CN101644042A - System for transporting and discharging silt through hydraulic fill pipeline in front of dam - Google Patents

System for transporting and discharging silt through hydraulic fill pipeline in front of dam Download PDF

Info

Publication number
CN101644042A
CN101644042A CN200810117840A CN200810117840A CN101644042A CN 101644042 A CN101644042 A CN 101644042A CN 200810117840 A CN200810117840 A CN 200810117840A CN 200810117840 A CN200810117840 A CN 200810117840A CN 101644042 A CN101644042 A CN 101644042A
Authority
CN
China
Prior art keywords
silt
pipeline
dam
transporting
discharging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200810117840A
Other languages
Chinese (zh)
Inventor
李泉洞
李越秀
杨乃桥
杨家桂
覃辛华
李越峰
李时清
石宏元
林明琼
王崇熙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN200810117840A priority Critical patent/CN101644042A/en
Publication of CN101644042A publication Critical patent/CN101644042A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention relates to a system for transporting and discharging silt through a hydraulic fill pipeline in front of a dam. The pipeline can transport silt with a high concentration and a small quantity of water by altitude difference operating force of a water head of the dam, and can discharge the silt of a water storage lake in a large scale. The system adopts a double-body silt dredge, wherein a gantry crane of the dredge hangs a hydraulic dredging suction end to carry out operation. The sucked hydrodynamic power drives water wheels to rotate harrowing wheels; and spike teeth of the harrowing wheels loosen hardened silt so that the silt is mixed with water flow and then becomes slurry to be transported. The foreign materials in the water flow are sheared into pieces by shears of gridholes of the harrowing wheels and a machine case. The pipeline is combined by sections, and the length of the pipeline can be changed by connections of quick connectors. The pipeline has bending flexibility because a high-strength elastic water tap structure is adopted. The pipeline discharges silt through a silt-discharging pipe orifice of a tunnel on the bottom of the dam. The tunnel on the bottom of the dam is provided with front and rear gates and a pipeline valve for safe maintenance. The system has the advantages of discharging silt in a large scale, avoiding influence of silt sediment on a dam reservoir, and saving energy along with simple equipment and convenient manufacturing, assembly, use and maintenance.

Description

System for transporting and discharging silt through hydraulic fill pipeline in front of dam
Technical field
Waterpower is arranged husky system, especially system for transporting and discharging silt through hydraulic fill pipeline in front of dam before the present invention relates to a kind of dam.
Background technology
Sedimentation is the significant problem of puzzlement Dam Construction always before the dam, and it not only influences the generating in power station, also influences the capacity of reservoir before the dam, and then influences the application life of dam.Arrange husky measure at the bottom of the dam of taking at present, though alleviated the influence of sedimentation to a certain extent to the generating of dam power station, arrange husky measure at the bottom of the dam and can only take away the silt near the limited range bottom outlet but the waterpower conveying principle defines, do not have to solve substantially before the dam sedimentation the problem that influences of dam.
Summary of the invention
Sedimentation the invention provides system for transporting and discharging silt through hydraulic fill pipeline in front of dam to the problem that influences of dam before the above-mentioned dam in order to solve, and elementary solution removes before the dam sedimentation to the influence of dam.
The technical solution adopted for the present invention to solve the technical problems is: utilize the head discrepancy in elevation that forms before and after the retaining dam to be used as power, adopt the silt discharging with the retaining lake region on a large scale of hydraulic fill pipe-line transportation system.
Hydraulic fill line transportation of the present invention has the advantage that Gao Shuisha compares, sediment concentration is big and water supply volume is little.Adopt long-term uniterrupted duty, utilize the reservoir overflow water, the discharging silt of doing little by little without a break makes warehouse-in silt sediment and outbound discharging silt reach balance, makes the dam and reservoir long-term operation.
The anterior terminal of system for transporting and discharging silt through hydraulic fill pipeline of the present invention is that silt is excavated ship.
Silt is excavated ship and is adopted twin hull construction, so that improve the job stability of surface facilities, also is convenient to set up the large span straddle truck.
The waterpower that hang under water the hoisting rope lower end of straddle truck is excavated suction nozzle.The oscilaltion of operation and hoisting rope guarantees that waterpower excavates suction nozzle and excavate solid space operation in the district in board about the operation of the front and back of gantry crane, straddle truck dolly.Excavating operation is controlled by computer program.
Waterpower of the present invention is excavated the suction nozzle utilization and is inhaled the flow dynamic promotion water wheels rotation that (pressure) goes into.Water wheels drive harrowing wheel by water wheel axle and rotate.The silt that the harrowing wheel spike-tooth of rotation will harden is loosening to stir, and makes it to be mixed into mud with current and carries.Bulk materials that current are carried secretly and rectangular foreign material are by harrowing wheel comb hole and casing comb hole the time, by harrowing wheel comb hole scissors and the scissors fragmentation of casing comb hole, in case line clogging.
Slurry transportation pipeline of the present invention adopts the segmentation form, adopts pipeline snap joint to connect between pipeline section.
The length of slurry transportation pipeline realizes that by the increase and decrease of slurry pipeline hop count amount the increase and decrease of pipeline section is finished with portal jib crane.
Slurry pipeline adopts high strength elastic fire hose structure, and is crooked flexible so that the slurry transportation pipeline has under water, adapts to reservoir lakebed landform and silt and excavates moving of ship.
The rear portion terminal of system for transporting and discharging silt through hydraulic fill pipeline of the present invention is tunnel at the bottom of the dam.
The tunnel is provided with forward and backward gate at the bottom of the dam, so that the maintenance of tunnel device.
Pipeline in the tunnel is a steel, sets up by support of pipelines.
Other pipeline valve and the backup pipeline valve of all being provided with of the forward and backward gate in tunnel is so that safety inspection.
Silt is drained by terminal row sand tube mouth.
The invention has the beneficial effects as follows, adopt the hydraulic fill pipe-line transportation system on a large scale in, silt to be discharged, elementary solution except the dam before sedimentation to the influence of dam, make the dam and reservoir long-term operation; Utilize the head discrepancy in elevation that forms before and after the dam to be used as power, utilize the reservoir overflow water, the discharging silt of doing little by little without a break is saved the energy; Equipment is simple, is convenient to manufacturing, mounting, commissioning and maintenance.
Description of drawings
The present invention is further described below in conjunction with the drawings and specific embodiments, but not as a limitation of the invention.
Fig. 1 is the general arrangement of system for transporting and discharging silt through hydraulic fill pipeline in front of dam shown in the present;
Fig. 2 excavates the structural layout plan of ship for silt;
Fig. 3 excavates the structural layout plan of suction nozzle for waterpower;
Fig. 4 is the layout of equipment in tunnel at the bottom of the dam;
Wherein, Reference numeral is as follows:
101-silt is excavated ship;
102-slurry transportation pipeline;
Bank, 103-lake region;
104-retaining lake region;
105-retaining dam;
Tunnel at the bottom of the 106-dam;
The 201-hoisting rope;
202-waterpower is excavated suction nozzle;
203-straddle truck dolly;
The 204-gantry crane;
The 205-catamaran;
206-slurry transportation pipeline;
The snap joint of 207-pipeline;
208a-is in the straddle truck of stern;
208b-is in the straddle truck of fore;
Excavate the district in the 209-ship;
210-gantry crane orbit;
The 301-hoisting rope;
302-hangs wire rope;
303-hangs nut;
The 304-thrust bearing;
The 305-bearing;
The 306-water wheel axle;
The 307-hanger;
308-water wheels key;
The 309-casing;
The 310-water wheels;
311-harrowing wheel comb hole scissors;
312-casing comb hole scissors;
313-harrowing wheel comb hole;
314-casing comb hole;
315-harrowing wheel key;
The 316-harrowing wheel;
317-harrowing wheel spike-tooth;
The 318-slurry pipeline;
The snap joint of 319-pipeline;
The 401-slurry pipeline;
The snap joint of 402-pipeline;
403-tunnel early gate;
The 404-pipeline valve;
405-backs up pipeline valve;
The 406-pipe support;
The 407-pipeline;
The 408-tunnel;
409-tunnel late gate;
The 410-pipeline valve;
411-backs up pipeline valve;
412-terminal row sand tube;
The specific embodiment
In Fig. 1, Fig. 2, Fig. 3, Fig. 4, the present invention has disclosed system for transporting and discharging silt through hydraulic fill pipeline in front of dam, the head discrepancy in elevation of utilizing retaining dam 105 front and back to form is used as power, and adopts the silt discharging with retaining lake region 104 on a large scale of hydraulic fill pipe-line transportation system.
The anterior terminal of system for transporting and discharging silt through hydraulic fill pipeline of the present invention is that silt is excavated ship 101.
Silt is excavated ship 101 and is adopted catamaran 205 structures, so that improve the job stability of surface facilities, also is convenient to set up large span straddle truck 203,204.
The waterpower that hang under water hoisting rope 201 lower ends of straddle truck 203,204 is excavated suction nozzle 202.The oscilaltion of operation and hoisting rope 201 guarantees that waterpower excavates suction nozzle 202 and excavate in the district 209 solid space operation in board about the operation of the front and back of gantry crane 204, straddle truck dolly 203.Excavating operation is controlled by computer program.
Waterpower of the present invention is excavated flow dynamic promotion water wheels 310 rotations that suction nozzle 202 utilizes suction (pressure) to go into.Water wheels 310 drive harrowing wheel 316 by water wheel axle 306 and rotate.The silt that the harrowing wheel spike-tooth 317 of rotation will harden is loosening to stir, and makes it to be mixed into mud with current and carries.Bulk materials that current are carried secretly and rectangular foreign material are by harrowing wheel comb hole 313 and casing comb hole 314 time, by harrowing wheel comb hole scissors 311 and scissors 312 fragmentations of casing comb hole, in case line clogging.
Waterpower is excavated suction nozzle 202 usefulness hangers 307 and is hung in hoisting rope 301 lower ends by hanging wire rope 302.
Slurry transportation pipeline of the present invention adopts the segmentation form, adopts pipeline snap joint 319 to connect between pipeline section.
Slurry pipeline 318 adopts high strength elastic fire hose structure, so that slurry transportation pipeline 102 has flexibility under water, adapts to reservoir lakebed landform and silt and excavates moving of ship 101.
The length of slurry transportation pipeline 102 realizes that by the increase and decrease of slurry pipeline hop count amount the increase and decrease of pipeline section is finished with portal jib crane 203,204.
The rear portion terminal of system for transporting and discharging silt through hydraulic fill pipeline of the present invention is tunnel 106 at the bottom of the dam.
Tunnel 106 is provided with forward and backward gate 403,409 at the bottom of the dam, so that the maintenance of tunnel device.
Pipeline 407 in the tunnel is steels, sets up by support of pipelines 406.
Forward and backward gate 403,409 other pipeline valve 404,410 and the backup pipeline valves 405,411 of all being provided with in tunnel are so that safety inspection.
Silt is by 412 mouthfuls of drainages of terminal row's sand tube.
Certainly; the present invention also can have other various embodiments; under the situation that does not deviate from spirit of the present invention and essence thereof; those of ordinary skill in the art work as can make various corresponding changes and distortion according to the present invention, but these corresponding changes and distortion all should belong to the protection domain of the appended claim of the present invention.

Claims (9)

1. system for transporting and discharging silt through hydraulic fill pipeline in front of dam is characterized in that, utilizes the head discrepancy in elevation that forms before and after the retaining dam to be used as power, and adopts the silt discharging with the retaining lake region on a large scale of hydraulic fill pipe-line transportation system.
2. system for transporting and discharging silt through hydraulic fill pipeline in front of dam according to claim 1 is characterized in that, the water Sha Bigao of hydraulic fill line transportation, sediment concentration is big, and water supply volume is little, can utilize the reservoir overflow water, the discharging silt of throughout the year doing little by little without a break makes the dam and reservoir long-term operation.
3. system for transporting and discharging silt through hydraulic fill pipeline in front of dam according to claim 1 is characterized in that, the anterior terminal of this system is that silt is excavated ship.Silt is excavated ship and is adopted twin hull construction, so that improve the job stability of surface facilities, also is convenient to set up the large span straddle truck.
4. system for transporting and discharging silt through hydraulic fill pipeline in front of dam according to claim 1 is characterized in that, the waterpower that hang under water the hoisting rope lower end of straddle truck is excavated suction nozzle.The oscilaltion of operation and hoisting rope guarantees that waterpower excavates suction nozzle and excavate solid space operation in the district in board about the operation of the front and back of gantry crane, straddle truck dolly.Excavating operation is controlled by computer program.
5. system for transporting and discharging silt through hydraulic fill pipeline in front of dam according to claim 1 is characterized in that, waterpower is excavated the suction nozzle utilization and inhaled the flow dynamic promotion water wheels rotation that (pressure) goes into.Water wheels drive harrowing wheel by water wheel axle and rotate.The silt that the harrowing wheel spike-tooth of rotation will harden is loosening to stir, and makes it to be mixed into mud with current and carries.Bulk materials that current are carried secretly and rectangular foreign material are by harrowing wheel comb hole and casing comb hole the time, by harrowing wheel comb hole scissors and the scissors fragmentation of casing comb hole, in case line clogging.
6. system for transporting and discharging silt through hydraulic fill pipeline in front of dam according to claim 1 is characterized in that, the slurry transportation pipeline adopts the segmentation form, adopts pipeline snap joint to connect between pipeline section.The length of slurry transportation pipeline realizes that by the increase and decrease of slurry pipeline hop count amount the increase and decrease of pipeline section is finished with portal jib crane.
7. system for transporting and discharging silt through hydraulic fill pipeline in front of dam according to claim 1, it is characterized in that, slurry pipeline adopts high strength elastic fire hose structure, and is crooked flexible so that the slurry transportation pipeline has under water, adapts to reservoir lakebed landform and silt and excavates moving of ship.
8. system for transporting and discharging silt through hydraulic fill pipeline in front of dam according to claim 1 is characterized in that, the rear portion terminal of system for transporting and discharging silt through hydraulic fill pipeline is tunnel at the bottom of the dam.The tunnel is provided with forward and backward gate at the bottom of the dam, so that the maintenance of tunnel device.
9. system for transporting and discharging silt through hydraulic fill pipeline in front of dam according to claim 1 is characterized in that, other pipeline valve and the backup pipeline valve of all being provided with of the forward and backward gate in tunnel at the bottom of the dam is so that safety inspection.Silt is drained by terminal row sand tube mouth.
CN200810117840A 2008-08-06 2008-08-06 System for transporting and discharging silt through hydraulic fill pipeline in front of dam Pending CN101644042A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810117840A CN101644042A (en) 2008-08-06 2008-08-06 System for transporting and discharging silt through hydraulic fill pipeline in front of dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810117840A CN101644042A (en) 2008-08-06 2008-08-06 System for transporting and discharging silt through hydraulic fill pipeline in front of dam

Publications (1)

Publication Number Publication Date
CN101644042A true CN101644042A (en) 2010-02-10

Family

ID=41656088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810117840A Pending CN101644042A (en) 2008-08-06 2008-08-06 System for transporting and discharging silt through hydraulic fill pipeline in front of dam

Country Status (1)

Country Link
CN (1) CN101644042A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103174577A (en) * 2013-03-13 2013-06-26 孔凡恒 Method for electricity generation with river water flow in subsection mode
CN110115862A (en) * 2019-05-20 2019-08-13 芜湖华衍水务有限公司 A kind of passive mud scraper

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103174577A (en) * 2013-03-13 2013-06-26 孔凡恒 Method for electricity generation with river water flow in subsection mode
CN110115862A (en) * 2019-05-20 2019-08-13 芜湖华衍水务有限公司 A kind of passive mud scraper

Similar Documents

Publication Publication Date Title
JP5005777B2 (en) Sedimentary mud excavation and removal method and its equipment
CN211395787U (en) River channel dredging device
CN109098221A (en) A kind of dedicated sand water mixing device of ship dredging construction
CN101644042A (en) System for transporting and discharging silt through hydraulic fill pipeline in front of dam
CN213143168U (en) Soft and hard garbage isolation treatment resistance-reducing blockage-free dredging, digging and sucking integrated device
CN201605617U (en) Combined type reservoir desilting device
CN201991023U (en) Integral hydraulic dredging implement for excavating and transporting sediment
JP2003138598A (en) Method and device for dredging by use of pipe having opening part in bent part
CN203412597U (en) Combined wet concrete wet spraying machine
CN201437584U (en) Full-closed and pollution spreading preventive device special for environmental protection dredging and reclamation
CN213116341U (en) Underground pressurized grouting water plugging soft and hard aggregate intermittent controllable filling device
CN101372835A (en) Hydraulic-mechanical integrated sand discharge apparatus
CN204941597U (en) A kind of mine coal slime cleaning plant
CN202644610U (en) Dredging device of environmental protection air hydraulic suction dredge
CN207905008U (en) A kind of loader-digger hydraulic control system
JP5731243B2 (en) Fixed dam construction method
CN206616609U (en) A kind of strand suction device of auxiliary desilting
CN110331754A (en) Drag head construction simulation experimental rig
CN217941344U (en) A excavate stirring injection equipment for deep contaminated soil normal position is restoreed
KR100997373B1 (en) Dredging plant equipment
CN106087855B (en) A kind of fluidisation rush flushing device based on silt rheology
CN213358738U (en) Immersed tube repairing device
CN213653566U (en) Dredger sand-blowing sea-filling pipeline structure
CN215759264U (en) Mud suction device
CN210151803U (en) Pneumatic type desilting system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20100210