CN101603624B - Integral installation method of top system of gas tank - Google Patents

Integral installation method of top system of gas tank Download PDF

Info

Publication number
CN101603624B
CN101603624B CN2008100117503A CN200810011750A CN101603624B CN 101603624 B CN101603624 B CN 101603624B CN 2008100117503 A CN2008100117503 A CN 2008100117503A CN 200810011750 A CN200810011750 A CN 200810011750A CN 101603624 B CN101603624 B CN 101603624B
Authority
CN
China
Prior art keywords
cabinet
top system
jack
gas tank
cushion block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2008100117503A
Other languages
Chinese (zh)
Other versions
CN101603624A (en
Inventor
焦洪福
李斌
刘吉民
吴刚
张喜超
史铭杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Third Metallurgical Group Co Ltd
Original Assignee
STRUCTURE MANUFACTURING INSTALLATION ENGINEERING COMPANY MCC NORTHEAST CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by STRUCTURE MANUFACTURING INSTALLATION ENGINEERING COMPANY MCC NORTHEAST CONSTRUCTION Co Ltd filed Critical STRUCTURE MANUFACTURING INSTALLATION ENGINEERING COMPANY MCC NORTHEAST CONSTRUCTION Co Ltd
Priority to CN2008100117503A priority Critical patent/CN101603624B/en
Publication of CN101603624A publication Critical patent/CN101603624A/en
Application granted granted Critical
Publication of CN101603624B publication Critical patent/CN101603624B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention relates to an integral installation method of a top system of a gas tank. A bracket is installed on a ring beam at the top of the gas tank, a jack installed on a transition packing block is utilized for jacking the top system up so that the top system of the gas tank reaches the precalculated position and is installed and fixed, then the jack, the transition packing block and other parts are disassembled, and finally, a piston system is lifted up, a bird-shaped hook is uplifted to be unhooked, the piston system falls back, and the integral installation of the top system is finished. The method has accurate positioning, simple operation, security, reliability and high operating efficiency, and can be widely used for installation operation of the top system of the gas tank.

Description

A kind of integral installation method of top system of gas tank
Technical field
The present invention relates to a kind of integral installation method of top system of gas tank.
Background technique
New shape cylindrical shape thin oil seal gas cabinet is a kind of novel waterless gasholder that last century end begins to build, and has characteristics such as gas storage pressure height, good sealing effect, operation function of use be stable, is fit to be widely used to large scale development.
But this gas holder external form is tall and big, internal structure complexity, quality requirement height.During construction gas holder piston and cabinet top system are adopted the whole buoyance lift of method of gas buoyance lift, utilize the capable gantry crane of cabinet apical ring that structures such as side panel and column are upwards installed piecemeal, after the cabinet body is mounted to design height, cabinet top system is connected with column, fixes, throw off bird shape hook then, piston system is fallen after rise, and the gas holder body structure installs.
Cabinet top system is connected with column, fixedly is last procedure that the cabinet body structure is installed.
Installation method in the past is after cabinet top system and column installation, removes bird shape hook and the cushion block that cabinet apical ring beam is connected with gas cutting, inflates the hoisting piston system then, throws off bird shape hook, and piston system is fallen after rise.Or on the piston operation is walked on stage, with the jack-block that interim column and jack match cabinet top system and column are installed, fix, throw off bird shape hook then, piston system is fallen after rise.These two kinds of method complicated operating process, structure stability are poor, and installation quality is bad after finishing, long, inefficiency of activity duration during construction, and certain danger is arranged.
Summary of the invention
The present invention has overcome deficiency of the prior art, a kind of easy to operate, safety is provided, integral installation method of top system of gas tank accurately is installed.
In order to address the above problem, the present invention realizes by the following technical solutions:
A kind of integral installation method of top system of gas tank, this method comprises the steps:
1) cabinet top system is shifted to predetermined altitude after, the measure bracket is installed on cabinet apical ring beam;
2) jack is installed in measure bracket bottom;
3) unclamp transition cushion block and cabinet roof construction connecting bolt;
4) jack stand, cabinet top system reaches the mounting point;
5) cabinet top system and column are installed, are fixed;
6) jack falls after rise and removes;
7) remove the measure bracket, remove transition cushion block and cabinet apical ring beam connecting bolt, extract the transition cushion block out;
8) piston system and bird shape hook rise, and bird shape hook lifts, breaks off relations.
9) piston system and the uncinate gyrus of bird shape fall, and the cabinet top installs.
Compared with prior art, the invention has the beneficial effects as follows: owing to adopted jack, measure bracket, transition cushion block, in very short stroke, can make accurate, the steadily installation of cabinet top system, only need to extract out the transition cushion block then, bird shape hook and cabinet top system can finish disengaging smoothly, reduce operational danger, simplified installment work, improved working efficiency.
Description of drawings
Fig. 1 is a gas cabinet body structure scheme of installation
Fig. 2 is for install on gas cabinet cabinet top, fixing schematic representation
Fig. 3 is that the C of Fig. 2 is to view
Among the figure: the interim hanger plate 11-of the 1-cabinet top 2-of system bird shape hook 3-piston system 4-cabinet apical ring shape crane 5-jack 6-transition cushion block 7-bolt 8-column 9-locating stud 10-measure bracket 12-cabinet apical ring beam 13-bolt
Embodiment
A kind of integral installation method of top system of gas tank, the concrete steps of this method are as follows:
1) in gas holder, inflates, cabinet top system 1 is shifted to predetermined altitude, bird shape hook 2 is hung on the interim link plate 10 that has installed.Stop in cabinet, to inflate.Measure bracket 11 is installed on cabinet apical ring beam 12, and measure bracket 11 is connected with cabinet apical ring beam 12 by bolt 7.
2) in measure bracket 11 bottoms, jack 5 is installed on the transition cushion block 6, carry out jack 5 pre-jack-up, and whether observation jack 5 strokes satisfy usage requirement.
3) unclamp the connecting bolt 13 of transition cushion block 6 and cabinet apical ring beam 12; The transition cushion block adopts bolt to be connected with cabinet apical ring beam, just finishes when the cabinet roof construction is installed in the bottom in this process.
4) take to divide three times synchronously, make cabinet top system 1 reach the mounting point jack 5 jack-up.
5) cabinet top system 1 installs, fixes with column 8, and concrete way is: with locating stud 9 location, change locating stud 9 with bolt one by one then earlier, cabinet top system 1 is connected with column 8, fixes.
6) check, check and accept cabinet item system 1 and column 8 installation qualities, can carry out next procedure after the acceptance(check).
7) take to divide synchronously three times with jack 5 fallings, after breaking away from fully, jack 5 is removed.
8) remove measure bracket 11, remove the connecting bolt 7 of transition cushion block 6 and cabinet apical ring beam 12, extract transition cushion block 6 out.
9) in gas holder, inflate, and monitor, adjust the piston levelness, strengthen the inside and outside liaison of cabinet, adjust the gas holder air output, piston system 3 is slowly risen, unify password by the commanding after reaching predetermined altitude, lift bird shape hook 2 simultaneously, make bird shape hook 2 and interim hanger plate 10 safe escapes.
10) piston system 3 and bird shape hook 2 fall after rise, and cabinet top system 1 installs.

Claims (1)

1. integral installation method of top system of gas tank, this method comprises the steps:
1) cabinet top system is shifted to predetermined altitude after, the measure bracket is installed on cabinet apical ring beam;
2) on measure bracket bottom, transition cushion block, jack is installed;
3) unclamp the connecting bolt of transition cushion block and cabinet apical ring beam;
4) jack stand, cabinet top system reaches the mounting point;
5) cabinet top system and column are installed, are fixed;
6) jack falls after rise and removes;
7) remove the measure bracket, remove the connecting bolt of transition cushion block and cabinet apical ring beam, extract the transition cushion block out;
8) piston system and bird shape hook rise, and bird shape hook lifts, breaks off relations;
9) piston system and the uncinate gyrus of bird shape fall, and cabinet top system installs.
CN2008100117503A 2008-06-12 2008-06-12 Integral installation method of top system of gas tank Active CN101603624B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100117503A CN101603624B (en) 2008-06-12 2008-06-12 Integral installation method of top system of gas tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100117503A CN101603624B (en) 2008-06-12 2008-06-12 Integral installation method of top system of gas tank

Publications (2)

Publication Number Publication Date
CN101603624A CN101603624A (en) 2009-12-16
CN101603624B true CN101603624B (en) 2010-09-08

Family

ID=41469469

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100117503A Active CN101603624B (en) 2008-06-12 2008-06-12 Integral installation method of top system of gas tank

Country Status (1)

Country Link
CN (1) CN101603624B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101832465B (en) * 2010-06-18 2012-08-29 江苏环能工程有限公司 Synchronously jacking construction method for side plate and top cover of rubber film sealed gas holder
CN101893162B (en) * 2010-07-23 2013-06-19 武汉一冶钢结构有限责任公司 Construction method for gas holder and connection hooking apparatus for same
CN102226497B (en) * 2011-03-23 2013-02-13 中化二建集团有限公司 Manufacturing method of large rubber rolling curtain sealed dry-type gas holder
CN104325266B (en) * 2014-10-23 2016-06-01 中国三冶集团有限公司 A kind of suspension system for the floating liter of top of gas cabinet entirety and hanging method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4132532A (en) * 1977-09-19 1979-01-02 Gatx Tank Erection Corporation Multi-lift dry seal gasholder
CN1966388A (en) * 2006-09-15 2007-05-23 中国第三冶金建设公司结构制造安装工程公司 Rubber membrane sealed type air storage cabinet thin shell top multiple-point digital control integrated raising method
CN201057354Y (en) * 2007-07-03 2008-05-07 中冶南方工程技术有限公司 Cabinet top structure of revolving furnace gas chamber

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4132532A (en) * 1977-09-19 1979-01-02 Gatx Tank Erection Corporation Multi-lift dry seal gasholder
CN1966388A (en) * 2006-09-15 2007-05-23 中国第三冶金建设公司结构制造安装工程公司 Rubber membrane sealed type air storage cabinet thin shell top multiple-point digital control integrated raising method
CN201057354Y (en) * 2007-07-03 2008-05-07 中冶南方工程技术有限公司 Cabinet top structure of revolving furnace gas chamber

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘亚玲.煤气储气柜顶升方案的有限元分析.山西建筑.2007,33(6),149-150. *
库少英.16.5万m3稀油密封型干式气柜施工方法.石油工程建设.1998,(3),14-18. *
焦洪福等.稀油密封型煤气柜柜体结构安装施工工法(YJGF45-96).施工技术.1997,(11),41-42. *

Also Published As

Publication number Publication date
CN101603624A (en) 2009-12-16

Similar Documents

Publication Publication Date Title
CN101603624B (en) Integral installation method of top system of gas tank
CN202924677U (en) Scissor fork type hydraulic elevator
CN102080356A (en) Box girder positioning temporary supporting seat and positioning construction method of box girder
CN201301200Y (en) Inflatable jack
CN101832465B (en) Synchronously jacking construction method for side plate and top cover of rubber film sealed gas holder
CN205112085U (en) Hydraulic pressure centre form construction system
CN201538944U (en) Bridge maintaining device
CN106481967B (en) A kind of installation method of rubber diaphragm gas chamber
CN202467254U (en) Auxiliary device for water lifting stage
CN213738414U (en) Multi-upright-column synchronous jacking joint adding system
CN201334318Y (en) Hoisting gear for tower crane
CN209411682U (en) A kind of movable hydraulic hoist component and movable hydraulic hoist
CN113820136A (en) Pressure balance test device and method for gas injection type accumulator
CN101774516A (en) Lifting device and construction method for replacing rake crane bridge
CN205537633U (en) Automatic change hydrology cruiser
CN201339309Y (en) Attached self-lifting scaffold
CN109972542A (en) Precast block assembled box culvert side wall mounting and positioning device and method
CN101463728A (en) Hoisting stand for mining
CN2474512Y (en) Horizontal hydraulic jack of vertical lift
CN206328098U (en) A kind of steel tower hydraulic lifting apparatus
CN114458937A (en) Single-stage Wiggins gas chamber hydraulic integral lifting cabinet top mounting method
CN201287475Y (en) Auxiliary lifting mechanism for double-oil cylinder and upper cover
CN201495070U (en) Lifting jack for weighing large structure
CN219685380U (en) Auxiliary installation device of water pump unit
CN201855906U (en) Electric hydraulic driver for large-tonnage air hammer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA THIRD METALLURGICAL GROUP CO., LTD.

Free format text: FORMER OWNER: STRUCTURE MANUFACTURING INSTALLATION ENGINEERING COMPANY, MCC NORTHEAST CONSTRUCTION CO., LTD.

Effective date: 20140710

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 114001 ANSHAN, LIAONING PROVINCE TO: 114039 ANSHAN, LIAONING PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20140710

Address after: 114039 Anshan province Liaoning City Mountain Road No. 105 building materials

Patentee after: CHINA THREE METALLURGICAL GROUP CO., LTD.

Address before: 114001 Anshan province Liaoning City Tiedong Oi Kwan Street No. 1

Patentee before: Structure Manufacturing Installation Engineering Company, MCC Northeast Construction Co., Ltd.