The processing method of deformation joints of clean room
Technical field
The present invention relates to the treatment technology of building deformation seam, specifically is a kind of processing method of deformation joints of clean room.
Background technology
The feature of clean room is that the dustiness and the bacteria containing amount of room air must be controlled within the limits prescribed, and Here it is clean room is to the requirement of cleanliness factor.The ground deformation seam that dynamic load motion is particularly arranged often produces distortion under the effect of dynamic load, both influenced attractive in appearancely, also makes dust in the deformation joint influence the cleanliness factor of factory building.
At present, all there is standard collective drawings the processing each department of domestic building construction deformation joint.But the deformation joint for clean room does not also have corresponding processing standard.With reference to the existing standard atlas processing method of building deformation seam is handled the deformation joint of clean room, do not satisfy the requirement of clean room cleanliness factor.
Summary of the invention
The purpose of this invention is to provide a kind of processing method that is applicable to deformation joints of clean room, can satisfy the requirement of clean room cleanliness factor.
The present invention realizes with following technical scheme: a kind of processing method of deformation joints of clean room comprises main deformation joint design of node and deformation joints of clean room construction two parts; It is characterized in that:
(1) deformation joint design of node
Its main deformation joint node comprises flooring deformation joint node, ground deformation seam node, exterior wall deformation joint node, roof deformation seam node, interior wall deformation joint node, cylindrical distortion seam node and deformation joint of roof node;
(1) flooring deformation joint design of node
1) prevent rolling distortion: select for use the 6mm steel plate to make the deformation joint cover plate, the buffering mat is made with the 10mm rubber tile in the bottom; It is indeformable down that hard and soft combination makes the flooring deformation joint roll at fork truck;
2) anti-leaking: can bend the thick galvanized iron sheet of 1mm, block deformation joint with expanded anchor bolt and floor anchoring; Fill with bitumen-dipped hemp, completely spread the buildings waterproof ointment above;
3) make deformation joint straight attractive in appearance, deformation joint is cut directly, angle steel is installed on both sides
20 * 20; And outside the 6mm steel plate, wrap the thick inferior light corrosion resistant plate of 1.5mm;
(2) ground deformation seam design of node
The ground deformation seam is on flooring deformation joint basis, the thick bending galvanized iron sheet of cancellation 1mm, and deformation joint gets final product with immersion oil flax silk plug is real;
(3) exterior wall deformation joint design of node
Exterior wall deformation joint pitch flax silk jam-pack, the ointment embedding is real, the thick inferior light corrosion resistant plate of enclosing cover 1.5mm, expanded anchor bolt anchoring;
(4) top board, interior wall and cylindrical distortion seam design of node
With the thick blockboard capping of 18mm, be coated with the coating identical outward with top board;
(5) deformation joint of roof design of node
1) for accessible roof: twice waterproof defence line is set; Be that the thick galvanized iron sheet of bending 1mm is set together, block deformation joint with expanded anchor bolt and floor anchoring; Fill with bitumen-dipped hemp, completely spread the buildings waterproof ointment above; Another road is to spread one deck APP waterproof roll thereon, covers protection with blue profiled sheet;
2) accessible roof is not identical with accessible roof deformation joint design of node;
(2) deformation joints of clean room construction comprises the flooring deformation joint construction, the construction of ground deformation seam, exterior wall deformation joint construction, top board, interior wall and intercolumniation deformation joint construction and deformation joint of roof construction;
(1) the flooring deformation joint construction is:
1) the flooring deformation joint carries out each professional coordinative construction in the work progress at flooring (wood floor bolck, terrazzo concrete etc.) facing after having constructed; Making cement mortar levelling layer at first, intensity reach and bend galvanized iron sheet after the requirement and angle steel is installed; Galvanized iron sheet and angle steel are fixed in basic unit with expanded anchor bolt; The lap length of galvanized iron sheet is 20mm, adopts rivet; The two sides, joint is sealed with water-repellent paint; Galvanized iron sheet is installed back filling pitch flax silk, smears ointment;
2) carry out carrying out the rubber strip installation after the leak test; After the secondary levelling, carry out corrosion resistant plate and install, make the corrosion resistant plate apparent height consistent with ground; Bag 6mm steel plate in the described corrosion resistant plate;
(2) construction of ground deformation seam is:
Ground deformation is sewn on and carries out after the ground facing has been constructed, making cement mortar levelling layer at first, and intensity reaches carries out angle steel after the requirement and installs; Angle steel is fixed in basic unit with expanded anchor bolt; The two sides, joint is sealed with water-repellent paint; Angle steel is installed back filling pitch flax silk, smears ointment;
(3) the exterior wall deformation joint construction is:
1) scrape rough intact back filling immersion oil flax silk at the exterior wall mortar, the jam-pack plug is real, and it can not be leaked gas by light leak;
2) smear the building ointment to strengthen waterproof effect;
3) corrosion resistant plate is installed: corrosion resistant plate is installed point-blank, and notes vertical; The joint alignment is polished after the welding, makes flat appearance smooth;
(4) top board, interior wall and intercolumniation deformation joint construction are:
Blockboard must be processed smooth, and thickness is even; The plate face is straight during installation, and the negative and positive angle becomes 90 °; Top board, intercolumniation deformation joint be so construction also; Surface coating is constructed with interior wall, top board, pillar;
(5) the deformation joint of roof construction is:
1) deformation joint of roof is constructed before facing tile stickup and roof waterproof construction; If deformation joint both sides parapet is contour, will be before the construction with wall end face mortar levelling; If contour then to scratch the cross section on high-wall by designing requirement be the groove of 60 * 60mm, and do not use the mortar troweling; At first carry out galvanized iron sheet during construction and install, then plug is filled out the immersion oil flax silk, smears the building ointment;
2) carry out roof waterproof construction, to deformation joint bag APP waterproof roll;
3) will be installed on the waterproofing course after the color profiling steel plate moulded section; Colored steel joint rivet, and the full coat glass cement is in case leak.
The invention has the beneficial effects as follows: the deformation joints of clean room that adopts said method to handle, air tight, water-tight, clean attractive in appearance, and satisfied the indeformable requirement of forklift-walking.
Description of drawings
Fig. 1 is floor plate and plate seam design of node;
Fig. 2 is floor plate and wall seam design of node;
Fig. 3 is ground panel and plate seam design of node;
Fig. 4 is an exterior wall deformation joint design of node;
Fig. 5 is a roof deformation seam design of node;
Fig. 6 is the deformation joint of roof design of node.
The specific embodiment
Embodiment
One, each main node design
1, flooring deformation joint design of node is seen Fig. 1 and Fig. 2.Among the figure: 1, ointment filleting; 2, cement mortar screeding layer; 3, the inferior light corrosion resistant plate of 1.5mm; 4,6mm steel plate.5,20 * 20 angle steel; 6, the thick rubber tile of 10mm; 7, pitch flax silk.8, the thick galvanized iron sheet of 1mm.
Indeformable down in order to guarantee that the flooring deformation joint rolls at fork truck, select for use 6mm steel plate 4 to make the deformation joint cover plate, the buffering mat is made with 10mm rubber tile 6 in the bottom.Hard and soft combination can be protected the flooring deformation joint and roll indeformable down at fork truck.
Leak for anti-, the thick galvanized iron sheet 8 of bending 1mm blocks deformation joint with expanded anchor bolt and floor anchoring.Fill with bitumen-dipped hemp 7, completely spread buildings waterproof ointment filleting 1 above.
For making deformation joint straight attractive in appearance, deformation joint is cut directly both sides peace L20 * 20 angle steel 5; And outside the 6mm steel plate, wrap the thick inferior light corrosion resistant plate 3 of 1.5mm
2, ground node design
The thick bending galvanized iron sheet of ground deformation seam cancellation 1mm, deformation joint is real with immersion oil flax silk plug, and all the other are identical with the flooring design of node; See Fig. 3.Among the figure 1, the 20x20 angle steel; 2, ground; 3, cement mortar screeding layer; 4, pitch flax silk; 5,6mm steel plate; 6, corrosion resistant plate; 7, rubber tile; 8, ointment filleting.
3, the exterior wall design of node is seen Fig. 4.Among the figure: 1, ointment; 2, pitch flax silk; 3, expanded anchor bolt.Exterior wall deformation joint pitch flax silk 2 jam-packs, ointment 1 embedding is real, the thick inferior light corrosion resistant plate of enclosing cover 1.5mm, expanded anchor bolt 3 anchorings;
4, top board, interior wall and cylinder design of node
This part deformation joint does not exist compressive deformation and seepy question, only considers attractive in appearance.Therefore, only, be coated with outward and the identical coating of top board (metope, cylinder) with the thick blockboard capping of 18mm; See Fig. 5.
5, the deformation joint of roof design of node is seen Fig. 6.Among the figure: 1, ointment; 2, pitch flax silk; 3, color profiling steel plate; 4, APP coiled material; 5, galvanized iron sheet.For accessible roof, both required water-tightly, require attractive in appearance again.Waterproof is provided with the twice defence line.The one, the thick galvanized iron sheet 5 of bending 1mm is set, block deformation joint with expanded anchor bolt and floor anchoring.Fill with bitumen-dipped hemp 2, completely spread buildings waterproof ointment 1 above.The 2nd, spread one deck APP waterproof roll 4 thereon, cover protection with color profiling steel plate 3.
Two, deformation joint construction method
(1) material structure
Arrive sample collectings such as inferior light corrosion resistant plate, blockboard, color profiling steel plate, galvanized iron sheet, angle steel, waterproofing unction standby according to scheme.With inferior light corrosion resistant plate, color profiling steel plate and galvanized iron sheet compression moulding, press the time of construction operation designing requirement, by the different parts moulded section installation of entering the court.
(2) construction operation
1, flooring deformation joint construction
The flooring deformation joint carries out each professional coordinative construction in the work progress after flooring (wood floor bolck, terrazzo concrete etc.) has been constructed.Making cement mortar levelling layer at first, intensity reach and bend galvanized iron sheet after the requirement and angle steel is installed.Galvanized iron sheet and angle steel are fixed in basic unit with expanded anchor bolt.The lap length of galvanized iron sheet is 20mm, adopts rivet.The two sides, joint is sealed with water-repellent paint.Galvanized iron sheet is installed back filling pitch flax silk, smears ointment.
Carry out carrying out the rubber strip installation after the leak test (checking and accepting signature) through managing.After the secondary levelling, carry out corrosion resistant plate (interior bag 6mm steel plate) and install, make the corrosion resistant plate apparent height consistent with ground.
2, exterior wall deformation joint construction
(1) scrape rough intact back filling immersion oil flax silk at the exterior wall mortar, necessary jam-pack plug is real, must not light leak gas leakage.
(2) smear the building ointment, strengthen waterproof effect.
(3) corrosion resistant plate is installed.Corrosion resistant plate will be installed point-blank, and notes vertical.Will align in the joint, will polish after the welding, guarantees that flat appearance is smooth.
3, interior wall deformation joint construction
Blockboard will be processed smooth, and thickness is even.Notice during installation that the plate face is straight, the negative and positive angle should become 90 °.Top board, intercolumniation deformation joint be so construction also.Surface coating is constructed with interior wall (top board, pillar).
5, deformation joint of roof construction
Deformation joint of roof is constructed before facing tile stickup and roof waterproof construction.If deformation joint both sides parapet is contour, then will be before the construction with wall end face mortar levelling.If contour then to scratch the cross section on high-wall by designing requirement be the groove of 60 * 60mm, and do not use the mortar troweling.At first carry out galvanized iron sheet during construction and install, then plug is filled out the immersion oil flax silk, smears the building ointment.
When carrying out roof waterproof construction,, notice that Bao Detai is not tight also to deformation joint bag APP waterproof roll.
Be installed on the waterproofing course after the color profiling steel plate moulded section.Colored steel joint rivet, and sternly be coated with glass cement, in case leak.