CN101600226B - Self-adaptation adjustment method of load balancing information interaction periodicity - Google Patents

Self-adaptation adjustment method of load balancing information interaction periodicity Download PDF

Info

Publication number
CN101600226B
CN101600226B CN2009100232440A CN200910023244A CN101600226B CN 101600226 B CN101600226 B CN 101600226B CN 2009100232440 A CN2009100232440 A CN 2009100232440A CN 200910023244 A CN200910023244 A CN 200910023244A CN 101600226 B CN101600226 B CN 101600226B
Authority
CN
China
Prior art keywords
base station
resource status
periodicity
information
adjacent base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009100232440A
Other languages
Chinese (zh)
Other versions
CN101600226A (en
Inventor
李红艳
王成
盛敏
李建东
赵林靖
周伟
李昌席
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xidian University
Original Assignee
Xidian University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xidian University filed Critical Xidian University
Priority to CN2009100232440A priority Critical patent/CN101600226B/en
Publication of CN101600226A publication Critical patent/CN101600226A/en
Application granted granted Critical
Publication of CN101600226B publication Critical patent/CN101600226B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses a self-adaptation adjustment method of load information sending periodicity, mainly solving the problems of load information delay caused by adopting a fixed periodicity for load information interaction and unnecessary overhead of signalling in an LTE-Advanced system. The invention proposes that an adjacent base station and a source base station negotiate to self-adaptively adjust resource status update sending periodicity, including the following specific steps: 1, the source base station sends a resource status request to the adjacent base station, and the adjacent base station returns a respond according to self capacity and returns load information in a fixed periodicity; 2, the adjacent base station proposes a periodicity reconfiguration request of resource status update return periodicity according to self load variation rate; 3, the source base station returns a respond according to self condition; 4, the adjacent base station returns resource status update in a new periodicity; 5, the source base station sends a resource status report stop message, and the adjacent base station returns a respond and finishes resource status report. The invention has the advantages of high load balancing successful rate and saved radio resource and is used for load information interaction in load balancing.

Description

The self-adapting regulation method of load balancing information interaction periodicity
Technical field
The present invention relates to the mobile communication technology field, relate to the global continent Radio Access Network after the evolution, particularly a kind of load information sends the self adaptation adjustment mechanism in cycle, is used for the mutual of mobility load balancing process load information.
Background technology
In the modern cell mobile communication systems,,, will produce Hot Spot in some public places because the number of mobile users purpose sharply increases.Big, new blocking rate and the switch call drop rate of calling out of these Hot Spot service traffics is very high, and less at the flow of non-Hot Spot, can cause the load distribution of whole system unbalanced like this, and wireless resource utility efficiency is very low.At this moment can a part of flow of Hot Spot be transferred in the lighter sub-district of load, realize the load balancing of system, improve the wireless resource utility efficiency of whole system.
In the prior LTE system technical scheme, with reference to Fig. 1, the flow process that load balancing realizes is following:
1. source base station sends resource status request message RESOURCE STATUSREQUEAST to adjacent base station.
2. after adjacent base station receives resource status request message RESOURCE STATUS REQUEAST; If can provide source base station required load information; Then return resource status request-reply information RESOURCE STATUS RESPONSE to source base station; Otherwise, return resource status request failure information RESOURCE STATUS FAILURE; After source base station is received RESOURCE STATUS RESPONSE information; Resource status report initialization is accomplished; Adjacent base station is according to the Reporting Periodicity information unit numerical value among the resource status request message RESOURCESTATUS REQUEAST; Cycle with fixing is returned resource status lastest imformation RESOURCE STATUS UPDATE, and the load condition of self is informed source base station
3. source base station carries out load balancing according to this Information Selection Target cell.
Through said process, can see that load information directly influences the selection of source base station to the load balancing Target cell.If load information is incorrect, source base station has been selected inappropriate Target cell, will influence load-balancing efficiency, will cause call drop when serious, reduces the service quality of system greatly.
In existing technical scheme; The cycle of resource status lastest imformation RESOURCE STATUSUPDATE is returned in adjacent base station; Stipulate in the Reporting Periodicity information unit in resource status request RESOURCE STATUS REQUEAST message, adjacent base station with this cycle fixing return load information.
If it is excessive that the cycle of load information is returned in adjacent base station, when adjacent base station load variations speed is big, will cause the hysteresis of load information, source base station utilizes out-of-date load information select target sub-district, causes the decline of load-balancing efficiency;
If it is too small that the cycle of load information is returned in adjacent base station, when adjacent base station load variations speed hour, will increase the expense of Signalling exchange, the waste Radio Resource causes the decline of wireless resource utility efficiency.
In sum; If adjacent base station adopts fixing resource status lastest imformation RESOURCE STATUSUPDATE to send the cycle; Will cause the hysteresis of load information, reduce the efficient of load balancing or Radio Resource is caused waste, produce unnecessary signaling consumption.
Summary of the invention
Target of the present invention is the problem that exists when overcoming the above-mentioned employing fixed cycle returns resource status lastest imformation RESOURCE STATUS UPDATE; A kind of self-adapting regulation method of load balancing information interaction periodicity has been proposed; Make adjacent base station according to self load variations situation; Consult with source base station, adaptive adjustment RESOURCE STATUS UPDATE information return period is with the hysteresis that reduces load information or unnecessary signaling consumption.
Main thought of the present invention is: resource status lastest imformation RESOURCE STATUS UPDATE return period not only is provided with when source base station sends resource status solicited message RESOURCE STATUS REQUEAST, and adjacent base station also consults to adjust with source base station simultaneously.Its implementation comprises:
(1) source base station sends resource status solicited message RESOURCE STATUSREQUEAST to adjacent base station; Adjacent base station is after the request of receiving source base station; If can provide source base station required resource state information; Then return resource status request-reply information RESOURCE STATUS RESPONSE to source base station, otherwise, resource status request failure information RESOURCE STATUS FAILURE returned; After source base station is received resource status request-reply information RESOURCE STATUS RESPONSE; Resource status report initialization is accomplished; Resource status lastest imformation RESOURCE STATUS UPDATE is periodically returned according to the Reporting Periodicity information unit numerical value among the resource status solicited message RESOURCE STATUS REQUEAST in adjacent base station;
(2) adjacent base station is periodically being returned in the resource status lastest imformation process; According to self load variations speed; Whether decision need change resource status lastest imformation RESOURCE STATUS UPDATE is sent the cycle; When if the load variations rate variation surpasses the threshold value that sets; Adjustment resource status lastest imformation RESOURCE STATUS UPDATE sends the cycle, and comprises the adjustment back cycle reconfiguration request information PERIODICITY RECONFIGURATION REQUEST in new transmission cycle to the source base station transmission;
(3) source base station is according to its hardware handles ability and these s own situation of interface transmittability; Accept or refuse the request of adjacent base station; Reshuffle response message PERIODICITYRECONFIGURATION RESPOND if accept then return period, otherwise return period reconfiguration failure information PERIODICITYRECONFIGURATION FAILURE;
(4) after the adjacent base station cycle of receiving is reshuffled response message PERIODICITY RECONFIGURATIONRESPOND, utilize the new cycle to return resource status lastest imformation RESOURCE STATUSUPDATE; If cycle reconfiguration failure information PERIODICITYRECONFIGURATION FAILURE is received in adjacent base station, then keep the former transmission cycle;
(5) when source base station need stop adjacent base station report resource status; Send resource status solicited message RESOURCE STATUS REQUEAST to adjacent base station; And the registration information unit is set to " stopping "; After this information is received in adjacent base station, return resource status request-reply information RESOURCESTATUS RESPONSE, stop the resource status reporting process to source base station.
The present invention proposes adaptive adjustment resource status lastest imformation RESOURCE STATUSUPDATE and send the cycle; This cycle not only is provided with in the Reporting Periodicity information unit when source base station sends resource status solicited message RESOURCESTATUS REQUEAST; And adjacent base station can also be according to self load variations situation; Consult with source base station, adaptive adjustment load information sends the cycle, has improved the load balancing success rate; Reduced signaling consumption, greatly save radio resources.
Figure of description
Fig. 1 is the flow chart of load balancing in the existing LTE system;
Fig. 2 is the flow chart of resource status reporting process Signalling exchange of the present invention..
Embodiment
With reference to Fig. 2, mainly based on resource status report initialize process in the existing LTE-Advanced system X2 interface application layer protocol and resource status report process, its practical implementation step is following in the present invention:
(1) resource status report initialization
Step 1; Source base station sends a resource status request message RESOURCE STATUSREQUEAST to adjacent base station; In this information,, then be used for the initialization of resource status reporting process if the value of registration information unit R egistration Request is made as " beginning "; If the value of registration information unit R egistrationRequest is made as " stopping ", then is used for source base station and stops adjacent base station report resource status.
Step 2; Adjacent base station is after receiving resource status solicited message RESOURCE STATUS REQUEAST, and inspection registration information unit is if its value is " beginning "; Judge whether to provide desired information in the resource status request message; If can, then feedback resources status response message RESOURCE STATUSRESPONSE accomplishes the initialization of resource status report; Adjacent base station is according to the requirement in the resource status request message simultaneously; Resource status is measured; And, periodically return resource status lastest imformation RESOURCE STATUS UPDATE according to Reporting Periodicity information unit numerical value in the RESOURCE STATUS REQUEAST message; Otherwise a resource status request failure message of adjacent base station feedback RESOURCE STATUS FAILURE gets back to step 1.
(2) resource status update cycle self adaptation adjustment
Step 3; Adjacent base station is periodically being returned in the resource status lastest imformation process; According to self load variations speed, judge whether need to change load information and send the cycle, if when load variations speed surpasses the threshold value that sets; Then resource status lastest imformation RESOURCE STATUS UPDATE return period is adjusted: when self load variations speed becomes big, adjacent base station reduces the transmission cycle of resource status lastest imformation RESOURCESTATUS UPDATE; When self load variations speed diminishes, the transmission cycle of resource status lastest imformation RESOURCE STATUS UPDATE is strengthened in adjacent base station; Simultaneously, adjacent base station is sent to source base station and is comprised the adjustment back reconfiguration request information PERIODICITY RECONFIGURATIONREQUEST in new cycle; If when load variations speed did not surpass the threshold value that sets, the cycle when then keeping initialization was returned resource status lastest imformation RESOURCE STATUS UPDATE.
Step 4; The request of adjacent base station is accepted or refused to source base station according to hardware handles ability and these s own situation of interface transmittability, after receiving the cycle reconfiguration request; If accept, reshuffle response message PERIODICITY RECONFIGURATION RESPOND to the source base station feedback cycle; Otherwise, feedback cycle reconfiguration request failure information PERIODICITY RECONFIGURATION FAILURE, and turn back to step 3.
Step 5; Reshuffle response message PERIODICITYRECONFIGURATION RESPOND information when the adjacent base station cycle of receiving; Adjustment RESOURCE STATUS UPDATE information is sent the cycle, and returns resource status lastest imformation RESOURCE STATUS UPDATE with the new cycle.
(3) the resource status report stops
Step 6 when source base station need stop the resource status report, is sent the resource status solicited message RESOURCE STATUS REQUEAST of registration information unit for " stopping " to adjacent base station; After the resource status solicited message is received in adjacent base station, return resource status request-reply information RESOURCE STATUSRESPONSE, stop the resource status reporting process.
The term explanation:
LTE, Long Term Evolution, Long Term Evolution
Reporting Periodicity comes from 3GPP TS 36.423v8.5.0 technical documentation, can be translated into " reporting period ";
RESOURCE STATUS REQUEAST comes from 3GPP TS 36.423v8.5.0 technical documentation, can be translated into " resource status request ";
RESOURCE STATUS RESPONSE comes from 3GPP TS 36.423v8.5.0 technical documentation, can be translated into " resource status request-reply ";
RESOURCE STATUS FAILURE comes from 3GPP TS 36.423v8.5.0 technical documentation, can be translated into " resource status request failure ";
RESOURCE STATUS UPDATE comes from 3GPP TS 36.423v8.5.0 technical documentation, can be translated into " resource status renewal ";
PERIODICITY RECONFIGURATION REQUEST, the cycle reconfiguration request is used for adjacent base station and adjusts request to the source base station proposition resource status lastest imformation RESOURCE STATUS UPDATE transmission cycle, and the new transmission cycle of notification source base station;
PERIODICITY RECONFIGURATION RESPOND, the cycle reconfiguration request is replied, and after being used for source base station and receiving the resource reconfiguration request of adjacent base station according to s own situation decision, receives request-reply to adjacent base station feedback;
PERIODICITY RECONFIGURATION FAILURE, cycle reconfiguration request failure, be used for the resource reconfiguration request of source base station according to the adjacent base station of s own situation decision refusal after, reject response to adjacent base station feedback.

Claims (6)

1. the self-adapting regulation method of a load balancing information interaction periodicity comprises the steps:
(1) source base station sends resource status solicited message RESOURCE STATUS REQUEAST to adjacent base station; Registration information unit wherein is set to " beginning "; Resource status request-reply information RESOURCE STATUS RESPONSE if can provide source base station required resource state information, is then returned to source base station in adjacent base station after the request of receiving source base station; Otherwise, return resource status request failure information RESOURCE STATUS FAILURE; After source base station is received resource status request-reply information RESOURCE STATUS RESPONSE; Resource status report initialization is accomplished; Resource status lastest imformation RESOURCE STATUS UPDATE is periodically returned according to the Reporting Periodicity information unit numerical value among the resource status solicited message RESOURCE STATUS REQUEAST in adjacent base station;
(2) adjacent base station is periodically being returned in the resource status lastest imformation process; According to self load variations speed; Whether decision need change resource status lastest imformation RESOURCE STATUS UPDATE is sent the cycle; When if the load variations rate variation surpasses the threshold value that sets; Adjustment resource status lastest imformation RESOURCE STATUS UPDATE sends the cycle, and comprises the adjustment back cycle reconfiguration request information PERIODICITY RECONFIGURATION REQUEST in new transmission cycle to the source base station transmission;
(3) source base station is according to its hardware handles ability and these s own situation of interface transmittability; Accept or refuse the request of adjacent base station; Reshuffle response message PERIODICITY RECONFIGURATION RESPOND if accept then return period, otherwise return period reconfiguration failure information PERIODICITY RECONFIGURATION FAILURE;
(4) after the adjacent base station cycle of receiving is reshuffled response message PERIODICITY RECONFIGURATION RESPOND, utilize the new cycle to return resource status lastest imformation RESOURCE STATUS UPDATE; If cycle reconfiguration failure information PERIODICITY RECONFIGURATION FAILURE is received in adjacent base station, then keep the former transmission cycle;
(5) when source base station need stop adjacent base station report resource status; Send resource status solicited message RESOURCE STATUS REQUEAST to adjacent base station; And the registration information unit is set to " stopping "; After this information is received in adjacent base station, return resource status request-reply information RESOURCE STATUS RESPONSE, stop the resource status reporting process to source base station.
2. the self-adapting regulation method of load balancing information interaction periodicity according to claim 1, wherein the described resource state information of step (1) comprises hardware load indication information, S1 interface transport layer load indication information, Radio Resource state information and available physical resources block state information.
3. the self-adapting regulation method of load balancing information interaction periodicity according to claim 1; Wherein the described adjustment of step (2) RESOURCE STATUS UPDATE information is sent the cycle; Be when self load variations speed becomes big, reduce the transmission cycle of RESOURCE STATUS UPDATE information; When self load variations speed diminishes, strengthen the transmission cycle of RESOURCE STATUS UPDATE information.
4. the self-adapting regulation method of load balancing information interaction periodicity according to claim 1; Step (2) reconfiguration request information of described cycle PERIODICITY RECONFIGURATION REQUEST wherein; Be used for adjacent base station and adjust request to the source base station proposition resource status lastest imformation RESOURCE STATUS UPDATE transmission cycle, and the new transmission cycle of notification source base station.
5. the self-adapting regulation method of load balancing information interaction periodicity according to claim 1; Wherein the described cycle of step (3) is reshuffled response message PERIODICITY RECONFIGURATION RESPOND; After being used for the resource reconfiguration request of source base station, receive request-reply to adjacent base station feedback according to the adjacent base station of s own situation decision reception.
6. the self-adapting regulation method of load balancing information interaction periodicity according to claim 1; Step (3) reconfiguration failure information of described cycle PERIODICITY RECONFIGURATION FAILURE wherein; After being used for the resource reconfiguration request of source base station, reject response to adjacent base station feedback according to the adjacent base station of s own situation decision refusal.
CN2009100232440A 2009-07-08 2009-07-08 Self-adaptation adjustment method of load balancing information interaction periodicity Expired - Fee Related CN101600226B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100232440A CN101600226B (en) 2009-07-08 2009-07-08 Self-adaptation adjustment method of load balancing information interaction periodicity

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100232440A CN101600226B (en) 2009-07-08 2009-07-08 Self-adaptation adjustment method of load balancing information interaction periodicity

Publications (2)

Publication Number Publication Date
CN101600226A CN101600226A (en) 2009-12-09
CN101600226B true CN101600226B (en) 2012-05-09

Family

ID=41421412

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100232440A Expired - Fee Related CN101600226B (en) 2009-07-08 2009-07-08 Self-adaptation adjustment method of load balancing information interaction periodicity

Country Status (1)

Country Link
CN (1) CN101600226B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102104930A (en) 2010-06-12 2011-06-22 电信科学技术研究院 Mapping method and apparatus in resource status process
CN102056240B (en) * 2010-12-15 2013-02-27 新邮通信设备有限公司 Load balancing method between cells and base station
CN102143587A (en) * 2010-12-31 2011-08-03 华为技术有限公司 Resource-allocating method and equipment
CN102625389B (en) 2011-01-31 2015-09-30 华为技术有限公司 A kind of cut-in method of mobile communications network, device and system
CN102833787B (en) * 2011-06-16 2018-01-23 盐城报业科技发展有限公司 A kind of method and system of Inter-Cell Interference Coordination
WO2014107872A1 (en) * 2013-01-10 2014-07-17 富士通株式会社 Method, device and system for reporting resource state
CN104427554A (en) * 2013-08-29 2015-03-18 中兴通讯股份有限公司 Method for cooperative multi-flow data transmission and base station
CN103581875B (en) * 2013-10-31 2016-12-07 大唐移动通信设备有限公司 Load of base station information interacting method and base station
CN105636117A (en) * 2014-11-04 2016-06-01 中兴通讯股份有限公司 Radio resource allocation method and communication node
CN111192443B (en) * 2020-01-20 2020-10-20 深圳市觅拓物联信息技术有限公司 Energy-saving warning method and warning system based on Bluetooth beacon
CN111897816B (en) * 2020-07-16 2024-04-02 中国科学院上海微系统与信息技术研究所 Interaction method of calculation information between satellites and generation method of information table applied by same

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101047933A (en) * 2006-03-30 2007-10-03 华为技术有限公司 Transmitting method of ICR information measuring report and ICR information collection method
CN101072391A (en) * 2006-05-08 2007-11-14 华为技术有限公司 Wireless evolution network base station and method for interacting load information between base stations
CN101267640A (en) * 2007-03-12 2008-09-17 大唐移动通信设备有限公司 A method, system and device for sending measurement report

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101047933A (en) * 2006-03-30 2007-10-03 华为技术有限公司 Transmitting method of ICR information measuring report and ICR information collection method
CN101072391A (en) * 2006-05-08 2007-11-14 华为技术有限公司 Wireless evolution network base station and method for interacting load information between base stations
CN101267640A (en) * 2007-03-12 2008-09-17 大唐移动通信设备有限公司 A method, system and device for sending measurement report

Also Published As

Publication number Publication date
CN101600226A (en) 2009-12-09

Similar Documents

Publication Publication Date Title
CN101600226B (en) Self-adaptation adjustment method of load balancing information interaction periodicity
US20240064779A1 (en) Communication system
CN104782175B (en) The pressure DRX during automatic neighbouring relations (ANR) in LTE
CN105745945B (en) Control the data transmission of the machine type communication in mobile communication system
CN105340355A (en) Traffic shaping mechanism for UE power saving in idle mode
US8977325B2 (en) Method and system for processing cell sleeping
CN103037512B (en) A kind of method that message based on pattern is transmitted
CN105684533B (en) Paging request is responded while waiting request and the connection of wireless network
CN101473676A (en) Method and device for switching in wireless access network
CN101938820B (en) Method for strengthening base station energy conservation
CN102695251A (en) Energy-saving method in mobile communication system
JP2014506758A (en) Method for short message transmission with reduced overhead
CN101772078A (en) Load control method and device
CN101267628A (en) Mobile radio station
US20150327170A1 (en) Method and device for power saving mode control in mobile communication system
CN104221430A (en) Apparatus and method for improving device handover during a call
CN102438277A (en) Terminal access method and system
WO2008080283A1 (en) The system, device and method for realizing wireless resource management in multi-mode communication network
US9144021B2 (en) Mobile communication system, controller and method
KR20140108320A (en) Techniques for improved energy-savings management
WO2014013810A1 (en) Base station in mobile communication system, and control method
EP2704504A1 (en) Base station and method for controlling same
GB2452691A (en) Signaling management in cellular mobile radio communications network
US20210029581A1 (en) Device and method for controlling network congestion with rrc inactive
CN102843741A (en) Source side switching communication device, objective side switching communication device, communication system and calling switching method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120509

Termination date: 20180708

CF01 Termination of patent right due to non-payment of annual fee