CN101598582A - 阵性泥石流平均峰值流量与泥石流一次总量计算方法及应用 - Google Patents
阵性泥石流平均峰值流量与泥石流一次总量计算方法及应用 Download PDFInfo
- Publication number
- CN101598582A CN101598582A CNA2009100599159A CN200910059915A CN101598582A CN 101598582 A CN101598582 A CN 101598582A CN A2009100599159 A CNA2009100599159 A CN A2009100599159A CN 200910059915 A CN200910059915 A CN 200910059915A CN 101598582 A CN101598582 A CN 101598582A
- Authority
- CN
- China
- Prior art keywords
- flow
- battle array
- rubble flow
- rubble
- property
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100599159A CN101598582B (zh) | 2009-07-06 | 2009-07-06 | 阵性泥石流平均峰值流量与泥石流一次总量计算方法及应用 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100599159A CN101598582B (zh) | 2009-07-06 | 2009-07-06 | 阵性泥石流平均峰值流量与泥石流一次总量计算方法及应用 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101598582A true CN101598582A (zh) | 2009-12-09 |
CN101598582B CN101598582B (zh) | 2011-06-29 |
Family
ID=41420101
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009100599159A Expired - Fee Related CN101598582B (zh) | 2009-07-06 | 2009-07-06 | 阵性泥石流平均峰值流量与泥石流一次总量计算方法及应用 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101598582B (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012088775A1 (zh) * | 2010-12-31 | 2012-07-05 | 中国科学院水利部成都山地灾害与环境研究所 | 一种主河输移控制型泥石流防治方法 |
CN104631378A (zh) * | 2014-12-31 | 2015-05-20 | 中国科学院、水利部成都山地灾害与环境研究所 | 一种粘性泥石流矩形排导槽深度测算方法及应用 |
CN106340159A (zh) * | 2016-09-23 | 2017-01-18 | 中国科学院、水利部成都山地灾害与环境研究所 | 泥石流与高含沙水流判别方法、山区灾害流体监测方法 |
CN106968217A (zh) * | 2017-04-14 | 2017-07-21 | 中国地质科学院探矿工艺研究所 | 基于降雨频率的泥石流淤积危险范围划分方法 |
CN106969756A (zh) * | 2017-04-27 | 2017-07-21 | 长江水利委员会水文局 | 河流悬移质泥沙输沙量改正计算方法 |
CN107832580A (zh) * | 2017-11-13 | 2018-03-23 | 中国科学院、水利部成都山地灾害与环境研究所 | 基于度日模型的冰水泥石流清水流量计算方法 |
CN116642662A (zh) * | 2023-07-20 | 2023-08-25 | 中国科学院、水利部成都山地灾害与环境研究所 | 一种泥石流流速测量系统及其方法 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006207174A (ja) * | 2005-01-26 | 2006-08-10 | Daiho Constr Co Ltd | 鉄筋コンクリート擁壁 |
CN101363730A (zh) * | 2008-08-07 | 2009-02-11 | 北京林业大学 | 山地灾害危险区调查与分类方法 |
CN101398968B (zh) * | 2008-10-31 | 2010-12-29 | 重庆交通大学 | 公路泥石流灾害预警方法 |
-
2009
- 2009-07-06 CN CN2009100599159A patent/CN101598582B/zh not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012088775A1 (zh) * | 2010-12-31 | 2012-07-05 | 中国科学院水利部成都山地灾害与环境研究所 | 一种主河输移控制型泥石流防治方法 |
CN104631378A (zh) * | 2014-12-31 | 2015-05-20 | 中国科学院、水利部成都山地灾害与环境研究所 | 一种粘性泥石流矩形排导槽深度测算方法及应用 |
CN106340159A (zh) * | 2016-09-23 | 2017-01-18 | 中国科学院、水利部成都山地灾害与环境研究所 | 泥石流与高含沙水流判别方法、山区灾害流体监测方法 |
CN106968217A (zh) * | 2017-04-14 | 2017-07-21 | 中国地质科学院探矿工艺研究所 | 基于降雨频率的泥石流淤积危险范围划分方法 |
CN106969756A (zh) * | 2017-04-27 | 2017-07-21 | 长江水利委员会水文局 | 河流悬移质泥沙输沙量改正计算方法 |
CN106969756B (zh) * | 2017-04-27 | 2019-01-29 | 长江水利委员会水文局 | 河流悬移质泥沙输沙量改正计算方法 |
CN107832580A (zh) * | 2017-11-13 | 2018-03-23 | 中国科学院、水利部成都山地灾害与环境研究所 | 基于度日模型的冰水泥石流清水流量计算方法 |
CN116642662A (zh) * | 2023-07-20 | 2023-08-25 | 中国科学院、水利部成都山地灾害与环境研究所 | 一种泥石流流速测量系统及其方法 |
CN116642662B (zh) * | 2023-07-20 | 2023-09-22 | 中国科学院、水利部成都山地灾害与环境研究所 | 一种泥石流流速测量系统及其方法 |
Also Published As
Publication number | Publication date |
---|---|
CN101598582B (zh) | 2011-06-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101598582B (zh) | 阵性泥石流平均峰值流量与泥石流一次总量计算方法及应用 | |
Martin et al. | Uncertainty of canal seepage losses estimated using flowing water balance with acoustic Doppler devices | |
CN109754025B (zh) | 结合水文模拟和连续遥感影像无资料小水库参数识别方法 | |
Tyagi et al. | SCS-CN based time-distributed sediment yield model | |
CN106529176B (zh) | 一种双核双驱洪水预报方法 | |
Kisi et al. | River suspended sediment modelling using a fuzzy logic approach | |
CN105160193B (zh) | 一种基于动力过程的泥石流动态风险分析系统及方法 | |
Greenhill et al. | Development of a simple method to predict discharges in compound meandering channels. | |
Sun et al. | Estimating daily time series of streamflow using hydrological model calibrated based on satellite observations of river water surface width: Toward real world applications | |
Wu et al. | Effects of alfalfa coverage on runoff, erosion and hydraulic characteristics of overland flow on loess slope plots | |
CN103940974A (zh) | 基于gis的中尺度流域土壤侵蚀时空动态分析方法 | |
CN106779296A (zh) | 一种基于多传感器的隧道施工周围建筑物安全预警方法 | |
CN101944161B (zh) | 一种基于对生态系统扰动程度评价的湿地生态需水量计算方法 | |
Li et al. | Analysis of the relationship between soil erosion risk and surplus floodwater during flood season | |
Xiao et al. | New flood early warning and forecasting method based on similarity theory | |
CN111310976B (zh) | 一种基于分布式计算的快速水质预报预警方法及系统 | |
CN102628856A (zh) | 一种湖泊营养物基准参照状态确定的组合方法 | |
Liu et al. | Flow velocity on cultivated soil slope with wheat straw incorporation | |
CN106709181A (zh) | 一种基于并行编程和模块法的分布式水文模型率定方法 | |
Karimov et al. | Effects of intra-storm soil moisture and runoff characteristics on ephemeral gully development: Evidence from a no-till field study | |
Kamel | Application of a hydrodynamic MIKE 11 model for the Euphrates River in Iraq | |
Nicosia et al. | Flow resistance due to shrubs and woody vegetation | |
Yao et al. | A categorical quantification of the effects of vegetation restorations on streamflow variations in the Loess Plateau, China | |
CN108038574A (zh) | 冲积河道深弘摆动预测及崩岸预警的方法 | |
CN103995976B (zh) | 一种基于渗透系数模型的回灌井堵塞预测诊断方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Chen Ningsheng Inventor after: Hu Guisheng Inventor after: Yang Chenglin Inventor after: Li Zhanlu Inventor after: Zhou Wei Inventor after: Liu Li Inventor before: Chen Ningsheng Inventor before: Yang Chenglin Inventor before: Hu Guisheng Inventor before: Li Zhanlu Inventor before: Zhou Wei Inventor before: Liu Li |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: CHEN NINGSHENG YANG CHENGLIN HU GUISHENG LI ZHANLU ZHOU WEI LIU LI TO: CHEN NINGSHENG HU GUISHENG YANG CHENGLIN LI ZHANLU ZHOU WEI LIU LI |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110629 Termination date: 20130706 |