Prior art keywords
main bearing
semi
bolt
finished product
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200910306707
Other languages
Chinese (zh)
Other versions
CN101644256A (en
Inventor
马永杰
王卫刚
刘春伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baoji Oilfield Machinery Co Ltd
Original Assignee
Baoji Oilfield Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoji Oilfield Machinery Co Ltd filed Critical Baoji Oilfield Machinery Co Ltd
Priority to CN 200910306707 priority Critical patent/CN101644256B/en
Publication of CN101644256A publication Critical patent/CN101644256A/en
Application granted granted Critical
Publication of CN101644256B publication Critical patent/CN101644256B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The invention relates to a method for improving assembly quality of bolt of main bearing of F-series slurry pump; a semi-finished frame and a semi-finished main bearing cover are respectively processed according to the existing processing method; the locating reference of threaded hole of main bearing appointed to process is a mounting reference A; the locating reference processing bolt through hole is a mounting reference B; the technique bolt is used to assemble the semi-finished frame and the semi-finished main bearing cover into a semi-finished shell so that the mounting reference A is coincident to the mounting reference B; the semi-finished shell is integrally processed to manufacture F-series slurry pump body; the slurry pump is assembled according to the existing assembly method; the bolts of main bearing are orderly installed from up to down; the wind age of main bearing is adjusted; the bolt of main bearing is re-mounted according to the threaded hole prior to the disassembly of each bolt of main bearing to finish the assembly of F-series slurry pump. The method of the invention can ensure the normal match of the bolt of main bearing and the threaded hole of main bearing of frame, and the centering of main bearing cover and the threaded hole of main bearing seat of frame, thereby improving the assembly quality of bolt of main bearing of F-series slurry pump.

Description

Improve the method for F series slurry pump assembly quality of bolt of main bearing
Technical field
The invention belongs to the oil-well drilling equipment technical field, relate to a kind of method of the F of raising series slurry pump assembly quality of bolt of main bearing.
Background technique
Slurry pump is the important component part of drilling equipment, in the drilling process, and the washing solutions such as slurry conveyed or water in the boring.In direct circulation probing commonly used, slurry pump is with the earth's surface flushing medium--and Qing Shui ﹑ mud or polymer flush fluid are under certain pressure, by the bottom of high pressure hose, water tap and drill string center hole direct sending drill bit, be used for the cooling drill bit, and the earth's surface is removed and be transported to the landwaste that cuts.Slurry pump commonly used is piston type or plunger type, and by the crank up of power engine drive pump, bent axle drives piston again by crosshead or plunger moves reciprocatingly in pumping cylinder.Under the alternating action of suction and expulsion valve, realize force feed and the circulation of washing solution.
The F series slurry pump is a kind of new-type slurry pump, have simple in structure, volume is little, the life-span is long, the characteristics of smooth running, can satisfy the needs of middle-deep well operation.But the normally problem of dismounting of Main bearing bolt often appears in existing F series slurry pump when large assembling, its form of expression mainly contains two kinds: 1) Main bearing bolt can't normally cooperate with the tapped hole of frame main bearing seat, and the on-the-spot manual method of crossing button of screw tap that usually adopts solves the problem that occurs in this assembling; When situation is serious, even Main bearing bolt occurs and be sintered together and separate with main bearing seat, so that Erbium-doped  is the situation of lucky Ignorant wantonly, and can only fall screw rod, built-up welding, the step such as bore hole and tapping thread mill drilling again again this moment by destroying bolt, boring, in order to make the Main bearing bolt normal mounting; 2) tapped hole of main bearing cap and frame main bearing seat can't centering, causes the Main bearing bolt can't normal mounting, and on-the-spot usually the employing redresses processing to main bearing cap on boring machine, so that the Main bearing bolt normal mounting.
Summary of the invention
The method that the purpose of this invention is to provide a kind of F of raising series slurry pump assembly quality of bolt of main bearing, can guarantee that Main bearing bolt and frame main bearing seat tapped hole are normal cooperates and the centering of main bearing cap and frame main bearing seat tapped hole, so that normally dismounting of Main bearing bolt.
The technical solution adopted in the present invention is, improves the method for F series slurry pump assembly quality of bolt of main bearing, and the method may further comprise the steps:
Step 1: process respectively by existing processing method and to obtain semi-finished product frame and semi-finished product main bearing cap, in the course of working of semi-finished product frame,
A. control the size conforms designing requirement of main bearing seat positioning spigot A on the semi-finished product frame, the lower side mark in position in this positioning spigot A is decided to be to reference for installation A, processing positioning datum using this reference for installation A as the base bearing screwed hole, process respectively two base bearing screwed holes of same main bearing hole both sides on this semi-finished product frame, guarantee that the distance between two base bearing screwed holes one of them and reference for installation A meets designing requirement, guarantee that the center line of these two base bearing screwed holes and the distance of mounting center line meet designing requirement
B. the main bearing tapped hole on the semi-finished product frame that machines among the step a is tested, obtains qualified semi-finished product frame,
C. whenever finish the processing of main bearing tapped hole on 10 semi-finished product frames, change screw tap, and tapping attachment is detected;
In the process of processing semi-finished product main bearing cap, one section on the semi-finished product main bearing cap among discontinuous two sections positioning spigot B as another benchmark, process two Main bearing bolt via holes, control these two Main bearing bolt via holes one of them center line and the distance between this another benchmark meet designing requirement, control simultaneously two centre distance between the Main bearing bolt via hole and meet designing requirement, the reference for installation B that to specify this another benchmark be the semi-finished product main bearing cap;
Step 2: the Main bearing bolt via hole on the semi-finished product main bearing cap that makes of the main bearing tapped hole on the semi-finished product frame that makes of cleanup step 1 and step 1 respectively;
Step 3: taking technique bolt, according to the service bolt adjacent with reference for installation B is installed first, rear installation is away from the order of the service bolt of reference for installation B, semi-finished product frame and semi-finished product main bearing cap after number of assembling steps 2 cleanings, and so that in the step 1 regulation the semi-finished product frame on reference for installation A and the reference for installation B on the semi-finished product main bearing cap coincide, obtain the semi-finished product pump housing of F series slurry pump, reference for installation B on the semi-finished product main bearing cap is the processing positioning datum, to the whole processing of this semi-finished product pump housing, make the pump housing;
Step 4: the service bolt on the pump housing that dismounting step 3 makes obtains frame and main bearing cap;
Step 5: the Main bearing bolt via hole on the main bearing cap that obtains of the main bearing tapped hole on the frame that obtains of cleanup step 4 and step 4 respectively;
Step 6: main bearing cap and frame and aforementioned all the other related components after the accurate Main bearing bolt of label taking, step 5 are cleared up respectively, obtain F series slurry pump semi-finished product according to existing assembly method assembling, in assembling process, so that the reference for installation A on the frame and the reference for installation B on the main bearing cap overlap, and by the Main bearing bolt of installing first away from reference for installation B, the order of the Main bearing bolt that rear installation is adjacent with reference for installation B is installed Main bearing bolt;
Step 7: remove the Main bearing bolt of installing in the step 6, adjust the main bearing play, then, remove front corresponding screw by each Main bearing bolt, and by the erection sequence in the step 6, the Main bearing bolt of pulling down is re-started installation, finish the assembling of F series slurry pump.
Method of the present invention is by strictly controlling the course of working of frame, main bearing cap, make the quality of product of these two kinds of parts obtain large increase, when effectively having avoided large assembling, since on the frame on Main bearing bolt hole, the main bearing cap screw thread cross hole location and the pitch-row error is excessive, cause on the frame problem that screw thread via hole on the Main bearing bolt hole and main bearing cap can't centering, effectively reducing Main bearing bolt can't dismounting phenomenon odds, has solved the problem that Main bearing bolt can't normally assemble.
Description of drawings
Fig. 1 is the structural representation that adopts the F series slurry pump semi-finished product frame that the inventive method makes;
Fig. 2 is the structural representation that adopts the semi-finished product bearing cap that the inventive method makes;
Fig. 3 is the left view of Fig. 2;
Fig. 4 is the structural representation after the frame that adopts the inventive method to make is assembled with main bearing cap.
Among the figure, 1. frame, 2. main bearing cap, 3. mounting center line, 4. reference for installation A, 5. reference for installation B, 6. positioning spigot A, 7. main bearing tapped hole, 8. positioning spigot B, 9. Main bearing bolt via hole.
Embodiment
The present invention is described in detail below in conjunction with the drawings and specific embodiments.
Adopt existing processing method to make frame and the main bearing seat of F series slurry pump, then, by existing assembly method assembling F series slurry pump, the normally problem of dismounting of Main bearing bolt often appears, show as: 1) Main bearing bolt can't normally cooperate with the tapped hole of frame main bearing seat, causes the Main bearing bolt can't normal mounting; 2) tapped hole of main bearing cap and frame main bearing seat can't centering.
In order to address the above problem, usually adopt the manual method of crossing button of artificial screw tap, Main bearing bolt is normally cooperated with frame main bearing seat tapped hole.If adopt preceding method not deal with problems, can only fall screw rod, built-up welding, the step such as bore hole and tapping thread mill drilling again again this moment by destroying bolt, boring, so that the Main bearing bolt normal mounting; Or adopt the method that on boring machine, main bearing cap is redressed processing, make the Main bearing bolt normal mounting.
These improper assembly processes have not only additionally increased cost of production, and have greatly prolonged the manufacture cycle, have also buried potential safety hazard simultaneously.For effectively addressing this problem, the inventive method is by controlling course of working and the assembly process of main bearing cap 2 and frame 1, solved the problem that F series slurry pump Main bearing bolt can't dismounting.
The inventive method specifically may further comprise the steps:
Step 1: process respectively by existing processing method and to obtain semi-finished product frame and semi-finished product main bearing cap
In the course of working of semi-finished product frame,
A. control the size conforms designing requirement of discontinuous main bearing seat positioning spigot A6 on the semi-finished product frame, the lower side mark in position among this discontinuous positioning spigot A6 is decided to be reference for installation A4, as shown in Figure 1, with the processing positioning datum of this reference for installation A4 as main bearing tapped hole 7, process respectively two main bearing tapped holes 7 of same main bearing hole both sides, the distance of controlling these two main bearing tapped hole 7 center lines and mounting center line 3 meets designing requirement, the center line of the main bearing tapped hole 7 close with reference for installation A4 and the distance between the reference for installation A4 meet designing requirement, mounting center line 3 is center lines of the main bearing hole that parallels with main bearing tapped hole 7 center lines
B. the main bearing tapped hole 7 on the semi-finished product frame that machines among the step a is tested, obtain qualified semi-finished product frame, the postorder of effectively having avoided causing because screw thread is defective assembles difficulty,
C. after whenever finishing the processing of main bearing tapped hole 7 on 10 semi-finished product frames, change screw tap, and tapping attachment is detected, avoid the bastard thread tooth form on the impact of assembling;
In the process of processing semi-finished product main bearing cap, one of them of discontinuous two sections positioning spigot B8 on the semi-finished product main bearing cap is as machining benchmark, process two Main bearing bolt via holes 9, control this two Main bearing bolt via holes 9 one of them center line and the distance between this benchmark meet designing requirement, control simultaneously two centre distance between the Main bearing bolt via hole 9 and meet designing requirement, specifying this benchmark is the reference for installation B5 of semi-finished product main bearing cap, and makes corresponding mark;
Step 2: the main bearing tapped hole 7 on the semi-finished product frame that step 1 is made is cleared up, and guarantees that this main bearing tapped hole 7 is interior without iron filings and impurity,
Main bearing bolt via hole 9 on the semi-finished product main bearing cap that step 1 is made is cleared up, and guarantees that these Main bearing bolt via hole 9 inwalls are without burr and impurity;
Step 3: taking technique bolt, semi-finished product frame and semi-finished product main bearing cap after step 2 cleaning are assembled, so that the reference for installation A4 on the semi-finished product frame of stipulating in the step 1 and the reference for installation B5 on the semi-finished product main bearing cap coincide, and according to the order mounting process bolt that gets on, get off, the service bolt adjacent with reference for installation B5 namely is installed first, rear installation is away from the service bolt of reference for installation B5, obtain the semi-finished product pump housing of F series slurry pump, then, take reference for installation B5 as the processing positioning datum, this semi-finished product pump housing is carried out integral body processing, make the structure pump housing as shown in Figure 4;
Step 4: remove the service bolt on the pump housing that machines in the step 3, obtain frame 1 and main bearing cap 2, after this service bolt is reused 5 times, must test, be up to the standards and continue to use, can not repair the screw thread of this service bolt, effectively prevent because of the defective destroying infection to the qualified tapped hole of frame main bearing seat of the tooth form of service bolt;
Step 5: the main bearing tapped hole 7 on the frame 1 that step 4 is obtained is cleared up, and guarantees that this main bearing tapped hole 7 is interior without iron filings and impurity,
2 Main bearing bolt via hole 9 is cleared up on the main bearing cap that step 4 is obtained, and guarantees that this Main bearing bolt via hole 9 is interior without burr and impurity;
Step 6: frame 1 and main bearing cap 2 and aforementioned all the other related components after the accurate Main bearing bolt of label taking, step 5 are cleared up respectively, obtain F series slurry pump semi-finished product according to existing assembly method assembling, in assembling process, so that the reference for installation A4 on the frame 1 and the reference for installation B5 on the main bearing cap 2 overlap, Main bearing bolt is installed by first up and then down order, Main bearing bolt away from reference for installation B5 namely is installed first, the Main bearing bolt that rear installation is adjacent with reference for installation B5, the phenomenon that the Action of Gravity Field that has effectively prevented main bearing cap 2 amplifies assembly error;
Step 7: remove the Main bearing bolt of installing in the step 6, adjust the main bearing play, the cleaning that keeps this Main bearing bolt, then, so that the reference for installation A4 on the frame 1 and the reference for installation B5 on the main bearing cap 2 overlap, remove front corresponding screw by each Main bearing bolt, and by the erection sequence in the step 6, the Main bearing bolt of pulling down is re-started installation, finish the assembling of F series slurry pump.
Embodiment
Obtain the semi-finished product frame by existing processing method processing, in the course of working of semi-finished product frame, discontinuous main bearing seat positioning spigot A6 is of a size of 800.1~800.5mm on the control semi-finished product frame, the lower side mark in position among this discontinuous positioning spigot A6 is decided to be reference for installation A4, with the processing positioning datum of this reference for installation A4 as main bearing tapped hole 7, process respectively two main bearing tapped holes 7 of same main bearing hole both sides, the center line of the main bearing hole that regulation parallels with main bearing tapped hole 7 center lines is mounting center line 3, and the distance of controlling these two main bearing tapped hole 7 center lines and mounting center line 3 is respectively 333.4 ± 0.4mm; Center line and the distance between the reference for installation A4 of the main bearing tapped hole 7 close with reference for installation A4 are 66.65 ± 0.4mm, main bearing tapped hole 7 is tested, obtain qualified semi-finished product frame, whenever after finishing the processing of main bearing tapped hole 7 on 10 semi-finished product frames, change screw tap, and tapping attachment detected, avoid the bastard thread tooth form on the impact of assembling; By existing processing method processing semi-finished product main bearing cap, and in course of working, one of them of discontinuous two sections positioning spigot B8 on the semi-finished product main bearing cap is the processing positioning datum, process two Main bearing bolt via holes 9, controlling one of them center line and the distance between this positioning datum of this two Main bearing bolt via holes 9 is 66.65 ± 0.4mm, controlling simultaneously two centre distance between the Main bearing bolt via hole 9 is 666.8 ± 0.4mm, specifying this positioning datum is the reference for installation B5 of semi-finished product main bearing cap, and make corresponding mark, main bearing tapped hole 7 on the semi-finished product frame that makes is cleared up, guarantee that this main bearing tapped hole 7 is interior without iron filings and impurity, Main bearing bolt via hole 9 on the semi-finished product main bearing cap that makes is cleared up, guaranteed that these Main bearing bolt via hole 9 inwalls are without burr and impurity; The taking technique bolt, semi-finished product frame and semi-finished product main bearing cap after the cleaning are assembled, so that the reference for installation A4 on the semi-finished product frame and the reference for installation B5 on the semi-finished product main bearing cap coincide, and according to the order mounting process bolt that gets on, get off, the bolt adjacent with reference for installation B5 namely is installed first, rear installation is away from reference for installation B5 bolt, form the semi-finished product pump housing of F series slurry pump, then, take reference for installation B5 as the processing positioning datum, this semi-finished product pump housing is carried out integral body processing, make the pump housing; Service bolt on the pump housing that dismounting machines, obtain frame 1 and main bearing cap 2, main bearing tapped hole 7 on the frame 1 that obtains is cleared up, guarantee that this main bearing tapped hole 7 is interior without iron filings and impurity, Main bearing bolt via hole 9 on the main bearing cap 2 that obtains is cleared up, guaranteed that this Main bearing bolt via hole 9 is interior without burr and impurity; The accurate Main bearing bolt of label taking, according to existing assembly method, frame 1 and main bearing cap 2 after required component and the cleaning are assembled, form F series slurry pump semi-finished product, in the assembling process, guarantee that reference for installation A4 and the reference for installation B5 on the main bearing cap 2 on the frame 1 overlaps, Main bearing bolt is installed by first up and then down order, Main bearing bolt away from reference for installation B5 namely is installed first, the Main bearing bolt that rear installation is adjacent with reference for installation B5; Remove Main bearing bolt, adjust the main bearing play, the cleaning that keeps this Main bearing bolt, then, remove front corresponding screw by each Main bearing bolt, and by the Main bearing bolt of installing first away from reference for installation B5, the erection sequence of the main bearing spiral shell that rear installation is adjacent with reference for installation B5, the Main bearing bolt of pulling down is re-started installation, finish the assembling of F series slurry pump.
The inventive method is passed through main bearing tapped hole 7 on the frame 1, the processing scheme of Main bearing bolt via hole 9 and course of working on the main bearing cap 2, the erection sequence of Main bearing bolt, the strict control of service bolt use condition in the assembly process, main bearing tapped hole 7 on the frame 1 and the position of the Main bearing bolt via hole 9 on the main bearing cap 2 are under control, when effectively having avoided large assembling, the excessive interference that causes Main bearing bolt and Main bearing bolt via hole 9 of the position degree of the Main bearing bolt via hole 9 on the main bearing cap 2 and pitch-row error, effectively reducing Main bearing bolt can't dismounting phenomenon odds, has solved the problem that Main bearing bolt can't normally assemble.

Claims (4)

1. improve the method for F series slurry pump assembly quality of bolt of main bearing, it is characterized in that the method may further comprise the steps:
Step 1: process respectively by existing processing method and to obtain semi-finished product frame and semi-finished product main bearing cap, in the course of working of semi-finished product frame,
A. control main bearing seat positioning spigot A(6 on the semi-finished product frame) the size conforms designing requirement, with this positioning spigot A(6) in a position lower side mark be decided to be reference for installation A(4), with this reference for installation A(4) as the processing positioning datum of main bearing tapped hole (7), process respectively two main bearing tapped holes (7) of same main bearing hole both sides on this semi-finished product frame, guarantee two main bearing tapped holes (7) one of them and reference for installation A(4) between distance meet designing requirement, guarantee that the center line of these two main bearing tapped holes (7) and the distance of mounting center line (3) meet designing requirement
B. the main bearing tapped hole (7) on the semi-finished product frame that machines among the step a is tested, obtains qualified semi-finished product frame,
C. whenever finish the processing of main bearing tapped hole (7) on 10 semi-finished product frames, change screw tap, and tapping attachment is detected;
In the process of processing semi-finished product main bearing cap, with discontinuous two sections positioning spigot B on the semi-finished product main bearing cap, (8) one section in is another benchmark, process two Main bearing bolt via holes, (9), control this two Main bearing bolt via holes, (9) distance between the center line of one of them and this another benchmark meets designing requirement, control simultaneously two Main bearing bolt via holes, (9) centre distance between meets designing requirement, the reference for installation B that to specify this another benchmark be the semi-finished product main bearing cap, (5)
Step 2: the Main bearing bolt via hole (9) on the semi-finished product main bearing cap that makes of the main bearing tapped hole (7) on the semi-finished product frame that makes of cleanup step 1 and step 1 respectively;
Step 3: taking technique bolt, according to installing and reference for installation B(5 first) adjacent service bolt, rear installation is away from reference for installation B(5) the order of service bolt, semi-finished product frame and semi-finished product main bearing cap after number of assembling steps 2 cleanings, and so that in the step 1 regulation the semi-finished product frame on reference for installation A(4) with the semi-finished product main bearing cap on reference for installation B(5) coincide, obtain the semi-finished product pump housing of F series slurry pump, reference for installation B(5 on the semi-finished product main bearing cap) is the processing positioning datum, to the whole processing of this semi-finished product pump housing, make the pump housing;
Step 4: the service bolt on the pump housing that dismounting step 3 makes obtains frame (1) and main bearing cap (2);
Step 5: the Main bearing bolt via hole (9) on the main bearing cap (2) that obtains of the main bearing tapped hole (7) on the frame (1) that obtains of cleanup step 4 and step 4 respectively;
Step 6: get respectively main bearing cap (2) and frame (1) after the cleaning of Main bearing bolt, step 5, obtain F series slurry pump semi-finished product according to existing assembly method assembling, in assembling process, so that the reference for installation A(4 on the frame (1)) and the reference for installation B(5 on the main bearing cap (2)) overlap, and by installing first away from reference for installation B(5) Main bearing bolt, rear installation and reference for installation B(5) order of adjacent Main bearing bolt, Main bearing bolt is installed;
Step 7: remove the Main bearing bolt of installing in the step 6, adjust the main bearing play, then, remove front corresponding screw by each Main bearing bolt, and by the erection sequence in the step 6, the Main bearing bolt of pulling down is re-started installation, finish the assembling of F series slurry pump.
2. method according to claim 1 is characterized in that, the mounting center line (3) in the described step 1 on the semi-finished product frame is the center line of the main bearing hole that parallels with main bearing tapped hole (7) center line.
3. method according to claim 1 is characterized in that, in the described step 7, when reinstalling Main bearing bolt, guarantees the reference for installation A(4 on the frame (1)) and main bearing cap (2) on reference for installation B(5) coincidence.
4. according to claim 1,2 or 3 described methods, it is characterized in that, after the service bolt in the described step 3 is reused 5 times, must be up to the standards and could continue to use, and can not repair the screw thread of this service bolt.
CN 200910306707 2009-09-08 2009-09-08 Method for improving assembly quality of bolt of main bearing of F-series slurry pump Expired - Fee Related CN101644256B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200910306707 CN101644256B (en) 2009-09-08 2009-09-08 Method for improving assembly quality of bolt of main bearing of F-series slurry pump

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200910306707 CN101644256B (en) 2009-09-08 2009-09-08 Method for improving assembly quality of bolt of main bearing of F-series slurry pump

Publications (2)

Publication Number Publication Date
CN101644256A CN101644256A (en) 2010-02-10
CN101644256B true CN101644256B (en) 2013-04-17

Family

ID=41656266

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200910306707 Expired - Fee Related CN101644256B (en) 2009-09-08 2009-09-08 Method for improving assembly quality of bolt of main bearing of F-series slurry pump

Country Status (1)

Country Link
CN (1) CN101644256B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106595449B (en) * 2016-12-21 2019-04-30 河南工程学院 Pipeline valve both ends flange coaxiality detection method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1277949A1 (en) * 2000-04-18 2003-01-22 Toyota Jidosha Kabushiki Kaisha High-pressure pump and assembly structure of high-pressure pump
CN1991178A (en) * 2005-12-27 2007-07-04 三菱电机株式会社 Double-cylinder rotary sealing type compressor and manufacturing method thereof
DE102006039782A1 (en) * 2006-08-24 2008-02-28 Siemens Ag Fluid pump, comprising a crank mechanism with undivided connecting rods, and method of assembly thereof
CN201218226Y (en) * 2007-02-20 2009-04-08 伟尔矿物澳大利亚私人有限公司 Pump apparatus

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1277949A1 (en) * 2000-04-18 2003-01-22 Toyota Jidosha Kabushiki Kaisha High-pressure pump and assembly structure of high-pressure pump
CN1991178A (en) * 2005-12-27 2007-07-04 三菱电机株式会社 Double-cylinder rotary sealing type compressor and manufacturing method thereof
DE102006039782A1 (en) * 2006-08-24 2008-02-28 Siemens Ag Fluid pump, comprising a crank mechanism with undivided connecting rods, and method of assembly thereof
CN201218226Y (en) * 2007-02-20 2009-04-08 伟尔矿物澳大利亚私人有限公司 Pump apparatus

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
杨琴.国内外钻井泥浆泵发展概况.《机械工程师》.2008,(第10期),63-65. *
王莉萍等.F系列泥浆泵国产化概要.《石油矿场机械》.2005,第34卷(第6期),94-96. *

Also Published As

Publication number Publication date
CN101644256A (en) 2010-02-10

Similar Documents

Publication Publication Date Title
CN101424162B (en) Back tong for top-drive drilling unit
CN201979174U (en) Special inner bore burring pneumatic machine for cylinder-type parts
CN101644256B (en) Method for improving assembly quality of bolt of main bearing of F-series slurry pump
CN201702418U (en) Drill bushing
CN204450037U (en) Z axis feed system
CN203751381U (en) Casing drilling device
CN207188802U (en) A kind of main spindle box for lathe
CN203516246U (en) Rotary guiding tool hydraulic system power driving device
CN105171499A (en) Direct-driven gear hobbing machine worktable
CN207508339U (en) Convenient for cooling down chip removal type long-hole boring apparatus
CN205673941U (en) A kind of structure eliminating bench type machine strike note
CN211258527U (en) Drill bit for oil development convenient to dismouting
CN205057113U (en) Drilling system is used to double fastener hoop
EP3135853A1 (en) Combined-type driving sleeve of drilling rig with reliably fixed draw key
CN105127477A (en) Method for drilling holes in small end of exhaust manifold of automobile
CN205713992U (en) Road surface puncher
CN202611583U (en) Power head for drilling rig
CN204545525U (en) A kind of pipe piercing machine
CN104339247A (en) Hydraulic driving type all-metal screw drill tool stator grinding device
CN105149649A (en) Small-head end drilling method for automobile exhaust manifold
CN105171047A (en) Hole-drilling system for double clamp
CN206009704U (en) A kind of guide sleeve mechanism of ten thousand tons of press filling devices
CN104563901A (en) Petroleum drilling top drive safety valve protecting joint
CN105108202A (en) Automobile exhaust manifold small-head end drilling tool
CN205733098U (en) A kind of novel high-power soupspoon for kitchen use mold hole boring machine tool equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130417

Termination date: 20160908