CN101619590A - 过滤渗透井浅层排除下穿道路积水的方法 - Google Patents

过滤渗透井浅层排除下穿道路积水的方法 Download PDF

Info

Publication number
CN101619590A
CN101619590A CN200810107543A CN200810107543A CN101619590A CN 101619590 A CN101619590 A CN 101619590A CN 200810107543 A CN200810107543 A CN 200810107543A CN 200810107543 A CN200810107543 A CN 200810107543A CN 101619590 A CN101619590 A CN 101619590A
Authority
CN
China
Prior art keywords
well
infiltration
filtration
road
infiltration well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200810107543A
Other languages
English (en)
Other versions
CN101619590B (zh
Inventor
刘朝晖
秦仁杰
周科峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Daguang Highway Hengda Section preparatory office
Changsha University of Science and Technology
Original Assignee
Changsha University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha University of Science and Technology filed Critical Changsha University of Science and Technology
Priority to CN2008101075438A priority Critical patent/CN101619590B/zh
Publication of CN101619590A publication Critical patent/CN101619590A/zh
Application granted granted Critical
Publication of CN101619590B publication Critical patent/CN101619590B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

本发明介绍了一种过滤渗透井浅层排除下穿道路积水的方法,该方法是在道路主线(1)与被交道路(2)之交叉道路两侧边沟(3)下设一集水井(4),集水井(4)侧边地下水位之上设一渗透井(6),该渗透井(6)的池底为具有良好过滤与渗透功能的蛭石格栅(7),集水井(4)与渗透井(6)之间用排水管(5)管通连接,利用蛭石格栅(7)去除污染物得净化水排出。该方法设计合理,设置简单,能使地表径流渗透到浅层地下透水土层,快速消除污染物,故在道路施工中容易推广,具有效果好、见效快、环保、经济的特点,能够获得很好的社会经济与环境效益。

Description

过滤渗透井浅层排除下穿道路积水的方法
技术领域
本发明属于公路工程技术领域,尤其涉及一种适用于路堤高度降低后的高速公路的下穿式被交道路积水排除方法。
背景技术
为降低高速公路路基填土高度,同时保证下穿式被交道路所汇集的地面雨水能及时排除,在一般降雨强度下不影响被交道路的正常通行,常用的排水方法主要有雨棚排水、蒸发池排水和渗坑或渗沟排水等方法。其中雨棚排水的主要缺陷是所使用的防水材料容易老化,造价高,雨棚的更换与维修费用较大。而且这种方式容易造成通道内积水;蒸发池排水的主要缺陷是占地较多,造价相应偏大,而且在下暴雨时无法满足排水要求,也容易造成下穿道路积水;而渗坑或渗沟排水方式虽对路面径流有一定的截流和渗滤净化作用,但排水效果不好,尤其是遇到暴雨天气时,排水慢易积水,影响下穿道路正常通行,还有可能对周边环境及地下水产生污染。
发明内容
本发明要解决的技术问题是,针对现有技术存在的不足,提供一种过滤渗透井浅层排除下穿道路积水的方法,使用该方法可使下穿道路地表径流雨水经汇集去污处理后渗透到浅层地下透水土层中,并补给地下水,从而获得很好的社会经济和环境效益。
本发明的解决方案是,所述过滤渗透井浅层排除下穿道路积水的方法,参照图1,是利用蛭石格栅良好的过滤净化去污与渗透能力达到净化处理道路地表径流污染物并实现净化水排出的目的。即在道路主线1与下穿式被交道路2之交叉道路两侧边沟3或暗沟下设一集水井4。集水井4侧边地下水位之上的透水土层中设一渗透井6。该渗透井6的池底为具有良好过滤与渗透功能的蛭石格栅7。所述集水井4与所述渗透井6之间用排水管5连接。利用所述渗透井6池底的格栅7通过过滤方式与进一步的渗透方式去除上述边沟或暗沟及渗透井中的悬浮物、氨氮、重金属离子一类污染物,从而获得经过净化处理的净化水渗透排出。
本发明的过滤渗透井浅层排除下穿道路积水方法投入使用时,所使用的集水井4置于路侧边沟3或暗沟下方,渗透井6底部置于地下水位之上的透水土层中,二者之间用排水管5管接,即可使边沟3或暗沟所积下穿道路地表径流雨水流入集水井4,然后经排水管5流入渗透井6,通过渗透井6池底的蛭石格栅7滤去路面径流雨水中的污染物并通过渗透方式排出经过净化处理的雨水。
本发明的有益效果是,由于这种带有过滤作用的过滤渗透井浅层排除下穿道路积水的方法设计合理,设置简单,能使地表径流雨水渗透到浅层地下透水土层,快速消除污染物,故在道路工程施工中十分容易推广应用。该方法具有效果好、见效快、投入少、环保、经济的特点,能够获得很好的社会经济与环境效益。
附图说明
图1是本发明一个具体实施例的实施状态示意图,图中标示为:
1-道路主线,
2-被交道路,
3-边沟,
4-集水井,
5-排水管,
6-渗透井,
7-蛭石格栅。
具体实施方式
实施例1,参见图1,该实施例中,集水井4设于道路主线1与下穿式被交道路2之交叉道路两侧边沟3之下。渗透井6采用钢筋混凝土筑建,设于集水井4侧边地下水位之上的透水土层中。渗透井6池底的格栅7采用具有良好过滤与渗透功能的蛭石格栅,其格栅内填满蛭石颗粒的市售0.5m厚蛭石格栅。集水井4与渗透井6之间采用管径为¢70cm的钢筋混凝土的排水管5连接。
实施例2,集水井4设于道路主线1与下穿式被交道路2之交叉道路两侧暗沟之下。渗透井6采用波纹管建造,设于集水井4侧边地下水位之上的透水土层中。渗透井6池底即格栅7亦采用市售0.5m厚蛭石格栅。管接集水井4与渗透井6的排水管5亦采用管径为¢70cm的钢筋混凝土材质。为进一步防止过多漂浮物进入渗透井,排水管5入口处还可加设一层或多层铁丝网对雨水进行初滤。
本发明的这种过滤渗透井浅层排除下穿道路积水的方法,经在中国大广高速公路河北衡水至大名段多处试验,被证明排水效果良好,完全达到设计要求,且净排污率达95%以上,获得了很好的社会经济与环境效益。

Claims (1)

  1. 一种过滤渗透井浅层排除下穿道路积水的方法,该方法是在道路主线(1)与下穿式被交道路(2)之交叉道路两侧边沟(3)_或暗沟下设一集水井(4),集水井(4)侧边地下水位之上的透水土层中设一渗透井(6),该渗透井(6)的池底为具有良好过滤与渗透功能的蛭石格栅(7),所述集水井(4)与所述渗透井(6)之间用排水管(5)管通连接,利用蛭石格栅(7)去除上述边沟或暗沟及渗透井中的污染物得净化水排出。
CN2008101075438A 2008-12-22 2008-12-22 过滤渗透井浅层排除下穿道路积水的方法 Expired - Fee Related CN101619590B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101075438A CN101619590B (zh) 2008-12-22 2008-12-22 过滤渗透井浅层排除下穿道路积水的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101075438A CN101619590B (zh) 2008-12-22 2008-12-22 过滤渗透井浅层排除下穿道路积水的方法

Publications (2)

Publication Number Publication Date
CN101619590A true CN101619590A (zh) 2010-01-06
CN101619590B CN101619590B (zh) 2010-10-06

Family

ID=41512985

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101075438A Expired - Fee Related CN101619590B (zh) 2008-12-22 2008-12-22 过滤渗透井浅层排除下穿道路积水的方法

Country Status (1)

Country Link
CN (1) CN101619590B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102213007A (zh) * 2010-04-09 2011-10-12 北京仁创科技集团有限公司 一种液体通道
CN103541421A (zh) * 2013-10-17 2014-01-29 广东圣腾科技股份有限公司 一种新型雨水截水及渗排一体化系统
CN104696011A (zh) * 2015-04-01 2015-06-10 广东安元矿业勘察设计有限公司 地下矿山中段平面排水系统的改进方法
CN105544696A (zh) * 2016-01-20 2016-05-04 山东省水利科学研究院 一种山丘区水土保持坡面截流促渗方法
CN112814120A (zh) * 2021-01-04 2021-05-18 中电建生态环境集团有限公司 一种初雨净化系统的施工方法

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102213007A (zh) * 2010-04-09 2011-10-12 北京仁创科技集团有限公司 一种液体通道
CN103541421A (zh) * 2013-10-17 2014-01-29 广东圣腾科技股份有限公司 一种新型雨水截水及渗排一体化系统
CN104696011A (zh) * 2015-04-01 2015-06-10 广东安元矿业勘察设计有限公司 地下矿山中段平面排水系统的改进方法
CN105544696A (zh) * 2016-01-20 2016-05-04 山东省水利科学研究院 一种山丘区水土保持坡面截流促渗方法
CN105544696B (zh) * 2016-01-20 2017-09-12 山东省水利科学研究院 一种山丘区水土保持坡面截流促渗方法
CN112814120A (zh) * 2021-01-04 2021-05-18 中电建生态环境集团有限公司 一种初雨净化系统的施工方法

Also Published As

Publication number Publication date
CN101619590B (zh) 2010-10-06

Similar Documents

Publication Publication Date Title
KR101410194B1 (ko) 초기우수 처리가 가능한 교량 배수시설, 그 배수시설을 이용한 초기우수유도방법, 그 배수시설을 갖는 비점오염 저감시설물 및 저감방법
CN105089302B (zh) 一种用于社区雨水分流、削峰及生态净化的雨水花园系统
CN101775839B (zh) 雨水渗透-排放一体生态系统
CN203475587U (zh) 道路雨水收集利用装置
KR101346104B1 (ko) 필터링 스페이스를 위한 데크보도형 빗물저류장치
CN102605852A (zh) 基于低影响开发的城市雨水渗透生态系统
CN101619590B (zh) 过滤渗透井浅层排除下穿道路积水的方法
CN106758675A (zh) 带有滤水净水路缘石的雨水收集生态路面
CN104032793A (zh) 用于居民小区道路的花园式抗雨水冲击系统
CN101624839B (zh) 过滤渗透池综合排除下穿道路积水的方法
KR101310150B1 (ko) 비점오염 여과형 정화장치
CN104988821A (zh) 道路排水结构
WO2019061869A1 (zh) 一种一体化雨水处理装置
CN107044081A (zh) 生态型街道排水结构
CN101624840B (zh) 过滤沉淀池深层排除下穿道路积水的方法
CN203866664U (zh) 一种具有导渗导排管的透水混凝土铺装系统
CN103498505B (zh) 一种能分离初期雨水径流的雨水篦子
CN203977495U (zh) 用于居民小区道路的花园式抗雨水冲击系统
CN104294731A (zh) 一种夹滤料透水水泥混凝土砂基砖铺装系统
KR20110056600A (ko) 빗물 정수 시스템
CN105293706A (zh) 城市下沉廊道式景观湿地
CN205313950U (zh) 一种具有净化功能的生态边沟
CN104328836A (zh) 一种环保型预制双箱深孔式排水井及其施工方法
CN111305362B (zh) 一种基于初期雨水截流净化的公园道路下渗层的结构
CN204098198U (zh) 一种设有滤料井的透水混凝土铺装系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: PREPARATION AND CONSTRUCTION OFFICE, HENGDA SECTIO

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Wei Hongbin

Inventor after: Luo Lihong

Inventor after: Qin Renjie

Inventor after: Liao Jijian

Inventor after: Liu Jihua

Inventor after: Liu Chaohui

Inventor after: Zhang Yong

Inventor after: Chen Junchao

Inventor after: Li Jianjun

Inventor after: Zhou Kefeng

Inventor before: Liu Chaohui

Inventor before: Qin Renjie

Inventor before: Zhou Kefeng

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LIU ZHAOHUI QIN RENJIE ZHOU KEFENG TO: WEI HONGBIN QIN RENJIE LIAO JIXIA LIU JIHUA LIU ZHAOHUI ZHANG YONG CHEN JUNZHAO LI JIANJUN ZHOU KEFENG LUO LIHONG

TR01 Transfer of patent right

Effective date of registration: 20110117

Address after: 410076 Hunan province Changsha Tianxin Qu Chi Ling Road No. 45

Co-patentee after: Hebei Daguang Highway Hengda Section preparatory office

Patentee after: Changsha University of Sciences and Technology

Address before: 410076 Hunan province Changsha Tianxin Qu Chi Ling Road No. 45

Patentee before: Changsha University of Sciences and Technology

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101006

Termination date: 20141222

EXPY Termination of patent right or utility model