A kind of integral installation method of top system of gas tank
Technical field
The present invention relates to a kind of integral installation method of top system of gas tank.
Background technique
New shape cylindrical shape thin oil seal gas cabinet is a kind of novel waterless gasholder that last century end begins to build, and has characteristics such as gas storage pressure height, good sealing effect, operation function of use be stable, is fit to be widely used to large scale development.
But this gas holder external form is tall and big, internal structure complexity, quality requirement height.During construction gas holder piston and cabinet top system are adopted the whole buoyance lift of method of gas buoyance lift, utilize the capable gantry crane of cabinet apical ring that structures such as side panel and column are upwards installed piecemeal, after the cabinet body is mounted to design height, cabinet top system is connected with column, fixes, throw off bird shape hook then, piston system is fallen after rise, and the gas holder body structure installs.
Cabinet top system is connected with column, fixedly is last procedure that the cabinet body structure is installed.
Installation method in the past is after cabinet top system and column installation, removes bird shape hook and the cushion block that cabinet apical ring beam is connected with gas cutting, inflates the hoisting piston system then, throws off bird shape hook, and piston system is fallen after rise.Or on the piston operation is walked on stage, with the jack-block that interim column and jack match cabinet top system and column are installed, fix, throw off bird shape hook then, piston system is fallen after rise.These two kinds of method complicated operating process, structure stability are poor, and installation quality is bad after finishing, long, inefficiency of activity duration during construction, and certain danger is arranged.
Summary of the invention
The present invention has overcome deficiency of the prior art, a kind of easy to operate, safety is provided, integral installation method of top system of gas tank accurately is installed.
In order to address the above problem, the present invention realizes by the following technical solutions:
A kind of integral installation method of top system of gas tank, this method comprises the steps:
1) cabinet top system is shifted to predetermined altitude after, the measure bracket is installed on cabinet apical ring beam;
2) jack is installed in measure bracket bottom;
3) unclamp transition cushion block and cabinet roof construction connecting bolt;
4) jack stand, cabinet top system reaches the mounting point;
5) cabinet top system and column are installed, are fixed;
6) jack falls after rise and removes;
7) remove the measure bracket, remove transition cushion block and cabinet apical ring beam connecting bolt, extract the transition cushion block out;
8) piston system and bird shape hook rise, and bird shape hook lifts, breaks off relations.
9) piston system and the uncinate gyrus of bird shape fall, and the cabinet top installs.
Compared with prior art, the invention has the beneficial effects as follows: owing to adopted jack, measure bracket, transition cushion block, in very short stroke, can make accurate, the steadily installation of cabinet top system, only need to extract out the transition cushion block then, bird shape hook and cabinet top system can finish disengaging smoothly, reduce operational danger, simplified installment work, improved working efficiency.
Description of drawings
Fig. 1 is a gas cabinet body structure scheme of installation
Fig. 2 is for install on gas cabinet cabinet top, fixing schematic representation
Fig. 3 is that the C of Fig. 2 is to view
Among the figure: the interim hanger plate 11-of the 1-cabinet top 2-of system bird shape hook 3-piston system 4-cabinet apical ring shape crane 5-jack 6-transition cushion block 7-bolt 8-column 9-locating stud 10-measure bracket 12-cabinet apical ring beam 13-bolt
Embodiment
A kind of integral installation method of top system of gas tank, the concrete steps of this method are as follows:
1) in gas holder, inflates, cabinet top system 1 is shifted to predetermined altitude, bird shape hook 2 is hung on the interim link plate 10 that has installed.Stop in cabinet, to inflate.Measure bracket 11 is installed on cabinet apical ring beam 12, and measure bracket 11 is connected with cabinet apical ring beam 12 by bolt 7.
2) in measure bracket 11 bottoms, jack 5 is installed on the transition cushion block 6, carry out jack 5 pre-jack-up, and whether observation jack 5 strokes satisfy usage requirement.
3) unclamp the connecting bolt 13 of transition cushion block 6 and cabinet apical ring beam 12; The transition cushion block adopts bolt to be connected with cabinet apical ring beam, just finishes when the cabinet roof construction is installed in the bottom in this process.
4) take to divide three times synchronously, make cabinet top system 1 reach the mounting point jack 5 jack-up.
5) cabinet top system 1 installs, fixes with column 8, and concrete way is: with locating stud 9 location, change locating stud 9 with bolt one by one then earlier, cabinet top system 1 is connected with column 8, fixes.
6) check, check and accept cabinet item system 1 and column 8 installation qualities, can carry out next procedure after the acceptance(check).
7) take to divide synchronously three times with jack 5 fallings, after breaking away from fully, jack 5 is removed.
8) remove measure bracket 11, remove the connecting bolt 7 of transition cushion block 6 and cabinet apical ring beam 12, extract transition cushion block 6 out.
9) in gas holder, inflate, and monitor, adjust the piston levelness, strengthen the inside and outside liaison of cabinet, adjust the gas holder air output, piston system 3 is slowly risen, unify password by the commanding after reaching predetermined altitude, lift bird shape hook 2 simultaneously, make bird shape hook 2 and interim hanger plate 10 safe escapes.
10) piston system 3 and bird shape hook 2 fall after rise, and cabinet top system 1 installs.