CN101639540B - 一种止水帷幕渗漏通道隐患的探测方法 - Google Patents

一种止水帷幕渗漏通道隐患的探测方法 Download PDF

Info

Publication number
CN101639540B
CN101639540B CN2009100336897A CN200910033689A CN101639540B CN 101639540 B CN101639540 B CN 101639540B CN 2009100336897 A CN2009100336897 A CN 2009100336897A CN 200910033689 A CN200910033689 A CN 200910033689A CN 101639540 B CN101639540 B CN 101639540B
Authority
CN
China
Prior art keywords
curtain
electrode
depth
automatic compensator
hidden trouble
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2009100336897A
Other languages
English (en)
Other versions
CN101639540A (zh
Inventor
谢兴楠
程知言
邹宝祥
朱德兵
蒋齐云
卢明
车平
周建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU EAST CHINA GEOLOGICAL CONSTRUCTION GROUP CO Ltd
Original Assignee
JIANGSU EAST CHINA GEOLOGICAL CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU EAST CHINA GEOLOGICAL CONSTRUCTION GROUP CO Ltd filed Critical JIANGSU EAST CHINA GEOLOGICAL CONSTRUCTION GROUP CO Ltd
Priority to CN2009100336897A priority Critical patent/CN101639540B/zh
Publication of CN101639540A publication Critical patent/CN101639540A/zh
Application granted granted Critical
Publication of CN101639540B publication Critical patent/CN101639540B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A90/00Technologies having an indirect contribution to adaptation to climate change
    • Y02A90/30Assessment of water resources

Abstract

止水帷幕渗漏隐患探测方法,首先在尚未开挖的帷幕基坑中央垂直埋设供电电极A,在基坑外围设置一供电电极B,打入地下。在待测帷幕外侧垂直钻探测孔,放入电极距固定的测量电极M、N并通过导线连接到电子自动补偿仪输入端口,测量记录点为MN中点,深度x,由电子自动补偿仪测量深度点x处两电极M、N之间的自然电位差ΔV 0(x);经电子自动补偿仪自然电位补偿使测量电位差ΔV 0(x)读数为零;A、B电极供入电流I,由电子自动补偿仪测量电极M、N在深度x处电位差V 1(x),并用I归一化;在深度坐标图上绘出ΔV 0(x)和V 1(x)/I随深度x变化曲线,V 1(x)/I曲线上出现正负(或负正)过渡现象,正负之间的零值点对应为渗漏隐患的存在位置和深度。

Description

一种止水帷幕渗漏通道隐患的探测方法
技术领域
本发明涉及一种地球物理探测方法,具体地说是涉及一种止水帷幕渗漏通道隐患定位的探测方法。 
背景技术
由于土地价格越来越昂贵,充分利用地下空间已成为城市建筑开发的一种趋势,深基坑的开挖和支护在高层建筑和地铁等工程上广泛使用。由于施工机具、周边环境、地质水文等条件所限,止水帷幕往往不能做到完全的搭接咬合,因此砂类土地区基坑“十坑九漏”的现状很难得到根本改观。在基坑开挖过程中,常常会出现渗漏险情。如果能够在止水帷幕形成后基坑未开挖前,检测止水帷幕质量,探测止水帷幕上的渗漏隐患,就可以避免开挖施工时出现漏水险情,保证工程建设安全。在基坑未开挖前国内外公认较好的检测方法是对帷幕内基坑进行抽水试验来确定渗漏隐患位置,但这种方法施工检测复杂,很少为施工工地使用。由于止水帷幕施工场地水文地质条件复杂,止水帷幕深埋于地下,帷幕内侧有支护桩、工型桩等建筑设施,在地球物理探测领域,基坑未开挖前的止水帷幕渗漏隐患检测为国际公认难题,国内外还没有有效技术来实现有效探测。 
发明内容
本发明所要解决的技术问题是提供一种止水帷幕渗漏通道隐患定位的探测方法。 
为了解决上述技术问题,本发明提供了一种探测止水帷幕渗漏通道隐患的方法,其特征在于探测方法步骤如下: 
(1)在帷幕基坑中央垂直埋设位于潜水面下0.5-1m深度的铜制供电电极A,在基坑外距离帷幕2-3倍基坑深度h的位置设置一供电电极B,并埋入地下保证接地良好;在待测帷幕外侧离帷幕边墙0.1~0.5m水平距离垂直钻出直径50~150mm的探 测孔,孔深超出帷幕深度h的1~2m;在探测孔中放入极距为10~30cm的测量电极M、N并通过导线连接到电子自动补偿仪器输入端口; 
(2)电子自动补偿仪和电极自检完成后,从探测孔孔底开始测量,然后逐步向孔口测量M、N之间的电位差,测量时首先通过M、N电极测量其深度点x处两电极之间的自然电位差ΔV0(x),经过电子自动补偿仪对自然电位进行补偿,补偿后使ΔV0(x)读数为零;电子自动补偿仪通过A、B电极的供入电流I(x),由电子自动补偿仪测量电极M、N在同样深度x处电位差V1(x),并用I(x)归一化,然后在同一个深度坐标图上绘出【ΔV0(x)】和【V1(x)/I】随深度x变化曲线,V1(x)/I曲线上出现正负或负正过渡现象,正负之间的零值点对应为渗漏通道隐患的存在位置和深度,而ΔV0(x)作为渗漏隐患评价的参考参数。 
上述用于测量电极M、N之间自然电位和供电后电位的仪器是电子自动补偿仪,它是一种地球物理探测仪器,或者用具有自然电位补偿功能的电传勘探仪器。 
上述的供电电极A作为正极,供电电极B作为负极,形成人工电场来拟合基坑渗漏水流场。 
上述的探测孔中放置测量电极M、N来实施电场测量,以保证渗漏隐患位置探测的转度。 
本发明探测方法的基本原理如下: 
埋置于地下的止水帷幕形成后,电阻率高的帷幕将电阻率相对较低的土层介质隔离开来,质量合格的帷幕渗透系数小、强度大,存在渗漏隐患的局部帷幕介质,渗透系数大、强度低。由于富含电解质的地下水的存在,使得渗透系数大的帷幕介质电阻率较低,往往接近于土层介质的电阻率,而低电阻率介质在均匀电场作用下存在集流效应,在渗漏隐患部位形成集流通道。该发明专利的基本原理是采用一定方法向地下供电,由电流场来拟合渗流场或水流场的分布特征,通过测量电场的异常分布特征来反映地下水流场的渗流特征,从而间接发现止水帷幕渗漏隐患。同时,由于隐患位置与周边帷幕在渗透系数或孔隙度上存在差异,为带电离子的产生选择吸附或过滤作用提供了环境,有可能在其附近形成自然电场异常,因此自然电位数据能作为一个可选参考参数。
止水帷幕渗漏探测仪器由电子自动补偿仪、电源、电位测量输入接口、高压输出接口和导线等组成,用于测量位于测量钻孔中极距相对固定的两电极M、N之间的自然电位差ΔV0(x),对自然电位差进行补偿,补偿后再测量供电电流场作用下的两电极之间电位差V1(x)并同时测量记录当前供电电流强度I。。 
根据地表点电源场的电流分布理论,由A、B两电极供电,电流主要分布在AB距离一半所代表的深度范围内,因此埋置于帷幕外的B极应尽可能远离帷幕,距离大于帷幕深度h的2-3倍为宜。 
本发明用于各类止水帷幕渗漏通道隐患快速准确探测,适用于城市建筑深基坑止水帷幕、地铁施工止水帷幕等在建地下工程,在基坑未开挖前进行周边止水帷幕渗漏隐患探测。提前指导渗漏隐患处理,避免开挖施工时出现漏水险情,保证工程建设安全。 
附图说明
图1是现场探测工作布置示意图; 
图2是电子自动补偿仪输入输出连接示意图; 
附图2标记: 
1.电子自动补偿仪, 
2.高压输入接口, 
3.高压输入电缆, 
4.高压电源, 
5.电流输出接口到A、B电极, 
6.测量输入接口连接到M、N电极。 
图3是本发明渗漏隐患探测步骤示意图; 
图4是电子自动补偿仪的结构示意图; 
图5是止水帷幕水槽模拟试验测试结果图。 
附图5标记 
data1:无漏点存在时【V1(x)/I】-x结果; 
data2:有漏点存在时【V1(x)/I】-x结果; 
实施例:止水帷幕水槽模拟试验结果 
模拟水槽尺寸:长5m,宽4.2m,深2.4m。用加尼龙筋的无底混凝土槽模拟四面结构的止水帷幕。帷幕尺寸:厚2cm,高1.0米,边长1.5米;渗漏点位于一面帷幕中央,为2cm×2cm的水平孔洞。 
模拟止水帷幕垂直入水深度1.0m;供电电极A位于帷幕中央,B极位于水槽边缘3m处。MN之间距离10cm,x方向垂直向下,原点对应于渗漏点位置。 
测量仪器为重庆地质仪器厂生产的DDC-6电子自动补偿仪。 
测量步骤: 
(1)垂直测量孔在帷幕外侧,对应模拟渗漏点正中央位置,离开帷幕边墙4cm垂直放入测量电极MN,记录MN中点坐标x。 
(2)电子自动补偿仪和电极自检完成后,首先由M、N电极测量深度点x处两电极之间的自然电位差ΔV0(x);然后经过探测仪器对自然电位进行补偿,补偿后使ΔV0(x)读数为零;A、B电极供入电流I(x),由探测仪器测量电极M、N在同样深度x处电位差V1(x),并用I(x)归一化;在深度坐标图上绘出【V1(x)/I】随深度变化曲线,V1(x)/I曲线上出现正负(或负正)过渡现象,正负之间的零值点对应为渗漏隐患的存在位置和深度。测试数据如表1所示。止水帷幕隐患模拟试验结果见图5. 
表1.止水帷幕隐患水槽物理模拟实测数据 

Claims (4)

1.一种止水帷幕渗漏通道隐患的探测方法,其特征在于探测步骤如下:
(1)在帷幕基坑中央垂直埋设位于潜水面下0.5~1m深度的铜制供电电极A,在基坑外围离帷幕2-3倍帷幕深度h的距离设置一供电电极B,并埋入地下保证接地良好;在待测帷幕外侧离帷幕边墙0.1~0.5m水平距离垂直钻出直径50~150mm的探测孔,孔深超出帷幕深度h的1~2m,在探测孔中放入极距为20~50cm的测量电极M、N,并通过导线连接到电子自动补偿仪输入端口;
(2)电子自动补偿仪和电极自检完成后,从探测孔孔底开始测量,然后逐步向孔口测量M、N之间电位差,测量时,首先由M、N电极测量M、N电极中点x处两电极之间的自然电位差
Figure FSB00000539567700011
Figure FSB00000539567700012
经过电子自动补偿仪对自然电位进行补偿,补偿后使
Figure FSB00000539567700013
读数为零;电子自动补偿仪通过A、B电极供入电流I(x),由电子自动补偿仪测量电极M、N在同样深度x处电位差V1(x),并用I(x)归一化,然后在深度坐标图上绘出
Figure FSB00000539567700015
和V1(x)/I随深度x变化曲线,V1(x)/I曲线上出现正负或负正过渡现象,正负之间的零值点对应为渗漏通道隐患的存在位置和深度,而
Figure FSB00000539567700016
作为渗漏隐患评价的参考参数。
2.根据权利要求1所述的一种止水帷幕渗漏通道隐患的探测方法,其特征在于,用于测量电极M、N之间自然电位和供电后电位的仪器是电子自动补偿仪,它是一种地球物理勘探仪器,也或者用具有自然电位补偿功能的电法勘探仪器。
3.根据权利要求1所述的一种止水帷幕渗漏通道隐患的探测方法,其特征在于步骤(1)中所述的基坑中央的供电电极A作为正极,基坑外远离帷幕的供电电极B作为负极,形成人工电场来拟合基坑渗漏水流场。
4.根据权利要求1所述的一种止水帷幕渗漏通道隐患的探测方法,其特征在于在步骤(1)中通过基坑帷幕旁侧的探测孔放置测量电极M、N来实施电场测量,以保证渗漏隐患位置探测的精度。
CN2009100336897A 2009-06-25 2009-06-25 一种止水帷幕渗漏通道隐患的探测方法 Active CN101639540B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100336897A CN101639540B (zh) 2009-06-25 2009-06-25 一种止水帷幕渗漏通道隐患的探测方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100336897A CN101639540B (zh) 2009-06-25 2009-06-25 一种止水帷幕渗漏通道隐患的探测方法

Publications (2)

Publication Number Publication Date
CN101639540A CN101639540A (zh) 2010-02-03
CN101639540B true CN101639540B (zh) 2011-11-16

Family

ID=41614621

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100336897A Active CN101639540B (zh) 2009-06-25 2009-06-25 一种止水帷幕渗漏通道隐患的探测方法

Country Status (1)

Country Link
CN (1) CN101639540B (zh)

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102147483B (zh) * 2010-12-30 2013-01-02 杨佃俊 地下水回灌双极双表电测井方法
CN102392461A (zh) * 2011-09-09 2012-03-28 同济大学 基坑止水帷幕隐伏渗漏点检测方法
CN102539478A (zh) * 2011-12-15 2012-07-04 黄河水利委员会黄河水利科学研究院 高聚物防渗墙连续性检测方法
CN102621191B (zh) * 2012-03-29 2014-08-27 上海交通大学 一种检测高聚物防渗墙的电测量方法及装置
CN102768369B (zh) * 2012-06-05 2015-06-03 武汉长盛煤安科技有限公司 巷道掘进钻孔激发极化超前探水预报方法、装置及探头
CN102691286B (zh) * 2012-06-19 2015-07-08 湖南继善高科技有限公司 一种监测建筑基坑地下连续墙渗漏的方法及装置
CN102758457B (zh) * 2012-08-02 2014-04-16 河海大学 高聚物防渗墙连续性检测方法
CN103015467B (zh) * 2012-12-25 2015-09-09 上海交通大学 一种检测高聚物防渗墙完整性的电位映像法
CN104237328A (zh) * 2013-10-22 2014-12-24 王磊 坝体高聚物注浆帷幕缺陷检测系统
CN103967476B (zh) * 2014-04-25 2016-08-17 武汉长盛煤安科技有限公司 随钻钻孔物探超前探测装置及探测方法
CN104652496B (zh) * 2014-12-26 2016-05-04 中铁二局工程有限公司 一种地下连续墙渗漏水探测方法
CN105604066B (zh) * 2015-12-25 2017-11-03 天津市勘察院 电阻率剖面法在建筑基坑围护结构渗漏水检测中的应用
CN108802828B (zh) * 2018-07-24 2020-01-24 中南大学 钻孔注浆帷幕质量检测方法
CN109557590B (zh) * 2018-11-30 2020-07-10 天津大学 一种墙体渗漏的直流聚焦精细检测方法
CN110888171A (zh) * 2019-12-14 2020-03-17 上海勘察设计研究院(集团)有限公司 一种基于电流场法的基坑围护结构渗漏隐患检测方法
CN112985718B (zh) * 2021-02-05 2022-09-30 中建一局集团建设发展有限公司 一种基于高密度电阻率法的止水帷幕评价方法
CN113050172B (zh) * 2021-03-12 2022-05-24 中国电建集团贵阳勘测设计研究院有限公司 一种渣库渗漏通道的电流场测试方法
CN113031078B (zh) * 2021-04-06 2022-01-28 中南大学 一种用于渗漏检测的频分电法校正方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201034749Y (zh) * 2007-04-09 2008-03-12 中国水利水电科学研究院 堤坝渗流通道检测用地温测量系统
CN101339087A (zh) * 2008-08-26 2009-01-07 江苏华东建设基础工程有限公司 一种止水帷幕渗漏通道快速探测仪系统及探测方法
CN101338565A (zh) * 2008-08-08 2009-01-07 江苏华东建设基础工程有限公司 一种双轴水泥土搅拌机套接止水帷幕的施工方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201034749Y (zh) * 2007-04-09 2008-03-12 中国水利水电科学研究院 堤坝渗流通道检测用地温测量系统
CN101338565A (zh) * 2008-08-08 2009-01-07 江苏华东建设基础工程有限公司 一种双轴水泥土搅拌机套接止水帷幕的施工方法
CN101339087A (zh) * 2008-08-26 2009-01-07 江苏华东建设基础工程有限公司 一种止水帷幕渗漏通道快速探测仪系统及探测方法

Non-Patent Citations (8)

* Cited by examiner, † Cited by third party
Title
JP特开2003-121294A 2003.04.23
JP特开平11-283146A 1999.10.15
于同超等.中关铁矿深孔注浆幕墙井间电阻率测试技术和效果评价.《地质调查与研究》.2009,第32卷(第1期),全文.
周建平等.抽水蓄能电站水库土工膜防渗技术的研究和应用.《水力发电》.2006,第32卷(第3期),全文.
李岳军
李岳军;周建平等.抽水蓄能电站水库土工膜防渗技术的研究和应用.《水力发电》.2006,第32卷(第3期),全文. *
韩贵雷
韩贵雷;于同超等.中关铁矿深孔注浆幕墙井间电阻率测试技术和效果评价.《地质调查与研究》.2009,第32卷(第1期),全文. *

Also Published As

Publication number Publication date
CN101639540A (zh) 2010-02-03

Similar Documents

Publication Publication Date Title
CN101639540B (zh) 一种止水帷幕渗漏通道隐患的探测方法
Bin et al. Comprehensive surface geophysical investigation of karst caves ahead of the tunnel face: a case study in the Xiaoheyan section of the water supply project from Songhua River, Jilin, China
CN204940237U (zh) 一种用于非正规垃圾填埋场污染调查与治理修复的多功能监测井
CN103266638B (zh) 一种地下混凝土连续墙渗漏点位置的检测方法
CN112836270B (zh) 一种应用于预测潜水降水对建筑物沉降影响的方法
Gao et al. Dynamic monitoring of water in a working face floor using 2D electrical resistivity tomography (ERT)
CN104929146A (zh) 一种多层岩溶发育带桩基础工程施工方法
CN113960695A (zh) 一种复杂城市环境富水岩溶精细探查方法
KR20130009606A (ko) 실시간 전기비저항 측정 시스템
CN107727337A (zh) 一种基于微测井电法的基坑围护结构的渗漏检测方法
Kayode et al. Monitoring of seepages around dams using geophysical methods: a brief review
Wan et al. Field measurement by fully grouted vibrating wire piezometers
CN101339087A (zh) 一种止水帷幕渗漏通道快速探测仪系统及探测方法
CN202548085U (zh) 堤坝防渗墙埋深的检测装置
CN111335904A (zh) 一种盾构下穿建构筑物施工监测方法
CN113007611B (zh) 燃气管道穿越河底的监测系统
Andrade Intervention of Electrical Resistance Tomography (ERT) in resolving hydrological problems of a semi arid granite terrain of Southern India
CN212405086U (zh) 一种嵌岩桩基底下伏溶洞处置检测结构
CN101858074A (zh) 现场注水试验施工方法及装置
Wang et al. Detection of shallow buried water-filled goafs using the fixed-loop transient electromagnetic method: A case study in Shaanxi, China
CN104695478B (zh) 一种超深地下连续墙内置地埋管结构及其施工方法
CN217689007U (zh) 一种单井地下水监测系统
Jiang et al. Review of the advanced monitoring technology of groundwater–air pressure (enclosed potentiometric) for karst collapse studies
CN105386430A (zh) 一种止水帷幕作用下止水帷幕两侧水位差的确定方法
CN213209012U (zh) 地面沉降监测分层标和水位监测井

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant