CN101602526B - Equipment and method for processing red mud in alumina factory - Google Patents

Equipment and method for processing red mud in alumina factory Download PDF

Info

Publication number
CN101602526B
CN101602526B CN2008103020938A CN200810302093A CN101602526B CN 101602526 B CN101602526 B CN 101602526B CN 2008103020938 A CN2008103020938 A CN 2008103020938A CN 200810302093 A CN200810302093 A CN 200810302093A CN 101602526 B CN101602526 B CN 101602526B
Authority
CN
China
Prior art keywords
red mud
press
plate
trough
frame type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2008103020938A
Other languages
Chinese (zh)
Other versions
CN101602526A (en
Inventor
白英伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN2008103020938A priority Critical patent/CN101602526B/en
Publication of CN101602526A publication Critical patent/CN101602526A/en
Application granted granted Critical
Publication of CN101602526B publication Critical patent/CN101602526B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses equipment and a method for processing the red mud in an alumina factory. The method for processing the red mud in the alumina factory comprises the following steps: the red mud precipitated in a red mud precipitating tank is mixed with hot water in a mixing tank; the mixture is pumped to a feeding tank of a plate-frame filter press which is arranged in a red mud stack field by a centrifugal pump; the mixture is fed to the plate-frame filter press so as to be filtered and dehydrated by a feeding pump until the content of water in the mixture is reduced below 30%; obtained filtrate is returned to the red mud precipitating tank to wash the red mud; the obtained red mud is delivered to the red mud stack field by an automobile or a belt; and the red mud is turned over by a bulldozer to be dried and stacked. The invention solves the problems that the red mud in the prior art is turned over to be dried in a large drying area by taking a long time and high land expenses because the red mud contains more water and can not be directly turned over by the bulldozer to be dried, and the invention saves more time and expenses.

Description

The method and apparatus that red mud for alumina plant is handled
Technical field
The present invention relates to the method that red mud is handled in a kind of alumina producing, also relate to the used equipment of red mud processing in a kind of alumina producing simultaneously.
Background technology
In the production engineering of aluminium oxide, the slip after the stripping will be clarified through red mud setting tank after dilution, and red mud and sodium aluminate solution are separated.The sodium aluminate solution that overflows obtains alumina product through follow-up workshop section, and the red mud that underflow comes out then has two kinds of processing methods: a kind of is to adopt red mud setting tank to carry out back flush with hot water; Another kind is to adopt subsider to add the red mud vacuum-type drum filter to carry out back flush with hot water, reduces alkali content wherein, reaches directly to be discharged into the red mud dam behind the environmental protection standard and to store up.
But no matter adopt any in above two kinds of methods; All have same problem: the moisture content that promptly is sent to the red mud that red mud dump stores up is all higher, in general adopts red mud moisture content >=48% of bulk deposition trough washery, adopts subsider to add red mud moisture content >=37% of filter mode; And under moisture content >=30% situation of red mud; Can not directly adopt bull-dozer to ted, can only rely on the natural evaporation of moisture content in the red mud to carry out drying, not only needed to store up the area that teds bigger; Cost of land is high, and drying time is longer.
Summary of the invention
Technical problem to be solved by this invention is, the method and apparatus that provides a kind of red mud for alumina plant to handle.Through this method and apparatus, can the moisture content of red mud be reduced to below 30%, store up thereby can directly adopt bull-dozer to ted, reduce the time of red mud drying, and practice thrift the area of red mud dump, the expense of practicing thrift the soil.
For solving the problems of the technologies described above, the technical scheme that the present invention adopts is following: the method that red mud for alumina plant is handled.The underflow that it comes out red mud setting tank is sent to earlier in the plate and frame type filter-press, behind the further filter-press dehydration of plate and frame type filter-press, the moisture content of red mud is reduced to moisture content≤30%; The filtrating that obtains after the press filtration is sent red mud setting tank back to as slurry through circulating pump, and the filter cake that obtains is transported to red mud dump with automobile or belt, teds with bull-dozer and stores up.
In the method that above-mentioned red mud for alumina plant is handled, be that the underflow that is come out by red mud setting tank is mixed in mixing channel with the hot water of washing usefulness is first, then with centrifugal pumping to trough, be sent to feeding pump again and carry out press filtration in the plate and frame type filter-press.
In the method that aforesaid red mud for alumina plant is handled, be convenient transportation, the present invention is set directly at plate and frame type filter-press and trough in the red mud dump, can adopt the belt transportation like this, saves cost of transportation.
The equipment that red mud for alumina plant is handled.Comprise red mud setting tank, after red mud setting tank, be provided with mixing channel, trough and plate and frame type filter-press, between mixing channel and trough, centrifugal pump is housed, between trough and plate and frame type filter-press, feeding pump is housed; Red mud setting tank, mixing channel, centrifugal pump, trough, feeding pump, plate and frame type filter-press connect through pipeline each other.
Compared with prior art, the present invention utilize plate and frame type filter-press can the moisture content of filter material be fallen very low characteristics, mix in mixing channel through underflow that red mud setting tank is come out hot water with washing usefulness; Use the trough of centrifugal pumping toward the plate and frame type filter-press of red mud dump then, send into plate and frame type filter-press through feeding pump and carry out filter press, the filtrating that obtains after the press filtration is sent red mud setting tank back to as slurry through circulating pump; The filter cake that obtains is that moisture content has dropped to the red mud below 30%; Transport to the stockyard with automobile or belt, since lower through the moisture content of the red mud after this method processing, can directly adopt bull-dozer to ted and store up; It is needed that to ted area less; Significantly reduce the time of red mud drying, practiced thrift the area of a large amount of red mud dumps, thereby practiced thrift the expense in soil greatly; Effectively solved in the prior art higher because of the red mud moisture content; Can not directly adopt bull-dozer to ted, cause tedding time length, need ted problems such as area is big, cost of land height, obtain saving greatly aspect time and the expense.
Description of drawings
Fig. 1 is a schematic flow sheet of the present invention.
The specific embodiment
Embodiments of the invention: shown in accompanying drawing 1, mixing channel 2, trough 3 and plate and frame type filter-press 4 are set after red mud setting tank 1.For convenient transportation, practice thrift cost of transportation, plate and frame type filter-press 4 and trough 3 all are arranged in the red mud dump 7.And centrifugal pump 5 is installed between mixing channel 2 and trough 3; Feeding pump 6 is installed between trough 3 and plate and frame type filter-press 4, red mud setting tank 1, mixing channel 2, centrifugal pump 5, trough 3, feeding pump 6, plate and frame type filter-press 4 are connected with pipeline each other.During processing; Red mud setting tank 1 underflow that comes out and the hot water that washs usefulness are mixed in mixing channel 2 earlier; Deliver to trough 3 with centrifugal pump 5 then; Be sent to feeding pump 6 again and carry out press filtration in the plate and frame type filter-press 4, behind plate and frame type filter-press 4 further filter-press dehydrations, the moisture content of red mud is reduced to moisture content≤30%; The filtrating that obtains after the press filtration is sent red mud setting tank 1 back to as slurry through circulating pump, and the filter cake that obtains is transported to red mud dump 7 with belt 8, teds with bull-dozer and stores up.

Claims (2)

1. the method handled of a red mud for alumina plant; It is characterized in that: the underflow that red mud setting tank (1) is come out mixes in mixing channel (2) with the hot water of washing usefulness; Use centrifugal pump (5) to deliver to trough (3) then; Use feeding pump (6) to be sent in the plate and frame type filter-press (4) again and carry out press filtration, plate and frame type filter-press (4) and trough (3) are arranged in the red mud dump (7); Through plate and frame type filter-press (4) further behind the filter-press dehydration, the moisture content of red mud is reduced to moisture content≤30%; The filtrating that obtains after the press filtration is sent red mud setting tank (1) back to as slurry through circulating pump, and the filter cake that obtains is transported to red mud dump (7) with automobile or belt, teds with bull-dozer and stores up.
2. the equipment handled of a red mud for alumina plant; Comprise red mud setting tank (1); It is characterized in that: be provided with mixing channel (2), trough (3) and plate and frame type filter-press (4) afterwards at red mud setting tank (1); Between mixing channel (2) and trough (3), centrifugal pump (5) is housed, between trough (3) and plate and frame type filter-press (4), feeding pump (6) is housed; Red mud setting tank (1), mixing channel (2), centrifugal pump (5), trough (3), feeding pump (6), plate and frame type filter-press (4) connect through pipeline each other; Plate and frame type filter-press (4) and trough (3) are arranged in the red mud dump (7).
CN2008103020938A 2008-06-11 2008-06-11 Equipment and method for processing red mud in alumina factory Active CN101602526B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008103020938A CN101602526B (en) 2008-06-11 2008-06-11 Equipment and method for processing red mud in alumina factory

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008103020938A CN101602526B (en) 2008-06-11 2008-06-11 Equipment and method for processing red mud in alumina factory

Publications (2)

Publication Number Publication Date
CN101602526A CN101602526A (en) 2009-12-16
CN101602526B true CN101602526B (en) 2012-08-08

Family

ID=41468444

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008103020938A Active CN101602526B (en) 2008-06-11 2008-06-11 Equipment and method for processing red mud in alumina factory

Country Status (1)

Country Link
CN (1) CN101602526B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102372408A (en) * 2010-08-26 2012-03-14 沈阳铝镁设计研究院有限公司 Method for dehydrating Bayer-process red mud generated during dry-method feeding and sintering of aluminum oxides produced by using series process
CN102556682A (en) * 2010-12-07 2012-07-11 中铝国际技术发展有限公司 Allocation method for bauxite homogenizing stock dump
CN103483880B (en) * 2013-10-09 2015-04-01 山东星之光环保科技工程有限公司 Production method of red mud filler
CN105417189A (en) * 2015-12-21 2016-03-23 东北大学设计研究院(有限公司) Fixed belt conveying and transporting system and method for filter pressing of red mud

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1150578A (en) * 1995-11-23 1997-05-28 山东铝业公司 Process for recovering alkali by red mud waste liquid film method
CN1724377A (en) * 2005-07-07 2006-01-25 贵阳铝镁设计研究院 Tech. for filtering and transporting of red mud
CN1730416A (en) * 2005-07-18 2006-02-08 贵阳铝镁设计研究院 Technique for conveying and filtering red mud

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1150578A (en) * 1995-11-23 1997-05-28 山东铝业公司 Process for recovering alkali by red mud waste liquid film method
CN1724377A (en) * 2005-07-07 2006-01-25 贵阳铝镁设计研究院 Tech. for filtering and transporting of red mud
CN1730416A (en) * 2005-07-18 2006-02-08 贵阳铝镁设计研究院 Technique for conveying and filtering red mud

Also Published As

Publication number Publication date
CN101602526A (en) 2009-12-16

Similar Documents

Publication Publication Date Title
US3578586A (en) Treatiment of slurries
CN101602526B (en) Equipment and method for processing red mud in alumina factory
CN104477956A (en) Technique for rapid separation and red-mud washing of sodium aluminate solution
CN103357212A (en) Equipment and method for tailing solid-liquid separation
CN105858964A (en) Tailing mud water treatment method for wet coal preparation plant
CN109867386A (en) A kind of waterborne moveable mud conditioning device and treatment process
CN110981296A (en) Pressing method brick making process for building waste mud
CN106186748B (en) A kind of recycling system and recoverying and utilizing method of industrial waste carbide slag
CN102127568A (en) Method for removing impurities from cassava raw material
CN111410337A (en) One-stop treatment system and method for foundation pit soil
CN101423203A (en) Water-saving and emission-reducing wet method phosphoric acid manufacture process
CN104069936A (en) Coal slime water treatment process of mine water coal
CN103899353A (en) Device and method for filling gobs with mine washing tailings
CN106480311A (en) A kind of Uranium extraction solid-liquid separation on ore pulp method
CN213077612U (en) Plate-and-frame filter press for producing titanium dioxide
CN210764904U (en) Novel silt separation device
CN102872645A (en) Long-distance pipeline coal conveying terminal dehydration system device and dehydration method
CN110404665A (en) A kind of processing method of ultra-fine coal slurry dehydration
CN111035991A (en) Dry-discharging and dewatering system and process for iron tailings
CN102489073A (en) Construction method for rapidly dehydrating dredging mud by centrifugation and plate frame
CN102643710A (en) Silicon wafer-cutting waste slurry recovery method
CN106335902B (en) A kind of recovery method of silicon carbide micro-powder
CN201730100U (en) Damming device for mixing red mud with slag
CN210885675U (en) Concrete mixing plant sewage waste residue recovery unit
CN211799351U (en) Dry-discharging and dewatering system for iron tailings

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: GUIYANG ALUMINUM AND MAGNESIUM DESIGN INSTITUTE CO

Free format text: FORMER OWNER: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

Effective date: 20110722

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 550004 NO. 208, BEIJING ROAD, GUIYANG CITY, GUIZHOU PROVINCE TO: 550081 NO.2, JINZHU ROAD, JINYANG NEW DISTRICT, GUIYANG CITY, GUIZHOU PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20110722

Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Applicant after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou

Applicant before: Guiyang Aluminium and Magnesium Design Inst.

C14 Grant of patent or utility model
GR01 Patent grant