头混凝土排水管装置
CN202936809U (zh) 应用于清理后浇带的排水沟
CN105178268A (zh) 一种导流洞和泄洪洞结合的施工方法及结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant