CN101619655A - Drilling method for accurately controlling hole deflection under complicated stratum and guide device - Google Patents

Drilling method for accurately controlling hole deflection under complicated stratum and guide device Download PDF

Info

Publication number
CN101619655A
CN101619655A CN200910062686A CN200910062686A CN101619655A CN 101619655 A CN101619655 A CN 101619655A CN 200910062686 A CN200910062686 A CN 200910062686A CN 200910062686 A CN200910062686 A CN 200910062686A CN 101619655 A CN101619655 A CN 101619655A
Authority
CN
China
Prior art keywords
hole
guide device
drilling
boulder
creep
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910062686A
Other languages
Chinese (zh)
Other versions
CN101619655B (en
Inventor
刘志文
柳新根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GEZHOUBA GROUP FOUNDATION ENGINEERING Co Ltd
China Gezhouba Group Co Ltd
Original Assignee
GEZHOUBA GROUP FOUNDATION ENGINEERING Co Ltd
China Gezhouba Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GEZHOUBA GROUP FOUNDATION ENGINEERING Co Ltd, China Gezhouba Group Co Ltd filed Critical GEZHOUBA GROUP FOUNDATION ENGINEERING Co Ltd
Priority to CN2009100626866A priority Critical patent/CN101619655B/en
Publication of CN101619655A publication Critical patent/CN101619655A/en
Application granted granted Critical
Publication of CN101619655B publication Critical patent/CN101619655B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a drilling method for accurately controlling a hole deflection under complicated stratums and a guide device. Under complicated stratums containing large stones, boulder stones and crack and faultage growths, the deflection of a drilling hole is overcomed by adopting methods of mounting the guide device, strictly controlling a drilling process, carrying out grouting in complicated cracked stratums, and the like under the condition of accurately controlling the drilling hole in a long distance, and the gradient can be controlled within a range of 1 percent, thereby effectively solving the problems of drilling hole deflections caused by long drilling hole channel, large difference of rock rigidity, flexure and deformation generated by impact, torque force and self gravity of a drilling rod, and the like. The invention has simple operation, waste hole reduction, cost reduction, good construction effect and smooth hole wall and is beneficial to subsequent working procedures.

Description

A kind of bad ground is accurately controlled the boring method and the guide device of hole deviation down
Technical field
The present invention relates to a boring method, particularly a kind of bad ground is accurately controlled the boring method and the guide device of hole deviation down.
Background technology
For satisfying the needs of engineering, some boring, for example: the probing prospecting hole of the concrete cut of thin wall construction, high accuracy are to wearing formula prestress anchorage cable hole etc., the required precision in these holes is very high, wherein hole deviation requires less than 1%, if do not take measures or improper measures in the boring procedure, the easy deflection of holing becomes useless hole.Especially under the bad ground condition, carry the easier deflection that causes of boring that boulder, boulder, crack tomography are brokenly grown, lithology soft or hard difference is big secretly, add some boring duct very long (tens meters even hundreds of rice), drilling rod, drilling tool are owing to impact, torsion, gravity (self gravitation also can produce the drilling rod distortion when low-angle dip or horizontal drilling) influence produce deflection deformation down and cause hole scattering, in the case, take which kind of effective measures, overcome hole scattering, satisfying high-precision requirement is a primary difficult problem that faces in the boring procedure.
Summary of the invention
Technical problem to be solved by this invention provides boring method and the guide device of accurately controlling hole deviation under a kind of bad ground, complicated broken formation can met, long distance accurately under the keyhole, overcomes hole scattering, and easy and simple to handle, cost is low, effective.
For solving the problems of the technologies described above, the technical solution adopted in the present invention is: a kind of bad ground is accurately controlled the boring method of hole deviation down, may further comprise the steps:
Creep into axis and design direction dead in line when 1) facility are installed, bit central overlaps with the site, hole, and support connects firmly with the basis.
2) during perforate, first low velocity impact creeps into, and after waiting to creep into 1.0~1.5m, repetition measurement boring parameters meets the requirements and then continues to creep into, otherwise rectifies a deviation;
3) in the drilling process, need to shut down every 5 meters and to carry out hole deviation with inclinometer and measure, grasp drilling trace in real time, the hole deviation rate is carried out drilling tool, guide device spacing if surpass permissible value, drilling speed the pressure of the drill adjustment;
4) regulate the pressure of the drill at any time according to rate of penetration, at the uniform velocity creep into, cleaning in the retaining hole;
5) guide device is installed on drilling rod;
6) complicated broken formation carries out grouting treatment;
Can under bad ground, obtain to grow distance through above step, and slope 1% with interior accurate duct.
Described a kind of bad ground is accurately controlled the boring method of hole deviation down, and per 4 meters-6 meter amperes are equipped with a guide device on drilling rod.
When boring must be passed bad grounds such as containing boulder, boulder, crack mature fault, take pressure limiting, limited grouting Gu Bi, grouting pressure is controlled at 0.2~1Mpa, with sending the slurry pipe with W/C=0.4: 1 slurries are limited the quantity of and are transported to zone of fracture, make the filling gluing in limited range of hole wall fragmented rock body, boulder, boulder, crack, form and stablize hole wall and under the effect of slurries calking gluing, improve formation strength, and then creep into.
Pilot is movably arranged on outside the drilling rod, and pilot is provided with many correcting bars outward.
Described many correcting bars are by circumferential arrangement.
Described many correcting bars are by axially-aligned.
Be staggered between the many correcting bars of axially-aligned.
A kind of bad ground provided by the invention is accurately controlled the boring method and the guide device of hole deviation down, when containing bad grounds such as boulder, boulder, crack mature fault, the installation requirement strictness of facility, thus borehole accuracy guaranteed, be convenient to the expansion of bottom operation.Adopt low speed to creep into when spudding in, the machining accuracy in hole is higher like this, and this section just can become the basis of follow-up processing.Average per 5 meters are carried out one-shot measurement, have guaranteed the precision in hole, thereby can adjust at any time, also are convenient to the installation of guide device because drilling tool weight is light more, drilling rod rigidity is big more, guider be provided with more little at interval, low more its hole deviation rate of drilling speed the pressure of the drill is more little.At the uniform velocity creep into and can avoid drilling speed to change the inclination that causes boring, cleaning can avoid talus deposit to cause hole scattering in the retaining hole.
The special guide device of the outer installation of drilling rod, the outer correcting bar multiple spot of guide device evenly contacts with hole wall, has guaranteed the radial accuracy of pilot, and pilot is helped drilling rod within it, thereby avoided inclination, the torsional deformation of drilling rod, more remarkable at gentle incline, horizontal operation effectiveness.
Take pressure limiting, limited grouting, and water/binder ratio is W/C=0.4: 1, and regulate the pressure that is in the milk, thereby guarantee that mortar evenly distributes at zone of fracture, improve formation drilling intensity, avoid making machining hole produce deflection because of the stratum soft or hard is uneven, can not waste too many mortar again, save cost.
Carry out methods such as grouting treatment by taking to install guide device, strict keyhole process, complicated broken formation, accurately under the keyhole, overcome hole scattering in long distance, slope can be controlled in 1% scope.Solved effectively that boring duct long (tens meters even hundreds of rice), lithology soft or hard difference are big, drill rod boring tool is because impact, torsion and self gravitation (the drilling rod distortion that low-angle dip or horizontal drilling self gravitation produce more very) produce the difficult problem of the hole scattering that deflection deformation etc. causes.
The present invention is easy and simple to handle, has reduced the generation in useless hole, and it is good to have reduced cost and construction effect, and hole wall is smooth, helps the operation of follow-up operation.
Description of drawings
The invention will be further described below in conjunction with drawings and Examples.
Fig. 1 is the embodiment of the present invention structural representation;
Fig. 2 is a guide device structural representation of the present invention;
Fig. 3 is a guide device B-B sectional view of the present invention.
The specific embodiment
As Fig. 1, Fig. 2, shown in Figure 3, a kind of bad ground is accurately controlled the boring method of hole deviation down, may further comprise the steps:
Creep into axis and design direction dead in line when 1) facility are installed, bit central overlaps with the site, hole, and support connects firmly with the basis.
2) during perforate, first low velocity impact creeps into, and after waiting to creep into 1.0~1.5m, repetition measurement boring parameters meets the requirements and then continues to creep into, otherwise rectifies a deviation;
3) in the drilling process, need to shut down every 5 meters and to carry out hole deviation with inclinometer and measure, grasp drilling trace in real time, the hole deviation rate is carried out drilling tool, guide device spacing if surpass permissible value, drilling speed the pressure of the drill adjustment;
4) regulate the pressure of the drill at any time according to rate of penetration, at the uniform velocity creep into, cleaning in the retaining hole;
5) guide device 12 is installed on drilling rod;
6) complicated broken formation carries out grouting treatment;
Can under bad ground, obtain to grow distance through above step, and slope 1% with interior accurate duct.
Described a kind of bad ground is accurately controlled the boring method of hole deviation down, and per 4 meters-6 meter amperes are equipped with a guide device 12 on drilling rod.
When boring must be passed bad grounds such as containing boulder, boulder, crack mature fault, take pressure limiting, limited grouting Gu Bi, grouting pressure is controlled at 0.2~1Mpa, with sending the slurry pipe with W/C=0.4: 1 slurries are limited the quantity of and are transported to zone of fracture, make the filling gluing in limited range of hole wall fragmented rock body, boulder, boulder, crack, form and stablize hole wall and under the effect of slurries calking gluing, improve formation strength, and then creep into.
Pilot 13 is movably arranged on outside the drilling rod 10, is provided with many correcting bars 14 outside the pilot 13.
Described many correcting bars 14 are by circumferential arrangement.
Described many correcting bars 14 are by axially-aligned.
Be staggered between the many correcting bars 14 of axially-aligned.
Embodiment:
As shown in Figure 1, at Qingjian River Shui Buya multi-purpose project 50m to wearing in the formula construction prestressed cable, boring must be passed the bad grounds such as tomography 5 that contain boulder, boulder 6, cranny development from source gallery 1 and be arrived target gallery 2, carries out wearing the formula construction prestressed cable after boring is finished.Boring requirement hole deviation rate must be controlled within 1%, otherwise becomes useless hole.Be to satisfy the high-precision requirement of long distance boring, must solve a series of difficult problems such as hole scattering that hole scattering that bad ground lithology soft or hard difference such as containing boulder, boulder, crack mature fault causes and drill rod boring tool cause owing to impact, torsion and self gravitation generation deflection deformation etc.
For realizing the purpose of high-precision borehole, processing scheme is made up of following three steps:
1, strict keyhole process
Creep into axis and design direction dead in line when 1) facility are installed, impactor 9 and drill bit 8 centers overlap with the site, hole, and support connects firmly with the basis, is shaken non-migration;
2) during perforate, first low velocity impact creeps into, and after waiting to creep into 1.0~1.5m, repetition measurement boring parameters meets the requirements and then continues to creep into, otherwise rectifies a deviation.
3) in the drilling process, need to shut down every 5 meters and to carry out hole deviation with inclinometer and measure, grasp drilling trace in real time, the hole deviation rate need be carried out drilling tool, guide device 12 spacings if surpass permissible value, drilling speed the pressure of the drill adjustment; Drilling tool weight is light more, drilling rod rigidity is big more, guide device be provided with at interval more little, low more its hole deviation rate of drilling speed the pressure of the drill is more little.
4) regulate the pressure of the drill at any time according to rate of penetration, make every effort at the uniform velocity creep into, keep having finished cleaning in boring section 11 holes, avoid talus deposit to cause hole scattering.
2, improve drilling tool and make it to have the correcting function
As shown in Figure 2, for correcting drill rod boring tool owing to impact, torsion, gravity produce the hole scattering that deflection deformation causes, per 4 meters-6 meters add a guide device 12 on drilling rod.Gapped between the pilot 13 of drilling rod and guide device 12, the pilot 13 outer multilayer correcting bars 14 that are provided with, every layer equidistantly is provided with 6 correcting bars 14 by circumference, be crisscross arranged between every layer of correcting bar 14, thereby guaranteed that correcting bar multiple spot evenly contacts with hole wall, guaranteed the radial accuracy of pilot 13, pilot is helped drilling rod 10 within it, thereby avoided inclination, the torsional deformation of drilling rod 10, effect is remarkable in the horizontal operation of this example.
3, complicated broken formation carries out grouting treatment
When boring must be passed bad grounds such as containing boulder, boulder, crack mature fault, take pressure limiting, limited grouting Gu Bi: (grouting pressure generally is controlled at 0.2~1Mpa under certain pressure, according to on-site actual situations and suction slurry amount size adjustment), is W/C=0.4 with sending the slurry pipe with water/binder ratio: 1 slurries are limited the quantity of and are transported to zone of fracture, make the filling gluing in limited range of hole wall fragmented rock body, boulder, boulder, crack, form consolidation grouting section 4, stablize hole wall and under the effect of slurries calking gluing, improve formation strength.And then creep into, longer as the weak broken band that need pass, one section of cement-grouting consolidation creeps into one section, and circulation is carried out, and the consolidation grouting boring section 7 of formation can effectively overcome hole scattering.
Adopt method of the present invention can satisfy engineering construction quality and schedule requirement, cost is low, effective.

Claims (7)

1, a kind of bad ground is accurately controlled the boring method of hole deviation down, it is characterized in that may further comprise the steps:
Creep into axis and design direction dead in line when 1) facility are installed, bit central overlaps with the site, hole, and support connects firmly with the basis.
2) during perforate, first low velocity impact creeps into, and after waiting to creep into 1.0~1.5m, repetition measurement boring parameters meets the requirements and then continues to creep into, otherwise rectifies a deviation;
3) in the drilling process, need to shut down every 5 meters and to carry out hole deviation with inclinometer and measure, grasp drilling trace in real time, the hole deviation rate is carried out drilling tool, guide device spacing if surpass permissible value, drilling speed the pressure of the drill adjustment;
4) regulate the pressure of the drill at any time according to rate of penetration, at the uniform velocity creep into, cleaning in the retaining hole;
5) guide device (12) is installed on drilling rod;
6) complicated broken formation carries out grouting treatment;
Can under bad ground, obtain to grow distance through above step, and slope 1% with interior accurate duct.
2, a kind of bad ground according to claim 1 is accurately controlled the boring method of hole deviation down, and it is characterized in that: per 4 meters-6 meter amperes are equipped with a guide device (12) on drilling rod.
3, a kind of bad ground according to claim 1 is accurately controlled the boring method of hole deviation down, boring it is characterized in that: when must be passed the bad grounds such as tomography 5 that contain boulder, boulder (6), cranny development, take pressure limiting, limited grouting Gu Bi, grouting pressure is controlled at 0.2~1Mpa, with sending the slurry pipe with W/C=0.4: 1 slurries are limited the quantity of and are transported to zone of fracture, make the filling gluing in limited range of hole wall fragmented rock body, boulder, boulder, crack, form and stablize hole wall and under the effect of slurries calking gluing, improve formation strength, and then creep into.
4, a kind of bad ground is accurately controlled the guide device of hole deviation down, and it is characterized in that: pilot (13) is movably arranged on outside the drilling rod (10), the outer many correcting bars (14) that are provided with of pilot (13).
5, a kind of bad ground according to claim 5 is accurately controlled the guide device of hole deviation down, it is characterized in that: described many correcting bars (14) are by circumferential arrangement.
6, according to the guide device of claim 5 or the accurate down control hole deviation of 6 described a kind of bad grounds, it is characterized in that: described many correcting bars (14) are by axially-aligned.
7, a kind of bad ground according to claim 7 is accurately controlled the guide device of hole deviation down, it is characterized in that: be staggered between the many correcting bars (14) of axially-aligned.
CN2009100626866A 2009-06-13 2009-06-13 Drilling method for accurately controlling hole deflection under complicated stratum and guide device Active CN101619655B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100626866A CN101619655B (en) 2009-06-13 2009-06-13 Drilling method for accurately controlling hole deflection under complicated stratum and guide device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100626866A CN101619655B (en) 2009-06-13 2009-06-13 Drilling method for accurately controlling hole deflection under complicated stratum and guide device

Publications (2)

Publication Number Publication Date
CN101619655A true CN101619655A (en) 2010-01-06
CN101619655B CN101619655B (en) 2012-08-15

Family

ID=41513046

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100626866A Active CN101619655B (en) 2009-06-13 2009-06-13 Drilling method for accurately controlling hole deflection under complicated stratum and guide device

Country Status (1)

Country Link
CN (1) CN101619655B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704909A (en) * 2012-06-28 2012-10-03 中国水利水电第七工程局成都水电建设工程有限公司 Hole-deflection control construction method for deep hole drilling
CN103352687A (en) * 2013-07-12 2013-10-16 葛洲坝集团第二工程有限公司 Method controlling hole deviation in hole drilling
CN109306850A (en) * 2018-09-27 2019-02-05 北京航天地基工程有限责任公司 Creep into method for correcting error in uneven mutually bed boundary
CN113756788A (en) * 2021-10-18 2021-12-07 中国地质大学(北京) Mechanical type is along with boring well deviation measuring apparatu
CN115270345A (en) * 2022-08-04 2022-11-01 中国地质调查局长沙自然资源综合调查中心 Computing method based on continuous beam rope coring anti-deviation drilling tool mechanical model

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2697302Y (en) * 2004-04-02 2005-05-04 新疆石油管理局钻井公司钻井工具技术服务公司 Rotary protector for pipe tool
CN2763471Y (en) * 2004-11-26 2006-03-08 大港油田集团有限责任公司 Centrilizer for logging weighing
CN200964804Y (en) * 2006-03-27 2007-10-24 李凤咏 Rolling body centralizer

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704909A (en) * 2012-06-28 2012-10-03 中国水利水电第七工程局成都水电建设工程有限公司 Hole-deflection control construction method for deep hole drilling
CN102704909B (en) * 2012-06-28 2015-03-11 中国水利水电第七工程局成都水电建设工程有限公司 Hole-deflection control construction method for deep hole drilling
CN103352687A (en) * 2013-07-12 2013-10-16 葛洲坝集团第二工程有限公司 Method controlling hole deviation in hole drilling
CN103352687B (en) * 2013-07-12 2016-06-29 中国葛洲坝集团第二工程有限公司 The method of keyhole hole deviation
CN109306850A (en) * 2018-09-27 2019-02-05 北京航天地基工程有限责任公司 Creep into method for correcting error in uneven mutually bed boundary
CN113756788A (en) * 2021-10-18 2021-12-07 中国地质大学(北京) Mechanical type is along with boring well deviation measuring apparatu
CN115270345A (en) * 2022-08-04 2022-11-01 中国地质调查局长沙自然资源综合调查中心 Computing method based on continuous beam rope coring anti-deviation drilling tool mechanical model
CN115270345B (en) * 2022-08-04 2023-08-25 中国地质调查局长沙自然资源综合调查中心 Calculation method based on continuous Liang Shengsuo coring anti-skew drilling tool mechanical model

Also Published As

Publication number Publication date
CN101619655B (en) 2012-08-15

Similar Documents

Publication Publication Date Title
CN101619655B (en) Drilling method for accurately controlling hole deflection under complicated stratum and guide device
CN104482815B (en) Tunnel smooth blasting method
CN109899089A (en) Goaf grouting method based on pinniform horizontal branch directional drilling technique
CN102226336B (en) Foundation reinforcement method
CN104947690B (en) Grooving construction method for embedding underground continuous wall into rock
CN101737012B (en) Drilling bit for guiding horizontal roatatably-jetting construction and construction method thereof
CN109098661B (en) Bidirectional paired river-crossing large-vertex-angle inclined hole drilling method for river valley of hydropower station
CN104295239A (en) Method for using rotary drilling rig to drill into hard rock stratum
CN104458444A (en) Method for testing mechanical parameters of joint surface of irregular rock mass
CN101818644A (en) Well digging process of mining vertical shaft by adopting one-drilling well completion and well drilling method
CN102535440A (en) Method of using all-casing drilling rig with rotary drilling rig to construct rock-socketed secant pile wall
CN104373041A (en) Drilling deviation rectification method for 60-meter-long hole drilling of tunnel large pipe shed
CN107144192A (en) A kind of intelligent construction method of pinpoint blasting
CN108678375B (en) Grouting construction process using GIN grouting method
CN112855029B (en) Goaf drilling external pipe expansion construction method
CN102747954A (en) Hole-drilling guiding positioning system suitable for inclined rock surface and construction method
CN110017155B (en) Grouting reinforcement water-proof method for water-rich gravel layer of top plate of coal face
CN103437774A (en) Shield excavation machining method
CN102817349A (en) Method for consolidating soft soil foundations through fine dynamic compaction replacement
CN102071925B (en) Method for tracking, positioning, quantifying and rectifying coordinate of reversed pendulum hole
CN108411919A (en) Pile bottom sediment cleaning method for rotary drilling mechanical hole-forming pile
CN101696633B (en) Construction method and equipment for cutting deep-buried structure with small-caliber drill tool
CN109989710A (en) High-precision heavy-caliber horizontal resistance force method
CN107542471A (en) A kind of smooth blasting method for constructing tunnel
CN113958262A (en) System device for adjusting operation parameters of raise boring machine in real time through ultrasonic detection

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant