CN101596767A - The moulding process of roller bearing retainer of railway carriage - Google Patents

The moulding process of roller bearing retainer of railway carriage Download PDF

Info

Publication number
CN101596767A
CN101596767A CN 200910148796 CN200910148796A CN101596767A CN 101596767 A CN101596767 A CN 101596767A CN 200910148796 CN200910148796 CN 200910148796 CN 200910148796 A CN200910148796 A CN 200910148796A CN 101596767 A CN101596767 A CN 101596767A
Authority
CN
China
Prior art keywords
moulding process
roller bearing
railway carriage
plastic
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200910148796
Other languages
Chinese (zh)
Inventor
刁克军
杨南翔
陈雷
刘凤山
潘安徽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Qingdao Sifang Rolling Stock Research Institute Co Ltd
Original Assignee
Qingdao Sifang Rolling Stock Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Sifang Rolling Stock Research Institute filed Critical Qingdao Sifang Rolling Stock Research Institute
Priority to CN 200910148796 priority Critical patent/CN101596767A/en
Publication of CN101596767A publication Critical patent/CN101596767A/en
Pending legal-status Critical Current

Links

Landscapes

  • Rolling Contact Bearings (AREA)

Abstract

The present invention relates to a kind of moulding process of roller bearing retainer of railway carriage, its moulding process step is: with glass-fiber-reinforced polyamide class plastics is raw material, adopt dehumidifying heat pump to carry out drying material, particle plastic conveying and plastic with oven dry arrives in the hopper of screw plastic-injection moulding machine then, deliver in the barrel of heating through screw rod, make its melted by heating to flow regime, under high-pressure injection, molten plastic is compressed and moves forward fast, penetrate by nozzle, inject the engineering plastics cage mould, behind cooling and shaping, open mould and take out product.Technical scheme advantages of simple of the present invention, cycle of its moulding process is short and can one-shot forming, and the production process clean and safe had not only saved time but also environmental protection.

Description

The moulding process of roller bearing retainer of railway carriage
Technical field
The present invention relates to be used for the retainer of passenger train roller bearing, be specifically related to a kind of moulding process of roller bearing retainer of railway carriage.
Background technology
Retainer in the rolling bearing plays multiple effect, fixing rolling element and keep suitable to each other distance to make rotation, the guiding rolling element that it can be correct enter non-load zones and damped vibration etc. from load zones, this just requires retainer to have enough intensity, toughness, wear-resistant, decay resistance and application reliability.
Railway truck bearing adopted the steel retainer originally, this retainer mainly is processed into retainer to low carbon steel plate by equipment such as punch press and lathes, and its production process has: shear, blanking, first shape, shaping, towards fabrication hole, towards fenestra, wipe away vibrations or heat treatment destressing, phosphatization etc. towards bottom outlet, pressure slope, expansion, car limit, light.Because there are problems such as running one-way, micro-crack, machining stress and quality fluctuation are big in the influence of factors such as structure, material, Sheet Metal Forming Technology, steel retainer.Adopt plate shearing machine, punch press, lathe, destressing equipment, phosphatization equipment etc. in the production, noise is big in shear and the punching production, manually-operated is dangerous big, produces industrial wastewater and the waste gas that pollution is arranged in the parkerizing process, has constituted the harm to employee and environment.Therefore, at present, engineering plastics cage has appearred on the market, this retainer has self lubricity, abrasion performance, corrosion resistance, resistance to impact, processability and reaches light-weighted characteristic well, compare with the steel retainer, this retainer exists but that mechanical strength is low, poor heat resistance, thermal coefficient of expansion is big, thermal conductivity factor low and defective such as heat ageing.And in the production forming process, there is the big problem of water imbibition height, poor stability and molding shrinkage.
Summary of the invention
The objective of the invention is at existing roller bearing retainer above shortcomings in process of production, the moulding process of the high roller bearing retainer of railway carriage of stability, the pliability of a kind of clean and safe, with short production cycle, one-shot forming and retainer is provided.
Technical scheme of the present invention is: a kind of moulding process of roller bearing retainer of railway carriage, its moulding process step is: with glass-fiber-reinforced polyamide class plastics is raw material, adopt dehumidifying heat pump to carry out drying material, particle plastic conveying and plastic with oven dry arrives in the hopper of screw plastic-injection moulding machine then, deliver in the barrel of heating through screw rod, make its melted by heating to flow regime, under high-pressure injection, molten plastic is compressed and moves forward fast, penetrate by nozzle, inject the engineering plastics cage mould, behind cooling and shaping, open mould and take out product;
Preferably, described raw material at the drying condition of dehumidifying heat pump are: 80 ℃ of temperature, and be 1-4 hour drying time;
Preferably, described barrel is heated to than the high 10-30 of plastics melting temperature ℃;
Preferably, the pressure of described high-pressure injection comprises plasticizing pressure and injection pressure, and wherein, plasticizing pressure is less than 10MPa, and injection pressure is got 80-120Mpa;
Preferably, the molding cycle of described plastics injection retainer mold cools down moulding is 40-80s;
Preferably, the product after the described injection moulding also will carry out post processing, and this post processing comprises stable the processing and the damping processing.
Beneficial effect of the present invention is: technical scheme advantages of simple of the present invention, and cycle of its moulding process is short and can one-shot forming, and the production process clean and safe had not only saved time but also environmental protection.It is raw material that moulding process of the present invention adopts glass-fiber-reinforced polyamide class plastics, is easy to moulding; Adopt the retainer of this moulding process manufacturing not only to have self lubricity, abrasion performance, corrosion resistance, resistance to impact, processability and reach light-weighted characteristic well, because raw-material mechanical property makes retainer also have higher stability, mechanical strength, pliability, simultaneously, because of raw material belongs to thermoplastic, the hear resistance of retainer improves, increase service life, and the recyclable other products that is used in again of waste material.
The specific embodiment
Specific embodiments of the invention: a kind of moulding process of roller bearing retainer of railway carriage, its moulding process step is: with glass-fiber-reinforced polyamide class plastics is raw material, adopt dehumidifying heat pump to carry out drying material, particle plastic conveying and plastic with oven dry arrives in the hopper of screw plastic-injection moulding machine then, deliver in the barrel of heating through screw rod, make its melted by heating to flow regime, under high-pressure injection, molten plastic is compressed and moves forward fast, penetrate by nozzle, inject the engineering plastics cage mould, behind cooling and shaping, open mould and take out product.
Its concrete moulding process step is as follows:
(1) raw material drying
Because of containing hydrophilic amide groups, moisture absorption easily is a kind of hygroscopicity plastics to glass-fiber-reinforced polyamide class plastics (nylon) in molecular structure.When moisture is high, can causes in the moulding that melt viscosity descends, thereby make product surface defectives such as bubble, color and luster inequality, flow liner occur, influence the outward appearance of product.Too high or too low moisture content all can have influence on the flowability of material, thereby makes the mechanical strength of goods the serviceability that fluctuation on a large scale has influence on product occur.In order to guarantee smooth moulding, must carry out drying to nylon material before the moulding and handle, adopt with dehumidifying heat pump under 80 ℃ of situations of temperature, dry 1-4 hour, moisture is dropped to below 0.2%.
(2) injection moulding
1. heating cylinder
Barrel to the screw plastic-injection moulding machine heats, and the particle plastic conveying and plastic of drying is arrived in the hopper of make-up machine, delivers in the barrel of heating through screw rod, makes its melted by heating to flow regime.The distribution of barrel temperature only should progressively raise from hopper one side (rear end) to nozzle (front end), so that the plastics temperature rises reposefully, reaches the purpose of even plasticizing.Barrel temperature determines that according to the fusing point of plastics barrel temperature is than the high 10-30 of plastics fusing point ℃.
2. high-pressure injection
Under high-pressure injection, molten plastic is compressed and moves forward fast, is penetrated by nozzle.When the plastics of fusion were penetrated by nozzle, nozzle temperature was less than the maximum temperature of barrel.
Pressure in the process of injection molding comprises two kinds of plasticizing pressure and injection pressures, and these pressure all directly influence the plasticizing and the Products Quality of plastics.Suffered pressure was called plasticizing pressure when screw rod top melt retreated in the screw rod rotation, also claimed back pressure.Concerning nylon, plasticizing pressure must be lower, otherwise fusion rate is with very fast reduction, so get plasticizing pressure in this process of injection molding less than 10MPa.
Injection pressure is the pressure of plastics being executed with screw rod top unit are.Its effect is: the plastics that promote in the barrel move forward, and plastics are mixed and plasticizing; Make plastics obtain enough filling mold speed and length of flow, make plastics before cooling, be full of die cavity; The plastics of packing stage injection pressure in should be able to the compacting die cavity, and plastics are carried out feed supplement because of the contraction that cooling produces make goods keep accurate shape and obtain required performance.Injection pressure in this forming process is got 80~120MPa.
3. cooling forming
The molten plastic of nozzle ejection injects the engineering plastics cage mould, behind cooling and shaping, opens mould and takes out product.Because mold temperature is very big to the internal performance of plastic products and surface quality influence,, goes bail for and hold shut die tool temperature and remain on 80-100 ℃ at this.Finishing the required time of shot forming process is called molding cycle.It mainly comprises inject time and cool time, and for the quality that guarantees product and shorten molding cycle as far as possible, the molding cycle of retainer is got in this forming process: 40-80s.
(3) post processing
After the engineering plastics cage injection moulding, the needs according to product uses will carry out appropriate postprocessing, so as to improving the performance of product.
1. stable the processing
The stable essence of handling is: it is loose that the strand that is compelled to freeze is obtained, thereby eliminate this a part of internal stress; Improve degree of crystallinity, the stable crystalline structure, the elastic modelling quantity and the hardness of raising engineering plastics cage reduce elongation at break, stable dimensions.The stable temperature of handling should be greater than the bearing limit of working temperature (120 ℃) more than 20 ℃.
2. damping is handled
The pliability and the impact strength that can improve engineering plastics cage handled in damping, eliminates internal stress and stable dimensions.Its process conditions are after engineering plastics cage is put into 95 ℃ of water and boiled 1-2h, to slowly cool to room temperature and take out, also can adopt other method moisture absorptions such as steam.
When under higher temperature, using, need retainer that dimensional stability is preferably arranged, should stablize processing.In the use, as require to improve engineering plastics cage toughness and should carry out damping and handle.Engineering plastics cage applying working condition condition is better, and post processing can not be carried out in no specific (special) requirements.

Claims (6)

1. the moulding process of a roller bearing retainer of railway carriage, it is characterized in that: its moulding process step is: with glass-fiber-reinforced polyamide class plastics is raw material, adopt dehumidifying heat pump to carry out drying material, particle plastic conveying and plastic with oven dry arrives in the hopper of screw plastic-injection moulding machine then, deliver in the barrel of heating through screw rod, make its melted by heating to flow regime, under high-pressure injection, molten plastic is compressed and moves forward fast, penetrate by nozzle, inject the engineering plastics cage mould, behind cooling and shaping, open mould and take out product.
2. the moulding process of roller bearing retainer of railway carriage as claimed in claim 1, it is characterized in that: described raw material at the drying condition of dehumidifying heat pump are: 80 ℃ of temperature, be 1-4 hour drying time.
3. the moulding process of roller bearing retainer of railway carriage as claimed in claim 1, it is characterized in that: described barrel is heated to than the high 10-30 of plastics melting temperature ℃.
4. the moulding process of roller bearing retainer of railway carriage as claimed in claim 1 is characterized in that: the pressure of described high-pressure injection comprises plasticizing pressure and injection pressure, and wherein, plasticizing pressure is less than 10MPa, and injection pressure is got 80-120MPa.
5. the moulding process of roller bearing retainer of railway carriage as claimed in claim 1 is characterized in that: the molding cycle that described plastics inject the moulding of retainer mold cools down is 40-80s.
6. the moulding process of roller bearing retainer of railway carriage as claimed in claim 1, it is characterized in that: the product after the described injection moulding also will carry out post processing, and this post processing comprises stable the processing and the damping processing.
CN 200910148796 2009-07-06 2009-07-06 The moulding process of roller bearing retainer of railway carriage Pending CN101596767A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200910148796 CN101596767A (en) 2009-07-06 2009-07-06 The moulding process of roller bearing retainer of railway carriage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200910148796 CN101596767A (en) 2009-07-06 2009-07-06 The moulding process of roller bearing retainer of railway carriage

Publications (1)

Publication Number Publication Date
CN101596767A true CN101596767A (en) 2009-12-09

Family

ID=41418441

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200910148796 Pending CN101596767A (en) 2009-07-06 2009-07-06 The moulding process of roller bearing retainer of railway carriage

Country Status (1)

Country Link
CN (1) CN101596767A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102407589A (en) * 2010-09-25 2012-04-11 上海浦东美灵塑料制品有限公司 Cover plate injection molding technology of ABS (Acrylonitrile Butadiene Styrene) plastic washing machine
CN102407587A (en) * 2010-09-25 2012-04-11 上海浦东美灵塑料制品有限公司 Injection molding process for polyphenylene oxide (PPO) plastic air conditioner shell
CN102862259A (en) * 2011-07-08 2013-01-09 昆山瑞华电器有限公司 Non-metal material motor gearbox
CN104004354A (en) * 2014-06-17 2014-08-27 增城华昌塑料五金模具有限公司 Injection moulding method of long glass fiber reinforced nylon 66 materials
CN105643863A (en) * 2014-11-14 2016-06-08 中国科学院金属研究所 Injection-molding preparation method for plastic angular contact ball bearing retainer and special mold for injection-molding preparation method
CN105782238A (en) * 2016-04-21 2016-07-20 浙江天马轴承有限公司 Radial and axial composite cylindrical roller bearing
CN107415137A (en) * 2017-05-04 2017-12-01 泰逸电子(昆山)有限公司 A kind of preparation technology of notebook host bonnet
CN110757724A (en) * 2019-10-14 2020-02-07 常州苏特轴承制造有限公司 Production process of nylon injection molding retainer with framework and retainer prepared by production process
CN112571747A (en) * 2019-09-28 2021-03-30 无锡市锡珠保持架有限公司 Plastic retainer production line and technology
CN112659453A (en) * 2019-09-28 2021-04-16 无锡市锡珠保持架有限公司 Plastic retainer production line
CN114643678A (en) * 2020-12-17 2022-06-21 东风(十堰)林泓汽车配套件有限公司 Production method of vehicle fender

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102407587A (en) * 2010-09-25 2012-04-11 上海浦东美灵塑料制品有限公司 Injection molding process for polyphenylene oxide (PPO) plastic air conditioner shell
CN102407587B (en) * 2010-09-25 2014-03-05 上海浦东美灵塑料制品有限公司 Injection molding process for polyphenylene oxide (PPO) plastic air conditioner shell
CN102407589B (en) * 2010-09-25 2014-03-05 上海浦东美灵塑料制品有限公司 Cover plate injection molding technology of ABS (Acrylonitrile Butadiene Styrene) plastic washing machine
CN102407589A (en) * 2010-09-25 2012-04-11 上海浦东美灵塑料制品有限公司 Cover plate injection molding technology of ABS (Acrylonitrile Butadiene Styrene) plastic washing machine
CN102862259A (en) * 2011-07-08 2013-01-09 昆山瑞华电器有限公司 Non-metal material motor gearbox
CN104004354B (en) * 2014-06-17 2016-08-24 增城华昌塑料五金模具有限公司 A kind of injection molding forming method of long glass fiber reinforced nylon 66 material
CN104004354A (en) * 2014-06-17 2014-08-27 增城华昌塑料五金模具有限公司 Injection moulding method of long glass fiber reinforced nylon 66 materials
CN105643863A (en) * 2014-11-14 2016-06-08 中国科学院金属研究所 Injection-molding preparation method for plastic angular contact ball bearing retainer and special mold for injection-molding preparation method
CN105782238A (en) * 2016-04-21 2016-07-20 浙江天马轴承有限公司 Radial and axial composite cylindrical roller bearing
CN107415137A (en) * 2017-05-04 2017-12-01 泰逸电子(昆山)有限公司 A kind of preparation technology of notebook host bonnet
CN112571747A (en) * 2019-09-28 2021-03-30 无锡市锡珠保持架有限公司 Plastic retainer production line and technology
CN112659453A (en) * 2019-09-28 2021-04-16 无锡市锡珠保持架有限公司 Plastic retainer production line
CN112571747B (en) * 2019-09-28 2022-06-28 无锡市锡珠保持架有限公司 Plastic retainer production line and process
CN110757724A (en) * 2019-10-14 2020-02-07 常州苏特轴承制造有限公司 Production process of nylon injection molding retainer with framework and retainer prepared by production process
CN114643678A (en) * 2020-12-17 2022-06-21 东风(十堰)林泓汽车配套件有限公司 Production method of vehicle fender

Similar Documents

Publication Publication Date Title
CN101596767A (en) The moulding process of roller bearing retainer of railway carriage
CN100569482C (en) A kind of moulding process of ultrahigh speed turbine pump bearing holder material
CN105365173A (en) Quick thermoplastic forming process
CN111086153B (en) Automobile thick-wall automobile logo and injection molding process
CN102248571A (en) Laminated wood plate forming equipment and method
CN104249448B (en) A kind of processing method of ABS resin low-pressure injection molding inner container of icebox
CN106751443B (en) The corrosion-resistant friction-resistant composite material of metallic plastic-lining and preparation method and application
CN104321182A (en) Method for operating a high productivity injection molding machine
KR101304569B1 (en) Method for manufacturing a separator of fuel cell, and separator of fuel cell manufactured by the method
CN1281398C (en) Moulding of mouldable materials
CN105694206A (en) Method for producing long-glass-fiber-reinforced polypropylene foaming injection product by using water as foaming agent
CN106626243B (en) A kind of preparation method and injection-compression mould of glass fiber enhanced nylon gauge apron
CN103660121A (en) High-capacity injection moulding machine
CN110588009A (en) High-temperature high-pressure pretreatment and re-sintering molding process of polytetrafluoroethylene
Ramesh et al. Optimization for Injection Moulding process parameters towards Warpage and Shrinkage of HDPE-PBI composites
CN109625098A (en) Floor and its manufacturing method after a kind of integrated form vehicle body
CN201544425U (en) Composite squeezing device
CN207915885U (en) A kind of wood plastics tray compression moulding die
CN204278424U (en) A kind of Preplasticizing injection moulding apparatus
CN101200114B (en) Plastics extrusion melt roughcast transfer molding process
CN101716817B (en) Compound extruding injection device
CN105774790A (en) Automatic vacuum booster support and manufacturing process thereof
CN205058498U (en) Glass fiber reinforced nylon gauge apron injects compression mold
CN103057793B (en) Plastic pallet with built-in steel tubes and method for manufacturing plastic pallet
CN106564163A (en) Mold cart system of injection molding machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20091209