CN101597900A CNA200810123756XA CN200810123756A CN101597900A CN 101597900 A CN101597900 A CN 101597900A CN A200810123756X A CNA200810123756X A CN A200810123756XA CN 200810123756 A CN200810123756 A CN 200810123756A CN 101597900 A CN101597900 A CN 101597900A
Authority
CN
China
Prior art keywords
metal tube
production technology
heated
iron
tube pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA200810123756XA
Other languages
Chinese (zh)
Inventor
端礼仁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNA200810123756XA priority Critical patent/CN101597900A/en
Publication of CN101597900A publication Critical patent/CN101597900A/en
Pending legal-status Critical Current

Links

Landscapes

  • Forging (AREA)

Abstract

The present invention relates to a kind of metal tube pile butt plate and production technology thereof, it is made by following weight ratio by following component: iron: 97.99-98.13%, manganese: 1.06-1.09%, silicon: 0.58-0.66%, aluminium: 0.23-0.26%, its production technology comprises the steps: that (1) is heated to 1500-1600 ℃ with iron, and be 1 hour 40 minutes heat time heating time; (2) continue to be heated under 1600-1700 ℃, after adding manganese, strontium, aluminium then in proportion and being incubated 5-10 minute molten iron poured into and carry out pouring in the shaping mould, take out cold i.e. back; (3) cool off after forging into blank part after aforementioned pouring part is heated to 800 ℃, and then trimming, deburring, semiproduct obtained; (4) by actual needs above-mentioned blank is carried out promptly making finished product after the conventional metalworking.The present invention is durable, imbeds the rarest 30 years maintenance phase of underground time, is difficult for the pile tube fracture, and easy for installation, protective nature is strong, and shock resistance is strong.

Description

Metal tube pile butt plate and production technology thereof
Technical field
The present invention relates to a kind of metal tube pile butt plate and production technology thereof.
Background technology
Present pile tube end bracket all adopts cement to make, and there is the problem of easy fracture, not corrosion-resistant, stretching resistance poor performance in this pile tube end bracket, generally will be wrenched with manual wrench during installation.
Summary of the invention
The present invention will solve is exactly problems such as the easy fracture that exists of existing cement pipe pile end bracket, not corrosion-resistant, stretching resistance poor performance.
Metal tube pile butt plate of the present invention is made in following ratio by following component:
Iron: 98-99%, manganese: 1.06-1.09%, silicon: 0.58-0.66%, aluminium: 0.23-0.26%
The production technology of metal tube pile butt plate of the present invention is as follows:
1, iron is heated to 1500-1600 ℃, for the hot time is 1 hour 40 minutes;
2, continue to be heated under 1600-1700 ℃, after adding manganese, silicon, aluminium then in proportion and being incubated 5-10 minute molten iron poured into and carry out pouring in the shaping mould, take out cold i.e. back;
3, cool off after forging into blank part after being heated to aforementioned pouring part about 800 ℃, and then trimming, deburring, semiproduct obtained;
4, by actual needs above-mentioned blank is carried out promptly making finished product after the conventional metalworking.
The present invention is durable, imbeds the rarest 30 years maintenance phase of underground time, is difficult for the pile tube fracture, and convenient by dress, protective nature is strong, and shock resistance is strong.
The specific embodiment
Embodiment 1:
At first, 500 kilograms of iron are dropped in the controllable silicon formula intermediate frequency furnace, be heated to 1500 ℃ and make its fusing, be 1 hour 40 minutes heat time heating time, continue to be heated to 1600 ℃ then, add 5.56 kilograms in manganese, 3.37 kilograms of silicon, 1.33 kilograms in aluminium again, it is fully melted and be incubated 5-10 minute.Then molten iron is poured in the shaping mould, cool off after 2 minutes and take out, stacking place of putting into appointment continues cooling.Utilize forging equipment will forge into the blank part of required size after being heated to cooled aforementioned pouring part about 800 ℃, utilize forging equipment trimming, deburring after cooling again, promptly obtain semiproduct of the present invention; At last, above-mentioned semiproduct are carried out promptly making finished product after the conventional metalworkings such as car complement, boring, tapping, reaming, groove milling again.
Embodiment 2:
At first, 600 kilograms of iron are dropped in the controllable silicon formula intermediate frequency furnace, be heated to 1500 ℃ and make its fusing, be 1 hour 40 minutes heat time heating time, continue to be heated to 1600 ℃ then, add 6.48 kilograms in manganese, 3.55 kilograms of silicon, 1.41 kilograms in aluminium again, it is fully melted and be incubated 5-10 minute.Then molten iron is poured in the shaping mould, cool off after 2 minutes and take out, stacking place of putting into appointment continues cooling. and utilize forging equipment will forge into the blank part of required size after being heated to cooled aforementioned pouring part about 800 ℃, utilize forging equipment trimming, deburring after cooling again, promptly obtain semiproduct of the present invention; At last, above-mentioned semiproduct are carried out promptly making finished product after the conventional metalworkings such as car complement, boring, tapping, reaming, groove milling again.

Claims (3)

1, a kind of metal tube pile butt plate is characterized in that it is made by following weight ratio by following component:
Iron: 97.99-98.13%, manganese: 1.06-1.09%, silicon: 0.58-0.66%, aluminium: 0.23-0.26%
2, plant the production technology that is used for the described metal tube pile butt plate of production claim 1, it is characterized in that comprising the steps:
(1) iron is heated to 1500-1600 ℃, for the hot time is 1 hour 40 minutes;
(2) continue to be heated under 1600-1700 ℃, after adding manganese, strontium, aluminium then in proportion and being incubated 5-10 minute molten iron poured into and carry out pouring in the shaping mould, take out cold i.e. back;
(3) cool off after forging into blank part after aforementioned pouring part is heated to 800 ℃, and then trimming, deburring, semiproduct obtained;
(4) by actual needs above-mentioned blank is carried out promptly making finished product after the conventional metalworking.
The production technology of 3 metal tube pile butt plates as claimed in claim 2 is characterized in that be at least 2 minutes the cool time in the step (2).
4, the production technology of metal tube pile butt plate as claimed in claim 2 is characterized in that comprising in the step (4) car complement, boring, tapping, reaming, five metalworking processing steps of groove milling.
CNA200810123756XA 2008-06-04 2008-06-04 Metal tube pile butt plate and production technology thereof Pending CN101597900A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA200810123756XA CN101597900A (en) 2008-06-04 2008-06-04 Metal tube pile butt plate and production technology thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA200810123756XA CN101597900A (en) 2008-06-04 2008-06-04 Metal tube pile butt plate and production technology thereof

Publications (1)

Publication Number Publication Date
CN101597900A true CN101597900A (en) 2009-12-09

Family

ID=41419487

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA200810123756XA Pending CN101597900A (en) 2008-06-04 2008-06-04 Metal tube pile butt plate and production technology thereof

Country Status (1)

Country Link
CN (1) CN101597900A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103212946A (en) * 2013-04-13 2013-07-24 江苏华冶科技有限公司 Machining method of gas radiation pipe
CN103753225A (en) * 2014-01-16 2014-04-30 安徽星亚冶金科技有限公司 Metal tubular pile end plate production process

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103212946A (en) * 2013-04-13 2013-07-24 江苏华冶科技有限公司 Machining method of gas radiation pipe
CN103212946B (en) * 2013-04-13 2015-05-13 江苏华冶科技有限公司 Machining method of gas radiation pipe
CN103753225A (en) * 2014-01-16 2014-04-30 安徽星亚冶金科技有限公司 Metal tubular pile end plate production process

Similar Documents

Publication Publication Date Title
CN102764838A (en) Gear thermal precision forging machining process adopting carburizing steel 20CrMnTi as material
CN106244959B (en) A kind of forging of 7085 aluminium alloy and Technology for Heating Processing
CN103966478A (en) Production technology for aluminium alloy casting rod special for automobile Peugeot hubs
CN102463272A (en) Short-flow preparation method of minor-caliber nickel-based alloy thin-wall tubes
CN109022686A (en) The manufacturing method of the high cartridge type ring forging of super-tonnage
CN101712116A (en) Process for manufacturing high-strength large-scale aluminum alloy plate
CN102676855A (en) Method for preparing high magnesium aluminium alloy ingot used for forging hubs
CN103350203A (en) Compound centrifugal casting method for large-scale ring piece
CN101712117B (en) Process for manufacturing light and thin aluminium alloy sheet materials
CN104550306A (en) Method for producing strips for aluminum flat tubes for automobile radiator made of 3003 alloy by casting and rolling method
CN104178667B (en) Radiator compound foil material and its manufacture method
CN103350331A (en) Manufacturing method of high-strength automobile brake hub
CN101597900A (en) Metal tube pile butt plate and production technology thereof
CN103695737A (en) Production process of aluminium alloy casting rod specially used for Ford automobile rotary-swaged hub decorative rings
CN104400324A (en) Production method of high-strength vehicle brake wheel hub
CN102373704A (en) Metallic tubular pile end connecting plate and production process thereof
CN102465527A (en) Metal pipe pile butt plate and production process thereof
CN1260434C (en) Metal tubular pile butt plate and producing process thereof
CN102691298A (en) Metal tubular pile butt plate and production technology thereof
CN101864767A (en) Metal tube pile butt plate and production process thereof
CN101864766A (en) Metal tube pile butt plate and production process thereof
CN103361548A (en) Metal tubular pile terminating plate and production process thereof
CN105155514B (en) Anti-corrosion concrete-filled round tubular pile for road bridge construction
CN104152809A (en) Alloy mandrel and preparation method thereof
CN1752353A (en) Metal tubular pile end jointing plate and producing technique thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20091209