CN101614645A - 一种测量输变电设备外绝缘污秽积累的方法 - Google Patents

一种测量输变电设备外绝缘污秽积累的方法 Download PDF

Info

Publication number
CN101614645A
CN101614645A CN200810028950A CN200810028950A CN101614645A CN 101614645 A CN101614645 A CN 101614645A CN 200810028950 A CN200810028950 A CN 200810028950A CN 200810028950 A CN200810028950 A CN 200810028950A CN 101614645 A CN101614645 A CN 101614645A
Authority
CN
China
Prior art keywords
insulator
external insulation
electric transmission
transformation equipment
measuring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200810028950A
Other languages
English (en)
Inventor
陈锡阳
刘刚
高明振
尹成
梁竞雷
杨挺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority to CN200810028950A priority Critical patent/CN101614645A/zh
Publication of CN101614645A publication Critical patent/CN101614645A/zh
Pending legal-status Critical Current

Links

Abstract

本发明涉及一种测量输变电设备外绝缘污秽积累的方法,在选取的每一个测量地点,雨季前期悬挂一串绝缘子串,预计旱季开始时,采集测量第一片绝缘子污秽物含量,经历一个干旱天气的采样间隔,采集测量第二片绝缘子污秽物含量,可以计算出积污速率和积污变化状态,为获得某区域n年一遇旱季的最大积污状态提供计算数据。

Description

一种测量输变电设备外绝缘污秽积累的方法
所属技术领域
本发明涉及输变电技术领域的测量方法,具体涉及一种测量输变电设备外绝缘污秽积累的方法。
背景技术
污秽物是造成外绝缘强度降低的首要条件,累积污秽是造成污闪的主要因素。要防治污闪,就要有一个尺度去衡量污秽度,外绝缘设备厂家、输变电设备设计单位、运行单位才有参照依据。输变电设备外绝缘所累积污秽的化学成分很复杂,用来等效表征污秽度的参变量有盐密和灰密等。污秽等级在不同的地区有很大的差别,在不同时间又有很大的变化。如何确定某设备外绝缘所要承受的污秽度是防污体系的一个基础课题。由于测定和衡量污秽度的方法不同,形成了不同的理论流派和技术标准。
我国从上世纪90年代开始在整个电力系统应用盐密测量手段划分污区,并绘制污区图。前期的污区图大都是以1年最大盐密或多年平均年度最大盐密划分污级。事实证明所划分的污级难以反映实际污级。在这样的污区图的指导下设计选择绝缘子的爬距无法充分满足电力系统运行的要求,需要依靠大规模的人工清扫来辅助防污闪,设备运行维护工作量大,又无质量保障。
在国际上,现流行的执行标准有IEC60815:2002,污秽度为ESDD/NSDD或SES测量值的最大值,测量时间规定为一年或多年,并强调要结合运行经验确定污秽度。执行IEC60815标准的一些发达国家近几年较少发生大面积污闪,许多经验和相关标准值得我们学习,但由于这些国家大气污秽环境较稳定,经过长期的经验积累,采用IEC60815等标准可以获得较准确的污级评定。由于我国许多地区污秽变化快,幅度大,完全照搬该国际标准并不能让我们尽快获得准确的污级评定,不利于及时安排调爬。
发明内容
本发明的目的是克服已有技术的不足,提供一种测量输变电设备外绝缘污秽积累的方法,实现:1、快速测量某区域的积污速率;2、获得某区域旱季的积污变化状态;3、为获得某区域n年一遇旱季的最大积污状态提供计算数据。
本发明的目的是这样实现的:一种测量输变电设备外绝缘污秽积累的方法,包括如下次序步骤:
(1)根据输变电设备地理区域分布,至少选取一个测量地点;
(2)在选取的每一个测量地点,在测量年度雨季前期悬挂一串至少由四片悬式绝缘子组成的绝缘子串;
(3)在测量年度预计旱季开始时,采集测量绝缘子串去除顶部和底部各一片绝缘子后的第一片绝缘子污秽物含量W1
(4)经历一个至少10天为干旱天气的采样间隔t1,采集测量绝缘子串去除顶部和底部各一片绝缘子后的第二片绝缘子污秽物含量W2
(5)计算该测量地点积污速率w=(W2-W1)/t1
(6)计算该测量地点在采集第一片绝缘子污秽物后经历t天干旱天气时,绝缘子污秽物含量W=W1+wt。
上述的绝缘子串悬挂于输电线路杆塔上。
上述的污秽物含量,包括盐密含量和灰密含量,或其中一种。
上述的采样间隔t1期间出现降雨时,等待降雨结束后重新从第(3)步骤开始的步骤。
上述的采样间隔确定方法包括根据当地天气预报结果,在至少经历10天后,降雨前进行采集测量的步骤。
上述的采样间隔确定方法包括在进行第二片采集测量前出现降雨时,等待降雨结束后重新从第(3)步骤开始的步骤。
设在采集第一片绝缘子污秽物时,干旱天气已经持续t0天,该测量地点气象统计n年一遇干旱天数为tn,则n年一遇绝缘子污秽物最大含量Wmax=W1+w(tn-t0)。
本发明与现有技术相比具有如下优点:1、可以测量出积污速率,进行污秽实时状态预测;2、测量时间短,在一年内即可准确测定绝缘子污秽物积累状况,不需测量多年求平均值;3、可以获得某区域n年一遇旱季的绝缘子污秽物最大含量。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1表示本发明的操作流程图。
具体实施方式
图1表示本发明一个操作流程图,在本实施例中,步骤101:根据输变电设备地理区域分布,至少选取一个测量地点。步骤102:在选取的每一个测量地点,在测量年度雨季前期悬挂一串至少由四片悬式绝缘子组成的绝缘子串,一般可考虑挂6片。悬式绝缘子一般选择标准型号绝缘子,如XP-7绝缘子。步骤103:根据当地天气预报,预计旱季开始时间。步骤104:采集测量绝缘子串去除顶部和底部各一片绝缘子后的第一片绝缘子污秽物含量W1。绝缘子污秽一般由人工用采样布采集,可以测量盐密、灰密,或者其中之一。步骤105:经历一个至少10天为干旱天气的采样间隔t1,记录是否出现降雨。如果出现降雨,则转至步骤103,如果不出现降雨,则转至步骤106。可根据当地气候特征和积污情况确定采样间隔t1,一般以15~20天为宜。步骤106:采集测量绝缘子串去除顶部和底部各一片绝缘子后的第二片绝缘子污秽物含量W2。步骤107:计算该测量地点积污速率w=(W2-W1)/t1。步骤108:计算该测量地点在采集第一片绝缘子污秽物后经历t天干旱天气时,绝缘子污秽物含量W=W1+wt;根据该算式,可以推算绝缘子的积污状况。设在采集第一片绝缘子污秽物时,干旱天气已经持续t0天,该测量地点气象统计n年一遇干旱天数为tn,则n年一遇绝缘子污秽物最大含量Wmax=W1+w(tn-t0)。

Claims (6)

1、一种测量输变电设备外绝缘污秽积累的方法,其特征在于包括如下次序步骤:
(1)根据输变电设备地理区域分布,至少选取一个测量地点;
(2)在选取的每一个测量地点,在测量年度雨季前期悬挂一串至少由四片悬式绝缘子组成的绝缘子串;
(3)在测量年度预计旱季开始时,采集测量绝缘子串去除顶部和底部各一片绝缘子后的第一片绝缘子污秽物含量W1
(4)经历一个至少10天为干旱天气的采样间隔t1,采集测量绝缘子串去除顶部和底部各一片绝缘子后的第二片绝缘子污秽物含量W2
(5)计算该测量地点积污速率w=(W2-W1)/t1
(6)计算该测量地点在采集第一片绝缘子污秽物后经历t天干旱天气时,绝缘子污秽物含量W=W1+wt。
2、根据权利要求1所述的一种测量输变电设备外绝缘污秽积累的方法,其特征在于所述的绝缘子串悬挂于输电线路杆塔上。
3、根据权利要求1所述的一种测量输变电设备外绝缘污秽积累的方法,其特征在于所述的污秽物含量,包括盐密含量和灰密含量,或其中一种。
4、根据权利要求1所述的一种测量输变电设备外绝缘污秽积累的方法,其特征在于所述的采样间隔t1期间出现降雨时,等待降雨结束后重新从第(3)步骤开始的步骤。
5、根据权利要求1所述的一种测量输变电设备外绝缘污秽积累的方法,其特征在于所述的采样间隔确定方法包括根据当地天气预报结果,在至少经历10天后,降雨前进行采集测量的步骤。
6、根据权利要求1、5所述的一种测量输变电设备外绝缘污秽积累的方法,其特征在于所述的采样间隔确定方法包括在进行第二片采集测量前出现降雨时,等待降雨结束后重新从第(3)步骤开始的步骤。
CN200810028950A 2008-06-23 2008-06-23 一种测量输变电设备外绝缘污秽积累的方法 Pending CN101614645A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810028950A CN101614645A (zh) 2008-06-23 2008-06-23 一种测量输变电设备外绝缘污秽积累的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810028950A CN101614645A (zh) 2008-06-23 2008-06-23 一种测量输变电设备外绝缘污秽积累的方法

Publications (1)

Publication Number Publication Date
CN101614645A true CN101614645A (zh) 2009-12-30

Family

ID=41494410

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810028950A Pending CN101614645A (zh) 2008-06-23 2008-06-23 一种测量输变电设备外绝缘污秽积累的方法

Country Status (1)

Country Link
CN (1) CN101614645A (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101949807A (zh) * 2010-09-09 2011-01-19 华南理工大学 一种高压输电线路外绝缘自然积污测试方法
CN102520119A (zh) * 2011-11-10 2012-06-27 广东电网公司东莞供电局 一种电力外绝缘表面污秽度测量方法
CN103245761A (zh) * 2013-04-28 2013-08-14 华南理工大学 一种以积污速率划分污区等级的方法
CN103411862A (zh) * 2013-07-15 2013-11-27 国家电网公司 绝缘子自然积污考核场
CN105973788A (zh) * 2016-04-25 2016-09-28 南方电网科学研究院有限责任公司 一种大气腐蚀挂片的耐腐蚀速率测定方法
CN108009130A (zh) * 2017-11-30 2018-05-08 国家电网公司 基于回归分析的自然环境中绝缘子积污预测方法
CN110610254A (zh) * 2019-07-29 2019-12-24 中国南方电网有限责任公司超高压输电公司广州局 一种设备表面污秽度多维度监控系统和预测评价方法
CN112147030A (zh) * 2020-09-26 2020-12-29 国网山东省电力公司电力科学研究院 外绝缘部件污秽沉积量检测装置及方法
CN112179800A (zh) * 2020-09-26 2021-01-05 国网山东省电力公司电力科学研究院 输变电设备污秽微质量测量装置及方法

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101949807B (zh) * 2010-09-09 2011-12-28 华南理工大学 一种高压输电线路外绝缘自然积污测试方法
CN101949807A (zh) * 2010-09-09 2011-01-19 华南理工大学 一种高压输电线路外绝缘自然积污测试方法
CN102520119A (zh) * 2011-11-10 2012-06-27 广东电网公司东莞供电局 一种电力外绝缘表面污秽度测量方法
CN103245761B (zh) * 2013-04-28 2015-08-26 华南理工大学 一种以积污速率划分污区等级的方法
CN103245761A (zh) * 2013-04-28 2013-08-14 华南理工大学 一种以积污速率划分污区等级的方法
CN103411862B (zh) * 2013-07-15 2016-08-31 国家电网公司 绝缘子自然积污考核场
CN103411862A (zh) * 2013-07-15 2013-11-27 国家电网公司 绝缘子自然积污考核场
CN105973788A (zh) * 2016-04-25 2016-09-28 南方电网科学研究院有限责任公司 一种大气腐蚀挂片的耐腐蚀速率测定方法
CN108009130A (zh) * 2017-11-30 2018-05-08 国家电网公司 基于回归分析的自然环境中绝缘子积污预测方法
CN108009130B (zh) * 2017-11-30 2022-03-22 国家电网公司 基于回归分析的自然环境中绝缘子积污预测方法
CN110610254A (zh) * 2019-07-29 2019-12-24 中国南方电网有限责任公司超高压输电公司广州局 一种设备表面污秽度多维度监控系统和预测评价方法
CN110610254B (zh) * 2019-07-29 2021-02-02 中国南方电网有限责任公司超高压输电公司广州局 一种设备表面污秽度多维度监控系统和预测评价方法
CN112147030A (zh) * 2020-09-26 2020-12-29 国网山东省电力公司电力科学研究院 外绝缘部件污秽沉积量检测装置及方法
CN112179800A (zh) * 2020-09-26 2021-01-05 国网山东省电力公司电力科学研究院 输变电设备污秽微质量测量装置及方法

Similar Documents

Publication Publication Date Title
CN101614645A (zh) 一种测量输变电设备外绝缘污秽积累的方法
De Vos et al. The potential of urban rainfall monitoring with crowdsourced automatic weather stations in Amsterdam
Suursaar et al. Decadal variations in mean and extreme sea level values along the Estonian coast of the Baltic Sea
Widdows et al. Effect of Spartina anglica stems on near-bed hydrodynamics, sediment erodability and morphological changes on an intertidal mudflat
Grillakis et al. Application of the HBV hydrological model in a flash flood case in Slovenia
CN102980612B (zh) 一种钢结构网架的三维虚拟现实健康监测方法
Melvold et al. Multiscale spatial variability of lidar-derived and modeled snow depth on Hardangervidda, Norway
Lenaerts et al. Impact of model resolution on simulated wind, drifting snow and surface mass balance in Terre Adélie, East Antarctica
Carturan et al. Estimation of winter precipitation in a high-altitude catchment of the Eastern Italian Alps: validation by means of glacier mass balance observations
CN112329582B (zh) 大数据分析与机理模型协同的道路积水深度监测方法及系统
CN102852166B (zh) 一种高海拔冻土层输电线路铁塔基础在线监测系统及方法
CN205140158U (zh) 山区输电线路基础应急预警系统
CN108022011A (zh) 自然环境中绝缘子积污动态预测方法
CN103278867A (zh) 一种基于经验模态分解的自动气象站数据质量控制方法
CN115879363A (zh) 一种基于降雨量的积水预测方法
CN113593191A (zh) 一种基于大数据的可视化城市内涝监测预警系统
CN106295896B (zh) 结合遥感地形信息的中微尺度电网风害预警方法
Hansen et al. Characterising turbulence intensity for fatigue load analysis of wind turbines
Bergström et al. Wind power in cold climates: Ice mapping methods
Lin et al. An integrated approach for site selection of offshore wind-wave power production
Delgado-Fernandez et al. Sediment input to foredunes: description and frequency of transport events at Greenwich Dunes, PEI, Canada
CN103205987B (zh) 一种水坝排水孔渗流参数智能测控系统
CN111397686B (zh) 一种城市内涝预警方法
CN210268800U (zh) 一种胡杨林断根孽新需水预报预警的地下水位监测装置
CN112781557A (zh) 一种基于物联网的输电线路杆塔倾斜预警方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20091230