CN101614013A - Pretensioning prestressed concrete pile and stretch-draw anchor spare thereof and manufacture method - Google Patents

Pretensioning prestressed concrete pile and stretch-draw anchor spare thereof and manufacture method Download PDF

Info

Publication number
CN101614013A
CN101614013A CN200910181460A CN200910181460A CN101614013A CN 101614013 A CN101614013 A CN 101614013A CN 200910181460 A CN200910181460 A CN 200910181460A CN 200910181460 A CN200910181460 A CN 200910181460A CN 101614013 A CN101614013 A CN 101614013A
Authority
CN
China
Prior art keywords
stretch
draw
concrete pile
hole
muscle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910181460A
Other languages
Chinese (zh)
Other versions
CN101614013B (en
Inventor
唐书斌
龙章松
宋峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YANCHENG TONGLI NOVEL BUILDING MATERIALS CO Ltd
Original Assignee
YANCHENG TONGLI NOVEL BUILDING MATERIALS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YANCHENG TONGLI NOVEL BUILDING MATERIALS CO Ltd filed Critical YANCHENG TONGLI NOVEL BUILDING MATERIALS CO Ltd
Priority to CN2009101814608A priority Critical patent/CN101614013B/en
Publication of CN101614013A publication Critical patent/CN101614013A/en
Application granted granted Critical
Publication of CN101614013B publication Critical patent/CN101614013B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a kind of pretensioning prestressed concrete pile stretch-draw anchor spare and pile body structure and manufacture method, described stretch-draw anchor spare is a key of the present invention, it comprises body (8), it is characterized in that being provided with in the described body (8) transitional pore (9) in the screw (2) of mutual perforation, heavy muscle hole (1) and connection screw (2) and heavy muscle hole (1), the diameter of the aperture in described heavy muscle hole (1) and prestressing force master muscle matches, the aperture of described screw (2) is greater than the aperture in heavy muscle hole (1), and described heavy muscle hole (1) is cylindrical hole or polygon prism hole.The present invention has simple in structure, and is easily manufactured, can reduce the manufacturing cost and the cost of raw material greatly.

Description

Pretensioning prestressed concrete pile and stretch-draw anchor spare thereof and manufacture method
Technical field
The present invention relates to a kind of precast concrete pile, especially a kind of cost-saved concrete pile of end plate that do not use, specifically a kind of pretensioning prestressed concrete pile and stretch-draw anchor spare and manufacture method.
Background technology
As everyone knows, pretensioning prestressed concrete pile is the pile foundation material of present use amount maximum, and it comprises Pretensioned spun concrete piles and pretensioning prestressed concrete hollow square pile.At present, when producing, change the preparation method of cast in situs in the past, adopted the guaranteed factory floor streamline of quality production technology more.
Concrete pile is the very big slender member of a kind of draw ratio, is easy to generate circumferential crack in production, carrying and work progress, and for remedying this defective, also in order to reach the purpose of saving steel, the normal prestressing stretching technique that adopts is produced in batch production simultaneously.
In order to make whole all tendon integral body of pile, average stretch-draw, factory is normal at present to use end plate to realize this purpose.Being fixed on the end plate behind the reinforcing bar heading, end plate is tightened by bolt and is fixed on stretch-draw plate or the anchor plate, carries out integral tension again.This method has solved the problem of integral tension well, and simultaneously end plate is also attached to the stake end portion, the connectivity problem of two stakes when having solved pile foundation construction well again.But the defective of this method also is significantly, mainly contains: 1, be not welded to connect by end plate and when only saving with one, accompanying end plate has just caused the waste of material when pile foundation.2, pile driving construction follower head plate in depth down, is subjected to influence on groundwater, thus the perishable quality that influences pile foundation of end plate.3, production assembly process labor strength is big, and production efficiency is low, and security incident etc. easily takes place.4, because end plate outside area is big, thin thickness, outside planeness is difficult to meet design requirement.
Summary of the invention
The objective of the invention is at existing pretensioning prestressed concrete pile because of the waste raw material that use end plate to exist, perishable and labor strength is big, the problem that production efficiency is low, design and a kind ofly can guarantee main muscle integral tension, save material again, reducing the stake termination tilts, prevent corrosion of steel, improve the quality of stake, reduced pretensioning prestressed concrete pile and the stretch-draw anchor spare and the manufacture method of labor strength.
One of technical scheme of the present invention is:
A kind of pretensioning prestressed concrete pile stretch-draw anchor spare, comprise body 8, it is characterized in that being provided with in the described body 8 transitional pore 9 in the screw 2 of mutual perforation, heavy muscle hole 1 and connection screw 2 and heavy muscle hole 1, the aperture in described heavy muscle hole 1 and the diameter of prestressing force master muscle match, the aperture of described screw 2 is greater than the aperture in heavy muscle hole 1, and described heavy muscle hole 1 is cylindrical hole or polygon prism hole.
Two of technical scheme of the present invention is:
A kind of pretensioning prestressed concrete pile stretch-draw anchor spare, comprise body 8, it is characterized in that being provided with in the described body 8 screw 2 and the heavy muscle hole 1 of mutual perforation, the aperture of described screw 2 is greater than the aperture in heavy muscle hole 1, the aperture in described heavy muscle hole 1 and the diameter of prestressing force master muscle match, and described heavy muscle hole 1 is cylindrical hole or polygon prism hole.
Three of technical scheme of the present invention is:
A kind of pretensioning prestressed concrete pile stretch-draw anchor spare, comprise body 8, it is characterized in that being provided with in the described body 8 screw 2 and the heavy muscle hole 1 of mutual perforation, described heavy muscle hole 1 is a bellmouth, and the big end of bellmouth is towards screw 2, the diameter of the end diameter of described bellmouth and prestressing force master muscle matches, and described heavy muscle hole 1 is conical bore or polygon prism taper hole.
The column anti-rotation structure that the end face profile of the body 8 described in the technique scheme one to three can be polygon (as triangle, quadrangle, pentagon, hexagon, heptagon, octagon, or the like) column anti-rotation structure or be made up of one section circular arc and at least one straight flange at least.
The profile of the body 8 described in the technique scheme one to three also can be step-like structure, the column anti-rotation structure that has at least the end of a step body to be polygon (as triangle, quadrangle, pentagon, hexagon, heptagon, octagon, or the like) column anti-rotation structure or to form by one section circular arc and at least one straight flange at least.
Four of technical scheme of the present invention is:
A kind of pretensioning prestressed concrete pile, comprise by main muscle 10 and spiral bar 11, main muscle 10 spiral bars 11 are compiled into the reinforcing cage body as the concrete pile stressed member, described reinforcing cage body is positioned in the concrete pile body, the two ends that it is characterized in that described main muscle 10 have at least an end to be connected with to be embedded in the concrete of the corresponding end of concrete pile as the described stretch-draw anchor spare 3 of claim 1,2 or 3.
Five of technical scheme of the present invention is:
A kind of pretensioning prestressed concrete pile manufacture method is characterized in that it mainly may further comprise the steps:
At first, all are needed the prestressing force master muscle 10 of stretch-draw all put as on claim 1, the 2 or 3 described stretch-draw anchor spares 3;
Secondly, all main muscle 10 are carried out heading, so that described stretch-draw anchor spare 3 can not come off from main muscle;
The 3rd, according to designing requirement establishment reinforcing cage body;
The 4th, use with stretch-draw anchor spare 3 on the bolt 4 that matches of screw 2 end of the main muscle 10 in the reinforcing cage body is linked to each other with anchor plate 5, the other end links to each other with stretch-draw plate 6, is connected with stretch-draw parts 12 on the stretch-draw plate 6;
The 5th, the above-mentioned reinforcing cage body that connects anchor plate 5 and stretch-draw plate 6 is placed a mould, feeding and matched moulds operation by hydraulic tensioner integral tension stretch-draw parts, apply prestressing force to main muscle after finishing;
The 6th, after prestressed concrete pile reaches the demoulding strength requirement, adopt the method for symmetry, staggered loose bolts 4 to put Zhang Gong's skill, take off bolt 4, anchor plate 5 and stretch- draw plate 6,3 of described stretch-draw anchor spares are stayed in the concrete pile.
On described stretch-draw plate 6, be provided with the tongue and groove 7 that prevents termination race slurry.
The cuff that a band impression is arranged in the design of concrete pile termination.
Beneficial effect of the present invention:
The present invention can make stretch-draw anchor technology become and operate easily, goes back economical with materials, has effectively prevented the sloped-end of stake, because nut (being stretch-draw anchor spare 3) is stayed in the concrete behind forming pile, can not contact, reduce the corrosion of steel, improve the quality of pile foundation effectively with underground water.
The present invention is not only applicable to the pretensioning prestressed concrete pipe pile, but also is applicable to the stake of pretensioning pre-stressed concrete hollow square.
All the main muscle of concrete pile that utilize manufacturing of the present invention are when guaranteeing integral tension, also saved material, reduced the phenomenon that the stake termination tilts, prevented the corrosion of steel, improve the quality of stake, reduced labor strength, improved workman's efficiency, also improved workman's labor safety coefficient, the cuff of band impression has also reduced the concrete damaged probability in stake termination.
Description of drawings
Fig. 1 is one of structural representation of stretch-draw anchor spare of the present invention.
Fig. 2 is the vertical view of Fig. 1.
Fig. 3 be stretch-draw anchor spare of the present invention structural representation two.
Fig. 4 be stretch-draw anchor spare of the present invention structural representation three.
Fig. 5 is the structural representation of concrete pile stretch-draw anchor state of the present invention.
Fig. 6 is the structural representation of crashproof impression cuff of the present invention.
The specific embodiment
The present invention is further illustrated below in conjunction with drawings and Examples.
Embodiment one.
As shown in Figure 1, 2.
A kind of pretensioning prestressed concrete pile stretch-draw anchor spare, comprise stainless steel body 8, be provided with the transitional pore 9 in the screw 2 of mutual perforation, heavy muscle hole 1 and connection screw 2 and heavy muscle hole 1 in the described body 8, the aperture in described heavy muscle hole 1 and the diameter of prestressing force master muscle match, the aperture of described screw 2 is greater than the aperture in heavy muscle hole 1, and described heavy muscle hole 1 is cylindrical hole or polygon prism hole.Ineffective during concrete enforcement in order to prevent body 8 stressed rotation in concrete, therefore the end face profile of body 8 can be designed to polygon (as triangle, quadrangle, pentagon, hexagon, heptagon, octagon, nonagon, or the like) the column anti-rotation structure, also can be designed at least the column anti-rotation structure formed by one section circular arc and at least one straight flange, can be designed to single straight flange that a cylinder cuts on one side and add arc structure, also can be designed to the two symmetrical or adjacent straight flanges or the structure of two arc sections or an arc section, also can be designed to the structure that many arc sections add many straight flanges, straight flange can spaced apartly also can be connected distribution with circular arc.In addition, the profile of described body 8 also can be designed to step-like structure, but the end face that has a step body at least is polygon (as triangle, quadrangle, pentagon, hexagon, heptagon, octagon, nonagon ... or the like) column anti-rotation structure or the column anti-rotation structure formed by one section circular arc and at least one straight flange at least.
Embodiment two.
As shown in Figure 3.
Present embodiment and the difference of embodiment one are that screw 2 directly is connected with the heavy muscle hole 1 of the column that installs main reinforcement, thereby the heading of step surface bottom screw and main reinforcement offsets prevent that main reinforcement from coming off from body 8.
Embodiment three.
As shown in Figure 4.
The difference of present embodiment and embodiment one is that screw 2 directly connects with the heavy muscle hole of the taper that installs main reinforcement, the heading of main reinforcement directly offsets with the conical surface of boring the heavy muscle hole of dish, because the heading size of main reinforcement is greater than the small end size in the heavy muscle hole of taper, so it also can play the effect that prevents that body from coming off from main reinforcement.
Embodiment four.
As shown in Figure 5.
A kind of pretensioning prestressed concrete pile, it both can be the circular hollow pile tube, it also can be hollow square pile, it comprises by main muscle 10 and spiral bar 11, main muscle 10 spiral bars 11 are compiled into the reinforcing cage body as the concrete pile stressed member, described reinforcing cage body is positioned in the concrete pile body, the two ends of described main muscle 10 have an end to be connected with to be embedded in the stretch-draw anchor spare 3 in the concrete of the corresponding end of concrete pile at least, stretch-draw anchor spare 3 can adopt Fig. 1,3, in the structure shown in 4 any, any in embodiment one to embodiment three described three kinds of structures just, the difference of concrete pile of the present invention and prior art maximum is to utilize the stretch-draw anchor spare that is similar to nut to replace traditional end plate at the two ends of main reinforcement, to save material, improve the application life of pipe fitting.
Embodiment five.
Shown in Fig. 5,6.
A kind of pretensioning prestressed concrete pile manufacture method, it mainly may further comprise the steps:
At first, need the prestressing force master muscle 10 of stretch-draw all to put on the stretch-draw anchor spare 3 of the present invention all, stretch-draw anchor spare 3 can adopt among the embodiment 1-3 any to be realized, it is similar to existing nut structure, Duoed a heavy muscle hole that installs main reinforcement than nut, increased a face that offsets with the main reinforcement heading and from stretch-draw anchor spare 3, come off to prevent main reinforcement;
Secondly, all main muscle 10 are carried out heading, so that described stretch-draw anchor spare 3 can not come off from main muscle;
The 3rd, according to designing requirement establishment reinforcing cage body, idea will make stretch-draw anchor spare 3 be positioned on the two ends of main steel disk;
The 4th, use with stretch-draw anchor spare 3 on the bolt 4 that matches of screw 2 end of the main muscle 10 in the reinforcing cage body is linked to each other with anchor plate 5, the other end links to each other with stretch-draw plate 6, is connected with stretch-draw parts 12 on the stretch-draw plate 6; Can on stretch-draw plate 6, design high 10 millimeters, dark 5 a millimeters tongue and groove 7 in case of necessity, and in tongue and groove, place retaining slurry straw rope, on an end relative, rotate cuff (structure as shown in Figure 6) with anchor plate 5;
The 5th, the above-mentioned reinforcing cage body (as shown in Figure 5) that connects anchor plate 5 and stretch-draw plate 6 is placed a mould, utilize feeding same as the prior art and mold closing mechanism to carry out feeding and matched moulds carries out concrete pouring, after cast finishes, by stretching-machine (can adopt fluid pressure type or mechanical type stretching-machine) integral tension stretch-draw parts, main muscle is applied prestressing force again; And then technology is carried out centrifugal forming and maintenance routinely
The 6th, after prestressed concrete pile reaches the demoulding strength requirement, adopt the method for symmetry, staggered loose bolts 4 to put Zhang Gong's skill, take off bolt 4, anchor plate 5 and stretch- draw plate 6,3 of described stretch-draw anchor spares are stayed in the concrete pile, finish the demoulding, are up to the standards and can dispatch from the factory.
Concrete pile of the present invention is to have adopted nut type stretch-draw anchor spare with the maximum difference of existing similar stake, and technologies such as remaining cast, maintenance are all same as the prior art, and all kinds of parameters also have mutually with existing end plate type concrete pile, so no longer carefully state.
The part that the present invention does not relate to prior art that maybe can adopt all same as the prior art is realized.

Claims (9)

1, a kind of pretensioning prestressed concrete pile stretch-draw anchor spare, comprise body (8), it is characterized in that being provided with in the described body (8) transitional pore (9) in the screw (2) of mutual perforation, heavy muscle hole (1) and connection screw (2) and heavy muscle hole (1), the diameter of the aperture in described heavy muscle hole (1) and prestressing force master muscle matches, the aperture of described screw (2) is greater than the aperture in heavy muscle hole (1), and described heavy muscle hole (1) is cylindrical hole or polygon prism hole.
2, a kind of pretensioning prestressed concrete pile stretch-draw anchor spare, comprise body (8), it is characterized in that being provided with in the described body (8) screw (2) and the heavy muscle hole (1) of mutual perforation, the aperture of described screw (2) is greater than the aperture in heavy muscle hole (1), the diameter of the aperture in described heavy muscle hole (1) and prestressing force master muscle matches, and described heavy muscle hole (1) is cylindrical hole or polygon prism hole.
3, a kind of pretensioning prestressed concrete pile stretch-draw anchor spare, comprise body (8), it is characterized in that being provided with in the described body (8) screw (2) and the heavy muscle hole (1) of mutual perforation, described heavy muscle hole (1) is a bellmouth, and the big end of bellmouth is towards screw (2), the diameter of the end diameter of described bellmouth and prestressing force master muscle matches, and described heavy muscle hole (1) is conical bore or polygon prism taper hole.
4, according to claim 1,2 or 3 described pretensioning prestressed concrete pile stretch-draw anchor spares, the column anti-rotation structure that the end face profile that it is characterized in that described body (8) is polygon column anti-rotation structure or is made up of one section circular arc and at least one straight flange at least.
5, according to claim 1,2 or 3 described pretensioning prestressed concrete pile stretch-draw anchor spares, the profile that it is characterized in that described body (8) is step-like structure, the column anti-rotation structure that has at least the end of a step body to be polygon column anti-rotation structure or to be made up of one section circular arc and at least one straight flange at least.
6, a kind of pretensioning prestressed concrete pile, comprise by main muscle (10) and spiral bar (11), main muscle (10) spiral bar (11) is compiled into the reinforcing cage body as the concrete pile stressed member, described reinforcing cage body is positioned in the concrete pile body, the two ends that it is characterized in that described main muscle (10) have at least an end to be connected with to be embedded in the concrete of the corresponding end of concrete pile as the described stretch-draw anchor spare of claim 1,2 or 3 (3).
7, a kind of pretensioning prestressed concrete pile manufacture method is characterized in that it mainly may further comprise the steps:
At first, all are needed the prestressing force master muscle (10) of stretch-draw all put as on claim 1, the 2 or 3 described stretch-draw anchor spares (3);
Secondly, all main muscle (10) are carried out heading, so that described stretch-draw anchor spare (3) can not come off from main muscle;
The 3rd, according to designing requirement establishment reinforcing cage body;
The 4th, use with stretch-draw anchor spare (3) on the bolt (4) that matches of screw (2) end of the main muscle (10) in the reinforcing cage body is linked to each other with anchor plate (5), the other end links to each other with stretch-draw plate (6), is connected with stretch-draw parts (12) on the stretch-draw plate (6);
The 5th, the above-mentioned reinforcing cage body that connects anchor plate (5) and stretch-draw plate (6) is placed a mould, feeding and matched moulds operation by stretching-machine integral tension stretch-draw parts, apply prestressing force to main muscle after finishing;
The 6th, after prestressed concrete pile reaches the demoulding strength requirement, adopt the method for symmetry, staggered loose bolts (4) to put Zhang Gong's skill, take off bolt (4), anchor plate (5) and stretch-draw plate (6), described stretch-draw anchor spare (3) is then stayed in the concrete pile.
8, manufacture method according to claim 7 is characterized in that being provided with the tongue and groove (7) that prevents termination race slurry on described stretch-draw plate (6).
9, manufacture method according to claim 7 is characterized in that in the design of concrete pile termination a cuff of being with impression being arranged.
CN2009101814608A 2009-07-16 2009-07-16 Pretensioning prestressed concrete pile, stretch-draw anchoring piece thereof and method for manufacturing stretch-draw anchoring piece Expired - Fee Related CN101614013B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101814608A CN101614013B (en) 2009-07-16 2009-07-16 Pretensioning prestressed concrete pile, stretch-draw anchoring piece thereof and method for manufacturing stretch-draw anchoring piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101814608A CN101614013B (en) 2009-07-16 2009-07-16 Pretensioning prestressed concrete pile, stretch-draw anchoring piece thereof and method for manufacturing stretch-draw anchoring piece

Publications (2)

Publication Number Publication Date
CN101614013A true CN101614013A (en) 2009-12-30
CN101614013B CN101614013B (en) 2011-01-05

Family

ID=41493884

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101814608A Expired - Fee Related CN101614013B (en) 2009-07-16 2009-07-16 Pretensioning prestressed concrete pile, stretch-draw anchoring piece thereof and method for manufacturing stretch-draw anchoring piece

Country Status (1)

Country Link
CN (1) CN101614013B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101886388A (en) * 2010-07-01 2010-11-17 江苏建华管桩有限公司 Pretensioned prestressed concrete polygonal pile and production method thereof
CN102490266A (en) * 2011-12-14 2012-06-13 盐城市同力新型建材有限公司 Method for preparing pre-tensioned prestressing concrete pile connected with basic bearing platform in non-welding mode
CN102689358A (en) * 2012-06-21 2012-09-26 江苏建华管桩有限公司 Tensioning component and tensioning method of prestressed endless sheet pile and pile including component
CN102776880A (en) * 2012-08-24 2012-11-14 占昌成 Prefabricated concrete irregular-shaped pile
CN103758119A (en) * 2014-01-24 2014-04-30 俞向阳 Pre-tensioning-mode centrifugal concrete pile with steel strands and manufacturing method
CN107012956A (en) * 2016-01-27 2017-08-04 李全民 Mechanical connecting device and its application method between a kind of housing industrialization component
CN109322305A (en) * 2018-11-22 2019-02-12 常德定海管桩有限公司 Pretensioned-prestressed tube pile jointing and tubular pole connection method
CN110258548A (en) * 2019-06-12 2019-09-20 宁波中淳高科股份有限公司 A kind of prestressed pile and attaching method thereof
CN111958809A (en) * 2020-08-20 2020-11-20 凡天建筑科技有限公司 Method for manufacturing precast pile rod
CN111975981A (en) * 2020-07-28 2020-11-24 南京钜力智能制造技术研究院有限公司 Prefabricated part, and tensioning device and tensioning method for end part of prefabricated part
CN113927728A (en) * 2021-11-29 2022-01-14 郑州大学综合设计研究院有限公司 Novel prestressed concrete mixed reinforcement pipe pile manufacturing device and method

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101886388A (en) * 2010-07-01 2010-11-17 江苏建华管桩有限公司 Pretensioned prestressed concrete polygonal pile and production method thereof
CN101886388B (en) * 2010-07-01 2012-08-22 江苏建华管桩有限公司 Pretensioned prestressed concrete polygonal pile and production method thereof
CN102490266A (en) * 2011-12-14 2012-06-13 盐城市同力新型建材有限公司 Method for preparing pre-tensioned prestressing concrete pile connected with basic bearing platform in non-welding mode
CN102490266B (en) * 2011-12-14 2013-10-16 盐城市同力新型建材有限公司 Method for preparing pre-tensioned prestressing concrete pile connected with basic bearing platform in non-welding mode
CN102689358A (en) * 2012-06-21 2012-09-26 江苏建华管桩有限公司 Tensioning component and tensioning method of prestressed endless sheet pile and pile including component
CN102689358B (en) * 2012-06-21 2014-07-16 江苏建华管桩有限公司 Tensioning component and tensioning method of prestressed endless sheet pile and pile including component
CN102776880A (en) * 2012-08-24 2012-11-14 占昌成 Prefabricated concrete irregular-shaped pile
CN103758119A (en) * 2014-01-24 2014-04-30 俞向阳 Pre-tensioning-mode centrifugal concrete pile with steel strands and manufacturing method
CN107012956A (en) * 2016-01-27 2017-08-04 李全民 Mechanical connecting device and its application method between a kind of housing industrialization component
CN107012956B (en) * 2016-01-27 2020-04-10 李全民 Mechanical connecting device between housing industrialization components and using method thereof
CN109322305A (en) * 2018-11-22 2019-02-12 常德定海管桩有限公司 Pretensioned-prestressed tube pile jointing and tubular pole connection method
CN110258548A (en) * 2019-06-12 2019-09-20 宁波中淳高科股份有限公司 A kind of prestressed pile and attaching method thereof
CN110258548B (en) * 2019-06-12 2024-03-26 宁波中淳高科股份有限公司 Prestressed pile and connecting method thereof
CN111975981A (en) * 2020-07-28 2020-11-24 南京钜力智能制造技术研究院有限公司 Prefabricated part, and tensioning device and tensioning method for end part of prefabricated part
WO2022021523A1 (en) * 2020-07-28 2022-02-03 南京钜力智能制造技术研究院有限公司 Prefabricated component, end tensioning device of prefabricated component, and tensioning method
CN111958809A (en) * 2020-08-20 2020-11-20 凡天建筑科技有限公司 Method for manufacturing precast pile rod
CN113927728A (en) * 2021-11-29 2022-01-14 郑州大学综合设计研究院有限公司 Novel prestressed concrete mixed reinforcement pipe pile manufacturing device and method
CN113927728B (en) * 2021-11-29 2023-01-24 郑州大学综合设计研究院有限公司 Novel prestressed concrete mixed reinforcement pipe pile manufacturing device and method

Also Published As

Publication number Publication date
CN101614013B (en) 2011-01-05

Similar Documents

Publication Publication Date Title
CN101614013B (en) Pretensioning prestressed concrete pile, stretch-draw anchoring piece thereof and method for manufacturing stretch-draw anchoring piece
CN101063509B (en) Tower adapter, method of producing a tower foundation and tower foundation
CN201502181U (en) Pre-tensioning prestressed concrete pile and tension anchoring part thereof
CN201693669U (en) Pretensioning prestressed concrete polygonal pile
CN101570969B (en) Horizontal force supporting pile and production process thereof
CN103866761A (en) Mechanical connection pile head using repetitively used precast concrete pile as end plate and manufacturing method of mechanical connection pile head
CN101914913A (en) Pretensioned prestressed concrete quadrilateral pile and production method thereof
CN101886388B (en) Pretensioned prestressed concrete polygonal pile and production method thereof
CN101349110B (en) Reducing prestress structure system before prestressed reinforcement withdrawing tension
CN201512788U (en) Horizontal load-bearing enhancement pre-stressed concrete pipe pile
CN101358485B (en) Structural system for reducing pre-stress before prestressed reinforcement tensioning unload by post-tensioning method
CN110953125A (en) Prefabricated polygonal prestressed concrete tower cylinder and manufacturing mold of cylinder sections thereof
CN101654958B (en) Post-tensioning no-cohesive prestressed reinforcement pre-tensioning structure
CN114718059B (en) Tubular pile connecting structure and pile splicing method thereof
CN102490266B (en) Method for preparing pre-tensioned prestressing concrete pile connected with basic bearing platform in non-welding mode
CN201730108U (en) Tensioning and stressing reinforcement stress structure
CN212563536U (en) Wind power tower cylinder transition section shell ring with replaceable prestressed anchor bolt
CN202416306U (en) End plate assembly used for pre-tensioned prestress concrete pile
CN101781933B (en) Structure and method for reducing steel bar stress in advance before tension withdrawal
CN201486153U (en) Pre-annealing and pre-stretching structure for post-tensioned prestressed steel bar
CN102975282A (en) Method for forming unnonuniformly reinforcement-arranged precast pile
KR20130083552A (en) Manufacturing methode for phc pile and manufacturing method thereof phc pile
CN201339324Y (en) Structural system for reducing prestressed force prior to releasing tension of post-tensioning prestressed reinforcement
CN218714382U (en) Novel semi-grouting sleeve for steel bar connection
CN212106548U (en) Prefabricated component resistance to plucking nut

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110105

Termination date: 20180716

CF01 Termination of patent right due to non-payment of annual fee